Solicitation No.: 140R3019R0001 Contract No.: TBD Full and Open Competition/Unrestricted
Turbine and Generator Hydroelectric Component Manufacturing and Rehabilitation IDIQ
U.S. Department of the Interior Bureau of Reclamation Lower Colorado Region 2019 Boulder City, Nevada
This page intentionally left blank.
Foreword Document No.
140R3019R0001
Document Title
FOREWORD
The Bureau of Reclamation, Lower Colorado Region, Lower Colorado Dams Office (LCDO), has a requirement for the repair/remanufacture, machine/rehabilitate existing Hydro Plant related components.
These Hydro Plant components may vary from items such as the generator, turbine, elevators, cranes, water passage valves and gates, barricades and basically any component found in a fully functioning hydroelectric power house and dam facility.
Each year, LCDO performs a major maintenance overhaul “teardown” on one of its 17 hydro turbine-generator units. There are nominal dimensional and configuration variations among the turbine-generators, but the basic design layout, assortment of parts and teardown procedures are consistent throughout.
The work is located at Hoover Dam, Parker Dam, and Davis Dam. Hoover Dam and Powerplant are approximately 8 miles northeast of Boulder City, Nevada and 32 miles from Las Vegas, Nevada in Clark County, Nevada and Mojave County, Arizona. Parker Dam and Powerplant are located on the California- Arizona border, approximately 20 miles south of Lake Havasu City, Arizona. The Powerplant, the Maintenance Yard, and the Staging Area are located on the California side of the Colorado River in San Bernardino County, California. The Davis Powerplant is on the Colorado River, immediately downstream from Davis Dam near the town of Bullhead City, Arizona.
This acquisition is being procured under Federal Acquisition Regulations (FAR) Part 15, Contracting by Negotiation. The Government intends to award contracts without discussion with Offerors. The award decision will be based on the Offeror’s initial proposal. Therefore, the Offeror’s initial proposal should contain the Offeror’s best terms from a technical and cost or price standpoint. Reference provisions in Section L that include General, Technical and Pricing Proposal Instructions and Section M for the Evaluation Factors for Award.
NOTE TO OFFERORS: This procurement involves both supply and construction portions of work. The predominant portion of the work will be for supplies. On-site/field work performed at Hoover, Parker or Davis Dams will be subject to the Construction Wage Rate Requirements. Supply and construction clauses are included in the solicitation and are designated “S” for Supply and “C” for Construction.
MULTIPLE AWARDS: The Government intends to make three awards under this Indefinite- Delivery/Indefinite-Quantity (IDIQ) solicitation, but it reserves the right to award more, less, or none at all.
IDIQ VALUE: The proposed IDIQ contract(s) will be for an ordering period of five years from the date of contract award with the cumulative/maximum amount of all task orders not exceeding $14,000,000.00.
The minimum order guarantee is $2,500.00 per contract. The Government does not guarantee an awardee will receive more than the contract’s minimum guarantee. There is no guarantee that the maximum contract value will be distributed equally among the pool of contractors as the total values will be determined through a competitive delivery/task order award process. Task order procedures are identified in F.4 Delivery/Task Order Issuance Procedures.
TASK ORDER 1: The Government anticipates that Task Order 1 for Machining of Facing Plates, Seal Rings and Wicket Gate Line Boring for unit N1 will be awarded at the time of award of IDIQ contract(s).
SITE VISIT: A site visit will be held prior to the proposal due date which will allow offerors to walk the site where construction will take place. Reference Section L.8, Site Visit (Construction). Please contact Luis Gallardo at lgallardo@usbr.gov, if you plan to attend.
WRITTEN QUESTIONS: Reclamation will only accept written questions for this solicitation. Please submit all written questions pertaining to this solicitation to Luis Gallardo at lgallardo@usbr.gov no later mailto:lgallardo@usbr.gov
Foreword Document No.
Document Title than 9:00 am. PT, Tuesday, March 19, 2019. Each question submitted must include the following information: document name, document date, specific page, paragraph, clause or other definitive citation for which clarification is requested. Written questions will be addressed in an amendment.
OFFER SUBMISSION: For date, time, and place of receipt of offerors, see Standard Form (SF) 33 (Solicitation, Offer, and Award) in Section A of the solicitation: The place of receipt of offers is Bureau of Reclamation, Attn: Luis Gallardo (LC-10304), 7301 Calle Agua Salada, Yuma, AZ 85364.
FOR INFORMATION REGARDING BUREAU OF RECLAMATION'S PUBLICATION "RECLAMATION
SAFETY AND HEALTH STANDARDS" (2009 EDITION AS REVISED, WITH REVISIONS AT
http://www.usbr.gov/ssle/safety/RSHS/rshs.html) WHICH IS APPLICABLE TO WORK UNDER THIS
CONTRACT, SEE CLAUSE AT I.22 1452.223-81, SAFETY AND HEALTH.
Non-Discrimination Notice To U.S. Department of the Interior Contractors, Subcontractors, And Lessors – Bureau of Reclamation--Lower Colorado Region
Based upon law, Executive Order, or internal policy, the Department of the Interior prohibits discrimination in the workplace, including sexual harassment, based on race, color, national origin, sex, religion, disability, age, or sexual orientation. The Department urges its contractors, subcontractors, and lessors to develop and enforce comprehensive anti-discrimination policies for their places of work.
Table of Contents
Document No.
140R3019R0001
Document Title Turbine and Generator Hydroelectric Component i
TABLE OF CONTENTS i
SECTION A – Solicitation, Offer, and Award (SF-33) A-1
SECTION B – Supplies or Services and Prices B-1
B.1 The Requirements – Negotiations B-1 B.2 Contract Price Schedule(s) B-1
SECTION C -- Descriptions and Specifications C-1
C.1 Statement of Work/Specifications/Work Statement C-1
SECTION D – Packaging and Marketing D-1
D.1 Preparation for Shipment and Handling D-1
SECTION E -- Inspection and Acceptance E-1 E.1 Clauses Incorporated By Reference E-1
SECTION F -- Deliveries or Performance F-1
F.1 Clauses Incorporated By Reference F-1 F.2 Commencement, Prosecution, and Completion of Work F-1 F.3 Delivery Information F-2 F.4 Delivery/Task Order Issuance Procedures F-2 F.5 Contract Ordering Period F-5 F.6 Delivery Order Delivery Dates F-5 F.7 Task Order Performance Periods F-5 F.8 Subcontracting Plan and Report Distribution F-6
SECTION G -- Contract Administration Data G-1
G.1 Authorities and Delegations G-1 G.2 Postaward Conference – Bureau of Reclamation G-2 G.3 Government Administration Personnel G-2 G.4 Contractor’s Administration Personnel G-2 G.5 Electronic Invoicing and Payment Requirements – Invoice Payment Platform (IPP) G-3
SECTION H -- Special Contract Requirements H-1
H.1 Contractor Performance Assessment Reporting System H-1 H.2 Applicability of Construction Wage Rate Requirements H-2 H.3 Bonding Requirements H-2 H.4 Site Visit H-3
SECTION I -- Contract Clauses I-1
I.1 Clauses Incorporated By Reference I-1 I.2 Display of Hotline Poster(s) I-4 I.3 Contractor Use of Mandatory Sources of Supply or Services I-5 I.4 Ordering I-6 I.5 Order Limitations I-6 I.6 Indefinite Quantity I-7 I.7 Equal Opportunity for Veterans I-7 I.8 Equal Opportunity for Workers with Disabilities I-8 I.9 Estimate of Percentage of Recovered Material Content for EPA-Designated Items I-8 I.10 Buy American–Construction Materials Under Trade Agreements I-9 I.11 Alternative Payment Protections I-12 I.12 Bid Guarantee I-13
Document No.
140R3019R0001
Document Title Turbine and Generator Hydroelectric Component ii
I.13 Subcontracts for Commercial Items I-13 I.14 Authorized Deviation in Clauses I-15 I.15 Restriction on Endorsements--Department of the Interior I-15 I.16 Release of Claims--Department of the Interior I-15 I.17 Examination for Records by the Department of the Interior I-16 I.18 Liability Insurance--Department of the Interior I-16 I.19 Prohibition Against Use of Lead-Base Paint-- Department of the Interior I-17 I.20 Contracting Officer’s Representative’s Authorities and Limitations--Bureau of
Reclamation I-17
I.21 Asbestos-Free Warranty--Bureau of Reclamation I-18 I.22 Safety and Health – Bureau of Reclamation I-18 I.23 Protecting Federal Employees and the Public from Exposure to Tobacco Smoke in the Federal Workplace--Bureau of Reclamation I-19
I.24 Certification of Representatives for Corporate Sureties--Bureau of Reclamation I-20 I.25 Equipment Ownership and Operating Expense--Bureau of Reclamation I-20 I.26 Limitation of Funds (Fixed-Price Contract) – Bureau of Reclamation I-22 I.27 Payment for Mobilization and Preparatory Work – Bureau of Reclamation I-23 I.28 Claims Accounting--Bureau of Reclamation I-25 I.29 Other Contracts (DEVIATION) I-25 I.30 Preservation of Cultural Resources--Bureau of Reclamation I-26 I.31 Security Requirements--Bureau of Reclamation I-27 I.32 Modification Proposals--Bureau of Reclamation I-35 I.33 Safety Data Submittal Requirements--Bureau of Reclamation—Lower Colorado
Region I-36
SECTION J – List of Documents, Exhibits and Other Attachments J-1
J.1 Applicability of Documents J-1 J.2 List of Contract Documents J-1
SECTION K – Representations, Certifications and Other Statements of Offerors K-1
K.1 Solicitation Provisions Incorporated by Reference K-1 K.2 Annual Representations and Certifications K-1 K.3 Information Regarding Responsibility Matters K-4 K.4 Place of Manufacture K-5
SECTION L – Instructions, Conditions and Notices to Offerors L-1
L.1 Solicitation Provisions Incorporated By Reference L-1 L.2 Availability of Specifications Not Listed in the GSA Index of Federal Specifications, Standards and Commercial Item Descriptions L-1
L.3 Type of Contract L-4 L.4 Construction Wage Rate Requirements – Secondary Site of the Work L-4 L.5 Notice of Requirement for Affirmative Action to Ensure Equal Employment
Opportunity for Construction L-5
L.6 Notice of Buy American Requirement – Construction Materials Under Trade Agreements
L-6
L.7 Service of Protest Department of the Interior (DEVIATION) L-7 L.8 Site Visit – Construction L-7 L.9 Authorized Deviations in Provisions L-8 L.10 Use and Disclosure of Proposal Information – Department of the Interior L-8 L.11 Source Evaluation and Selection Procedures – Bureau of Reclamation L-10 L.12 General Proposal Instructions – Bureau of Reclamation L-12 L.13 Technical Proposal Instructions – Bureau of Reclamation L-14 L.14 Pricing Proposal Instructions – Bureau of Reclamation L-17
Document No.
140R3019R0001
Document Title Turbine and Generator Hydroelectric Component iii
L.15 Instruction for Mobilization and Preparatory Work Schedule Line Item – Bureau of Reclamation
L-18
L.16 Disclosure of the Magnitude of Construction Projects L-19
SECTION M – Evaluation Factors for Award M-1
M.1 Evaluation Factors for Award – Quality Predominance – Bureau of Reclamation M-1 M.2 Notice of World Trade Organization Government Procurement Agreement
Evaluations--Bureau of Reclamation M-3
Document No.
140R3019R0001
Document Title Turbine and Generator Hydroelectric Component iv
SOLICITATION, OFFER AND AWARD
4. TYPE OF SOLICITATION2. CONTRACT NUMBER 3. SOLICITATION NUMBER
7. ISSUED BY CODE 8. ADDRESS OFFER TO (If other than Item 7)
ORDER UNDER DPAS (15 CFR 700)
6. REQUISITION/PURCHASE NUMBER
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
NEGOTIATED (RFP)
SEALED BID (IFB)
5. DATE ISSUED
1. THIS CONTRACT IS A RATED RATING PAGE OF PAGES
1 1
C. E-MAIL ADDRESS
EXT.NUMBERAREA CODE
B. TELEPHONE (NO COLLECT CALLS)A. NAME
10. FOR
INFORMATION
CALL:
CAUTION: LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
(Date)(Hour) local timeuntildepository located in copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if hand carried, in the
SOLICITATION
9. Sealed offers in original and
PART IV - REPRESENTATIONS AND INSTRUCTIONS
OTHER STATEMENTS OF OFFERORS
EVALUATION FACTORS FOR AWARD
INSTRS., CONDS., AND NOTICES TO OFFERORS
REPRESENTATIONS, CERTIFICATIONS AND
LIST OF ATTACHMENTS
CONTRACT CLAUSES
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACH.
I
J
K
L
M SPECIAL CONTRACT REQUIREMENTS
CONTRACT ADMINISTRATION DATA
DELIVERIES OR PERFORMANCE
INSPECTION AND ACCEPTANCE
PACKAGING AND MARKING
DESCRIPTION/SPECS./WORK STATEMENT
SUPPLIES OR SERVICES AND PRICES/COSTS
SOLICITATION/CONTRACT FORM
PART II - CONTRACT CLAUSESPART I - THE SCHEDULE
H
G
F
E
D
C
B
A
SEC. DESCRIPTION PAGE(S) (X) DESCRIPTION SEC. (X)
11. TABLE OF CONTENTS
18. OFFER DATE17. SIGNATURE
SUCH ADDRESS IN SCHEDULE.
IS DIFFERENT FROM ABOVE - ENTER
15C. CHECK IF REMITTANCE ADDRESS
EXT.NUMBERAREA CODE
15B. TELEPHONE NUMBER
(Type or print)AND
ADDRESS
OF
OFFEROR
CODE FACILITY
16. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER15A. NAME
DATEAMENDMENT NO.DATEAMENDMENT NO.
and related documents numbered and dated):
amendments to the SOLICITATION for offerors
(The offeror acknowledges receipt of
14. ACKNOWLEDGEMENT OF AMENDMENTS
CALENDAR DAYS (%)30 CALENDAR DAYS (%)20 CALENDAR DAYS (%)10 CALENDAR DAYS (%)
(See Section I, Clause No. 52.232.8)
13. DISCOUNT FOR PROMPT PAYMENT
designated point(s), within the time specified in the schedule.
by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
OFFER (Must be fully completed by offeror)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
28. AWARD DATE
(Signature of Contracting Officer)
27. UNITED STATES OF AMERICA
25. PAYMENT WILL BE MADE BY
26. NAME OF CONTRACTING OFFICER (Type or print)
CODE 24. ADMINISTERED BY (If other than Item 7)
ITEM
(4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN
41 U.S.C. 253 (c) ( 10 U.S.C. 2304 (c) (
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
21. ACCOUNTING AND APPROPRIATION20. AMOUNT19. ACCEPTED AS TO ITEMS NUMBERED
AWARD (To be completed by government)
CODE
03/01/2019 X
R30
Bureau of Reclamation Lower Colorado Region Regional Office 500 Fir Street Boulder City NV 89005
Bureau of Reclamation Attn: Luis Gallardo (LC-10304) 7301 Calle Agua Salada Yuma, AZ 85364
1400 PT 04/04/2019
Luis Gallardo 928 lgallardo@usbr.gov
343-8129
X
X
X
X
X
X
X
X
X
X
X
X
X
PAGE(S)
Nicholas Clements
AUTHORIZED FOR LOCAL REPRODUCTION
Previous edition is unusable
STANDARD FORM 33 (Rev. 9-97)
Prescribed by GSA - FAR (48 CFR) 53.214(c)
A1-A2 B1-B2
C1-C2 D1-D2 E1-E2 F1-F8 G1-G4 H1-H4
I1-I37
J1-J2
K1-K6
L1-L20
M1-M4
See Section L, L.12
12. In compliance with the above, the undersigned agrees, if this offer is accepted within _____60_________ calendar days (60 calendar days unless a different period is inserted
Part I – Section A
– Solicitation, Offer and Award
Document No.
140R3019R0001
Document Title Turbine and Generator Hydroelectric Component
A-2
Part I – Continuation of Section B – Supplies or Services and Prices/Costs
Document No.
140R3019R0001
Document Title Turbine and Generator Hydroelectric Component
B-1
CONTINUATION OF
SECTION B – SUPPLIES OR SERVICES AND PRICES
B.1 THE REQUIREMENTS - NEGOTIATION
(a) The Contractor shall furnish the items identified in this Section, in accordance with the terms, conditions, and specifications contained in the contract.
(b) Offerors are cautioned to carefully review the proposal submission requirements contained in Section L. Failure to comply with these requirements may result in an offer being determined technically unacceptable.
(c) The quantities stated in the Schedule(s), other than those identified as "lump sum," are estimated quantities for evaluation of offers, and no claim shall be made against the Government for variations in the quantities stated.
(d) The Section I clause entitled "Payment for Mobilization and Preparatory Work" applies to Schedule item(s) for Mobilization and Preparatory Work. Also, see the Section L provision entitled “Instruction for Mobilization and Preparatory Work Schedule Line Item.”
Turbine and Generator Hydroelectric Component Manufacturing and Rehabilitation IDIQ Item No. Schedule of Supplies/Services Quantity Unit Unit Price Extended Amount
*0001 *TBD *TBD *TBD *TBD *TBD
*0002 *TBD *TBD *TBD *TBD *TBD
*0003 *TBD *TBD *TBD *TBD *TBD
*0004 *TBD *TBD *TBD *TBD *TBD
*0005 *TBD *TBD *TBD *TBD *TBD
*0006 *TBD *TBD *TBD *TBD *TBD
Total for Schedule *TBD
*To be determined on individual task/delivery orders.
NOTE: In lieu of completing the Schedule above for IDIQ contract award/price evaluation consideration, offerors must complete and submit the Price Schedules for the Task Order and Delivery Order found in Section J, Attachment 3. The prices proposed for the task order “Field Machining of Facing Plates, Seal Rings and Wicket Gate Line Boring for Unit N1” are binding. The proposed prices for the delivery order “Facing Plates and Break-off Screws” is a sample delivery order for evaluation purposes and will not be awarded; therefore, those prices are not binding. See solicitation Section L.14 for pricing proposal instructions and solicitation Section M.1 for discussion of Price as an evaluation factor.
B.2 CONTRACT PRICE SCHEDULE(S)
Part I – Continuation of Section B – Supplies or Services and Prices/Costs
Document No.
140R3019R0001
Document Title Turbine and Generator Hydroelectric Component
B-2
Part I – Section C – Description/ Specifications/ Statement of Work
Document No.
140R3019R0001
Document Title Turbine and Generator Hydroelectric Component
C-1
SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK
C.1 STATEMENT OF WORK/SPECIFICATIONS/WORK STATEMENT
The Contractor shall furnish the necessary personnel, materials, equipment, services, and facilities (except as otherwise specified) to perform the requirement specified in the Statement of Work/Specifications/Work Statement contained in Attachment No. 1 of this solicitation/contract.
*Note: Each individual delivery/task order will have its supplemental statement of work/specifications/work statement and performance period.
Part I – Section C – Description/ Specifications/ Statement of Work
Document No.
140R3019R0001
Document Title Turbine and Generator Hydroelectric Component
C-2
Part I – Section D
– Packaging and Marking
Document No.
140R3019R0001
Document Title Turbine and Generator Hydroelectric Component
D-1
SECTION D – PACKAGING AND MARKING
D.1 PREPARATION FOR SHIPMENT AND HANDLING
(a) The Contractor shall prepare all materials and articles for shipment in such a manner as to protect them from damage, and shall be responsible for and make good any and all damage due to improper preparation or loading for shipment.
(b) Heavy or bulky parts or equipment shall be provided with eye bolts, lugs, or other lifting devices to facilitate handling with a crane, and, if necessary, shall be mounted on skids or crated. Where parts are boxed or crated and it is unsafe to attach slings to the box or crate, slings shall be attached to the parts and the slings shall project through the box or crate so that attachment can be readily made. Instructions for handling and lifting all parts, boxes, and crates shall be clearly painted on or attached to the part or crate. Any articles or materials that otherwise might be lost shall be boxed or bundled and plainly marked for identification. All finished ferrous surfaces shall be coated with a rust preventative compound, and all finished nonferrous metalwork and devices subject to damage shall be suitably wrapped or otherwise protected from damage during shipment.
Part I – Section D
– Packaging and Marking
Document No.
140R3019R0001
Document Title Turbine and Generator Hydroelectric Component
D-2
Part I – Section E
– Inspection and Acceptance
Document No.
140R3019R0001
Document Title Turbine and Generator Hydroelectric Component
E-1
SECTION E – INSPECTION AND ACCEPTANCE
E.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE February 1998
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
Federal Acquisition Regulations (FAR) clauses - https://www.acquisition.gov/?q=browsefar; and Department of the Interior Acquisition Regulations (DIAR) clauses - https://www.ecfr.gov/cgi-bin/text-idx?SID=c83bc1f346e91d20ba0ef5a8c2512b45&tpl=/ecfrbrowse/Title48/48chapter14.tpl.
In addition, the clauses can be identified as follows:
FAR - by the number prefix 52, e.g. 52.252-1, etc.;
DIAR - by the number prefix 1452 and number suffix of -70, e.g. 1452.204-70; and RAR - by the number prefix 1452 and number suffix of -80, e.g. 1452.201-80.
Portion of Work Clause is Applicable
To
Clause Title Date
“S” 52.246-2 Inspection of Supplies--Fixed Price August 1996 “C” 52.246-12 Inspection of Construction August 1996 “S” 52.246-16 Responsibility for Supplies April 1984
(End of clause) https://www.acquisition.gov/?q=browsefar https://www.ecfr.gov/cgi-bin/text-idx?SID=c83bc1f346e91d20ba0ef5a8c2512b45&tpl=/ecfrbrowse/Title48/48chapter14.tpl https://www.ecfr.gov/cgi-bin/text-idx?SID=c83bc1f346e91d20ba0ef5a8c2512b45&tpl=/ecfrbrowse/Title48/48chapter14.tpl
Part I – Section E
– Inspection and Acceptance
Document No.
140R3019R0001
Document Title Turbine and Generator Hydroelectric Component
E-2
Part I – Section F – Deliveries or Performance
Document No.
140R3019R0001
Document Title Turbine and Generator Hydroelectric Component
F-1
SECTION F – DELIVERIES OR PERFORMANCE
F.1 52.252-02 CLAUSES INCORPORATED BY REFERENCE February 1998
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
Federal Acquisition Regulations (FAR) clauses - https://www.acquisition.gov/?q=browsefar; and Department of the Interior Acquisition Regulations (DIAR) clauses - https://www.ecfr.gov/cgi-bin/text-idx?SID=c83bc1f346e91d20ba0ef5a8c2512b45&tpl=/ecfrbrowse/Title48/48chapter14.tpl.
In addition, the clauses can be identified as follows:
FAR - by the number prefix 52, e.g. 52.252-1, etc.;
DIAR - by the number prefix 1452 and number suffix of -70, e.g. 1452.204-70; and
Work Clause is Applicable To
Clause Title Date
“C” 52.242-14 Suspension of Work APR 1984 “S” 52.242-15 Stop-Work Order AUG 1989 “S” 52.242-17 Government Delay of Work APR 1984 “S” 52.247-34 F.O.B. Destination NOV 1991
F.2 Portion of
Clause is Applicable to “C”
52.211-10 COMMENCEMENT, PROSECUTION, AND
COMPLETION OF WORK
APR 1984
The Contractor shall be required to (a) commence work under this contract within ____ (to be provided for each task order) calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than ____ (to be provided for each task order). The time stated for completion shall include final cleanup of the premises.
https://www.acquisition.gov/?q=browsefar https://www.ecfr.gov/cgi-bin/text-idx?SID=c83bc1f346e91d20ba0ef5a8c2512b45&tpl=/ecfrbrowse/Title48/48chapter14.tpl https://www.ecfr.gov/cgi-bin/text-idx?SID=c83bc1f346e91d20ba0ef5a8c2512b45&tpl=/ecfrbrowse/Title48/48chapter14.tpl
Performance
Document No.
140R3019R0001
Document Title Turbine and Generator Hydroelectric Component
F-2
F.3 Portion of
Clause is Applicable to “S” & “C”
DELIVERY INFORMATION
(a) All supplies or equipment required under this contract for Hoover Dam shall be shipped F.O.B.
destination to the following address:
Lower Colorado Dams Facilities Office Hoover Dam Central Warehouse South U.S. Highway 93, SR 172 Boulder City, Nevada 89005
Deliveries will be accepted between 7:30 a.m. to 3:30 p.m., Pacific Time, Monday through Friday only.
Point of contact for delivery information is Hoover Dam Warehouse, (702) 494-2513.
(b) All supplies or equipment required under this contract for Davis Dam shall be shipped F.O.B.
Davis Dam Field Division Bullhead City, Arizona 86429
Deliveries will be accepted between 7:30 a.m. to 3:30 p.m., Pacific Time, Monday through Friday only.
Point of contact for delivery information will be provided upon award of individual task orders.
(c) All supplies or equipment required under this contract for Parker Dam shall be shipped F.O.B.
Parker Dam Field Division Highway 95 Parker, California 92267
Deliveries will be accepted between 7:30 a.m. to 3:30 p.m., Pacific Time, Monday through Friday only.
Point of contact for delivery information will be provided upon award of individual task orders.
F.4 Portion of
Work Clause is Applicable to “S” & “C”
DELIVERY/TASK ORDER (DO/TO) ISSUANCE
PROCEDURES
(a) General. Delivery/Task Orders will be issued under this contract in the form and manner set forth below.
(1) Delivery/task orders will be issued on a fair opportunity basis.
Performance
Document No.
140R3019R0001
Document Title Turbine and Generator Hydroelectric Component
F-3
(2) Delivery/task orders will be issued on a Firm-Fixed Price basis.
(3) Work under this contract will be ordered by individual orders issued on Optional Form (OF) 347 (Order for Supplies or Services) to the Contractor by any Lower Colorado Region Contracting Officer having the appropriate warrant authority. In the case of an urgent requirement, the Contracting Officer may issue written notice to the Contractor to begin immediate work under a delivery/task order. Delivery Orders may include Original Equipment Manufacturer (OEM) drawings and Statement of Work.
(b) Fair Opportunity. Competition for issuance of Delivery/Task Orders is limited to those awardees under this multiple award IDIQ contract. If multiple IDIQ contracts are awarded, each awardee shall be provided a fair opportunity for Delivery/Task orders in accordance with FAR 16.505(b)(1), unless the Contracting Officer determines that one of the exceptions at FAR 16.505(b)(2) applies. The Task and Delivery Order Ombudsman is: Heather Hirshman, Denver Federal Center, 6Th & Kipling 25007 Denver CO 80225 United States; telephone: 303-445-2477; email: hhirshman@usbr.gov.
There is an expectation that each Contractor will compete for all the work forthcoming under this contract.
If the Contractor is unable to compete for the task order, the Contractor shall provide a no proposal response to the Contracting Officer and provide reason for inability to compete.
(c) Order Placement Procedures.
(1) The Government will issue a written request for proposal (RFP) electronically via e-mail which will include the proposed Statement of Work (SOW), drawings, the evaluation criteria and relative importance of each evaluation factor (if applicable), and the due date for receipt of proposals. All other terms and conditions will be contained in the basic contract. However, any minor/pertinent changes to these terms and conditions, including applicable fill-ins for certain clauses and additional contract direction or details specifically pertaining to the delivery/task order, will also be identified in the RFP and incorporated into the individual delivery/task order. Contractors must acknowledge receipt of each RFP.
Contractors are also required to notify the Contract Specialist within 2 days of receipt of an RFP if the firm cannot or will not propose on a delivery/task order. Receipt of the proposals after the specified time and date set by the Contracting Officer may result in the proposal not being considered for award.
(2) Unless the Contracting Officer applies the fair opportunity exceptions, each delivery/task Order will be awarded, as a result of competition to the contractor whose offer is the best value to the Government considering the evaluation criteria specified in the delivery/task order. RFPs will state the specific evaluation factors for each order and, when applicable, the relative importance of the evaluation factors. When non-price (e.g. technical) factors are applicable to the evaluation and selection, the Government may use the lowest-price technically-acceptable (LPTA), best delivery time, or tradeoffs of contracting by negotiation in order to obtain the best value for the Government. The Government reserves the right to use procedure(s) that are best suited to the circumstances of the contract action to fulfill the Government’s requirements.
(3) If delivery is an evaluation factor, a proposal must meet the Government’s expressed requirement for delivery as stated in the RFP/SOW or it may be considered non-responsive. The proposal should indicate the contractor’s compliance with the stated delivery date for the supplies or identify the date the supplies will be delivered (if delivery is an evaluation factor).
(4) Offerors are expected to examine the SOW, drawings, schedule, and all instructions. Failure to do so will be at the Offeror’s risk.
(5) A proposal shall not include any terms and conditions that would conflict with the contract terms and conditions; otherwise, the proposal may be considered non-responsive.
Performance
Document No.
140R3019R0001
Document Title Turbine and Generator Hydroelectric Component
F-4
(6) Each RFP will state whether the contractor’s proposal is to be submitted as a lump sum price or whether the proposal price is to include a detailed cost breakdown for evaluation. The lump sum price shall include the contractor’s best price for the item(s) including all applicable costs such as, but not limited to, cost of subcontractors, cost of miscellaneous equipment, materials, services, G&A, overhead, reasonable profit, and shipping (FOB Destination). In those instances where a detailed cost breakdown is required, the contractor’s price proposal shall identify the proposed quantity and type of labor, labor rates, material and equipment, shipping (FOB Destination), G&A, overhead, and a reasonable profit estimated for the type and complexity of the work required under the individual proposed delivery/task order. Estimated travel-related costs, if applicable, should also be provided in the proposal price. Payment for travel-related costs will be reimbursed based on allowable costs in accordance with the Federal Travel Regulations. Maximum lodging and per diem rates are identified at http://www.gsa.gov.
(7) After evaluation of the proposals has been completed, the proposal which offers the best value to the Government will be awarded the DO/TO. In cases where price is the only evaluation factor, the proposal which offers the lowest price to the Government will be awarded the DO/TO, subject to a positive determination that such proposed price is fair and reasonable. Price reasonableness of each DO/TO will be determined in accordance with FAR Subpart 15.4. Delivery/Task Orders may require discussions/negotiations. It is anticipated that competition among each DO/TO will exist. However, if no competition exists, data other than certified cost or pricing data may be required to be submitted by the contractor in order to determine if the proposed price is fair and reasonable.
(8) If a particular task order will require work to be performed at Hoover Dam, Parker or Davis
Dams for on-site/field work, the requirements of the Construction Wage Rate Requirements shall apply.
(9) All provisions and clauses included in this solicitation and resulting IDIQ contract will apply to
RFPs for DO/TO and resulting DO/TO contracts, unless otherwise noted on a DO/TO basis. Additional contract clauses may be inserted into DO/TO as applicable for the work ordered in the DO/TO. The notice for each DO/TO will provide any required "fill-ins" for provisions and clauses and other specific information/direction pertaining to the DO/TO, including, but not limited to:
• Magnitude of construction/estimated price range (FAR36.204).
• Details regarding Commencement, Prosecution, and Completion of Work (reference FAR Clause 52.211-10).
(10) If required, the Government may seek comments from two or more contractors on draft statements of work in order to promote exchanges of information and to encourage awardees to respond to potential RFPs. For a particular requirement, the Government may contact all Offerors for possible technical discussions in order to exchange information and further clarify and define the nature of the requirement.
(d) Other Ordering Requirements.
(1) Bonding Requirements/Alternate Payment Protections. Reference Section H.4, Bonding Requirements.
(2) Labor Laws. The Construction Wage Rate Requirements is applicable to all individual task order requirements for on-site repairs that are $2,000 and above. See Section H.3, Applicability of Construction Wage Rate Requirements.
(3) Certified Payroll Reports. For each task order issued, the awardee shall be required to furnish weekly certified payrolls (prime and subcontractor) in accordance with Contract Clause I.1, FAR http://www.gsa.gov/
Performance
Document No.
140R3019R0001
Document Title Turbine and Generator Hydroelectric Component
F-5
Clause 52.222-8, Payrolls and Basic Records. Funds shall be retained from progress payments until all payroll reports are submitted.
(4) Release of Claims. Reference Contract Clause 1452.204-70, Release of Claims. For each order issued, the awardee shall be required to furnish a Release of Claims prior to final payment.
(5) Insurance. Reference Contract Clause WBR 1452.228-70, Liability Insurance – Department of the Interior. The contractor is required to procure and maintain liability insurance during the term of the contract. It is the responsibility of the contractor to provide updated insurance certificates when insurance policies expire.
(6) Subcontracting Plan. Large business firms shall be required to submit an individual subcontracting plan with the initial proposal. See the Solicitation’s Provision 1452.215-81, General Proposal Instructions. See Section F.9, Subcontracting Plan and Report Distribution, for submission of required reports. All Offerors shall demonstrate a satisfactory commitment to utilize small business concerns to the maximum extent possible in subcontracting opportunities.
(7) Competition in Subcontracting. The contractor shall select subcontractors (including suppliers) on a competitive basis to the maximum practical extent consistent with the objectives and requirements of the contract.
(e) Minimum Guarantee. The Government shall order and the contractor shall furnish supplies/services costing the Government at least $2,500.00 during the 5-year IDIQ contract ordering period.
(f) Monetary Limitations. The cumulative/maximum amount of all task/delivery orders shall not exceed $14,000,000.00.
F.5 Portion of
Clause is Applicable to
CONTRACT ORDERING PERIOD
The overall ordering period will be for 5 calendar years commencing upon contract award.
F.6 Portion of
Work Clause is Applicable to “S”
DELIVERY ORDER DELIVERY DATES
Each individual delivery order will specify a required delivery date.
F.7 Portion of
Work Clause is Applicable to “C”
TASK ORDER PERFORMANCE PERIODS
Each individual task order will specify a performance period for the work covered under the task order.
Performance
Document No.
140R3019R0001
Document Title Turbine and Generator Hydroelectric Component
F-6
F.8 Portion of
Clause is Applicable to “S” & “C”
SUBCONTRACTING PLAN AND REPORT
DISTRIBUTION
(a) Offeror’s Subcontracting Plan should provide assurances that the Offeror will--
(1) Cooperate in any studies or surveys as may be required;
(2) Submit periodic reports so that the Government can determine the extent of compliance by the Offeror with the subcontracting plan;
(3) Submit the Individual Subcontract Report (ISR), and the Summary Subcontract Report (SSR) using the Electronic Subcontracting Reporting System (ESRS) (http://www.esrs.gov), following the instructions in the ESRS;
(4) Ensure that its subcontractors with subcontracting plans agree to submit the ISR and/or the SSR using the ESRS;
(5) Provide its prime contract number and its DUNS number and the e-mail address of the Government or Contractor official responsible for acknowledging or rejecting the reports, to all first-tier subcontractors with subcontracting plans so they can enter this information into the ESRS when submitting their reports; and
(6) Require that each subcontractor with a subcontracting plan provide the prime contract number and its own DUNS number, and the e-mail address of the Government or Contractor official responsible for acknowledging or rejecting the reports, to its subcontractors with subcontracting plans.
(7) Assurances that the Offeror will make a good faith effort to acquire articles, equipment, supplies, services, or materials, or obtain the performance of construction work from the small business concerns that it used in preparing the bid or proposal, in the same or greater scope, amount, and quality used in preparing and submitting the bid or proposal. Responding to a request for a quote does not constitute use in preparing a bid or proposal. The Offeror used a small business concern in preparing the bid or proposal if–
(i) The Offeror identifies the small business concern as a subcontractor in the bid or proposal or associated small business subcontracting plan, to furnish certain supplies or perform a portion of the subcontract; or
(ii) The Offeror used the small business concern’s pricing or cost information or technical expertise in preparing the bid or proposal, where there is written evidence of an intent or understanding that the small business concern will be awarded a subcontract for the related work if the Offeror is awarded the contract.
(8) Assurances that the Contractor will provide the Contracting Officer with a written explanation if the Contractor fails to acquire articles, equipment, supplies, services or materials or obtain the performance of construction work as described in (d)(12) of this clause. This written explanation must be submitted to the Contracting Officer within 30 days of contract completion.
(9) Assurances that the Contractor will not prohibit a subcontractor from discussing with the Contracting Officer any material matter pertaining to payment to or utilization of a subcontractor.
http://www.esrs.gov/
Performance
Document No.
140R3019R0001
Document Title Turbine and Generator Hydroelectric Component
F-7
(10) Assurances that the offeror will pay its small business subcontractors on time and in accordance with the terms and conditions of the underlying subcontract, and notify the contracting officer when the prime contractor makes either a reduced or an untimely payment to a small business subcontractor (see FAR 52.242-5).
(b) Large businesses will be required to keep track of their goals obtained on each awarded deliver/task order and report that information in ESRS.
Performance
Document No.
140R3019R0001
Document Title Turbine and Generator Hydroelectric Component
F-8
Part I – Section G
– Contract Administration Data
Document No.
140R3019R0001
Document Title Turbine and Generator Hydroelectric Component
G-1
SECTION G – CONTRACT ADMINISTRATION DATA
G.1 Portion of
Clause is Applicable to
1452.201-70 AUTHORITIES AND DELEGATIONS SEP 2011
(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.
(b) The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award.
The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor.
Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment.
(c) The COR is not authorized to perform, formally or informally, any of the following actions:
(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;
(2) Waive or agree to modification of the delivery schedule;
(3) Make any final decision on any contract matter subject to the Disputes Clause;
(4) Terminate, for any reason, the Contractor's right to proceed;
(5) Obligate in any way, the payment of money by the Government.
(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representative(s) acting within the scope and authority of the appointment memorandum. The Contractor need not proceed with direction that it considers to have been issued without proper authority. The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction (written or oral) that the Contractor considers to exceed the COR's appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the Contracting Officer's response issued under paragraph (e) of this clause.
(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph
(d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.
(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the COR.
(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting Officer or the COR acting within his or her appointment, shall be at the Contractor's risk.
Administration Data
Document No.
140R3019R0001
Document Title Turbine and Generator Hydroelectric Component
G-2
G.2 Portion of
Clause is Applicable to “S” & “C”
1452.242-80 POSTAWARD CONFERENCE - BUREAU OF
RECLAMATION
JUL 1993
(a) Prior to the Contractor starting work, a postaward conference (as described in FAR Subpart 42.5), will be convened by the contracting activity or contract administration office. The Contractor's Project Manager shall attend the conference. If the contract involves subcontractors, a representative of each major subcontractor is also required to attend.
(b) The conference will be held via conference call.
(c) The Contracting Officer and the Contractor will agree to the date and time of the conference after award of the contract. In event of a conflict in schedules, the Contracting Officer shall establish the date for the conference.
(d) The Contractor shall include any associated costs for attendance at the conference, in its offer.
The contracting office representative responsible for overall administration of this contract is:
Luis Gallardo, Contract Specialist (LC-10304) Bureau of Reclamation 7301 Calle Agua Salada Yuma, AZ 85364 Phone No.: 928-343-8129 Facsimile No.: 928-343-8568 E-mail: lgallardo@usbr.gov
Nicholas Clements, Contracting Officer (LC-10200) Bureau of Reclamation P.O. Box 61470 Boulder City, NV 89006-1470 Phone No.: 702-293-8156 Facsimile No.: 702-293-8499 E-mail: nclements@usbr.gov
G.4 Portion of
Work Clause is Applicable to
CONTRACTOR’S ADMINISTRATION PERSONNEL
The designated contractor official who will be in charge of overall administration of this contract is:
G.3 Portion of
Clause is Applicable to “S” & “C”
GOVERNMENT ADMINISTRATION
PERSONNEL
mailto:nclements@usbr.gov
Administration Data
Document No.
140R3019R0001
Document Title Turbine and Generator Hydroelectric Component
G-3
Name: ____________________________ Address: __________________________
City/State/Zip: ______________________ Phone No.: ________________________ E-mail: ____________________________
G.5 Portion of
Work Clause is Applicable to
“S” & “C”
ELECTRONIC INVOICING AND PAYMENT REQUIREMENTS –
INTERNET PAYMENT PLATFORM (IPP)
APR 2013
Payment requests must be submitted electronically through the U.S. Department of the Treasury’s Internet Payment Platform System (IPP). “Payment requests” means any request for contract financing payment or invoicing payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract. The IPP website address is: https://www.ipp.gov.
Under this contract, the following documents are required to be submitted as an attachment to the IPP invoice:
1) Invoice - courtesy copy to the Contract Specialist of IPP submitted invoice;
2) (Attachment 12 Construction) Invoice
3) (Attachment 12 Construction) Monthly Certificate of Labor Conformance;
4) (Attachment 12 Construction) Subcontractor/Supplier Payment Summary; and
5) Any additional documentation to substantiate each payment request and as required by the
Contracting Officer’s Representative or Contracting Officer.
The construction invoice forms are included in Attachment 12.
The Contractor must use the IPP website to register access and use IPP for submitting requests for payment. The Contractor Government Business Point of Contact (as listed in CCR) will receive enrollment instructions via email from the Federal Reserve Bank of Boston (FRBB) within 3-5 business days of the contract award date. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email IPPCustomerSupport@fiscal.treasury.gov or phone (866) 973-3131.
If the Contractor is unable to comply with the requirement to use IPP for submitting invoices for payment, the Contractor must submit a waiver request in writing to the Contracting Officer with its proposal or quotation.
https://www.ipp.gov/
Administration Data
Document No.
140R3019R0001
Document Title Turbine and Generator Hydroelectric Component
G-4
Part I – Section H
– Special Contract Requirements
Document No.
140R3019R0001
Document Title Turbine and Generator Hydroelectric Component
H-1
SECTION H – SPECIAL CONTRACT REQUIREMENTS
H.1 Portion of
Work Clause is Applicable to “S” & “C”
DOI-AAAP
NOTICE TO CONTRACTOR--CONTRACTOR
PERFORMANCE ASSESSMENT REPORTING
SYSTEM
DEC 2015
1. FAR 42.1502 directs all Federal agencies to collect past performance information on contracts.
The Department of the Interior (DOI) has implemented the Contractor Performance Assessment Reporting System (CPARS) to comply with this regulation. One or more past performance evaluations will be conducted in order to record your contract performance as required by FAR 42.15.
2. The past performance evaluation process is a totally paperless process using CPARS. CPARS is a web-based system that allows for electronic processing of the performance evaluation report.
Once the report is processed, it is available in the Past Performance Information Retrieval System (PPIRS) for Government use in evaluating past performance as part of a source selection action.
3. We request that you furnish the Contracting Officer (CO) with the name, position title, phone number, and email address for each person designated to have access to your firm's past performance evaluation(s) for the contract no later than 30 days after award. Each person granted access will have the ability to provide comments in the Contractor portion of the report and state whether or not the Contractor agrees with the evaluation, before returning the report to the Assessing Official (AO). Information in the report must be protected as source selection sensitive information not releasable to the public.
4. When your Contractor Representative(s) are registered in CPARS, they will receive an automatically generated email with detailed login instructions. Further details, systems requirements, and training information for CPARS is available at https://www.cpars.gov/.
5. Within 60 days after the end of a performance period, the AO will complete an interim or final past performance evaluation, and the report will be accessible at https://www.cpars.gov/.
a. Contractor Representatives may then provide comments in response to the 6.evaluation, or return the evaluation without comment.
b. Your comments should focus on objective facts in the AO's narrative and should a)provide your views on the causes and ramifications of the assessed performance.
c. All information provided should be reviewed for accuracy prior to submission.
d. If you elect not to provide comments, please acknowledge receipt of the evaluation by indicating "No comment" in the space provided, and then selecting “Accept the Ratings and Close the Evaluation”.
e. Your response is due within 60 calendar days after receipt of the CPAR. On day 15, the evaluation will become available in PPIRS-RC marked as “Pending” with or without comments and whether or not it has been closed.
f. If you do not sign and submit the CPAR within 60 days, it will automatically be returned to the Government and will be annotated: "The report was delivered/received by the contractor on (date). The contractor neither signed nor offered comment in response to this assessment."
6. The following guidelines apply concerning your use of the past performance evaluation:
a. Protect the evaluation as source selection information. After review, transmit the evaluation by completing and submitting the form through CPARS. If for some reason you are unable to view and/or submit the form through CPARS, contact the CO for instructions.
https://www.acquisition.gov/sites/default/files/current/far/html/Subpart%2042_15.html https://www.acquisition.gov/sites/default/files/current/far/html/Subpart%2042_15.html…