Attachment_J2_-_Drawings_11x17.pdf
PDF 17 MB Posted
- Attached to
- Friant Dam Compressor System Replacement Federal contract opportunity
- Solicitation number
- 140R2026B0002
About this file
These are design and technical drawings for the Friant Dam Spillway Gate Rehabilitation and Drum Gate Gallery Air Compressor System Installation project, managed by the U.S. Bureau of Reclamation. The drawings span multiple document types including site use plans, reservoir elevation charts, piping and instrumentation diagrams, control system schematics, equipment chamber details, and electrical installation specifications.
The project encompasses comprehensive mechanical and electrical systems for Gate 1 and Gate 3 crest gate operations at Friant Dam. Key equipment includes two air compressor systems (Atlas Copco 50 HP units) with air dryers, air receiver tanks, oil/water separators, pilot pressure tanks, hydropneumatic tanks, and an emergency cooling water pump rated at 3–5 HP. The compressed air systems deliver 236 CFM at 100 PSI, while the cooling water system provides 16 GPM at 50 PSI. Piping materials include aluminum (AL 6063), copper (Type K and L), PVC Schedule 40, and HDPE for bladder inflate/deflate lines. The control system utilizes a Programmable Logic Controller (PLC) with discrete input/output modules, analog inputs for pressure transducers and gate inclinometers, and solenoid-operated control valves for gate inflation and deflation. An Electronic Processing Unit (EPU) serves as the primary control interface with manual/automatic selector switches, pressure gauges, and alarm indicators. The electrical distribution includes 480-volt three-phase power for air compressor motors, 120-volt single-phase power for cooling water pump, and 24-volt DC instrumentation power. All equipment chambers are located at elevation 534.50 feet within the Drum Gate Gallery, with conduit routing, grounding details, and cable management specifications provided throughout the technical documentation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment_0002_to_140R2026B0002_0002.pdf | ||
| Sol_140R2026B0002_Amd_0002.pdf | ||
| Amendment_0001_to_140R2026B0002_0001.pdf | ||
| Sol_140R2026B0002_Amd_0001.pdf | ||
| Attachment_J1_-_Specifications.pdf | ||
| Sol_140R2026B0002.pdf | ||
| Solicitation_140R2026B0002.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LEGEND
Contractor use area Roads
Water features
Contractor use area
Stilling Basin
San Joaquin River
Water Level Recorder House
Stilling Basin
San Joaquin River Outlets
Friant-Kern CanalRoadway gate Restrooms
Guard house
Parking area
Exhibit building
Bureau Rd
Millerton Rd
Millerton Rd
Millerton Lake
Flow
Crest Gate
Staging area access route
Roadway gate
Roadway gate
Dam wall Friant-Kern Canal Outlet
Work Area
Crest Gate
A
LW
A
YS
T H
IN
K
S A
FE
TY
SHEET
D
C
B
A
D
C
B
A
B U
R
EA
U O
F R
EC
LA
M
A
TI
O N
U .S
D
EP
A R
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
C A D
S
YS
TE
M
A ut oC A D
4.
2S
LM
S T
EC
H
C A D
F
IL
EN
A M
E
4- D
-6
S
IT
E U
S E
PL
A N
.D W
G
LA
S T
S A V
ED
D A
TE
-0 2-
LA
S T
S A V
ED
B Y
M
LA
Z A N
A S
¦D_DT¦
¦STATUS¦
C
EN
TR
A L
V A
LL
EY
P
R O
JE
C T
FR
IA
N T
D
IV
IS
IO
N
FR
IA
N T
D A M
O B
ER
M
EY
ER
C
R
ES
T G
A
TE
S C O
M
PR
ES
S O
R S
YS
TE
M R
EP
LA
C
EM
EN
T
SITE USE PLAN
DENVER, CO
214-D-60533
2025-02-28
DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
PEER REVIEW
£TT£
£AT£
£AA£
£TA£
M. LAZANAS
M. LAZANAS
D. SALINAS, P.E.
J. HAMMOND, P.E.
M. DIUBALDO, P.E.
Digitally signed by Jeremy Hammond, P.E.
Date: 2025.02.28 11:21:27 -07'00'
A
LW
A
YS
T H
IN
K
S A
FE
TY
SHEET
D
C
B
A
D
C
B
A
B U
R
EA
U O
F R
EC
LA
M
A
TI
O N
U .S
D
EP
A R
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
C A D
S
YS
TE
M
A ut oC A D
4.
2S
LM
S T
EC
H
C A D
F
IL
EN
A M
E
4- D
-6
R
ES
E L
T O
7.
D
W G
LA
S T
S A V
ED
D A
TE
-0 2-
LA
S T
S A V
ED
B Y
M
LA
Z A N
A S
¦D_DT¦
¦STATUS¦
C
EN
TR
A L
V A
LL
EY
P
R O
JE
C T
FR
IA
N T
D
IV
IS
IO
N
FR
IA
N T
D A M
O B
ER
M
EY
ER
C
R
ES
T G
A
TE
S C O
M
PR
ES
S O
R S
YS
TE
M R
EP
LA
C
EM
EN
T
RESERVOIR
OPERATIONS
RESERVOIR
ELEVATIONS
2012 - 2017
DENVER, CO
214-D-60534
2025-02-28
DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
PEER REVIEW
£TT£
£AT£
£AA£
£TA£
M. LAZANAS
M. LAZANAS
D. SALINAS, P.E.
J. HAMMOND, P.E.
M. DIUBALDO, P.E.
Digitally signed by Jeremy
Date: 2025.02.28 11:21:34 -07'00'
A
YS
T H
IN
K
S A
FE
TY
SHEET
D
C
B
A
D
C
B
A
B U
R
EA
U O
F R
EC
LA
M
A
TI
O N
U .S
D
EP
A R
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
C A D
S
YS
TE
M
A ut oC A D
4.
2S
LM
S T
EC
H
C A D
F
IL
EN
A M
E
4- D
-6
R
ES
E L
T O
3.
D
W G
LA
S T
S A V
ED
D A
TE
-0 2-
LA
S T
S A V
ED
B Y
M
LA
Z A N
A S
¦D_DT¦
¦STATUS¦
C
EN
TR
A L
V A
LL
EY
P
R O
JE
C T
FR
IA
N T
D
IV
IS
IO
N
FR
IA
N T
D A M
O B
ER
M
EY
ER
C
R
ES
T G
A
TE
S C O
M
PR
ES
S O
R S
YS
TE
M R
EP
LA
C
EM
EN
T
RESERVOIR
OPERATIONS
RESERVOIR
ELEVATIONS
2018 - 2023
DENVER, CO
214-D-60535
2025-02-28
DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
PEER REVIEW
£TT£
£AT£
£AA£
£TA£
M. LAZANAS
M. LAZANAS
D. SALINAS, P.E.
J. HAMMOND, P.E.
M. DIUBALDO, P.E.
Digitally signed by Jeremy
Date: 2025.02.28 11:21:42 -07'00'
PI
Control Valve/Instrument Identification(Type) Instrument Tag/Loop Identification Number
TYPICAL TAG NUMBERS,
TAGGING STANDARD &
DESIGNATION
XXX
XXX
INSTRUMENTATION
OFF-PAGE CONNECTOR
Connector Number Service Code
Drawing Number
Origin/Destination
EQUIPMENT
Equipment Tag/Loop Identification Number
##-XX-###
Area Designation Equipment Type
VALVES
Valve System & Identification Number
##-XXX-##
Valve Type Area Designation
PIPE
Class or Specification
XX-XX-XXX
Optional Tag
Tag/Loop Identification Number Type Area Designation
Line Service
INSTRUMENT AND FUNCTION IDENTIFICATION
Letter Column 1 Column 2 Column 3 Column 4 Column 5
Measuring/Initiating Variable Variable Modifier Readout/Passive Function Output/Active Function Function Modifier
A Analysis Alarm
B Burner, Combustion Users Choice Users Choice Users Choice
C Users Choice Control Close
D Users Choice Difference,Differential Deviation
E Voltage Sensor, Primary Element
F Flow, Flow Rate Ratio
G Users Choice Glass, Gauge, Viewing Device
H Hand High
I Current Indicate
J Power Scan
K Time, Schedule Time Rate of Change Control Station
L Level Light Low
M Users Choice Middle, Intermediate
N Users Choice Users Choice Users Choice Users Choice
O Users Choice Orifice, Restriction Open
P Pressure Point (Test Connection)
Q Quantity Integrate, Totalize Integrate, Totalize
R Radiation Record Run
S Speed, Frequency Safety Switch Stop
T Temperature Transmit
U Multivariable Multifunction Multifunction
V Vibration, Mechanical Analysis Valve, Damper, Louver
W Weight, Force Well, Probe
X Unclassified X-axis Accessory Devices, Unclassified Unclassified Unclassified
Y Event State, Presence Y-axis Auxiliary Device
Z Position, Dimension Z-axis, Safety Instrument System Driver, Actuator, Unclassified final control element
INSTRUMENTATION DEVICE AND FUNCTION SYMBOLS
Shared
Display & Control System
Programmable Logic
Controller
Computer System and Software
Discrete Instrument
Location and Accessibility
Located in field
Not panel, cabinet, or console mounted
Visible at field location
Normally operator accessible
Located in or on front of central or main panel or console
Visible on front of panel or on video display
Normally operator accessible at panel front or console
Located in rear of central or main panel
Located in cabinet behind panel
Not visible on front of panel or on video display
Not normally operator accessible at panel or console
Located in or on front of secondary or local panel or console
Visible on front of panel or on video display
Normally operator accessible at panel front or console
Located in rear of secondary or local panel
Located in field cabinet
Not visible on front of panel or on video display
Not normally operator accessible at panel or console
Interlock or control function
I Undefined Interlock
PLC Function
Pilot Light or Gauge Glass Illuminator
Dual Function or Instruments sharing common housing
##-XXX
LINESTYLES
Linetype Function
Pipeline
Existing Pipeline
Instrument Supply
Electrical Signal
Pneumatic Signal
Skid / Supplier Boundary
Capillary Tube
Hydraulic Signal
Data / Software Communication
Mechanical Link
TAGGING SCHEME
AAA-EQUIP-BBB
PROCESS AAA BBB
COMPRESSED AIR - GATE 1 01 100
COMPRESSED AIR - GATE 3 03 300
COOLING WATER SYSTEM 05 500
A
LW
A
YS
T H
IN
K
S A
FE
TY
SHEET
D
C
B
A
D
C
B
A
B U
R
EA
U O
F R
EC
LA
M
A
TI
O N
U .S
D
EP
A R
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
C A D
S
YS
TE
M
A ut oC A D
4.
2S
LM
S T
EC
H
C A D
F
IL
EN
A M
E
5.
D W
G
LA
S T
S A V
ED
D A
TE
-0 2-
LA
S T
S A V
ED
B Y
M
LA
Z A N
A S
C
EN
TR
A L
V A
LL
EY
P
R O
JE
C T
FR
IA
N T
D
IV
IS
IO
N
FR
IA
N T
D A M
O B
ER
M
EY
ER
C
R
ES
T G
A
TE
S C O
M
PR
ES
S O
R S
YS
TE
M R
EP
LA
C
EM
EN
T
PIPING AND
INSTRUMENTATION
DIAGRAM
LEGEND
DENVER, CO
214-D-60525
2025-02-28
DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
PEER REVIEW
M. LAZANAS
A. WOODRUFF
D. SALINAS, P.E.
M. DIUBALDO, P.E.
E. MORLEY, P.E.
NOTES
1. Equipment and instrumentation symbols are based on ANSI/ISA and PIP standards.
A
YS
T H
IN
K
S A
FE
TY
SHEET
D
C
B
A
D
C
B
A
B U
R
EA
U O
F R
EC
LA
M
A
TI
O N
U .S
D
EP
A R
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
C A D
S
YS
TE
M
A ut oC A D
4.
2S
LM
S T
EC
H
C A D
F
IL
EN
A M
E
6.
D W
G
LA
S T
S A V
ED
D A
TE
-0 2-
LA
S T
S A V
ED
B Y
M
LA
Z A N
A S
C
EN
TR
A L
V A
LL
EY
P
R O
JE
C T
FR
IA
N T
D
IV
IS
IO
N
FR
IA
N T
D A M
O B
ER
M
EY
ER
C
R
ES
T G
A
TE
S C O
M
PR
ES
S O
R S
YS
TE
M R
EP
LA
C
EM
EN
T
PIPING AND
INSTRUMENTATION
DIAGRAM
SYMBOLS AND
ABBREVIATIONS
DENVER, CO
214-D-60526
2025-02-28
DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
PEER REVIEW
M. LAZANAS
A. WOODRUFF
D. SALINAS, P.E.
M. DIUBALDO, P.E.
E. MORLEY, P.E.
VALVE SYMBOLS
Symbol Description
Ball Valve
General Valve
Check Valve
Ball Check Valve
Control Valve
Pressure Relief Valve
Zero-Loss Drain Valve
Three Way Valve
CONTROL VALVE
ACTUATOR SYMBOLS
Symbol Description
Pilot Operated Relief Valve
Pressure Reducing Regulator
Pressure Reducing Regulator with External Tap
Back Pressure Regulator
Back Pressure Regulator with External Tap
Differential Pressure Reducing
Regulator
Pressure Reducing Regulator with Integral Outlet
Automatic Float Drain Valve
Handwheel/Manual Actuator
Diaphragm Actuator - Spring Return Actuator
Pressure Balanced Diaphragm Actuator
Diaphragm Actuator
Throttling Actuator
Spring Actuator
Motor Actuator
Solenoid Actuator
Electro-Hydraulic Actuator
Digital Actuator
Solenoid Actuator with Remote Reset
MECHANICAL COMPONENTS
Symbol Description
Reducer
Air Receiver Tank
Blind Flange
Centrifugal Pump
Coalescing Filter
Rotary Screw Compressor with Motor
Mass Flow Meter
Oil/Water Separator
Open Drain
Particulate Filter
Y-Strainer
Refrigerated Air Dryer
Flex Hose Clamp
FC Fail Closed
FO Fail Open
Camlock Fitting
LINE SERVICE CODES
ATM Atmospheric Air
CA Compressed Air
CW Cooling Water
CWDR Cooling Water Drain
DR Condensate Drain
EQUIPMENT TYPE
ADV Automatic Drain Valve PCV Pressure Control Valve
BCV Ball Check Valve PMP Pump
BV Ball Valve PRV Pressure Relief Valve
C Compressor PSV Pressure Safety Valve
CV Check Valve SV Solenoid Valve
DR Air Dryer TK Tank
FE Flow Element U Miscellaneous Equipment
FIL Filter
HTR Heater
COMPRESSOR
COMPRESSOR
AIR DRYER
AIR DRYER
AIR RECEIVER
AIR RECEIVER
AIR
PLUMBING
CABINET
AIR
PLUMBING
CABINET
System Flow Pressure Compressed Air 230 SCFM 100 PSI
Cooling Water 16 GPM 50 PSI
A
LW
A
YS
T H
IN
K
S A
FE
TY
SHEET
D
C
B
A
D
C
B
A
B U
R
EA
U O
F R
EC
LA
M
A
TI
O N
U .S
D
EP
A R
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
C A D
S
YS
TE
M
A ut oC A D
4.
2S
LM
S T
EC
H
C A D
F
IL
EN
A M
E
7.
D W
G
LA
S T
S A V
ED
D A
TE
-0 2-
LA
S T
S A V
ED
B Y
A W
O O
D R U
FF
C
EN
TR
A L
V A
LL
EY
P
R O
JE
C T
FR
IA
N T
D
IV
IS
IO
N
FR
IA
N T
D A M
O B
ER
M
EY
ER
C
R
ES
T G
A
TE
S C O
M
PR
ES
S O
R S
YS
TE
M R
EP
LA
C
EM
EN
T
PIPING AND
INSTRUMENTATION
DIAGRAM
PROCESS FLOW
DIAGRAM
DENVER, CO
214-D-60527
2025-02-28
DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
PEER REVIEW
M. LAZANAS
A. WOODRUFF
D. SALINAS, P.E.
M. DIUBALDO, P.E.
E. MORLEY, P.E.
NOTES
1. Process Flow Diagram does not show emergency cooling water supply system.
See drawing 214-D-60532 for cooling water systems.
2. Process Flow Diagram is diagrammatic only and shows the flow of compressed air from the compressors to the bladders for Gates 1 and 3.
PDI
PDI
Emergency Compressor Connection From Top of Dam
DRAIN
A .
CA
GATE 1 DISTRIBUTION
B .
CA
GATE 3 AIR SYSTEM
01-C-110
01-DR-110
-T
K -1
01-FIL-110 01-FIL-120
01-U-110
01-FE-110
D .
CW
COOLING WATER SUPPLY
60532
60529
60530
C .
CA
EMERGENCY AIR CONNECTION
60530
1 1/2"
01-BV-100
1/
2"
-B
V -1
1 1/2"
01-BV-101
1 1/2"
01-BV-102
1 1/2"
01-BV-104
1 1/2"
01-BV-105
1 1/2"
01-BV-106
01-PSV-111
-A
D V -1
1/ 2"
-B
V -1
-A
D V -1
1/ 2"
-A
D V -1
1/ 2"1/
2"
PI
FI
1 1/2"-AL 6063-CA
1/
2" -A
L
-C
A
1 1/2"-AL 6063-CA
1 1/2"-AL 6063-CA 1 1/2"-AL 6063-CA
1/
2" -A
L
-C
A
1/2"-CU Type L-DR
1/ 2"
-C U
T yp e L-
D R
1/ 2"
-C U
T yp e L-
D R
1/ 2"
-C U
T yp e L-
D R
1/2"-CU Type L-DR
01-CP-100
01-PLC-110
YIR
PI
YR
PT
1 1/2"
01-BV-107
1 1/2"-AL 6063-CA
1" x1
/2
1"-CU Type L-CWDR
1" -P
V C S ch
0- C W
1"
-B
V -1
1"
-B
V -1
ELECTRONIC PROCESSING UNIT (EPU)
PS
PIL
ATM
YIR
XA
FI
HS
YIA
XE
XA
YR
XE
FT
A
LW
A
YS
T H
IN
K
S A
FE
TY
SHEET
D
C
B
A
D
C
B
A
B U
R
EA
U O
F R
EC
LA
M
A
TI
O N
U .S
D
EP
A R
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
C A D
S
YS
TE
M
A ut oC A D
4.
2S
LM
S T
EC
H
C A D
F
IL
EN
A M
E
8.
D W
G
LA
S T
S A V
ED
D A
TE
-0 5-
LA
S T
S A V
ED
B Y
M
LA
Z A N
A S
C
EN
TR
A L
V A
LL
EY
P
R O
JE
C T
FR
IA
N T
D
IV
IS
IO
N
FR
IA
N T
D A M
O B
ER
M
EY
ER
C
R
ES
T G
A
TE
S C O
M
PR
ES
S O
R S
YS
TE
M R
EP
LA
C
EM
EN
T
PIPING AND
INSTRUMENTATION
DIAGRAM
GATE 1
COMPRESSED
AIR SYSTEM
DENVER, CO
214-D-60528
2025-02-28
DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
PEER REVIEW
M. LAZANAS
A. WOODRUFF
D. SALINAS, P.E.
M. DIUBALDO, P.E.
E. MORLEY, P.E.
NOTES
1. All electrical instruments and signals are in area 01 unless otherwise noted.
R
EV
N O
-0 5-
D
M
D
IU
B A
LD
O
P.
E
A D
D
ED
S
EV
ER
A L
S
IG
N A
LS
T O
T H
E
PL
C
A H
A N
D S
W
IT
C H
A N
D S
EV
ER
A L
S
IG
N A
LS
F R O
M
TH
E C O
M
PR
ES
S O
R A
N D
D R
YE
R
DEFLATE EXHAUST TO
PIER, ATMOSPHERE
S
S
S S
S S
PT
PI
PT
PI
PT
PI
PT
PI
PI
PSL
BLADDER A
BLADDER B
BLADDER C
BLADDER D
PI
Service Air Connection, Typ.
-T
K -1
01-FE-120
60528
60531
60531
BIDIRECTIONAL FLOW
BIDIRECTIONAL FLOW
PI
01-PCV-113
01-PCV-114
5/ 8"
-B
C V -1
1" x5
/8
1 1/2"
01-BV-116
01-PRV-117
1 1/2"
01-BV-118
01-SV-119
01-SV-120
1 1/2"
01-BV-121
1 1/2"
01-BV-122
01-PRV-123
1/
2"
-B
V -1
-S
V -1
-S V -1
-S
V -1
-S V -1
1/
2"
-B
V -1
1/
2"
-B
V -1
01-PRV-124
1"
-B
V -1
3/ 4"
-B
V -1
2"
01-BCV-134
4" x1
/2
2"
01-BCV-135
2"
01-BCV-136
2"
01-BCV-137
2"
01-BCV-138
2"
01-BCV-139
2"
01-BCV-140
2"
01-BCV-141
2"
01-BV-142
2"
01-BV-143
2"
01-BV-144
2"
01-BV-145
3/ 4"
-B
V -1
3/ 4"
-B
V -1
3/ 4"
-B
V -1
3/ 4"
-B
V -1
1 1/2"
01-BV-146
1 1/2"
01-BV-147
4"x1 1/2" 1 1/2"x4"
4"x1 1/2" 1 1/2"x4"
FI
1 1/2"-CU Type K-ATM
CU Type K AL 6063
CU Type K AL 6063
1/
2" -C
U T yp e
K -C
A
1 1/2"-AL 6063-CA
2"-AL 6063-CA
2"-AL 6063-CA
2"-AL 6063-CA
2"-AL 6063-ATM
2"-AL 6063-CA
2"-AL 6063-CA
2"-AL 6063-CA
2"-AL 6063-CA
4" -A
L
-C
A
4" -A
L
-C
A
1 1/2"-CU Type K-CA
1 1/2"-CU Type K-CA 1 1/2"x4"
1" -A
L
-C
A 5/
8" -C
U T yp e
K -C
A
CU Type K AL 6063
1 1/2"-AL 6063-CA
01-CP-100
01-PLC-110
PIL
PIR
PIR
PIR
PIR
ZO
ZO
01-SV-126
01-SV-127
ZO-110
PT-141PT-131
PI
ELECTRONIC PROCESSING UNIT (EPU)
ZO
ZO
ZOL
ZO-111
ZOL
ZO
01-SV-128
01-SV-129
ZOL
ZO-112
ZO-113
ZO
ZOL
115112/113110/111
PIR-131
PIR-141
AL 6063 CU Type K
AL 6063 PVC Sch 40
A L
C U
T yp e K
FC
FC
FC
FC FC
FC
4"-PVC Sch 40-ATM
A .
CA
GATE 1 COMPRESSOR
F .
CA
INFLATE LINE GATE 3
G .
CA
DEFLATE LINE GATE 3
FI
FT
A
LW
A
YS
T H
IN
K
S A
FE
TY
SHEET
D
C
B
A
D
C
B
A
B U
R
EA
U O
F R
EC
LA
M
A
TI
O N
U .S
D
EP
A R
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
C A D
S
YS
TE
M
A ut oC A D
4.
2S
LM
S T
EC
H
C A D
F
IL
EN
A M
E
9.
D W
G
LA
S T
S A V
ED
D A
TE
-0 5-
LA
S T
S A V
ED
B Y
M
LA
Z A N
A S
C
EN
TR
A L
V A
LL
EY
P
R O
JE
C T
FR
IA
N T
D
IV
IS
IO
N
FR
IA
N T
D A M
O B
ER
M
EY
ER
C
R
ES
T G
A
TE
S C O
M
PR
ES
S O
R S
YS
TE
M R
EP
LA
C
EM
EN
T
PIPING AND
INSTRUMENTATION
DIAGRAM
GATE 1
AIR
DISTRIBUTION
DENVER, CO
214-D-60529
2025-02-28
DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
PEER REVIEW
M. LAZANAS
A. WOODRUFF
D. SALINAS, P.E.
M. DIUBALDO, P.E.
E. MORLEY, P.E.
01-APC-100
NOTES
1. Piping within Air Plumbing Cabinet is Copper
Type K.
2. Connection fitting to Bladders not shown.
3. Existing pipe shown represents flex hose connection to air bladders. This flex hose connection is not being replaced.
4. All electrical instruments and signals are in area 01 unless otherwise noted.
R
EV
N O
-0 5-
D
M
D
IU
B A
LD
O
P.
E.
A D
D
ED
F I-
0.
PDI
PDI
DRAIN
H .
CA
GATE 3 DISTRIBUTION
E .
CW
COOLING WATER
B .
CA
GATE 1 AIR TANK
03-C-310
03-FIL-310
03-DR-310
03-FIL-320
-T
K -3
03-FE-310
03-U-310
60528
60532
60531
60528
1/
2"
-B
V -3
1 1/2"
01-BV-301
1 1/2"
03-BV-302
1 1/2"
03-BV-303
1 1/2"
03-BV-304
1 1/2"
03-BV-305
PI
1 1/2"
03-BV-306
FI
03-PSV-310
-A
D V -3
-A
D V -3
1 1/2"-AL 6063-CA
1 1/2"-AL 6063-CA
1 1/2"-AL 6063-CA 1 1/2"-AL 6063-CA
1 1/2"-AL 6063-CA
1 1/2"-AL 6063-CA
1/2"-CU Type L-DR
1/ 2"
-C U
T yp e L-
D R
1/ 2"
-B
V -3
1/ 2"
-C U
T yp e L-
D R
1/ 2"
-C U
T yp e L-
D R
-A
D V -3
1/2"-CU Type L-DR
YIR
PI
YR
PT
1 1/2"
03-BV-307
1"
-B
V -3
1"
-B
V -3
1" -P
V C S ch
0- C W
1" x1
/2
1"-CU Type L-CWDR
PS
PIL
ATM
XA
YIR
FI
XA
01-PLC-310
01-CP-100
ELECTRONIC PROCESSING UNIT (EPU)
XE
YR
XE
YIA
HS
FT
A
LW
A
YS
T H
IN
K
S A
FE
TY
SHEET
D
C
B
A
D
C
B
A
B U
R
EA
U O
F R
EC
LA
M
A
TI
O N
U .S
D
EP
A R
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
C A D
S
YS
TE
M
A ut oC A D
4.
2S
LM
S T
EC
H
C A D
F
IL
EN
A M
E
0.
D W
G
LA
S T
S A V
ED
D A
TE
-0 5-
LA
S T
S A V
ED
B Y
A W
O O
D R U
FF
C
EN
TR
A L
V A
LL
EY
P
R O
JE
C T
FR
IA
N T
D
IV
IS
IO
N
FR
IA
N T
D A M
O B
ER
M
EY
ER
C
R
ES
T G
A
TE
S C O
M
PR
ES
S O
R S
YS
TE
M R
EP
LA
C
EM
EN
T
PIPING AND
INSTRUMENTATION
DIAGRAM
GATE 3
COMPRESSED
AIR SYSTEM
DENVER, CO
214-D-60530
2025-02-28
DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
PEER REVIEW
M. LAZANAS
A. WOODRUFF
D. SALINAS, P.E.
M. DIUBALDO, P.E.
E. MORLEY, P.E.
NOTES
1. All electrical instruments and signals are in area 03 unless otherwise noted.
R
EV
N O
-0 5-
D
M
D
IU
B A
LD
O
P.
E
A D
D
ED
S
EV
ER
A L
S
IG
N A
LS
T O
T H
E
PL
C
A H
A N
D S
W
IT
C H
A N
D S
EV
ER
A L
S
IG
N A
LS
F R O
M
TH
E C O
M
PR
ES
S O
R A
N D
D R
YE
DEFLATE EXHAUST TO
PIER, ATMOPSHERIC
S
S
S S
S S
PT
PI
PT
PI
PT
PI
PT
PI
PI
PSL
BLADDER A
BLADDER B
BLADDER C
BLADDER D
PI
Service Air Connection, Typ.
F .
CA
INFLATE LINE GATE 1
G .
CA
DEFLATE LINE GATE 1
-T
K -3
03-FE-320
60530
60529
60529
BIDIRECTIONAL FLOW
BIDIRECTIONAL FLOW
1"
-B
V -3
PI
03-PCV-313
03-PCV-314
5/ 8"
-B
C V -3
1 1/2"
03-BV-316
03-PSV-317
1 1/2"
03-BV-318
03-SV-319
03-SV-320
1 1/2"
03-BV-321
FI
1 1/2"
03-BV-322
03-PRV-323
03-PRV-324
1/
2"
-B
V -3
-S
V -3
-S V -3
-S
V -3
-S V -3
1/
2"
-B
V -3
1/
2"
-B
V -3
4" x1
/2
2"
03-BCV-334
2"
03-BCV-335
2"
03-BCV-336
2"
03-BCV-337
2"
03-BCV-338
2"
03-BCV-339
2"
03-BCV-340
2"
03-BCV-341
2"
03-BV-342
2"
03-BV-343
2"
03-BV-344
2"
03-BV-345
3/ 4"
-B
V -3
3/ 4"
-B
V -3
3/ 4"
-B
V -3
3/ 4"
-B
V -3
CU Type K AL 6063
CU Type K AL 6063
CU Type K AL 6063
5/ 8"
-C U
T yp e K -C
A
1 1/2"-CU Type K-CA
1/
2" -A
L
-C
A
1 1/2"-CU Type K-CA 1 1/2"-AL 6063-CA
1 1/2"-CU Type K-CA
1/
2" -C
U T yp e
K -C
A
1 1/2"-CU Type K-CA
4"-AL 6063-CA
4"-AL 6063-CA
1 1/2"x4"
2"-AL 6063-CA
2"-AL 6063-CA
2"-AL 6063-CA
2"-AL 6063-ATM
2"-AL 6063-CA
2"-AL 6063-CA
2"-AL 6063-CA
2"-AL 6063-CA
4" -A
L
-C
A
4" -A
L
-C
A
01-CP-100
03-PLC-310
PIL
PIR
PIR
PIR
PIR
ZO
ZO
PT-331 PT-341
PI
3/ 4"
-B
V -3
ELECTRONIC PROCESSING UNIT (EPU)
01-SV-326
01-SV-327
ZOLZOL
314 310/311
ZO
ZO
ZO-310
ZO-311
ZO
01-SV-328
01-SV-329
ZOL
312/313
ZO
ZOL
ZO-312
ZO-313
PIR-331
PIR-341
AL 6063 CU Type K
AL 6063 PVC Sch 40
1" x5
/8
1" -A
L
-A
TM
A L
C U
T yp e K
4"-PVC Sch 40-ATM
FC
FC
FC
FC
FC
FC
H .
CA
GATE 3 COMPRESSOR
FI
FT
1 1/2"-AL 6063-CA
A
LW
A
YS
T H
IN
K
S A
FE
TY
SHEET
D
C
B
A
D
C
B
A
B U
R
EA
U O
F R
EC
LA
M
A
TI
O N
U .S
D
EP
A R
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
C A D
S
YS
TE
M
A ut oC A D
4.
2S
LM
S T
EC
H
C A D
F
IL
EN
A M
E
1.
D W
G
LA
S T
S A V
ED
D A
TE
-0 5-
LA
S T
S A V
ED
B Y
M
LA
Z A N
A S
C
EN
TR
A L
V A
LL
EY
P
R O
JE
C T
FR
IA
N T
D
IV
IS
IO
N
FR
IA
N T
D A M
O B
ER
M
EY
ER
C
R
ES
T G
A
TE
S C O
M
PR
ES
S O
R S
YS
TE
M R
EP
LA
C
EM
EN
T
PIPING AND
INSTRUMENTATION
DIAGRAM
GATE 3
AIR
DISTRIBUTION
DENVER, CO
214-D-60531
2025-02-28
DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
PEER REVIEW
M. LAZANAS
A. WOODRUFF
D. SALINAS, P.E.
M. DIUBALDO, P.E.
E. MORLEY, P.E.
03-APC-300
NOTES
1. Piping within Air Plumbing Cabinet is Copper
Type K.
2. Connection fitting to Bladders not shown.
3. All electrical instruments and signals are in area 03 unless otherwise noted.
R
EV
N O
-0 5-
D
M
D
IU
B A
LD
O
P.
E.
A D
D
ED
F I-
0.
E .
CW
GATE 3 COMPRESSOR
PI
PSL
CS PVC
PI
05-TK-510 05-TK-520
05-PMP-510
EMERGENCY COOLING
WATER SUPPLY
MAIN COOLING WATER
SUPPLY D .
CW
GATE 1 COMPRESSOR
60528
60530
BIDIRECTIONAL FLOW
2"
05-CV-500
3/ 4"
-B
V -5
1 1/4"
05-BV-502
1 1/4"
05-BV-503
2"x1"
2"x1"
1/
4" -P
V C S ch
0- C W
2"-PVC Sch 40-CW
1 1/4"-PVC Sch 40-CW
2" -P
V C S ch
0- C W
1"-PVC Sch 40-CW
1"-PVC Sch 40-CW
01-CP-100
03-PLC-310
PIL
1/ 2" x1
/4
05-PSV-507
1/2"
05-BV-504
PSH
2"-CS Sch 40-CW 2"
05-BV-508
1 1/4"
05-CV-505
2"
05-BV-506
CS PVC
PIH
YIR
3/4"-PVC Sch 40-CW
ELECTRONIC PROCESSING UNIT (EPU)
IEH
2"-PVC Sch 40-CW
A
LW
A
YS
T H
IN
K
S A
FE
TY
SHEET
D
C
B
A
D
C
B
A
B U
R
EA
U O
F R
EC
LA
M
A
TI
O N
U .S
D
EP
A R
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
C A D
S
YS
TE
M
A ut oC A D
4.
2S
LM
S T
EC
H
C A D
F
IL
EN
A M
E
2.
D W
G
LA
S T
S A V
ED
D A
TE
-0 2-
LA
S T
S A V
ED
B Y
M
LA
Z A N
A S
C
EN
TR
A L
V A
LL
EY
P
R O
JE
C T
FR
IA
N T
D
IV
IS
IO
N
FR
IA
N T
D A M
O B
ER
M
EY
ER
C
R
ES
T G
A
TE
S C O
M
PR
ES
S O
R S
YS
TE
M R
EP
LA
C
EM
EN
T
PIPING AND
INSTRUMENTATION
DIAGRAM
COOLING
WATER SYSTEM
DENVER, CO
214-D-60532
2025-02-28
DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
PEER REVIEW
M. LAZANAS
A. WOODRUFF
D. SALINAS, P.E.
M. DIUBALDO, P.E.
E. MORLEY, P.E.
NOTES
1. Cooling water piping replacement of PVC pipe only, beginning at locations where piping transitions from carbon steel to PVC.
2. Main cooling water supply outlet pipe material transition occurs where pipe enters the Drum Gate Gallery at outlet of isolation valve 05-BV-508.
3. Existing carbon steel pipe is not being replaced.
4. All electrical instruments and signals are in area 05 unless otherwise noted.
11'-6"
6'-0"
7'-0" 15'-0"
6'-0" TYP.
6'-0"
100'-0"
6'-0"
100'-0"
TRANSFORMER VAULT
GATE 3GATE 1
EPU CABINET
EMERGENCY
COOLING WATER
SUPPLY PUMP
AND CONTROL
ENCLOSURE
STAIRS AND 24"
WEDGE GATE VALVE
ACCESS, TYP.
HYDROPNEUMATIC TANKS
5'-8" TYP.
NOTE 4
7'-0" TYP.
4" COMPRESSED
AIR INFLATE AND
DEFLATE LINE
CAPPED AT END
CONDUIT
ROUTE
60550
20'-0"
15'-0"
C 60549
D 60549
60550
CONTINUED ON
214-D-60546
CONTINUED
ON
214-D-60546
109'-0"
M A
TC
H
LIN
E
M A
TC
H
LIN
E
2" COOLING
WATER LINE
Ø6'-0" SPIRAL
STAIRWAY SHAFT
Ø6'-0" ACCESS SHAFT
CONDUIT ROUTE
2" COOLING WATER LINE
4" BLADDER DEFLATE LINE
4" BLADDER INFLATE LINE
2" SYSTEM CROSS
CONNECTION
NOTE 7
NOTES
1. This drawing must be printed in color. Demolition limits shown in green.
2. Stairs at entrance to equipment chambers to be removed, refurbished, and reinstalled.
3. All air piping within the equipment chambers is 11
2" aluminum.
All condensate drain line is 12" copper tubing.
4. Only PVC cooling water pipe replaced. Carbon steel water pipe to remain. See drawing 214-D-60532.
5. See 214-D-60543 for general notes and reference drawings.
6. Existing trench drain within Drum Gate Gallery not shown.
7. 2" cooling water line continued outside of Drum Gate Gallery.
Cooling water supply line from outlet of Friant-Kern Canal.
DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
PEER REVIEWER
£TT£
£AT£
£AA£
£TA£
M. LAZANAS
A. WOODRUFF
D. SALINAS, P.E.
J. HAMMOND, P.E.
M. DIUBALDO, P.E.
A
LW
A
YS
T H
IN
K
S A
FE
TY
SHEET
D
C
B
A
D
C
B
A
B U
R
EA
U O
F R
EC
LA
M
A
TI
O N
U .S
D
EP
A R
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
C A D
S
YS
TE
M
A ut oC A D
4.
2S
LM
S T
EC
H
C A D
F
IL
EN
A M
E
FR
IA
N
T D
EM
O
.D W
G
LA
S T
S A V
ED
D A
TE
-0 2-
LA
S T
S A V
ED
B Y
M
LA
Z A N
A S
¦D_DT¦
¦STATUS¦
C
EN
TR
A L
V A
LL
EY
P
R O
JE
C T
FR
IA
N T
D
IV
IS
IO
N
FR
IA
N T
D A M
O B
ER
M
EY
ER
C
R
ES
T G
A
TE
S C O
M
PR
ES
S O
R S
YS
TE
M R
EP
LA
C
EM
EN
T
DRUM GATE GALLERY
EXISTING INSTALLATION
DEMO PLAN VIEW
DENVER, CO
214-D-60548
2025-02-28
DRUM GATE GALLERY PLAN CONTINUED EL. 534.50
NOT TO SCALE
DRUM GATE GALLERY PARTIAL PLAN EL. 534.50
NOT TO SCALE
Digitally signed by Jeremy
Date: 2025.02.28 11:22:14 -07'00'
4" DEFLATE LINE
4" INFLATE LINE
2" FLEX
LINE
PG
PG
TO BLADDER THROUGH
CORE DRILL IN CONCRETE
2" BALL CHECK
VALVE
2" BALL
VALVE
6'-0"
8'-0"
2" COOLING WATER LINE PVC
2" SYSTEM CROSS-CONNECTION HDPE
4" BLADDER DEFLATE LINE HDPE
4" BLADDER INFLATE LINE HDPE
EMERGENCY COOLING
WATER SUPPLY PUMP
05-PMP-510
(WALL-MOUNTED)
HYDROPNEUMATIC TANKS
LIGHTING CIRCUIT (NOTE 3)
PUMP MOTOR CONDUIT
DRUM GATE OUTLETS AND
LIGHTING CONDUIT (NOTE 3)
DRUM GATE OUTLETS
CONDUIT (NOTE 3)
1" APC GATE #1 CONDUIT
2" COMPRESSOR
GATE #1 CONDUIT
1" APC GATE #3 CONDUIT
2" COMPRESSOR GATE #3
CONDUIT
4" BLADDER PRESSURE TRANSDUCER CONDUIT
COOLING WATER
SUPPLY CONTROL
ENCLOSURE
2"
COOLING WATER
PRESSURE SWITCHES
NOTE 4
2" COOLING WATER
PRESSURE
TRANSDUCER
TO EPU
4" BLADDER PRESSURE
TRANSDUCER CONDUIT
DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
PEER REVIEWER
£TT£
£AT£
£AA£
£TA£
M. LAZANAS
A. WOODRUFF
D. SALINAS, P.E.
J. HAMMOND, P.E.
M. DIUBALDO, P.E.
A
LW
A
YS
T H
IN
K
S A
FE
TY
SHEET
D
C
B
A
D
C
B
A
B U
R
EA
U O
F R
EC
LA
M
A
TI
O N
U .S
D
EP
A R
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
C A D
S
YS
TE
M
A ut oC A D
4.
2S
LM
S T
EC
H
C A D
F
IL
EN
A M
E
FR
IA
N
T D
EM
O
.D W
G
LA
S T
S A V
ED
D A
TE
-0 2-
LA
S T
S A V
ED
B Y
M
LA
Z A N
A S
¦D_DT¦
¦STATUS¦
C
EN
TR
A L
V A
LL
EY
P
R O
JE
C T
FR
IA
N T
D
IV
IS
IO
N
FR
IA
N T
D A M
O B
ER
M
EY
ER
C
R
ES
T G
A
TE
S C O
M
PR
ES
S O
R S
YS
TE
M R
EP
LA
C
EM
EN
T
DRUM GATE GALLERY
EXISTING INSTALLATION
DEMO SECTION VIEWS
DENVER, CO
214-D-60549
2025-02-28
DRUM GATE GALLERY SECTION
60548
C
NOT TO SCALE
MANIFOLD SECTION, TYPICAL
60548 D
NOT TO SCALE
NOTES
1. This drawing must be printed in color. Demolition limits shown in green.
2. See 214-D-60543 for general notes and reference drawings.
3. Existing conduit. Not in scope. Do not remove.
4. Pipe clamps and other fasteners not shown for clarity.
5. Flexible pipe connection to bladders is not in scope of work.
Do not remove.
Digitally signed by Jeremy Hammond, P.E.
Date: 2025.02.28 11:22:21 -07'00'
PILOT PRESSURE TANK
(WALL-MOUNTED)
6" TYP.
5'-0"
2'-9"
Ø2'-6"
1'-10"
1'-6"
2'-6"
Ø10"
AIR COMPRESSOR
AIR DRYER
8'-3"
8'-3"
15'-0"
15'-0"
AIR COMPRESSOR
EDGE OF STAIR
PLATFORM
AIR RECIEVER
AIR PLUMBING
CABINET
MOTOR CONTROLLER
COMPRESSOR
DISCONNECT
SWITCH
AIR
COMPRESSOR
AIR
RECEIVER
AIR
DRYER
3'-11"
F
E
5'-5"
3'-6"
4'-0"
2'-6" 7'-8"
AIR PLUMBING CABINET
(FLOOR-MOUNTED)
CONTINUED FROM
214-D-60544
24" MANHOLE
AIR DRYER
DISCONNECT SWITCH
COOLING WATER
DISCHARGE
GOOSENECK AT
TOP OF PIER
TOP OF PIER
EL. 585.00'
24" MANHOLETOP OF SECOND
LEVEL EL. 542.75'
6" PVC, DEMO
MOTOR
CONTROLLER
EQUIPMENT
CHAMBER EL.
534.50'
AIR DRYER
DISCONNECT SWITCH
STAIRS (NOTE 7)
GOOSENECK AT
TOP OF PIER TOP OF PIER
EL. 585.00'
TOP OF SECOND
LEVEL EL. 542.75'
4" PVC, DEMO
PILOT PRESSURE
TANK
EQUIPMENT
CHAMBER EL.
534.50'
A
LW
A
YS
T H
IN
K
S A
FE
TY
SHEET
D
C
B
A
D
C
B
A
B U
R
EA
U O
F R
EC
LA
M
A
TI
O N
U .S
D
EP
A R
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
C A D
S
YS
TE
M
A ut oC A D
4.
2S
LM
S T
EC
H
C A D
F
IL
EN
A M
E
FR
IA
N
T D
EM
O
.D W
G
LA
S T
S A V
ED
D A
TE
-0 2-
LA
S T
S A V
ED
B Y
M
LA
Z A N
A S
¦D_DT¦
¦STATUS¦
C
EN
TR
A L
V A
LL
EY
P
R O
JE
C T
FR
IA
N T
D
IV
IS
IO
N
FR
IA
N T
D A M
O B
ER
M
EY
ER
C
R
ES
T G
A
TE
S C O
M
PR
ES
S O
R S
YS
TE
M R
EP
LA
C
EM
EN
T
GATE 1 EQUIPMENT
CHAMBER EXISTING
INSTALLATION
DEMO DETAIL DRAWING
DENVER, CO
214-D-60550
2025-02-28
DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
PEER REVIEWER
£TT£
£AT£
£AA£
£TA£
M. LAZANAS
A. WOODRUFF
D. SALINAS, P.E.
J. HAMMOND, P.E.
M. DIUBALDO, P.E.
AIR COMPRESSOR EQUIPMENT CHAMBER
60548
NOT TO SCALE
NOTES
1. This drawing must be printed in color. Demolition limits shown in green.
2. Equipment dimensions shown are existing equipment dimensions.
3. Remove all cooling water pipe and compressed air pipe within the equipment chambers. Maximum pipe size is 1 1/2".
4. Drawing shows general location of existing equipment.
5. Equipment shown in gray hatch is to be removed and disposed of unless otherwise noted.
6. Existing air and water piping within equipment chamber not shown.
7. Stairs to be removed and refurbished in accordance with
Specifications. Reinstall stairs after new compressed air equipment has been installed and commissioned.
GATE 1 EQUIPMENT CHAMBER RIGHT SIDE VIEWF NOT TO SCALE
GATE 1 EQUIPMENT CHAMBER LEFT SIDE VIEWE NOT TO SCALE
Digitally signed by Jeremy
Date: 2025.02.28 11:22:25 -07'00'
6" TYP.
5'-0"
2'-9"
Ø2'-6"
1'-10"
1'-6"
2'-6"
Ø10"
AIR
COMPRESSOR
AIR
RECEIVER
AIR
DRYER
AIR COMPRESSOR
8'-3"
8'-3"
15'-0"
15'-0"
AIR COMPRESSOR
EDGE OF STAIR
PLATFORM
AIR RECIEVER
AIR PLUMBING
CABINET
2'-1"
MOTOR CONTROLLER
COMPRESSOR
DISCONNECT
SWITCH
AIR DRYER
H
G
5'-5"
3'-2"
2'-6"
4'-0"
7'-8"
GOOSENECK AT
TOP OF PIER TOP OF PIER
EL. 585.00'
TOP OF SECOND
LEVEL EL. 542.75'
4" PVC, DEMO
PILOT PRESSURE
TANK
EQUIPMENT
CHAMBER EL.
534.50'
AIR DRYER
DISCONNECT
SWITCH
GOOSENECK AT
TOP OF PIER
TOP OF PIER
EL. 585.00'
24" MANHOLETOP OF SECOND
LEVEL EL. 542.75'
6" PVC, DEMO
MOTOR
CONTROLLER
EQUIPMENT
CHAMBER EL.
534.50'
STAIRS (NOTE 7)
NOTE 6
PILOT PRESSURE TANK
(WALL-MOUNTED)
AIR PLUMBING CABINET
(FLOOR-MOUNTED)
CONTINUED FROM
214-D-60544
24" MANHOLE
COOLING WATER
DISCHARGE
AIR DRYER
DISCONNECT SWITCH
A
LW
A
YS
T H
IN
K
S A
FE
TY
SHEET
D
C
B
A
D
C
B
A
B U
R
EA
U O
F R
EC
LA
M
A
TI
O N
U .S
D
EP
A R
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
C A D
S
YS
TE
M
A ut oC A D
4.
2S
LM
S T
EC
H
C A D
F
IL
EN
A M
E
FR
IA
N
T D
EM
O
.D W
G
LA
S T
S A V
ED
D A
TE
-0 2-
LA
S T
S A V
ED
B Y
M
LA
Z A N
A S
¦D_DT¦
¦STATUS¦
C
EN
TR
A L
V A
LL
EY
P
R O
JE
C T
FR
IA
N T
D
IV
IS
IO
N
FR
IA
N T
D A M
O B
ER
M
EY
ER
C
R
ES
T G
A
TE
S C O
M
PR
ES
S O
R S
YS
TE
M R
EP
LA
C
EM
EN
T
GATE 3 EQUIPMENT
CHAMBER EXISTING
INSTALLATION
DEMO DETAIL DRAWING
DENVER, CO
214-D-60551
2025-02-28
DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
PEER REVIEWER
£TT£
£AT£
£AA£
£TA£
M. LAZANAS
A. WOODRUFF
D. SALINAS, P.E.
J. HAMMOND, P.E.
M. DIUBALDO, P.E.
NOTES
1. This drawing must be printed in color. Demolition limits shown in green.
2. Equipment dimensions shown are maximum allowable footprints.
3. Remove all cooling water pipe and compressed air pipe within the equipment chambers. Maximum pipe size is 1 1/2".
4. Drawing shows general location of existing equipment.
5. Equipment shown in gray hatch is to be removed and disposed of unless otherwise noted.
6. Air dryer for Gate 3 to be removed and stored on-site.
Coordinate storage location with COR.
GATE 3 EQUIPMENT CHAMBER RIGHT SIDE VIEWH NOT TO SCALE
GATE 3 EQUIPMENT CHAMBER LEFT SIDE VIEWG NOT TO SCALE
AIR COMPRESSOR EQUIPMENT CHAMBER
60548
NOT TO SCALE
Digitally signed by Jeremy
Date: 2025.02.28 11:22:36 -07'00'
A
YS
T H
IN
K
S A
FE
TY
SHEET
D
C
B
A
D
C
B
A
B U
R
EA
U O
F R
EC
LA
M
A
TI
O N
U .S
D
EP
A R
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
C A D
S
YS
TE
M
A ut oC A D
4.
2S
LM
S T
EC
H
C A D
F
IL
EN
A M
E N
EW
I
N S
TA
LL
A
TI
O N
.D W
G
LA
S T
S A V
ED
D A
TE
-0 5-
LA
S T
S A V
ED
B Y
M
LA
Z A N
A S
¦D_DT¦
¦STATUS¦
C
EN
TR
A L
V A
LL
EY
P
R O
JE
C T
FR
IA
N T
D
IV
IS
IO
N
FR
IA
N T
D A M
O B
ER
M
EY
ER
C
R
ES
T G
A
TE
S C O
M
PR
ES
S O
R S
YS
TE
M R
EP
LA
C
EM
EN
T
DRUM GATE GALLERY
GENERAL NOTES &
EQUIPMENT SCHEDULE
DENVER, CO
214-D-60543
2025-02-28
DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
PEER REVIEWER
£TT£
£AT£
£AA£
£TA£
M. LAZANAS
A. WOODRUFF
D. SALINAS, P.E.
J. HAMMOND, P.E.
M. DIUBALDO, P.E.
NOTES
1. Contractor to field verify all system dimensions prior to demolition.
2. Emergency air connection to be field routed from compressors, through Drum Gate
Gallery, up 6'-0" spiral stairway shaft, terminating at top of stairs near access door.
Location of termination to be coordinated with COR. Connection shall be quick connect fitting.
3. Drawings are diagrammatic only and represent general layout of equipment and routing of pipe and conduit. Drawings are not to scale. Fittings and pipe connections are not shown for all pipe and conduit lines.
4. Pipe routing must follow drawings 214-D-60527 to 214-D-60532.
5. Non-potable water is available at the top of dam near the personnel access staircase. 2-inch threaded connection and standard threaded hose-bib connection.
See specification section 51 00 26 for photos of water connections.
6. Stairs at mouth of equipment chambers shall be removed prior to start of demolition of equipment and shall be installed after new equipment has been tested/commissioned.
REFERENCE DRAWINGS
GALLERIES - PLAN AND SECTIONS 214-D-640
100'X 18' DRUM GATE CONTROL GENERAL
INSTALLATION - ASSEMBLY 214-D-5064
100'X 18' DRUM GATE CONTROL GENERAL
INSTALLATION - SECTIONS 214-D-5065
SPILLWAY ACCESS LADDERS - PLAN &
ELEVATION 214-D-10355
PIPING AND INSTRUMENTATION DIAGRAM -
LEGEND 214-D-60525
PIPING AND INSTRUMENTATION DIAGRAM -
SYMBOLS AND ABBREVIATIONS 214-D-60526
PIPING AND INSTRUMENTATION DIAGRAM -
PROCESS FLOW DIAGRAM 214-D-60527
PIPING AND INSTRUMENTATION DIAGRAM -
GATE 1 COMPRESSED AIR SYSTEM 214-D-60528
PIPING AND INSTRUMENTATION DIAGRAM -
GATE 1 AIR DISTRIBUTION 214-D-60529
PIPING AND INSTRUMENTATION DIAGRAM -
GATE 3 COMPRESSED AIR SYSTEM 214-D-60530
PIPING AND INSTRUMENTATION DIAGRAM -
GATE 3 AIR DISTRIBUTION 214-D-60531
PIPING AND INSTRUMENTATION DIAGRAM -
COOLING WATER SYSTEMS 214-D-60532
EQUIPMENT SCHEDULE
EQUIPMENT TYPE EQUIPMENT TAG QTY. MOTOR ELECTRICAL DESIGN
PRESSURE CAPACITY NOTES
AIR COMPRESSOR - ATLAS COPCO 01-C-110, 03-C-310 2 50 HP 460V/3PH/60Hz 100 PSI 236 CFM COOLING WATER INLET/OUTLET CONNECTIONS 1"
AIR DRYER 01-DR-110, 03-DR-310 2 3.94 kW 230V/3PH/60Hz 100 PSI 382 CFM
AIR RECIEVER 01-TK-110, 03-TK-310 2 - - 200 PSI 200 GAL
OIL/WATER SEPARATOR 01-U-110, 03-U-310 2 - - 100 PSI 451 CFM
HYDROPNEUMATIC TANKS 05-TK-510, 05-TK-520 2 - - 150 PSI 119 GAL
COOLING WATER PUMP 05-PMP-510 1 3-5 HP 120V/1PH/60Hz 50 PSI 32 GPM
LEGEND
Compressed Air Piping
Cooling Water Piping
Conduit
Work Extents
ABBREVIATIONS
APC Air Plumbing Cabinet
HDPE High Density Polyethylene
PG Pressure Gauge
GENERAL MECHANICAL SUMMARY OF WORK
SCOPE LOCATION OF WORK DESCRIPTION OF WORK
DEMOLITION OF AIR COMPRESSOR SYSTEMS
FOR GATE 1 AND GATE 3
DRUM GATE GALLERY
REMOVAL OF MECHANICAL EQUIPMENT INCLUDING BUT NOT LIMITED TO:
AIR COMPRESSORS, AIR DRYERS, AIR RECEIVER TANKS, PILOT PRESSURE TANKS, AIR PLUMBING CABINETS, HYDROPNEUMATIC TANKS, EMERGENCY COOLING WATER PUMP, ALL PVC COOLING WATER SUPPLY AND DISCHARGE PIPING AND VALVES, ALL COMPRESSED AIR PIPING AND
VALVES OF ALL MATERIALS.
INSTALLATION OF AIR COMPRESSOR SYSTEMS
FOR GATE 1 AND GATE 3
INSTALLATION OF MECHANICAL EQUIPMENT INCLUDING BUT NOT LIMITED TO:
AIR COMPRESSORS, AIR DRYERS, AIR RECEIVER TANKS, OIL WATER SEPARATORS, PILOT PRESSURE TANKS, AIR PLUMBING CABINETS, HYDROPNEUMATIC TANKS, EMERGENCY COOLING WATER PUMP, PVC COOLING WATER SUPPLY PIPING AND VALVES TO AIR COMPRESSORS, PVC
COOLING WATER DISCHARGE PIPING AND VALVES, ALL COMPRESSED AIR PIPING AND VALVES.
R
EV
N O
¦R_DT¦ £RA£
-0
5-
D
M
D
IU
B A
LD
O
P.
E.
A D
D
ED
W O
R K E
X
TE
N
TS
T O
T H
E
LE
G
EN
D
A D
D
ED
N O
TE
U
N D
ER
S
U M
M A R Y
O F
W O
R K
TA
B
LE
NOTES: AREAS AND DESCRIPTIONS ARE PROVIDED FOR GENERAL SUMMARY AND ARE NOT ALL-INCLUSIVE. CONTRACTOR TO COORDINATE WITH EXISTING CONDITIONS, PLANS, SPECIFICATIONS, AND OTHER TRADES PRIOR TO BID.
11'-6"
7'-0" 15'-0"
6'-0" TYP.
6'-0"
106'-0"
6'-0"
106'-0"
TRANSFORMER VAULT
GATE 3GATE 1
EPU CABINET
EMERGENCY
COOLING
WATER SUPPLY
PUMP AND
CONTROL
ENCLOSURE
STAIRS AND 24"
WEDGE GATE VALVE
ACCESS, TYP.
HYDROPNEUMATIC TANKS
CONTINUED ON
214-D-60546
CONTINUED
ON
214-D-60546
5'-8" TYP.
NOTE 2
7'-0" TYP.
4" COMPRESSED AIR
INFLATE AND DEFLATE
LINE CAPPED AT END
CONDUIT
ROUTE
EMERGENCY
COOLING WATER
SUPPLY LINE
20'-0"
15'-0"
A 60545
60545
M A
TC
H
LIN
E
109'-0"
B 60545
NOTE 10
2" COOLING WATER LINE
2" EMERGENCY
AIR CONNECTION
Ø6'-0" SPIRAL STAIRWAY
SHAFT (NOTE 7)
M A
TC
H
LIN
E
NOTE 11
Ø6'-0" ACCESS SHAFT
(NOTE 6)
2" COOLING WATER LINE
2" EMERGENCY AIR CONNECTION
4" BLADDER DEFLATE LINE
4" BLADDER INFLATE LINE
CONDUIT ROUTE
2" SYSTEM CROSS
CONNECTION
NOTES
1. Stairs at entrance to equipment chambers to be removed, refurbished, and reinstalled.
2. Only PVC cooling water pipe replaced. Carbon steel water pipe to remain. See drawing 214-D-60532.
3. See 214-D-60543 for general notes and reference drawings.
4. Mount emergency cooling water supply pump in same location as existing pump using new mounting equipment.
5. Existing trench drain within Drum Gate Gallery not shown.
6. Access shaft is the main equipment access point. Top of access shaft at elevation 581.25'.
7. Spiral staircase is the main personnel access point.
8. Piping offset for clarity, see 214-D-60545 Section A for general piping layout.
9. Detail 1 is typical for both Gate 1 and Gate 3 equipment chambers. See drawing 214-D-60546 for equipment locations.
10. 2" cooling water line continued outside of Drum Gate Gallery.
Cooling water supply line from outlet of Friant-Kern Canal.
11. Emergency air connection routed up spiral stair shaft to top of dam. See Note 2 on drawing 214-D-60543.
DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
PEER REVIEWER
£TT£
£AT£
£AA£
£TA£
M. LAZANAS
A. WOODRUFF
D. SALINAS, P.E.
J. HAMMOND, P.E.
M. DIUBALDO, P.E.
A
LW
A
YS
T H
IN
K
S A
FE
TY
SHEET
D
C
B
A
D
C
B
A
B U
R
EA
U O
F R
EC
LA
M
A
TI
O N
U .S
D
EP
A R
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
C A D
S
YS
TE
M
A ut oC A D
4.
2S
LM
S T
EC
H
C A D
F
IL
EN
A M
E N
EW
I
N S
TA
LL
A
TI
O N
.D W
G
LA
S T
S A V
ED
D A
TE
-0 5-
LA
S T
S A V
ED
B Y
M
LA
Z A N
A S
¦D_DT¦
¦STATUS¦
C
EN
TR
A L
V A
LL
EY
P
R O
JE
C T
FR
IA
N T
D
IV
IS
IO
N
FR
IA
N T
D A M
O B
ER
M
EY
ER
C
R
ES
T G
A
TE
S C O
M
PR
ES
S O
R S
YS
TE
M R
EP
LA
C
EM
EN
T
DRUM GATE GALLERY
NEW INSTALLATION
PLAN VIEW
DENVER, CO
214-D-60544
2025-02-28
DRUM GATE GALLERY PLAN CONTINUED EL. 534.50
NOT TO SCALE
DRUM GATE GALLERY PARTIAL PLAN EL. 534.50
NOT TO SCALE
R
EV
N O
¦R_DT¦ £RA£
-0
5-
D
M
D
IU
B A
LD
O
P.
E.
A D
D
ED
C O
N D
U
IT
L
IN
E
TO
A
IR
P
LU
M B
IN
G C A B
IN
ET
F
O R G
A
TE
8'-0"
2" COOLING WATER LINE PVC
2" SYSTEM CROSS-CONNECTION ALUMINUM
4" BLADDER DEFLATE LINE ALUMINUM
4" BLADDER INFLATE LINE ALUMINUM
EMERGENCY COOLING
WATER SUPPLY PUMP
05-PMP-510
(WALL-MOUNTED)
(NOTE 3)
HYDROPNEUMATIC TANKS
05-TK-510 & 05-TK-520
LIGHTING CIRCUIT (NOTE 2)
2" EMERGENCY AIR CONNECTION ALUMINUM (SEE NOTE 2 ON 60543)
PUMP MOTOR CONDUIT
DRUM GATE OUTLETS
AND LIGHTING CONDUIT
(NOTE 2)
DRUM GATE OUTLETS
CONDUIT (NOTE 2)
2" APC, FLOW METERS,
COMPRESSOR, AIR DRYER
CONDUIT GATE #1
2" COMPRESSOR GATE #1
CONDUIT
2" APC, FLOW METERS,
COMPRESSOR, AIR DRYER
CONDUIT GATE #3
2" COMPRESSOR GATE #3
CONDUIT
4" BLADDER PRESSURE TRANSDUCER CONDUIT
COOLING WATER
SUPPLY CONTROL
ENCLOSURE
2" EMERGENCY COOLING WATER
SUPPLY LINE, CONTINUED ON
214-D-60544
4" DEFLATE LINE
4" INFLATE LINE
2" FLEX
LINE
(NOTE 5)
PG
TO BLADDER
THROUGH CORE
DRILL IN CONCRETE
2" BALL CHECK
VALVE
2" BALL
VALVE
COOLING WATER
PRESSURE SWITCHES
CONDUIT TO APC
CONTINUED ON
214-D-60546
PRESSURE
TRANSDUCER
NOTE 6
4" COOLING WATER
LINE PVC
2" COOLING WATER
4" BLADDER PRESSURE
TRANSDUCER CONDUIT
GATE #1
TO EPU
4" BLADDER PRESSURE
TRANSDUCER CONDUIT
2" EMERGENCY AIR CONNECTION
NOTES
1. See 214-D-60543 for general notes and reference drawings.
2. Existing conduit. Not in scope.
3. Mount emergency cooling water supply pump in same location as existing pump.
4. Pipe clamps and other fasteners not show for clarity.
5. Connect new piping to the existing flexible hose connection to the air bladders.
6. Trench drain routed though Drum Gate Gallery not shown.
DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
PEER REVIEWER
£TT£
£AT£
£AA£
£TA£
M. LAZANAS
A. WOODRUFF
D. SALINAS, P.E.
J. HAMMOND, P.E.
M. DIUBALDO, P.E.
A
LW
A
YS
T H
IN
K
S A
FE
TY
SHEET
D
C
B
A
D
C
B
A
B U
R
EA
U O
F R
EC
LA
M
A
TI
O N
U .S
D
EP
A R
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
C A D
S
YS
TE
M
A ut oC A D
4.
2S
LM
S T
EC
H
C A D
F
IL
EN
A M
E N
EW
I
N S
TA
LL
A
TI
O N
.D W
G
LA
S T
S A V
ED
D A
TE
-0 5-
LA
S T
S A V
ED
B Y
M
LA
Z A N
A S
¦D_DT¦
¦STATUS¦
C
EN
TR
A L
V A
LL
EY
P
R O
JE
C T
FR
IA
N T
D
IV
IS
IO
N
FR
IA
N T
D A M
O B
ER
M
EY
ER
C
R
ES
T G
A
TE
S C O
M
PR
ES
S O
R S
YS
TE
M R
EP
LA
C
EM
EN
T
DRUM GATE GALLERY
NEW INSTALLATION
SECTION VIEWS
DENVER, CO
214-D-60545
2025-02-28
DRUM GATE GALLERY SECTION
60544
A
NOT TO SCALE
INFALTE/DEFLATE MANIFOLD SECTION, TYPICAL
60544
B
NOT TO SCALE
R
EV
N O
¦R_DT¦ £RA£
-0
5-
D
M
D
IU
B A
LD
O
P.
E.
U
PD
A
TE
D A
PC
C
O N
D U
IT
S
IZ
E
TO
/2
TO
IN
C
LU
D E
FL
O
W M
ET
ER
S
C O
M
PR
ES
S O
R S A
N D
A
IR
D R
YE
R S I
N D
ES
C R
IP
TI
O
N
6" TYP.
4'-4"
2'-11"
2'-6" TYP.
1'-6"
2'-6"
Ø10"
AIR COMPRESSOR
03-C-310
AIR DRYER
03-DR-310
8'-3"
3'-0" MINUMUM
6" MIN
8'-3"
15'-0"
15'-0"
AIR COMPRESSOR
03-C-310
1'-6"
EDGE OF STAIR
PLATFORM
AIR RECIEVER
03-TK-310
AIR PLUMBING
CABINET
03-APC-300
MOTOR CONTROLLER
COMPRESSOR
DISCONNECT
SWITCH
AIR
COMPRESSOR
03-C-310
AIR
RECEIVER
03-TK-310
AIR DRYER
03-DR-310
OIL/WATER
SEPARATOR
03-U-310
D
C
PILOT PRESSURE
TANK 03-T-320
(WALL-MOUNTED)
Ø2'-6"
1'-8" 5'-11"
3'-6"
2'-2"
6'-8"
4'-0"
2'-6"
AIR PLUMBING
CABINET 03-APC-300
(FLOOR-MOUNTED)
CONTINUED FROM
214-D-60544
24" MANHOLE
AIR DRYER
DISCONNECT
SWITCH
OIL/WATER
SEPARATOR
COOLING WATER
DISCHARGE
CONTINUED ON
214-D-60544
GOOSENECK AT
TOP OF PIER
(NOTE 5) TOP OF PIER
EL. 585.00'
TOP OF SECOND
LEVEL EL. 542.75'
CONTINUED IN
DETAIL 1
EQUIPMENT CHAMBER
EL. 534.50'
PILOT PRESSURE
TANK 03-T-320
NOTE 6
TOP OF PIER EL.
585.00'
24" MANHOLE
STAIRS (NOTE 7)
NOTE 3EQUIPMENT CHAMBER
EL. 534.50'
AIR DRYER
DISCONNECT
SWITCH
COMPRESSOR
DISCONNECT
SWITCH
MOTOR
CONTROLLER
TOP OF SECOND
LEVEL EL. 542.75'
CONTINUED IN
SECTION D
12"
12"
A
LW
A
YS
T H
IN
K
S A
FE
TY
SHEET
D
C
B
A
D
C
B
A
B U
R
EA
U O
F R
EC
LA
M
A
TI
O N
U .S
D
EP
A R
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
C A D
S
YS
TE
M
A ut oC A D
4.
2S
LM
S T
EC
H
C A D
F
IL
EN
A M
E N
EW
I
N S
TA
LL
A
TI
O N
.D W
G
LA
S T
S A V
ED
D A
TE
-0 5-
LA
S T
S A V
ED
B Y
M
LA
Z A N
A S
¦D_DT¦
¦STATUS¦
C
EN
TR
A L
V A
LL
EY
P
R O
JE
C T
FR
IA
N T
D
IV
IS
IO
N
FR
IA
N T
D A M
O B
ER
M
EY
ER
C
R
ES
T G
A
TE
S C O
M
PR
ES
S O
R S
YS
TE
M R
EP
LA
C
EM
EN
T
AIR COMPRESSOR
EQUIPMENT CHAMBER
NEW INSTALLATION
DETAIL DRAWING
DENVER, CO
214-D-60546
2025-02-28
DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
PEER REVIEWER
£TT£
£AT£
£AA£
£TA£
M. LAZANAS
A. WOODRUFF
D. SALINAS, P.E.
J. HAMMOND, P.E.
M. DIUBALDO, P.E.
AIR COMPRESSOR EQUIPMENT CHAMBER
60544
NOT TO SCALE
NOTES
1. Detail is typical for both Gate 1 and 3 equipment chambers.
See drawings 214-D-60525 thru 214-D-60532 for equipment tag numbers for Gate 1.
2. Equipment dimensions shown are maximum allowable footprints. See specifications for more details.
3. Drain cooling water outlet to open trench drain. Coordinate location with COR.
4. 6" PVC Sch 40 air intake pipe with gooseneck at top of pier.
Install bird screen on gooseneck in accordance with Specifications.
5. 4" PVC Sch 40 deflate air exhaust with gooseneck at top of pier. Install bird screen on gooseneck in accordance with Specifications.
6. Air intake pipe terminates in equipment chamber with square to round duct fitting. Pipe provides makeup air to the equipment chamber space.
7. Stairs to be reinstalled after commissioning of air compressor system.
8. See 214-D-60543 for general notes and reference drawings.
EQUIPMENT CHAMBER RIGHT SIDE VIEWD NOT TO SCALE
EQUIPMENT CHAMBER LEFT SIDE VIEWC NOT TO SCALE
R
EV
N O
¦R_DT¦ £RA£
-0
5-
D
M
D
IU
B A
LD
O
P.
E.
A D
D
ED
N O
TE
C O
N D
U
IT
T O
D R
YE
R A
N D
C O
N D
U
IT
T O
C O
M
PR
ES
S O
R M
O
TO
R D
IS
C O
N N
EC
T
A N
D C
O N
TR
O
LL
ER
EPU
UPS
TROUBLE
A
SYSTEM ON
BATTERY
POWER
A
CREST
GATE 1
DEFLATE
WARNING
A
LOW
RECEIVER
PRESSURE
A
LOW PILOT
PRESSURE
A
EQUIPMENT
ERROR
A
PLC
ERROR
A
CREST
GATE 3
MAN AUTO
DEFLATE
WARNING
A
LOW
RECEIVER
PRESSURE
A
LOW PILOT
PRESSURE
A
EQUIPMENT
ERROR
A
PLC
ERROR
A
AUTO
DIALER
APC 1
INFLATE SOLENOID A
01-SV-119G
INFLATE SOLENOID B
01-SV-120G
DEFLATE SOLENOID A
01-SV-126
01-SV-127
G
DEFLATE SOLENOID B
01-SV-128
01-SV-129
G
SET PRESSURE
REGULATOR KNOB
01-PCV-114
BLADDER
PRESSURE
01-PI-103
SET PRESSURE
01-PI-102
INLET PRESSURE
01-PI-100
APC 3
INFLATE SOLENOID A
03-SV-319G
INFLATE SOLENOID B
03-SV-320G
DEFLATE SOLENOID A
03-SV-326
03-SV-327
G
DEFLATE SOLENOID B
03-SV-328
03-SV-329
G
SET PRESSURE
REGULATOR KNOB
03-PCV-314
BLADDER
PRESSURE
03-PI-303
SET PRESSURE
03-PI-302
INLET PRESSURE
03-PI-300
01-CP-100
OIT
01-APC-100
03-APC-300
CWP
05-CWP-510
START
BL
STOP
RE
RUN
R
STANDBY
G
LOW
PRESSURE
A
MOTOR
OVERLOAD
A
PIA-510 XA-510
H O A
XE-510
PIL-101 PAL-110
PIL-301 PAL-310
MAN AUTO
DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
PEER REVIEWER
£TT£
£AT£
£AA£
£TA£
DAVID SALINAS
ASHLEY WOODRUFF
ALDO ARMAS
DAVID SALINAS, P.E.
ELIZABETH MORLEY, P.E.
A
LW
A
YS
T H
IN
K
S A
FE
TY
SHEET
D
C
B
A
D
C
B
A
B U
R
EA
U O
F R
EC
LA
M
A
TI
O N
U .S
D
EP
A R
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
C A D
S
YS
TE
M
A ut oC A D
4.
2S
LM
S T
EC
H
C A D
F
IL
EN
A M
E
4- D
-6
.D
W G
LA
S T
S A V
ED
D A
TE
-0 4-
LA
S T
S A V
ED
B Y
A W
O O
D R U
FF
¦D_DT¦
¦STATUS¦
C
EN
TR
A L
V A
LL
EY
P
R O
JE
C T
FR
IA
N T
D
IV
IS
IO
N
FR
IA
N T
D A M
O B
ER
M
EY
ER
C
R
ES
T G
A
TE
S C O
M
PR
ES
S O
R S
YS
TE
M R
EP
LA
C
EM
EN
T
GATES 1 AND 3
CONTROL SYSTEM DRUM
GATE GALLERY
LAYOUT DIAGRAM
DENVER, CO
214-D-60536
2025-02-28
NOTES
1. Drawings are based on "Typical" equipment information and do not represent final design information or drawing details.
Contractor to update and complete design as required.
R
EV
N O
¦R_DT¦ £RA£
-0
5-
D
D
S A
LI
N A S
P.
E.
U
PD
A
TE
D M
A N
A
U
TO
S W
IT
C H
ES
O
N E
PU
MANUAL MODE
LOW PILOT PRESSURE
LOW RECEIVER PRESSURE
AIR DRYER RUNNING
IN
UPS TROUBLE 01-CP-100
80-132 VAC
DISCRETE INPUT
SLOT 1
IN SELECTOR SWITCH
IN AUTO HS-1101
IN LOW SOLENOID
PILOT PRESSURE 2
IN LOW RECEIVER TANK
PRESSURE PSL-1103
IN UPS STATUS ON
BATTERY 01-CP-1004
IN AIR DRYER 01-DR-110
IS RUNNING5
IN
G
G
G
R
R
R
R
RELAY
SOLENOID 01-SV-120
INFLATE
RELAY
SOLENOID 01-SV-119
INFLATE
RELAY
SOLENOID 01-SV-127
DEFLATE
RELAY
SOLENOID 01-SV-126
DEFLATE
INFLATE
INFLATE
SOLENOID 01-SV-119
DEFALTE
SOLENOID 01-SV-127
DEFLATE
SOLENOID 01-SV-126
DEFLATE
WARNING 01-CP-100
PLC ERROR 01-CP-100
EQUIPMENT
SOLENOID 01-SV-120
ERROR 01-CP-100
LOW PILOT SOLENOID
PRESSURE 01-CP-100
12-28 VDC
DISCRETE OUTPUT
SLOT 2
OUT
OUT
OUT
OUT
OUT
OUT
OUT
OUT
IN
IN
IN
IN
IN
IN
IN
IN
IN
IN
IN
IN
IN
IN
IN
IN
IN
UPS TROUBLE
UPS STATUS ON BATTERY
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
OUT
OUT
OUT
OUT
OUT
OUT
OUT
OUT
OUT
OUT
OUT
OUT
OUT
OUT
OUT
OUT
R
RECEIVER TANK LOW
PRESSURE 01-CP-100
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
XE-110
YIA-110
PIL-101
PIL-110
YE-110
YIR-111
ZO-115
ZO-114
ZO-110
ZO-111
XA-110
XA-111
XA-112
PIL-121
PIL-122
SPARE
G
RELAY
SOLENOID 01-SV-129
DEFLATE
RELAY
SOLENOID 01-SV-128
DEFLATE
DEFALTE
SOLENOID 01-SV-129
DEFLATE
SOLENOID 01-SV-128
ZO-112
ZO-113
SPARE
SPARE
SPARE
AIR DRYER ALARM
AIR DRYER 01-DR-110
ALARM/MALFUNCTION
XA-111
DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
PEER REVIEWER
£TT£
£AT£
£AA£
£TA£
DAVID SALINAS
ASHLEY WOODRUFF
ALDO ARMAS
DAVID SALINAS, P.E.
ELIZABETH MORLEY, P.E.
A
LW
A
YS
T H
IN
K
S A
FE
TY
SHEET
D
C
B
A
D
C
B
A
B U
R
EA
U O
F R
EC
LA
M
A
TI
O N
U .S
D
EP
A R
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
C A D
S
YS
TE
M
A ut oC A D
4.
2S
LM
S T
EC
H
C A D
F
IL
EN
A M
E
4- D
-6
.D
W G
LA
S T
S A V
ED
D A
TE
-0 4-
LA
S T
S A V
ED
B Y
A W
O O
D R U
FF
¦D_DT¦
¦STATUS¦
C
EN
TR
A L
V A
LL
EY
P
R O
JE
C T
FR
IA
N T
D
IV
IS
IO
N
FR
IA
N T
D A M
O B
ER
M
EY
ER
C
R
ES
T G
A
TE
S C O
M
PR
ES
S O
R S
YS
TE
M R
EP
LA
C
EM
EN
T
CONTROL SYSTEM
GATE 1 PLC I/O
SCHEMATIC
DENVER, CO
214-D-60537
2025-02-28
NOTES
1. Drawings are based on "Typical" equipment information and do not represent final design information or drawing details.
Contractor to update and complete design as required.
R
EV
N O
¦R_DT¦ £RA£
-0
5-
D
D
S A
LI
N A S
P.
E.
U
PD
A
TE
D I
N
PU
T 1, A D
D
ED
D R
YE
R S T
O I
N
PU
TS
A N
D
SLOT 3
ANALOG INPUT
FROM 24 VDC
POWER SUPPLY
BLADDER
PRESSURE A PT-111
PIR-111
SIGNAL
4-20mA
SIGNAL
4-20mA
SIGNAL
4-20mA
SIGNAL
4-20mA
SIGNAL
4-20mA
BLADDER
PRESSURE B PT-121
PIR-121
BLADDER
PRESSURE C PT-131
PIR-131
BLADDER
PRESSURE D PT-141
PIR-141
GATE
INCLINOMETER A
ZG-111
SIGNAL
4-20mA
SIGNAL
4-20mA
GATE
INCLINOMETER B
ZG-121
RESERVOIR WATER LEVEL
LT-111
SPARE
CH1
+24V
0V
CH2
CH3
CH4
CH5
CH6
CH7
CH8
CH1
+24V
0V
CH2
CH3
CH4
CH5
CH6
CH7
CH8
SLOT 4
ANALOG INPUT
FROM 24 VDC
POWER SUPPLY
SPARE
SPARE
SPARE
SPARE
SPARE
SIGNAL
4-20mA FLOW METER 01-FE-110
FIT-110
SIGNAL
4-20mA FLOW METER 01-FE-120
FIT-120
SIGNAL
4-20mA RESERVOIR WATER LEVEL
SECONDARY
LT-121
DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
PEER REVIEWER
£TT£
£AT£
£AA£
£TA£
DAVID SALINAS
ASHLEY WOODRUFF
ALDO ARMAS
DAVID SALINAS, P.E.
ELIZABETH MORLEY, P.E.
A
LW
A
YS
T H
IN
K
S A
FE
TY
SHEET
D
C
B
A
D
C
B
A
B U
R
EA
U O
F R
EC
LA
M
A
TI
O N
U .S
D
EP
A R
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
C A D
S
YS
TE
M
A ut oC A D
4.
2S
LM
S T
EC
H
C A D
F
IL
EN
A M
E
4- D
-6
.D
W G
LA
S T
S A V
ED
D A
TE
-0 4-
LA
S T
S A V
ED
B Y
A W
O O
D R U
FF
¦D_DT¦
¦STATUS¦
C
EN
TR
A L
V A
LL
EY
P
R O
JE
C T
FR
IA
N T
D
IV
IS
IO
N
FR
IA
N T
D A M
O B
ER
M
EY
ER
C
R
ES
T G
A
TE
S C O
M
PR
ES
S O
R S
YS
TE
M R
EP
LA
C
EM
EN
T
CONTROL SYSTEM
GATE 1 PLC I/O
SCHEMATIC
DENVER, CO
214-D-60538
2025-02-28
NOTES
1. Drawings are based on "Typical" equipment information and do not represent final design information or drawing details.
Contractor to update and complete design as required.
R
EV
N O
¦R_DT¦ £RA£
-0
5-
D
D
S A
LI
N A S
P.
E.
A D
D
ED
R
ES
ER
V O
IR
W
A
TE
R L
EV
EL
S A
N D
F
LO
W M
ET
ER
S
MANUAL MODE
LOW PILOT PRESSURE
LOW RECEIVER PRESSURE
IN
80-132 VAC
DISCRETE INPUT
SLOT 1
IN SELECTOR SWITCH
IN AUTO HS-1101
IN LOW SOLENOID
PILOT PRESSURE2
IN LOW RECEIVER TANK
PRESSURE 03-TK-3203
IN UPS STATUS ON
BATTERY 01-CP-1004
IN
IN
G
G
G
A
A
A
A
RELAY
SOLENOID 03-SV-320
INFLATE
RELAY
SOLENOID 03-SV-319
INFLATE
RELAY
SOLENOID 03-SV-327
DEFLATE
RELAY
SOLENOID 03-SV-326
DEFLATE
INFLATE
INFLATE
SOLENOID 03-SV-319
DEFALTE
SOLENOID 03-SV-327
DEFLATE
SOLENOID 03-SV-326
DEFLATE
WARNING 01-CP-100
PLC ERROR 01-CP-100
EQUIPMENT ERROR 01-CP-100
SOLENOID 03-SV-320
XA-312
LOW PILOT SOLENOID
PRESSURE 01-CP-100
12-28 VDC
DISCRETE OUTPUT
SLOT 2
OUT
OUT
OUT
OUT
OUT
OUT
OUT
OUT
IN
IN
IN
IN
IN
IN
IN
IN
IN
IN
IN
IN
IN
IN
IN
IN
IN
UPS TROUBLE
UPS STATUS ON BATTERY
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
OUT
OUT
OUT
OUT
OUT
OUT
OUT
OUT
OUT
OUT
OUT
OUT
OUT
OUT
OUT
OUT
A
RECEIVER TANK LOW
PRESSURE 01-CP-100
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
SPARE
UPS TROUBLE 01-CP-100
XE-310
YIA-310
PIL-301
PIL-310
YE-310
COOLING WATER LOW PRESSURE
COOLING WATER LOW
PRESSURE PSL-510
PIL-510
ZO-315
ZO-314
ZO-310
ZO-311
XA-310
XA-311
PIL-321
PIL-322
COOLING WATER PRESSURE HIGH
COOLING WATER HIGH
PRESSURE PSH-510
PIH-510
A
RELAY
SOLENOID 03-SV-329
DEFLATE
RELAY
SOLENOID 03-SV-328
DEFLATE
DEFALTE
SOLENOID 03-SV-329
DEFLATE
SOLENOID 03-SV-328
ZO-312
ZO-313
WATER PUMP
COOLING
COOLING WATER
PUMP RUN 05-CWP-510
YIR-510
A
COOLING WATER PUMP
MOTOR OVERLOAD 05-CWP-510
A
COOLING WATER PUMP
PRESSURE HIGH/LOW 05-CWP-510
XA-510
PIA-510
COOLING WATER PUMP
MOTOR OVERLOAD 05-CWP-510
IEH-510
COOLING WATER PUMP
SELECTOR SWITCH 05-CWP-510
XE-510
COOLING WATER MOTOR OVERLOAD
COOLING WATER MOTOR OVERLOAD
AIR DRYER RUNNING
AIR DRYER ALARM
AIR DRYER 03-DR-310
IS RUNNING
YIR-311
AIR DRYER 03-DR-310
ALARM/MALFUNCTION
XA-311
DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
PEER REVIEWER
£TT£
£AT£
£AA£
£TA£
DAVID SALINAS
ASHLEY WOODRUFF
ALDO ARMAS
DAVID SALINAS, P.E.
ELIZABETH MORLEY, P.E.
A
LW
A
YS
T H
IN
K
S A
FE
TY
SHEET
D
C
B
A
D
C
B
A
B U
R
EA
U O
F R
EC
LA
M
A
TI
O N
U .S
D
EP
A R
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
C A D
S
YS
TE
M
A ut oC A D
4.
2S
LM
S T
EC
H
C A D
F
IL
EN
A M
E
4- D
-6
.D
W G
LA
S T
S A V
ED
D A
TE
-0 4-
LA
S T
S A V
ED
B Y
A W
O O
D R U
FF
¦D_DT¦
¦STATUS¦
C
EN
TR
A L
V A
LL
EY
P
R O
JE
C T
FR
IA
N T
D
IV
IS
IO
N
FR
IA
N T
D A M
O B
ER
M
EY
ER
C
R
ES
T G
A
TE
S C O
M
PR
ES
S O
R S
YS
TE
M R
EP
LA
C
EM
EN
T
CONTROL SYSTEM
GATE 3 PLC I/O
SCHEMATIC
DENVER, CO
214-D-60539
2025-02-28
NOTES
1. Drawings are based on "Typical" equipment information and do not represent final design information or drawing details.
Contractor to update and complete design as required.
R
EV
N O
¦R_DT¦ £RA£
-0
5-
D
D
S A
LI
N A S
P.
E.
U
PD
A
TE
D I
N
PU
T
S W
IT
C H
A D
D
ED
A
IR
D R
YE
R
TO
I N
PU
TS
1.
SLOT 3
ANALOG INPUT
FROM 24 VDC
POWER SUPPLY
BLADDER
PRESSURE A
PIR-311
SIGNAL
4-20mA
SIGNAL
4-20mA
SIGNAL
4-20mA
SIGNAL
4-20mA
SIGNAL
4-20mA
BLADDER
PRESSURE B
PIR-321
BLADDER
PRESSURE C
PIR-331
BLADDER
PRESSURE D
PIR-341
GATE
INCLINOMETER A
ZG-311
SIGNAL
4-20mA
SIGNAL
4-20mA
GATE
INCLINOMETER B
ZG-321
RESERVOIR WATER LEVEL
LT-321
SPARE
CH1
+24V
0V
CH2
CH3
CH4
CH5
CH6
CH7
CH8
CH1
+24V
0V
CH2
CH3
CH4
CH5
CH6
CH7
CH8
SLOT 4
ANALOG INPUT
FROM 24 VDC
POWER SUPPLY
SPARE
SPARE
SPARE
SPARE
SPARESPARE
SIGNAL
4-20mA FLOW METER 03-FE-310
FIT-310
SIGNAL
4-20mA FLOW METER 03-FE-320
FIT-320
DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
PEER REVIEWER
£TT£
£AT£
£AA£
£TA£
DAVID SALINAS
ASHLEY WOODRUFF
ALDO ARMAS
DAVID SALINAS, P.E.
ELIZABETH MORLEY, P.E.
A
LW
A
YS
T H
IN
K
S A
FE
TY
SHEET
D
C
B
A
D
C
B
A
B U
R
EA
U O
F R
EC
LA
M
A
TI
O N
U .S
D
EP
A R
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
C A D
S
YS
TE
M
A ut oC A D
4.
2S
LM
S T
EC
H
C A D
F
IL
EN
A M
E
4- D
-6
.D
W G
LA
S T
S A V
ED
D A
TE
-0 4-
LA
S T
S A V
ED
B Y
A W
O O
D R U
FF
¦D_DT¦
¦STATUS¦
C
EN
TR
A L
V A
LL
EY
P
R O
JE
C T
FR
IA
N T
D
IV
IS
IO
N
FR
IA
N T
D A M
O B
ER
M
EY
ER
C
R
ES
T G
A
TE
S C O
M
PR
ES
S O
R S
YS
TE
M R
EP
LA
C
EM
EN
T
CONTROL SYSTEM
GATE 3 PLC I/O
SCHEMATIC
DENVER, CO
214-D-60540
2025-02-28
NOTES
1. Drawings are based on "Typical" equipment information and do not represent final design information or drawing details.
Contractor to update and complete design as required.
R
EV
N O
¦R_DT¦ £RA£
-0
5-
D
D
S A
LI
N A S
P.
E.
A D
D
ED
R
ES
ER
V O
IR
W
A
TE
R L
EV
EL
A N
D F
LO
W
M
ET
ER
01-PLC-110 OIT
EXISTING PANEL (NOTE 4)
ELECTRONIC PROCESSING UNIT (EPU)
MULTIMEDIA
INTERFACE
PLC
OIT
SYMBOLS
Serial cable
SERIAL
Programmable Logic Controller
Operator Interface Terminal
EXPLANATION
PLC
OIT
LEGEND
Multimedia Interface
03-PLC-310
SERIAL
DRUM GATE
SERIAL
Future CVACS
AUTO DIALER
TELEPHONE
AUTO DIALER
Existing CVACS
Telephone cable
SERIAL
03-C-310
01-C-110
DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
PEER REVIEWER
£TT£
£AT£
£AA£
£TA£
DAVID SALINAS
ASHLEY WOODRUFF
ALDO ARMAS
DAVID SALINAS, P.E.
ELIZABETH MORLEY, P.E.
A
LW
A
YS
T H
IN
K
S A
FE
TY
SHEET
D
C
B
A
D
C
B
A
B U
R
EA
U O
F R
EC
LA
M
A
TI
O N
U .S
D
EP
A R
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
C A D
S
YS
TE
M
A ut oC A D
4.
2S
LM
S T
EC
H
C A D
F
IL
EN
A M
E
4- D
-6
.D
W G
LA
S T
S A V
ED
D A
TE
-0 4-
LA
S T
S A V
ED
B Y
A W
O O
D R U
FF
¦D_DT¦
¦STATUS¦
C
EN
TR
A L
V A
LL
EY
P
R O
JE
C T
FR
IA
N T
D
IV
IS
IO
N
FR
IA
N T
D A M
O B
ER
M
EY
ER
C
R
ES
T G
A
TE
S C O
M
PR
ES
S O
R S
YS
TE
M R
EP
LA
C
EM
EN
T
CONTROL SYSTEM
NETWORK DIAGRAM
DENVER, CO
214-D-60541
2025-02-28
1. Drawings are based on "Typical" equipment information and do not represent final design information or drawing details. Contractor to update and complete design as required.
2. System I/O not shown.
3. Government furnished telephone.
4. Drum gate PLC is not part of the scope. Connection only to pass through bladder pressures, gate inclinometer, and water level information.
NOTES
R
EV
N O
¦R_DT¦ £RA£
-0
5-
D
D
S A
LI
N A S
P.
E.
A D
D
ED
C O
M
PR
ES
S O
R S A
N D
T H
EI
R S
ER
IA
L C O
N N
EC
TI
O N
DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
ADMIN APPROVAL - Materials Engineer
A
LW
A
YS
T H
IN
K
S A
FE
TY
SHEET
D
C
B
A
D
C
B
A
B U
R
EA
U O
F R
EC
LA
M
A
TI
O N
U .S
D
EP
A R
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
LAR M TA IOCE N
C A D
S
YS
TE
M
A ut oC A D
3.
0S
LM
S T
EC
H
C A D
F
IL
EN
A M
E
4- D
-6
-R
D -1
.D W
G
LA
S T
S A V
ED
D A
TE
-1 1-
LA
S T
S A V
ED
B Y
S
PR
O C H
A S K A
C
EN
TR
A L
V A
LL
EY
P
R O
JE
C T
FR
IA
N T
D
IV
IS
IO
N
FR
IA
N T
D A M
LO
C A
TI
O N
M A P
LOCATION MAP
DENVER, CO 2019-11-01
R el ea se d
DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
ADMIN APPROVAL - Materials Engineer
A
LW
A
YS
T H
IN
K
S A
FE
TY
SHEET
D
C
B
A
D
C
B
A
B U
R
EA
U O
F R
EC
LA
M
A
TI
O N
U .S
D
EP
A R
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
LAR M TA IOCE N
C A D
S
YS
TE
M
A ut oC A D
3.
0S
LM
S T
EC
H
C A D
F
IL
EN
A M
E
4- D
-6
-R
D -1
.D W
G
LA
S T
S A V
ED
D A
TE
-1 1-
LA
S T
S A V
ED
B Y
S
PR
O C H
A S K A
C
EN
TR
A L
V A
LL
EY
P
R O
JE
C T
FR
IA
N T
D
IV
IS
IO
N
FR
IA
N T
D A M
S
IT
E U
S E
PL
A N
SITE USE PLAN
DENVER, CO 2019-11-06
R el ea se
1.50"
34.00"
0.75"
.0
0"
G O
V
ER
N M
EN
T
TI
TL
E B
LO
C K
S ee
N ot e
See Note 4
Trim line, see Note 5
Trim line, see Note 5
See Note 2
0.
0.
SHEET
B U
R
EA
U O
F R
EC
LA
M
A
TI
O N
U .S
D
EP
A R
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
PR
O
JE
C T
N A M
E D
IV
IS
IO
N
CITY, STATE
PRJ-STA-SEQ
YYYY-MM-DD
NUMBER
DRAWN
ACCEPTED
BUREAU OF RECLAMATION
U.S. DEPARTMENT OF THE INTERIOR
YAKIMA PROJECT
KENNEWICK DIVISION
DRAWN
MANUFACTURER OR CONTRACTOR
ACCEPTED
TITLE
1. Government will provide contractor with an electronic AutoCAD template to be used by manufacturer for submittal of manufacturer's/contractors drawing in Government format.
2. The manufacturer's title block and drawing revisions as a result of the submittal process, may be located anywhere outside of the trim lines. The location shown on this drawing is the Government's preferred area.
3. The manufacturer shall show the Government solicitation/specification number, the manufacturer's name, drawing and sheet number in this area.
4. Government drawing number(s) will be issued at the end of the submittal process and drawing will be entered into the Government's electronic drawing system by the Government.
5. Trim lines shall be shown on all submitted drawings.
NOTES
AL
W
AY
S
TH
IN
K
SA
FE
TY
SHEET
D
C
B
A
D
C
B
A
B U
R
EA
U O
F R
EC
LA
M
A
TI
O N
U .S
D
EP
A R
TM
EN
T
O F
TH
E
IN
TE
R
IO
R
S
TA
N D
A R D
D R A W
IN
G
S
S
TA
N D
A R D
A N
D T
YP
IC
A L
D
ES
IG
N
S
G O
V
ER
N M
EN
T
D R A W
IN
G
F O
R M
A T
DRAWING BORDER,
SAMPLE TITLE BLOCK,
AND SIGNATURE LINES
DENVER, CO
40-D-7102
DESIGNED
DRAWN
CHECKED
TECH. APPR.
APPROVED
ADMIN APPROVAL -
S. NITTA
S. NITTA
D. CRAWFORD
-1 2-
D
E.
M en dl in
U
PD
A
TE
D T
IT
LE
B
LO
C K A
N D
S
IG
N A
TU
R E
LI
N
ES
-0 3-
D
B ar th el
R od ne y
J P.
E.
U
PD
A
TE
D T
IT
LE
B
LO
C K A
N D
S
IG
N A
TU
R E
LI
N
ES
-0 4-
D
U
PD
A
TE
D D
R A W
IN
G
T O
C U
R R
EN
T D
R A W
IN
G
R
EC
O R D
S S
YS
TE
M
M
IN
O R R
EV
IS
IO
N
S
1. Information Management Handbook (IMH - 2020), Chapter 2, Section 9.A.4 - "Sheet Border" and Figures G2, G3, and G4.
REFERENCE
R. BARTHEL, P.E.
R.W. LAFOND, P.E.
Re le as ed
B
C
D
5 4
3 2 1
A
B
3 2
C
D
ALWAYS THINK SAFETY
Re le as ed
LAR M TA IOCE N
el ea se
File details come from the government source that posted it. Updated .