Attachment_J2_-_Drawings_11x17.pdf

PDF 17 MB Posted

Attached to
Friant Dam Compressor System Replacement Federal contract opportunity
Solicitation number
140R2026B0002
Issued by
Department of the Interior Bureau of Reclamation

About this file

These are design and technical drawings for the Friant Dam Spillway Gate Rehabilitation and Drum Gate Gallery Air Compressor System Installation project, managed by the U.S. Bureau of Reclamation. The drawings span multiple document types including site use plans, reservoir elevation charts, piping and instrumentation diagrams, control system schematics, equipment chamber details, and electrical installation specifications.

The project encompasses comprehensive mechanical and electrical systems for Gate 1 and Gate 3 crest gate operations at Friant Dam. Key equipment includes two air compressor systems (Atlas Copco 50 HP units) with air dryers, air receiver tanks, oil/water separators, pilot pressure tanks, hydropneumatic tanks, and an emergency cooling water pump rated at 3–5 HP. The compressed air systems deliver 236 CFM at 100 PSI, while the cooling water system provides 16 GPM at 50 PSI. Piping materials include aluminum (AL 6063), copper (Type K and L), PVC Schedule 40, and HDPE for bladder inflate/deflate lines. The control system utilizes a Programmable Logic Controller (PLC) with discrete input/output modules, analog inputs for pressure transducers and gate inclinometers, and solenoid-operated control valves for gate inflation and deflation. An Electronic Processing Unit (EPU) serves as the primary control interface with manual/automatic selector switches, pressure gauges, and alarm indicators. The electrical distribution includes 480-volt three-phase power for air compressor motors, 120-volt single-phase power for cooling water pump, and 24-volt DC instrumentation power. All equipment chambers are located at elevation 534.50 feet within the Drum Gate Gallery, with conduit routing, grounding details, and cable management specifications provided throughout the technical documentation.

View the file

Other files for this federal contract opportunity

Other files attached to Friant Dam Compressor System Replacement, newest first.
File Type Posted
Amendment_0002_to_140R2026B0002_0002.pdf PDF
Sol_140R2026B0002_Amd_0002.pdf PDF
Amendment_0001_to_140R2026B0002_0001.pdf PDF
Sol_140R2026B0002_Amd_0001.pdf PDF
Attachment_J1_-_Specifications.pdf PDF
Sol_140R2026B0002.pdf PDF
Solicitation_140R2026B0002.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LEGEND

Contractor use area Roads

Water features

Contractor use area

Stilling Basin

San Joaquin River

Water Level Recorder House

Stilling Basin

San Joaquin River Outlets

Friant-Kern CanalRoadway gate Restrooms

Guard house

Parking area

Exhibit building

Bureau Rd

Millerton Rd

Millerton Rd

Millerton Lake

Flow

Crest Gate

Staging area access route

Roadway gate

Roadway gate

Dam wall Friant-Kern Canal Outlet

Work Area

Crest Gate

A

LW

A

YS

T H

IN

K

S A

FE

TY

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

C A D

S

YS

TE

M

A ut oC A D

4.

2S

LM

S T

EC

H

C A D

F

IL

EN

A M

E

4- D

-6

S

IT

E U

S E

PL

A N

.D W

G

LA

S T

S A V

ED

D A

TE

-0 2-

LA

S T

S A V

ED

B Y

M

LA

Z A N

A S

¦D_DT¦

¦STATUS¦

C

EN

TR

A L

V A

LL

EY

P

R O

JE

C T

FR

IA

N T

D

IV

IS

IO

N

FR

IA

N T

D A M

O B

ER

M

EY

ER

C

R

ES

T G

A

TE

S C O

M

PR

ES

S O

R S

YS

TE

M R

EP

LA

C

EM

EN

T

SITE USE PLAN

DENVER, CO

214-D-60533

2025-02-28

DESIGNED

DRAWN

CHECKED

TECH. APPR.

APPROVED

PEER REVIEW

£TT£

£AT£

£AA£

£TA£

M. LAZANAS

M. LAZANAS

D. SALINAS, P.E.

J. HAMMOND, P.E.

M. DIUBALDO, P.E.

Digitally signed by Jeremy Hammond, P.E.

Date: 2025.02.28 11:21:27 -07'00'

A

LW

A

YS

T H

IN

K

S A

FE

TY

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

C A D

S

YS

TE

M

A ut oC A D

4.

2S

LM

S T

EC

H

C A D

F

IL

EN

A M

E

4- D

-6

R

ES

E L

T O

7.

D

W G

LA

S T

S A V

ED

D A

TE

-0 2-

LA

S T

S A V

ED

B Y

M

LA

Z A N

A S

¦D_DT¦

¦STATUS¦

C

EN

TR

A L

V A

LL

EY

P

R O

JE

C T

FR

IA

N T

D

IV

IS

IO

N

FR

IA

N T

D A M

O B

ER

M

EY

ER

C

R

ES

T G

A

TE

S C O

M

PR

ES

S O

R S

YS

TE

M R

EP

LA

C

EM

EN

T

RESERVOIR

OPERATIONS

RESERVOIR

ELEVATIONS

2012 - 2017

DENVER, CO

214-D-60534

2025-02-28

DESIGNED

DRAWN

CHECKED

TECH. APPR.

APPROVED

PEER REVIEW

£TT£

£AT£

£AA£

£TA£

M. LAZANAS

M. LAZANAS

D. SALINAS, P.E.

J. HAMMOND, P.E.

M. DIUBALDO, P.E.

Digitally signed by Jeremy

Date: 2025.02.28 11:21:34 -07'00'

A

YS

T H

IN

K

S A

FE

TY

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

C A D

S

YS

TE

M

A ut oC A D

4.

2S

LM

S T

EC

H

C A D

F

IL

EN

A M

E

4- D

-6

R

ES

E L

T O

3.

D

W G

LA

S T

S A V

ED

D A

TE

-0 2-

LA

S T

S A V

ED

B Y

M

LA

Z A N

A S

¦D_DT¦

¦STATUS¦

C

EN

TR

A L

V A

LL

EY

P

R O

JE

C T

FR

IA

N T

D

IV

IS

IO

N

FR

IA

N T

D A M

O B

ER

M

EY

ER

C

R

ES

T G

A

TE

S C O

M

PR

ES

S O

R S

YS

TE

M R

EP

LA

C

EM

EN

T

RESERVOIR

OPERATIONS

RESERVOIR

ELEVATIONS

2018 - 2023

DENVER, CO

214-D-60535

2025-02-28

DESIGNED

DRAWN

CHECKED

TECH. APPR.

APPROVED

PEER REVIEW

£TT£

£AT£

£AA£

£TA£

M. LAZANAS

M. LAZANAS

D. SALINAS, P.E.

J. HAMMOND, P.E.

M. DIUBALDO, P.E.

Digitally signed by Jeremy

Date: 2025.02.28 11:21:42 -07'00'

PI

Control Valve/Instrument Identification(Type) Instrument Tag/Loop Identification Number

TYPICAL TAG NUMBERS,

TAGGING STANDARD &

DESIGNATION

XXX

XXX

INSTRUMENTATION

OFF-PAGE CONNECTOR

Connector Number Service Code

Drawing Number

Origin/Destination

EQUIPMENT

Equipment Tag/Loop Identification Number

##-XX-###

Area Designation Equipment Type

VALVES

Valve System & Identification Number

##-XXX-##

Valve Type Area Designation

PIPE

Class or Specification

XX-XX-XXX

Optional Tag

Tag/Loop Identification Number Type Area Designation

Line Service

INSTRUMENT AND FUNCTION IDENTIFICATION

Letter Column 1 Column 2 Column 3 Column 4 Column 5

Measuring/Initiating Variable Variable Modifier Readout/Passive Function Output/Active Function Function Modifier

A Analysis Alarm

B Burner, Combustion Users Choice Users Choice Users Choice

C Users Choice Control Close

D Users Choice Difference,Differential Deviation

E Voltage Sensor, Primary Element

F Flow, Flow Rate Ratio

G Users Choice Glass, Gauge, Viewing Device

H Hand High

I Current Indicate

J Power Scan

K Time, Schedule Time Rate of Change Control Station

L Level Light Low

M Users Choice Middle, Intermediate

N Users Choice Users Choice Users Choice Users Choice

O Users Choice Orifice, Restriction Open

P Pressure Point (Test Connection)

Q Quantity Integrate, Totalize Integrate, Totalize

R Radiation Record Run

S Speed, Frequency Safety Switch Stop

T Temperature Transmit

U Multivariable Multifunction Multifunction

V Vibration, Mechanical Analysis Valve, Damper, Louver

W Weight, Force Well, Probe

X Unclassified X-axis Accessory Devices, Unclassified Unclassified Unclassified

Y Event State, Presence Y-axis Auxiliary Device

Z Position, Dimension Z-axis, Safety Instrument System Driver, Actuator, Unclassified final control element

INSTRUMENTATION DEVICE AND FUNCTION SYMBOLS

Shared

Display & Control System

Programmable Logic

Controller

Computer System and Software

Discrete Instrument

Location and Accessibility

Located in field

Not panel, cabinet, or console mounted

Visible at field location

Normally operator accessible

Located in or on front of central or main panel or console

Visible on front of panel or on video display

Normally operator accessible at panel front or console

Located in rear of central or main panel

Located in cabinet behind panel

Not visible on front of panel or on video display

Not normally operator accessible at panel or console

Located in or on front of secondary or local panel or console

Visible on front of panel or on video display

Normally operator accessible at panel front or console

Located in rear of secondary or local panel

Located in field cabinet

Not visible on front of panel or on video display

Not normally operator accessible at panel or console

Interlock or control function

I Undefined Interlock

PLC Function

Pilot Light or Gauge Glass Illuminator

Dual Function or Instruments sharing common housing

##-XXX

LINESTYLES

Linetype Function

Pipeline

Existing Pipeline

Instrument Supply

Electrical Signal

Pneumatic Signal

Skid / Supplier Boundary

Capillary Tube

Hydraulic Signal

Data / Software Communication

Mechanical Link

TAGGING SCHEME

AAA-EQUIP-BBB

PROCESS AAA BBB

COMPRESSED AIR - GATE 1 01 100

COMPRESSED AIR - GATE 3 03 300

COOLING WATER SYSTEM 05 500

A

LW

A

YS

T H

IN

K

S A

FE

TY

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

C A D

S

YS

TE

M

A ut oC A D

4.

2S

LM

S T

EC

H

C A D

F

IL

EN

A M

E

5.

D W

G

LA

S T

S A V

ED

D A

TE

-0 2-

LA

S T

S A V

ED

B Y

M

LA

Z A N

A S

C

EN

TR

A L

V A

LL

EY

P

R O

JE

C T

FR

IA

N T

D

IV

IS

IO

N

FR

IA

N T

D A M

O B

ER

M

EY

ER

C

R

ES

T G

A

TE

S C O

M

PR

ES

S O

R S

YS

TE

M R

EP

LA

C

EM

EN

T

PIPING AND

INSTRUMENTATION

DIAGRAM

LEGEND

DENVER, CO

214-D-60525

2025-02-28

DESIGNED

DRAWN

CHECKED

TECH. APPR.

APPROVED

PEER REVIEW

M. LAZANAS

A. WOODRUFF

D. SALINAS, P.E.

M. DIUBALDO, P.E.

E. MORLEY, P.E.

NOTES

1. Equipment and instrumentation symbols are based on ANSI/ISA and PIP standards.

A

YS

T H

IN

K

S A

FE

TY

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

C A D

S

YS

TE

M

A ut oC A D

4.

2S

LM

S T

EC

H

C A D

F

IL

EN

A M

E

6.

D W

G

LA

S T

S A V

ED

D A

TE

-0 2-

LA

S T

S A V

ED

B Y

M

LA

Z A N

A S

C

EN

TR

A L

V A

LL

EY

P

R O

JE

C T

FR

IA

N T

D

IV

IS

IO

N

FR

IA

N T

D A M

O B

ER

M

EY

ER

C

R

ES

T G

A

TE

S C O

M

PR

ES

S O

R S

YS

TE

M R

EP

LA

C

EM

EN

T

PIPING AND

INSTRUMENTATION

DIAGRAM

SYMBOLS AND

ABBREVIATIONS

DENVER, CO

214-D-60526

2025-02-28

DESIGNED

DRAWN

CHECKED

TECH. APPR.

APPROVED

PEER REVIEW

M. LAZANAS

A. WOODRUFF

D. SALINAS, P.E.

M. DIUBALDO, P.E.

E. MORLEY, P.E.

VALVE SYMBOLS

Symbol Description

Ball Valve

General Valve

Check Valve

Ball Check Valve

Control Valve

Pressure Relief Valve

Zero-Loss Drain Valve

Three Way Valve

CONTROL VALVE

ACTUATOR SYMBOLS

Symbol Description

Pilot Operated Relief Valve

Pressure Reducing Regulator

Pressure Reducing Regulator with External Tap

Back Pressure Regulator

Back Pressure Regulator with External Tap

Differential Pressure Reducing

Regulator

Pressure Reducing Regulator with Integral Outlet

Automatic Float Drain Valve

Handwheel/Manual Actuator

Diaphragm Actuator - Spring Return Actuator

Pressure Balanced Diaphragm Actuator

Diaphragm Actuator

Throttling Actuator

Spring Actuator

Motor Actuator

Solenoid Actuator

Electro-Hydraulic Actuator

Digital Actuator

Solenoid Actuator with Remote Reset

MECHANICAL COMPONENTS

Symbol Description

Reducer

Air Receiver Tank

Blind Flange

Centrifugal Pump

Coalescing Filter

Rotary Screw Compressor with Motor

Mass Flow Meter

Oil/Water Separator

Open Drain

Particulate Filter

Y-Strainer

Refrigerated Air Dryer

Flex Hose Clamp

FC Fail Closed

FO Fail Open

Camlock Fitting

LINE SERVICE CODES

ATM Atmospheric Air

CA Compressed Air

CW Cooling Water

CWDR Cooling Water Drain

DR Condensate Drain

EQUIPMENT TYPE

ADV Automatic Drain Valve PCV Pressure Control Valve

BCV Ball Check Valve PMP Pump

BV Ball Valve PRV Pressure Relief Valve

C Compressor PSV Pressure Safety Valve

CV Check Valve SV Solenoid Valve

DR Air Dryer TK Tank

FE Flow Element U Miscellaneous Equipment

FIL Filter

HTR Heater

COMPRESSOR

COMPRESSOR

AIR DRYER

AIR DRYER

AIR RECEIVER

AIR RECEIVER

AIR

PLUMBING

CABINET

AIR

PLUMBING

CABINET

System Flow Pressure Compressed Air 230 SCFM 100 PSI

Cooling Water 16 GPM 50 PSI

A

LW

A

YS

T H

IN

K

S A

FE

TY

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

C A D

S

YS

TE

M

A ut oC A D

4.

2S

LM

S T

EC

H

C A D

F

IL

EN

A M

E

7.

D W

G

LA

S T

S A V

ED

D A

TE

-0 2-

LA

S T

S A V

ED

B Y

A W

O O

D R U

FF

C

EN

TR

A L

V A

LL

EY

P

R O

JE

C T

FR

IA

N T

D

IV

IS

IO

N

FR

IA

N T

D A M

O B

ER

M

EY

ER

C

R

ES

T G

A

TE

S C O

M

PR

ES

S O

R S

YS

TE

M R

EP

LA

C

EM

EN

T

PIPING AND

INSTRUMENTATION

DIAGRAM

PROCESS FLOW

DIAGRAM

DENVER, CO

214-D-60527

2025-02-28

DESIGNED

DRAWN

CHECKED

TECH. APPR.

APPROVED

PEER REVIEW

M. LAZANAS

A. WOODRUFF

D. SALINAS, P.E.

M. DIUBALDO, P.E.

E. MORLEY, P.E.

NOTES

1. Process Flow Diagram does not show emergency cooling water supply system.

See drawing 214-D-60532 for cooling water systems.

2. Process Flow Diagram is diagrammatic only and shows the flow of compressed air from the compressors to the bladders for Gates 1 and 3.

PDI

PDI

Emergency Compressor Connection From Top of Dam

DRAIN

A .

CA

GATE 1 DISTRIBUTION

B .

CA

GATE 3 AIR SYSTEM

01-C-110

01-DR-110

-T

K -1

01-FIL-110 01-FIL-120

01-U-110

01-FE-110

D .

CW

COOLING WATER SUPPLY

60532

60529

60530

C .

CA

EMERGENCY AIR CONNECTION

60530

1 1/2"

01-BV-100

1/

2"

-B

V -1

1 1/2"

01-BV-101

1 1/2"

01-BV-102

1 1/2"

01-BV-104

1 1/2"

01-BV-105

1 1/2"

01-BV-106

01-PSV-111

-A

D V -1

1/ 2"

-B

V -1

-A

D V -1

1/ 2"

-A

D V -1

1/ 2"1/

2"

PI

FI

1 1/2"-AL 6063-CA

1/

2" -A

L

-C

A

1 1/2"-AL 6063-CA

1 1/2"-AL 6063-CA 1 1/2"-AL 6063-CA

1/

2" -A

L

-C

A

1/2"-CU Type L-DR

1/ 2"

-C U

T yp e L-

D R

1/ 2"

-C U

T yp e L-

D R

1/ 2"

-C U

T yp e L-

D R

1/2"-CU Type L-DR

01-CP-100

01-PLC-110

YIR

PI

YR

PT

1 1/2"

01-BV-107

1 1/2"-AL 6063-CA

1" x1

/2

1"-CU Type L-CWDR

1" -P

V C S ch

0- C W

1"

-B

V -1

1"

-B

V -1

ELECTRONIC PROCESSING UNIT (EPU)

PS

PIL

ATM

YIR

XA

FI

HS

YIA

XE

XA

YR

XE

FT

A

LW

A

YS

T H

IN

K

S A

FE

TY

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

C A D

S

YS

TE

M

A ut oC A D

4.

2S

LM

S T

EC

H

C A D

F

IL

EN

A M

E

8.

D W

G

LA

S T

S A V

ED

D A

TE

-0 5-

LA

S T

S A V

ED

B Y

M

LA

Z A N

A S

C

EN

TR

A L

V A

LL

EY

P

R O

JE

C T

FR

IA

N T

D

IV

IS

IO

N

FR

IA

N T

D A M

O B

ER

M

EY

ER

C

R

ES

T G

A

TE

S C O

M

PR

ES

S O

R S

YS

TE

M R

EP

LA

C

EM

EN

T

PIPING AND

INSTRUMENTATION

DIAGRAM

GATE 1

COMPRESSED

AIR SYSTEM

DENVER, CO

214-D-60528

2025-02-28

DESIGNED

DRAWN

CHECKED

TECH. APPR.

APPROVED

PEER REVIEW

M. LAZANAS

A. WOODRUFF

D. SALINAS, P.E.

M. DIUBALDO, P.E.

E. MORLEY, P.E.

NOTES

1. All electrical instruments and signals are in area 01 unless otherwise noted.

R

EV

N O

-0 5-

D

M

D

IU

B A

LD

O

P.

E

A D

D

ED

S

EV

ER

A L

S

IG

N A

LS

T O

T H

E

PL

C

A H

A N

D S

W

IT

C H

A N

D S

EV

ER

A L

S

IG

N A

LS

F R O

M

TH

E C O

M

PR

ES

S O

R A

N D

D R

YE

R

DEFLATE EXHAUST TO

PIER, ATMOSPHERE

S

S

S S

S S

PT

PI

PT

PI

PT

PI

PT

PI

PI

PSL

BLADDER A

BLADDER B

BLADDER C

BLADDER D

PI

Service Air Connection, Typ.

-T

K -1

01-FE-120

60528

60531

60531

BIDIRECTIONAL FLOW

BIDIRECTIONAL FLOW

PI

01-PCV-113

01-PCV-114

5/ 8"

-B

C V -1

1" x5

/8

1 1/2"

01-BV-116

01-PRV-117

1 1/2"

01-BV-118

01-SV-119

01-SV-120

1 1/2"

01-BV-121

1 1/2"

01-BV-122

01-PRV-123

1/

2"

-B

V -1

-S

V -1

-S V -1

-S

V -1

-S V -1

1/

2"

-B

V -1

1/

2"

-B

V -1

01-PRV-124

1"

-B

V -1

3/ 4"

-B

V -1

2"

01-BCV-134

4" x1

/2

2"

01-BCV-135

2"

01-BCV-136

2"

01-BCV-137

2"

01-BCV-138

2"

01-BCV-139

2"

01-BCV-140

2"

01-BCV-141

2"

01-BV-142

2"

01-BV-143

2"

01-BV-144

2"

01-BV-145

3/ 4"

-B

V -1

3/ 4"

-B

V -1

3/ 4"

-B

V -1

3/ 4"

-B

V -1

1 1/2"

01-BV-146

1 1/2"

01-BV-147

4"x1 1/2" 1 1/2"x4"

4"x1 1/2" 1 1/2"x4"

FI

1 1/2"-CU Type K-ATM

CU Type K AL 6063

CU Type K AL 6063

1/

2" -C

U T yp e

K -C

A

1 1/2"-AL 6063-CA

2"-AL 6063-CA

2"-AL 6063-CA

2"-AL 6063-CA

2"-AL 6063-ATM

2"-AL 6063-CA

2"-AL 6063-CA

2"-AL 6063-CA

2"-AL 6063-CA

4" -A

L

-C

A

4" -A

L

-C

A

1 1/2"-CU Type K-CA

1 1/2"-CU Type K-CA 1 1/2"x4"

1" -A

L

-C

A 5/

8" -C

U T yp e

K -C

A

CU Type K AL 6063

1 1/2"-AL 6063-CA

01-CP-100

01-PLC-110

PIL

PIR

PIR

PIR

PIR

ZO

ZO

01-SV-126

01-SV-127

ZO-110

PT-141PT-131

PI

ELECTRONIC PROCESSING UNIT (EPU)

ZO

ZO

ZOL

ZO-111

ZOL

ZO

01-SV-128

01-SV-129

ZOL

ZO-112

ZO-113

ZO

ZOL

115112/113110/111

PIR-131

PIR-141

AL 6063 CU Type K

AL 6063 PVC Sch 40

A L

C U

T yp e K

FC

FC

FC

FC FC

FC

4"-PVC Sch 40-ATM

A .

CA

GATE 1 COMPRESSOR

F .

CA

INFLATE LINE GATE 3

G .

CA

DEFLATE LINE GATE 3

FI

FT

A

LW

A

YS

T H

IN

K

S A

FE

TY

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

C A D

S

YS

TE

M

A ut oC A D

4.

2S

LM

S T

EC

H

C A D

F

IL

EN

A M

E

9.

D W

G

LA

S T

S A V

ED

D A

TE

-0 5-

LA

S T

S A V

ED

B Y

M

LA

Z A N

A S

C

EN

TR

A L

V A

LL

EY

P

R O

JE

C T

FR

IA

N T

D

IV

IS

IO

N

FR

IA

N T

D A M

O B

ER

M

EY

ER

C

R

ES

T G

A

TE

S C O

M

PR

ES

S O

R S

YS

TE

M R

EP

LA

C

EM

EN

T

PIPING AND

INSTRUMENTATION

DIAGRAM

GATE 1

AIR

DISTRIBUTION

DENVER, CO

214-D-60529

2025-02-28

DESIGNED

DRAWN

CHECKED

TECH. APPR.

APPROVED

PEER REVIEW

M. LAZANAS

A. WOODRUFF

D. SALINAS, P.E.

M. DIUBALDO, P.E.

E. MORLEY, P.E.

01-APC-100

NOTES

1. Piping within Air Plumbing Cabinet is Copper

Type K.

2. Connection fitting to Bladders not shown.

3. Existing pipe shown represents flex hose connection to air bladders. This flex hose connection is not being replaced.

4. All electrical instruments and signals are in area 01 unless otherwise noted.

R

EV

N O

-0 5-

D

M

D

IU

B A

LD

O

P.

E.

A D

D

ED

F I-

0.

PDI

PDI

DRAIN

H .

CA

GATE 3 DISTRIBUTION

E .

CW

COOLING WATER

B .

CA

GATE 1 AIR TANK

03-C-310

03-FIL-310

03-DR-310

03-FIL-320

-T

K -3

03-FE-310

03-U-310

60528

60532

60531

60528

1/

2"

-B

V -3

1 1/2"

01-BV-301

1 1/2"

03-BV-302

1 1/2"

03-BV-303

1 1/2"

03-BV-304

1 1/2"

03-BV-305

PI

1 1/2"

03-BV-306

FI

03-PSV-310

-A

D V -3

-A

D V -3

1 1/2"-AL 6063-CA

1 1/2"-AL 6063-CA

1 1/2"-AL 6063-CA 1 1/2"-AL 6063-CA

1 1/2"-AL 6063-CA

1 1/2"-AL 6063-CA

1/2"-CU Type L-DR

1/ 2"

-C U

T yp e L-

D R

1/ 2"

-B

V -3

1/ 2"

-C U

T yp e L-

D R

1/ 2"

-C U

T yp e L-

D R

-A

D V -3

1/2"-CU Type L-DR

YIR

PI

YR

PT

1 1/2"

03-BV-307

1"

-B

V -3

1"

-B

V -3

1" -P

V C S ch

0- C W

1" x1

/2

1"-CU Type L-CWDR

PS

PIL

ATM

XA

YIR

FI

XA

01-PLC-310

01-CP-100

ELECTRONIC PROCESSING UNIT (EPU)

XE

YR

XE

YIA

HS

FT

A

LW

A

YS

T H

IN

K

S A

FE

TY

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

C A D

S

YS

TE

M

A ut oC A D

4.

2S

LM

S T

EC

H

C A D

F

IL

EN

A M

E

0.

D W

G

LA

S T

S A V

ED

D A

TE

-0 5-

LA

S T

S A V

ED

B Y

A W

O O

D R U

FF

C

EN

TR

A L

V A

LL

EY

P

R O

JE

C T

FR

IA

N T

D

IV

IS

IO

N

FR

IA

N T

D A M

O B

ER

M

EY

ER

C

R

ES

T G

A

TE

S C O

M

PR

ES

S O

R S

YS

TE

M R

EP

LA

C

EM

EN

T

PIPING AND

INSTRUMENTATION

DIAGRAM

GATE 3

COMPRESSED

AIR SYSTEM

DENVER, CO

214-D-60530

2025-02-28

DESIGNED

DRAWN

CHECKED

TECH. APPR.

APPROVED

PEER REVIEW

M. LAZANAS

A. WOODRUFF

D. SALINAS, P.E.

M. DIUBALDO, P.E.

E. MORLEY, P.E.

NOTES

1. All electrical instruments and signals are in area 03 unless otherwise noted.

R

EV

N O

-0 5-

D

M

D

IU

B A

LD

O

P.

E

A D

D

ED

S

EV

ER

A L

S

IG

N A

LS

T O

T H

E

PL

C

A H

A N

D S

W

IT

C H

A N

D S

EV

ER

A L

S

IG

N A

LS

F R O

M

TH

E C O

M

PR

ES

S O

R A

N D

D R

YE

DEFLATE EXHAUST TO

PIER, ATMOPSHERIC

S

S

S S

S S

PT

PI

PT

PI

PT

PI

PT

PI

PI

PSL

BLADDER A

BLADDER B

BLADDER C

BLADDER D

PI

Service Air Connection, Typ.

F .

CA

INFLATE LINE GATE 1

G .

CA

DEFLATE LINE GATE 1

-T

K -3

03-FE-320

60530

60529

60529

BIDIRECTIONAL FLOW

BIDIRECTIONAL FLOW

1"

-B

V -3

PI

03-PCV-313

03-PCV-314

5/ 8"

-B

C V -3

1 1/2"

03-BV-316

03-PSV-317

1 1/2"

03-BV-318

03-SV-319

03-SV-320

1 1/2"

03-BV-321

FI

1 1/2"

03-BV-322

03-PRV-323

03-PRV-324

1/

2"

-B

V -3

-S

V -3

-S V -3

-S

V -3

-S V -3

1/

2"

-B

V -3

1/

2"

-B

V -3

4" x1

/2

2"

03-BCV-334

2"

03-BCV-335

2"

03-BCV-336

2"

03-BCV-337

2"

03-BCV-338

2"

03-BCV-339

2"

03-BCV-340

2"

03-BCV-341

2"

03-BV-342

2"

03-BV-343

2"

03-BV-344

2"

03-BV-345

3/ 4"

-B

V -3

3/ 4"

-B

V -3

3/ 4"

-B

V -3

3/ 4"

-B

V -3

CU Type K AL 6063

CU Type K AL 6063

CU Type K AL 6063

5/ 8"

-C U

T yp e K -C

A

1 1/2"-CU Type K-CA

1/

2" -A

L

-C

A

1 1/2"-CU Type K-CA 1 1/2"-AL 6063-CA

1 1/2"-CU Type K-CA

1/

2" -C

U T yp e

K -C

A

1 1/2"-CU Type K-CA

4"-AL 6063-CA

4"-AL 6063-CA

1 1/2"x4"

2"-AL 6063-CA

2"-AL 6063-CA

2"-AL 6063-CA

2"-AL 6063-ATM

2"-AL 6063-CA

2"-AL 6063-CA

2"-AL 6063-CA

2"-AL 6063-CA

4" -A

L

-C

A

4" -A

L

-C

A

01-CP-100

03-PLC-310

PIL

PIR

PIR

PIR

PIR

ZO

ZO

PT-331 PT-341

PI

3/ 4"

-B

V -3

ELECTRONIC PROCESSING UNIT (EPU)

01-SV-326

01-SV-327

ZOLZOL

314 310/311

ZO

ZO

ZO-310

ZO-311

ZO

01-SV-328

01-SV-329

ZOL

312/313

ZO

ZOL

ZO-312

ZO-313

PIR-331

PIR-341

AL 6063 CU Type K

AL 6063 PVC Sch 40

1" x5

/8

1" -A

L

-A

TM

A L

C U

T yp e K

4"-PVC Sch 40-ATM

FC

FC

FC

FC

FC

FC

H .

CA

GATE 3 COMPRESSOR

FI

FT

1 1/2"-AL 6063-CA

A

LW

A

YS

T H

IN

K

S A

FE

TY

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

C A D

S

YS

TE

M

A ut oC A D

4.

2S

LM

S T

EC

H

C A D

F

IL

EN

A M

E

1.

D W

G

LA

S T

S A V

ED

D A

TE

-0 5-

LA

S T

S A V

ED

B Y

M

LA

Z A N

A S

C

EN

TR

A L

V A

LL

EY

P

R O

JE

C T

FR

IA

N T

D

IV

IS

IO

N

FR

IA

N T

D A M

O B

ER

M

EY

ER

C

R

ES

T G

A

TE

S C O

M

PR

ES

S O

R S

YS

TE

M R

EP

LA

C

EM

EN

T

PIPING AND

INSTRUMENTATION

DIAGRAM

GATE 3

AIR

DISTRIBUTION

DENVER, CO

214-D-60531

2025-02-28

DESIGNED

DRAWN

CHECKED

TECH. APPR.

APPROVED

PEER REVIEW

M. LAZANAS

A. WOODRUFF

D. SALINAS, P.E.

M. DIUBALDO, P.E.

E. MORLEY, P.E.

03-APC-300

NOTES

1. Piping within Air Plumbing Cabinet is Copper

Type K.

2. Connection fitting to Bladders not shown.

3. All electrical instruments and signals are in area 03 unless otherwise noted.

R

EV

N O

-0 5-

D

M

D

IU

B A

LD

O

P.

E.

A D

D

ED

F I-

0.

E .

CW

GATE 3 COMPRESSOR

PI

PSL

CS PVC

PI

05-TK-510 05-TK-520

05-PMP-510

EMERGENCY COOLING

WATER SUPPLY

MAIN COOLING WATER

SUPPLY D .

CW

GATE 1 COMPRESSOR

60528

60530

BIDIRECTIONAL FLOW

2"

05-CV-500

3/ 4"

-B

V -5

1 1/4"

05-BV-502

1 1/4"

05-BV-503

2"x1"

2"x1"

1/

4" -P

V C S ch

0- C W

2"-PVC Sch 40-CW

1 1/4"-PVC Sch 40-CW

2" -P

V C S ch

0- C W

1"-PVC Sch 40-CW

1"-PVC Sch 40-CW

01-CP-100

03-PLC-310

PIL

1/ 2" x1

/4

05-PSV-507

1/2"

05-BV-504

PSH

2"-CS Sch 40-CW 2"

05-BV-508

1 1/4"

05-CV-505

2"

05-BV-506

CS PVC

PIH

YIR

3/4"-PVC Sch 40-CW

ELECTRONIC PROCESSING UNIT (EPU)

IEH

2"-PVC Sch 40-CW

A

LW

A

YS

T H

IN

K

S A

FE

TY

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

C A D

S

YS

TE

M

A ut oC A D

4.

2S

LM

S T

EC

H

C A D

F

IL

EN

A M

E

2.

D W

G

LA

S T

S A V

ED

D A

TE

-0 2-

LA

S T

S A V

ED

B Y

M

LA

Z A N

A S

C

EN

TR

A L

V A

LL

EY

P

R O

JE

C T

FR

IA

N T

D

IV

IS

IO

N

FR

IA

N T

D A M

O B

ER

M

EY

ER

C

R

ES

T G

A

TE

S C O

M

PR

ES

S O

R S

YS

TE

M R

EP

LA

C

EM

EN

T

PIPING AND

INSTRUMENTATION

DIAGRAM

COOLING

WATER SYSTEM

DENVER, CO

214-D-60532

2025-02-28

DESIGNED

DRAWN

CHECKED

TECH. APPR.

APPROVED

PEER REVIEW

M. LAZANAS

A. WOODRUFF

D. SALINAS, P.E.

M. DIUBALDO, P.E.

E. MORLEY, P.E.

NOTES

1. Cooling water piping replacement of PVC pipe only, beginning at locations where piping transitions from carbon steel to PVC.

2. Main cooling water supply outlet pipe material transition occurs where pipe enters the Drum Gate Gallery at outlet of isolation valve 05-BV-508.

3. Existing carbon steel pipe is not being replaced.

4. All electrical instruments and signals are in area 05 unless otherwise noted.

11'-6"

6'-0"

7'-0" 15'-0"

6'-0" TYP.

6'-0"

100'-0"

6'-0"

100'-0"

TRANSFORMER VAULT

GATE 3GATE 1

EPU CABINET

EMERGENCY

COOLING WATER

SUPPLY PUMP

AND CONTROL

ENCLOSURE

STAIRS AND 24"

WEDGE GATE VALVE

ACCESS, TYP.

HYDROPNEUMATIC TANKS

5'-8" TYP.

NOTE 4

7'-0" TYP.

4" COMPRESSED

AIR INFLATE AND

DEFLATE LINE

CAPPED AT END

CONDUIT

ROUTE

60550

20'-0"

15'-0"

C 60549

D 60549

60550

CONTINUED ON

214-D-60546

CONTINUED

ON

214-D-60546

109'-0"

M A

TC

H

LIN

E

M A

TC

H

LIN

E

2" COOLING

WATER LINE

Ø6'-0" SPIRAL

STAIRWAY SHAFT

Ø6'-0" ACCESS SHAFT

CONDUIT ROUTE

2" COOLING WATER LINE

4" BLADDER DEFLATE LINE

4" BLADDER INFLATE LINE

2" SYSTEM CROSS

CONNECTION

NOTE 7

NOTES

1. This drawing must be printed in color. Demolition limits shown in green.

2. Stairs at entrance to equipment chambers to be removed, refurbished, and reinstalled.

3. All air piping within the equipment chambers is 11

2" aluminum.

All condensate drain line is 12" copper tubing.

4. Only PVC cooling water pipe replaced. Carbon steel water pipe to remain. See drawing 214-D-60532.

5. See 214-D-60543 for general notes and reference drawings.

6. Existing trench drain within Drum Gate Gallery not shown.

7. 2" cooling water line continued outside of Drum Gate Gallery.

Cooling water supply line from outlet of Friant-Kern Canal.

DESIGNED

DRAWN

CHECKED

TECH. APPR.

APPROVED

PEER REVIEWER

£TT£

£AT£

£AA£

£TA£

M. LAZANAS

A. WOODRUFF

D. SALINAS, P.E.

J. HAMMOND, P.E.

M. DIUBALDO, P.E.

A

LW

A

YS

T H

IN

K

S A

FE

TY

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

C A D

S

YS

TE

M

A ut oC A D

4.

2S

LM

S T

EC

H

C A D

F

IL

EN

A M

E

FR

IA

N

T D

EM

O

.D W

G

LA

S T

S A V

ED

D A

TE

-0 2-

LA

S T

S A V

ED

B Y

M

LA

Z A N

A S

¦D_DT¦

¦STATUS¦

C

EN

TR

A L

V A

LL

EY

P

R O

JE

C T

FR

IA

N T

D

IV

IS

IO

N

FR

IA

N T

D A M

O B

ER

M

EY

ER

C

R

ES

T G

A

TE

S C O

M

PR

ES

S O

R S

YS

TE

M R

EP

LA

C

EM

EN

T

DRUM GATE GALLERY

EXISTING INSTALLATION

DEMO PLAN VIEW

DENVER, CO

214-D-60548

2025-02-28

DRUM GATE GALLERY PLAN CONTINUED EL. 534.50

NOT TO SCALE

DRUM GATE GALLERY PARTIAL PLAN EL. 534.50

NOT TO SCALE

Digitally signed by Jeremy

Date: 2025.02.28 11:22:14 -07'00'

4" DEFLATE LINE

4" INFLATE LINE

2" FLEX

LINE

PG

PG

TO BLADDER THROUGH

CORE DRILL IN CONCRETE

2" BALL CHECK

VALVE

2" BALL

VALVE

6'-0"

8'-0"

2" COOLING WATER LINE PVC

2" SYSTEM CROSS-CONNECTION HDPE

4" BLADDER DEFLATE LINE HDPE

4" BLADDER INFLATE LINE HDPE

EMERGENCY COOLING

WATER SUPPLY PUMP

05-PMP-510

(WALL-MOUNTED)

HYDROPNEUMATIC TANKS

LIGHTING CIRCUIT (NOTE 3)

PUMP MOTOR CONDUIT

DRUM GATE OUTLETS AND

LIGHTING CONDUIT (NOTE 3)

DRUM GATE OUTLETS

CONDUIT (NOTE 3)

1" APC GATE #1 CONDUIT

2" COMPRESSOR

GATE #1 CONDUIT

1" APC GATE #3 CONDUIT

2" COMPRESSOR GATE #3

CONDUIT

4" BLADDER PRESSURE TRANSDUCER CONDUIT

COOLING WATER

SUPPLY CONTROL

ENCLOSURE

2"

COOLING WATER

PRESSURE SWITCHES

NOTE 4

2" COOLING WATER

PRESSURE

TRANSDUCER

TO EPU

4" BLADDER PRESSURE

TRANSDUCER CONDUIT

DESIGNED

DRAWN

CHECKED

TECH. APPR.

APPROVED

PEER REVIEWER

£TT£

£AT£

£AA£

£TA£

M. LAZANAS

A. WOODRUFF

D. SALINAS, P.E.

J. HAMMOND, P.E.

M. DIUBALDO, P.E.

A

LW

A

YS

T H

IN

K

S A

FE

TY

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

C A D

S

YS

TE

M

A ut oC A D

4.

2S

LM

S T

EC

H

C A D

F

IL

EN

A M

E

FR

IA

N

T D

EM

O

.D W

G

LA

S T

S A V

ED

D A

TE

-0 2-

LA

S T

S A V

ED

B Y

M

LA

Z A N

A S

¦D_DT¦

¦STATUS¦

C

EN

TR

A L

V A

LL

EY

P

R O

JE

C T

FR

IA

N T

D

IV

IS

IO

N

FR

IA

N T

D A M

O B

ER

M

EY

ER

C

R

ES

T G

A

TE

S C O

M

PR

ES

S O

R S

YS

TE

M R

EP

LA

C

EM

EN

T

DRUM GATE GALLERY

EXISTING INSTALLATION

DEMO SECTION VIEWS

DENVER, CO

214-D-60549

2025-02-28

DRUM GATE GALLERY SECTION

60548

C

NOT TO SCALE

MANIFOLD SECTION, TYPICAL

60548 D

NOT TO SCALE

NOTES

1. This drawing must be printed in color. Demolition limits shown in green.

2. See 214-D-60543 for general notes and reference drawings.

3. Existing conduit. Not in scope. Do not remove.

4. Pipe clamps and other fasteners not shown for clarity.

5. Flexible pipe connection to bladders is not in scope of work.

Do not remove.

Digitally signed by Jeremy Hammond, P.E.

Date: 2025.02.28 11:22:21 -07'00'

PILOT PRESSURE TANK

(WALL-MOUNTED)

6" TYP.

5'-0"

2'-9"

Ø2'-6"

1'-10"

1'-6"

2'-6"

Ø10"

AIR COMPRESSOR

AIR DRYER

8'-3"

8'-3"

15'-0"

15'-0"

AIR COMPRESSOR

EDGE OF STAIR

PLATFORM

AIR RECIEVER

AIR PLUMBING

CABINET

MOTOR CONTROLLER

COMPRESSOR

DISCONNECT

SWITCH

AIR

COMPRESSOR

AIR

RECEIVER

AIR

DRYER

3'-11"

F

E

5'-5"

3'-6"

4'-0"

2'-6" 7'-8"

AIR PLUMBING CABINET

(FLOOR-MOUNTED)

CONTINUED FROM

214-D-60544

24" MANHOLE

AIR DRYER

DISCONNECT SWITCH

COOLING WATER

DISCHARGE

GOOSENECK AT

TOP OF PIER

TOP OF PIER

EL. 585.00'

24" MANHOLETOP OF SECOND

LEVEL EL. 542.75'

6" PVC, DEMO

MOTOR

CONTROLLER

EQUIPMENT

CHAMBER EL.

534.50'

AIR DRYER

DISCONNECT SWITCH

STAIRS (NOTE 7)

GOOSENECK AT

TOP OF PIER TOP OF PIER

EL. 585.00'

TOP OF SECOND

LEVEL EL. 542.75'

4" PVC, DEMO

PILOT PRESSURE

TANK

EQUIPMENT

CHAMBER EL.

534.50'

A

LW

A

YS

T H

IN

K

S A

FE

TY

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

C A D

S

YS

TE

M

A ut oC A D

4.

2S

LM

S T

EC

H

C A D

F

IL

EN

A M

E

FR

IA

N

T D

EM

O

.D W

G

LA

S T

S A V

ED

D A

TE

-0 2-

LA

S T

S A V

ED

B Y

M

LA

Z A N

A S

¦D_DT¦

¦STATUS¦

C

EN

TR

A L

V A

LL

EY

P

R O

JE

C T

FR

IA

N T

D

IV

IS

IO

N

FR

IA

N T

D A M

O B

ER

M

EY

ER

C

R

ES

T G

A

TE

S C O

M

PR

ES

S O

R S

YS

TE

M R

EP

LA

C

EM

EN

T

GATE 1 EQUIPMENT

CHAMBER EXISTING

INSTALLATION

DEMO DETAIL DRAWING

DENVER, CO

214-D-60550

2025-02-28

DESIGNED

DRAWN

CHECKED

TECH. APPR.

APPROVED

PEER REVIEWER

£TT£

£AT£

£AA£

£TA£

M. LAZANAS

A. WOODRUFF

D. SALINAS, P.E.

J. HAMMOND, P.E.

M. DIUBALDO, P.E.

AIR COMPRESSOR EQUIPMENT CHAMBER

60548

NOT TO SCALE

NOTES

1. This drawing must be printed in color. Demolition limits shown in green.

2. Equipment dimensions shown are existing equipment dimensions.

3. Remove all cooling water pipe and compressed air pipe within the equipment chambers. Maximum pipe size is 1 1/2".

4. Drawing shows general location of existing equipment.

5. Equipment shown in gray hatch is to be removed and disposed of unless otherwise noted.

6. Existing air and water piping within equipment chamber not shown.

7. Stairs to be removed and refurbished in accordance with

Specifications. Reinstall stairs after new compressed air equipment has been installed and commissioned.

GATE 1 EQUIPMENT CHAMBER RIGHT SIDE VIEWF NOT TO SCALE

GATE 1 EQUIPMENT CHAMBER LEFT SIDE VIEWE NOT TO SCALE

Digitally signed by Jeremy

Date: 2025.02.28 11:22:25 -07'00'

6" TYP.

5'-0"

2'-9"

Ø2'-6"

1'-10"

1'-6"

2'-6"

Ø10"

AIR

COMPRESSOR

AIR

RECEIVER

AIR

DRYER

AIR COMPRESSOR

8'-3"

8'-3"

15'-0"

15'-0"

AIR COMPRESSOR

EDGE OF STAIR

PLATFORM

AIR RECIEVER

AIR PLUMBING

CABINET

2'-1"

MOTOR CONTROLLER

COMPRESSOR

DISCONNECT

SWITCH

AIR DRYER

H

G

5'-5"

3'-2"

2'-6"

4'-0"

7'-8"

GOOSENECK AT

TOP OF PIER TOP OF PIER

EL. 585.00'

TOP OF SECOND

LEVEL EL. 542.75'

4" PVC, DEMO

PILOT PRESSURE

TANK

EQUIPMENT

CHAMBER EL.

534.50'

AIR DRYER

DISCONNECT

SWITCH

GOOSENECK AT

TOP OF PIER

TOP OF PIER

EL. 585.00'

24" MANHOLETOP OF SECOND

LEVEL EL. 542.75'

6" PVC, DEMO

MOTOR

CONTROLLER

EQUIPMENT

CHAMBER EL.

534.50'

STAIRS (NOTE 7)

NOTE 6

PILOT PRESSURE TANK

(WALL-MOUNTED)

AIR PLUMBING CABINET

(FLOOR-MOUNTED)

CONTINUED FROM

214-D-60544

24" MANHOLE

COOLING WATER

DISCHARGE

AIR DRYER

DISCONNECT SWITCH

A

LW

A

YS

T H

IN

K

S A

FE

TY

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

C A D

S

YS

TE

M

A ut oC A D

4.

2S

LM

S T

EC

H

C A D

F

IL

EN

A M

E

FR

IA

N

T D

EM

O

.D W

G

LA

S T

S A V

ED

D A

TE

-0 2-

LA

S T

S A V

ED

B Y

M

LA

Z A N

A S

¦D_DT¦

¦STATUS¦

C

EN

TR

A L

V A

LL

EY

P

R O

JE

C T

FR

IA

N T

D

IV

IS

IO

N

FR

IA

N T

D A M

O B

ER

M

EY

ER

C

R

ES

T G

A

TE

S C O

M

PR

ES

S O

R S

YS

TE

M R

EP

LA

C

EM

EN

T

GATE 3 EQUIPMENT

CHAMBER EXISTING

INSTALLATION

DEMO DETAIL DRAWING

DENVER, CO

214-D-60551

2025-02-28

DESIGNED

DRAWN

CHECKED

TECH. APPR.

APPROVED

PEER REVIEWER

£TT£

£AT£

£AA£

£TA£

M. LAZANAS

A. WOODRUFF

D. SALINAS, P.E.

J. HAMMOND, P.E.

M. DIUBALDO, P.E.

NOTES

1. This drawing must be printed in color. Demolition limits shown in green.

2. Equipment dimensions shown are maximum allowable footprints.

3. Remove all cooling water pipe and compressed air pipe within the equipment chambers. Maximum pipe size is 1 1/2".

4. Drawing shows general location of existing equipment.

5. Equipment shown in gray hatch is to be removed and disposed of unless otherwise noted.

6. Air dryer for Gate 3 to be removed and stored on-site.

Coordinate storage location with COR.

GATE 3 EQUIPMENT CHAMBER RIGHT SIDE VIEWH NOT TO SCALE

GATE 3 EQUIPMENT CHAMBER LEFT SIDE VIEWG NOT TO SCALE

AIR COMPRESSOR EQUIPMENT CHAMBER

60548

NOT TO SCALE

Digitally signed by Jeremy

Date: 2025.02.28 11:22:36 -07'00'

A

YS

T H

IN

K

S A

FE

TY

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

C A D

S

YS

TE

M

A ut oC A D

4.

2S

LM

S T

EC

H

C A D

F

IL

EN

A M

E N

EW

I

N S

TA

LL

A

TI

O N

.D W

G

LA

S T

S A V

ED

D A

TE

-0 5-

LA

S T

S A V

ED

B Y

M

LA

Z A N

A S

¦D_DT¦

¦STATUS¦

C

EN

TR

A L

V A

LL

EY

P

R O

JE

C T

FR

IA

N T

D

IV

IS

IO

N

FR

IA

N T

D A M

O B

ER

M

EY

ER

C

R

ES

T G

A

TE

S C O

M

PR

ES

S O

R S

YS

TE

M R

EP

LA

C

EM

EN

T

DRUM GATE GALLERY

GENERAL NOTES &

EQUIPMENT SCHEDULE

DENVER, CO

214-D-60543

2025-02-28

DESIGNED

DRAWN

CHECKED

TECH. APPR.

APPROVED

PEER REVIEWER

£TT£

£AT£

£AA£

£TA£

M. LAZANAS

A. WOODRUFF

D. SALINAS, P.E.

J. HAMMOND, P.E.

M. DIUBALDO, P.E.

NOTES

1. Contractor to field verify all system dimensions prior to demolition.

2. Emergency air connection to be field routed from compressors, through Drum Gate

Gallery, up 6'-0" spiral stairway shaft, terminating at top of stairs near access door.

Location of termination to be coordinated with COR. Connection shall be quick connect fitting.

3. Drawings are diagrammatic only and represent general layout of equipment and routing of pipe and conduit. Drawings are not to scale. Fittings and pipe connections are not shown for all pipe and conduit lines.

4. Pipe routing must follow drawings 214-D-60527 to 214-D-60532.

5. Non-potable water is available at the top of dam near the personnel access staircase. 2-inch threaded connection and standard threaded hose-bib connection.

See specification section 51 00 26 for photos of water connections.

6. Stairs at mouth of equipment chambers shall be removed prior to start of demolition of equipment and shall be installed after new equipment has been tested/commissioned.

REFERENCE DRAWINGS

GALLERIES - PLAN AND SECTIONS 214-D-640

100'X 18' DRUM GATE CONTROL GENERAL

INSTALLATION - ASSEMBLY 214-D-5064

100'X 18' DRUM GATE CONTROL GENERAL

INSTALLATION - SECTIONS 214-D-5065

SPILLWAY ACCESS LADDERS - PLAN &

ELEVATION 214-D-10355

PIPING AND INSTRUMENTATION DIAGRAM -

LEGEND 214-D-60525

PIPING AND INSTRUMENTATION DIAGRAM -

SYMBOLS AND ABBREVIATIONS 214-D-60526

PIPING AND INSTRUMENTATION DIAGRAM -

PROCESS FLOW DIAGRAM 214-D-60527

PIPING AND INSTRUMENTATION DIAGRAM -

GATE 1 COMPRESSED AIR SYSTEM 214-D-60528

PIPING AND INSTRUMENTATION DIAGRAM -

GATE 1 AIR DISTRIBUTION 214-D-60529

PIPING AND INSTRUMENTATION DIAGRAM -

GATE 3 COMPRESSED AIR SYSTEM 214-D-60530

PIPING AND INSTRUMENTATION DIAGRAM -

GATE 3 AIR DISTRIBUTION 214-D-60531

PIPING AND INSTRUMENTATION DIAGRAM -

COOLING WATER SYSTEMS 214-D-60532

EQUIPMENT SCHEDULE

EQUIPMENT TYPE EQUIPMENT TAG QTY. MOTOR ELECTRICAL DESIGN

PRESSURE CAPACITY NOTES

AIR COMPRESSOR - ATLAS COPCO 01-C-110, 03-C-310 2 50 HP 460V/3PH/60Hz 100 PSI 236 CFM COOLING WATER INLET/OUTLET CONNECTIONS 1"

AIR DRYER 01-DR-110, 03-DR-310 2 3.94 kW 230V/3PH/60Hz 100 PSI 382 CFM

AIR RECIEVER 01-TK-110, 03-TK-310 2 - - 200 PSI 200 GAL

OIL/WATER SEPARATOR 01-U-110, 03-U-310 2 - - 100 PSI 451 CFM

HYDROPNEUMATIC TANKS 05-TK-510, 05-TK-520 2 - - 150 PSI 119 GAL

COOLING WATER PUMP 05-PMP-510 1 3-5 HP 120V/1PH/60Hz 50 PSI 32 GPM

LEGEND

Compressed Air Piping

Cooling Water Piping

Conduit

Work Extents

ABBREVIATIONS

APC Air Plumbing Cabinet

HDPE High Density Polyethylene

PG Pressure Gauge

GENERAL MECHANICAL SUMMARY OF WORK

SCOPE LOCATION OF WORK DESCRIPTION OF WORK

DEMOLITION OF AIR COMPRESSOR SYSTEMS

FOR GATE 1 AND GATE 3

DRUM GATE GALLERY

REMOVAL OF MECHANICAL EQUIPMENT INCLUDING BUT NOT LIMITED TO:

AIR COMPRESSORS, AIR DRYERS, AIR RECEIVER TANKS, PILOT PRESSURE TANKS, AIR PLUMBING CABINETS, HYDROPNEUMATIC TANKS, EMERGENCY COOLING WATER PUMP, ALL PVC COOLING WATER SUPPLY AND DISCHARGE PIPING AND VALVES, ALL COMPRESSED AIR PIPING AND

VALVES OF ALL MATERIALS.

INSTALLATION OF AIR COMPRESSOR SYSTEMS

FOR GATE 1 AND GATE 3

INSTALLATION OF MECHANICAL EQUIPMENT INCLUDING BUT NOT LIMITED TO:

AIR COMPRESSORS, AIR DRYERS, AIR RECEIVER TANKS, OIL WATER SEPARATORS, PILOT PRESSURE TANKS, AIR PLUMBING CABINETS, HYDROPNEUMATIC TANKS, EMERGENCY COOLING WATER PUMP, PVC COOLING WATER SUPPLY PIPING AND VALVES TO AIR COMPRESSORS, PVC

COOLING WATER DISCHARGE PIPING AND VALVES, ALL COMPRESSED AIR PIPING AND VALVES.

R

EV

N O

¦R_DT¦ £RA£

-0

5-

D

M

D

IU

B A

LD

O

P.

E.

A D

D

ED

W O

R K E

X

TE

N

TS

T O

T H

E

LE

G

EN

D

A D

D

ED

N O

TE

U

N D

ER

S

U M

M A R Y

O F

W O

R K

TA

B

LE

NOTES: AREAS AND DESCRIPTIONS ARE PROVIDED FOR GENERAL SUMMARY AND ARE NOT ALL-INCLUSIVE. CONTRACTOR TO COORDINATE WITH EXISTING CONDITIONS, PLANS, SPECIFICATIONS, AND OTHER TRADES PRIOR TO BID.

11'-6"

7'-0" 15'-0"

6'-0" TYP.

6'-0"

106'-0"

6'-0"

106'-0"

TRANSFORMER VAULT

GATE 3GATE 1

EPU CABINET

EMERGENCY

COOLING

WATER SUPPLY

PUMP AND

CONTROL

ENCLOSURE

STAIRS AND 24"

WEDGE GATE VALVE

ACCESS, TYP.

HYDROPNEUMATIC TANKS

CONTINUED ON

214-D-60546

CONTINUED

ON

214-D-60546

5'-8" TYP.

NOTE 2

7'-0" TYP.

4" COMPRESSED AIR

INFLATE AND DEFLATE

LINE CAPPED AT END

CONDUIT

ROUTE

EMERGENCY

COOLING WATER

SUPPLY LINE

20'-0"

15'-0"

A 60545

60545

M A

TC

H

LIN

E

109'-0"

B 60545

NOTE 10

2" COOLING WATER LINE

2" EMERGENCY

AIR CONNECTION

Ø6'-0" SPIRAL STAIRWAY

SHAFT (NOTE 7)

M A

TC

H

LIN

E

NOTE 11

Ø6'-0" ACCESS SHAFT

(NOTE 6)

2" COOLING WATER LINE

2" EMERGENCY AIR CONNECTION

4" BLADDER DEFLATE LINE

4" BLADDER INFLATE LINE

CONDUIT ROUTE

2" SYSTEM CROSS

CONNECTION

NOTES

1. Stairs at entrance to equipment chambers to be removed, refurbished, and reinstalled.

2. Only PVC cooling water pipe replaced. Carbon steel water pipe to remain. See drawing 214-D-60532.

3. See 214-D-60543 for general notes and reference drawings.

4. Mount emergency cooling water supply pump in same location as existing pump using new mounting equipment.

5. Existing trench drain within Drum Gate Gallery not shown.

6. Access shaft is the main equipment access point. Top of access shaft at elevation 581.25'.

7. Spiral staircase is the main personnel access point.

8. Piping offset for clarity, see 214-D-60545 Section A for general piping layout.

9. Detail 1 is typical for both Gate 1 and Gate 3 equipment chambers. See drawing 214-D-60546 for equipment locations.

10. 2" cooling water line continued outside of Drum Gate Gallery.

Cooling water supply line from outlet of Friant-Kern Canal.

11. Emergency air connection routed up spiral stair shaft to top of dam. See Note 2 on drawing 214-D-60543.

DESIGNED

DRAWN

CHECKED

TECH. APPR.

APPROVED

PEER REVIEWER

£TT£

£AT£

£AA£

£TA£

M. LAZANAS

A. WOODRUFF

D. SALINAS, P.E.

J. HAMMOND, P.E.

M. DIUBALDO, P.E.

A

LW

A

YS

T H

IN

K

S A

FE

TY

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

C A D

S

YS

TE

M

A ut oC A D

4.

2S

LM

S T

EC

H

C A D

F

IL

EN

A M

E N

EW

I

N S

TA

LL

A

TI

O N

.D W

G

LA

S T

S A V

ED

D A

TE

-0 5-

LA

S T

S A V

ED

B Y

M

LA

Z A N

A S

¦D_DT¦

¦STATUS¦

C

EN

TR

A L

V A

LL

EY

P

R O

JE

C T

FR

IA

N T

D

IV

IS

IO

N

FR

IA

N T

D A M

O B

ER

M

EY

ER

C

R

ES

T G

A

TE

S C O

M

PR

ES

S O

R S

YS

TE

M R

EP

LA

C

EM

EN

T

DRUM GATE GALLERY

NEW INSTALLATION

PLAN VIEW

DENVER, CO

214-D-60544

2025-02-28

DRUM GATE GALLERY PLAN CONTINUED EL. 534.50

NOT TO SCALE

DRUM GATE GALLERY PARTIAL PLAN EL. 534.50

NOT TO SCALE

R

EV

N O

¦R_DT¦ £RA£

-0

5-

D

M

D

IU

B A

LD

O

P.

E.

A D

D

ED

C O

N D

U

IT

L

IN

E

TO

A

IR

P

LU

M B

IN

G C A B

IN

ET

F

O R G

A

TE

8'-0"

2" COOLING WATER LINE PVC

2" SYSTEM CROSS-CONNECTION ALUMINUM

4" BLADDER DEFLATE LINE ALUMINUM

4" BLADDER INFLATE LINE ALUMINUM

EMERGENCY COOLING

WATER SUPPLY PUMP

05-PMP-510

(WALL-MOUNTED)

(NOTE 3)

HYDROPNEUMATIC TANKS

05-TK-510 & 05-TK-520

LIGHTING CIRCUIT (NOTE 2)

2" EMERGENCY AIR CONNECTION ALUMINUM (SEE NOTE 2 ON 60543)

PUMP MOTOR CONDUIT

DRUM GATE OUTLETS

AND LIGHTING CONDUIT

(NOTE 2)

DRUM GATE OUTLETS

CONDUIT (NOTE 2)

2" APC, FLOW METERS,

COMPRESSOR, AIR DRYER

CONDUIT GATE #1

2" COMPRESSOR GATE #1

CONDUIT

2" APC, FLOW METERS,

COMPRESSOR, AIR DRYER

CONDUIT GATE #3

2" COMPRESSOR GATE #3

CONDUIT

4" BLADDER PRESSURE TRANSDUCER CONDUIT

COOLING WATER

SUPPLY CONTROL

ENCLOSURE

2" EMERGENCY COOLING WATER

SUPPLY LINE, CONTINUED ON

214-D-60544

4" DEFLATE LINE

4" INFLATE LINE

2" FLEX

LINE

(NOTE 5)

PG

TO BLADDER

THROUGH CORE

DRILL IN CONCRETE

2" BALL CHECK

VALVE

2" BALL

VALVE

COOLING WATER

PRESSURE SWITCHES

CONDUIT TO APC

CONTINUED ON

214-D-60546

PRESSURE

TRANSDUCER

NOTE 6

4" COOLING WATER

LINE PVC

2" COOLING WATER

4" BLADDER PRESSURE

TRANSDUCER CONDUIT

GATE #1

TO EPU

4" BLADDER PRESSURE

TRANSDUCER CONDUIT

2" EMERGENCY AIR CONNECTION

NOTES

1. See 214-D-60543 for general notes and reference drawings.

2. Existing conduit. Not in scope.

3. Mount emergency cooling water supply pump in same location as existing pump.

4. Pipe clamps and other fasteners not show for clarity.

5. Connect new piping to the existing flexible hose connection to the air bladders.

6. Trench drain routed though Drum Gate Gallery not shown.

DESIGNED

DRAWN

CHECKED

TECH. APPR.

APPROVED

PEER REVIEWER

£TT£

£AT£

£AA£

£TA£

M. LAZANAS

A. WOODRUFF

D. SALINAS, P.E.

J. HAMMOND, P.E.

M. DIUBALDO, P.E.

A

LW

A

YS

T H

IN

K

S A

FE

TY

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

C A D

S

YS

TE

M

A ut oC A D

4.

2S

LM

S T

EC

H

C A D

F

IL

EN

A M

E N

EW

I

N S

TA

LL

A

TI

O N

.D W

G

LA

S T

S A V

ED

D A

TE

-0 5-

LA

S T

S A V

ED

B Y

M

LA

Z A N

A S

¦D_DT¦

¦STATUS¦

C

EN

TR

A L

V A

LL

EY

P

R O

JE

C T

FR

IA

N T

D

IV

IS

IO

N

FR

IA

N T

D A M

O B

ER

M

EY

ER

C

R

ES

T G

A

TE

S C O

M

PR

ES

S O

R S

YS

TE

M R

EP

LA

C

EM

EN

T

DRUM GATE GALLERY

NEW INSTALLATION

SECTION VIEWS

DENVER, CO

214-D-60545

2025-02-28

DRUM GATE GALLERY SECTION

60544

A

NOT TO SCALE

INFALTE/DEFLATE MANIFOLD SECTION, TYPICAL

60544

B

NOT TO SCALE

R

EV

N O

¦R_DT¦ £RA£

-0

5-

D

M

D

IU

B A

LD

O

P.

E.

U

PD

A

TE

D A

PC

C

O N

D U

IT

S

IZ

E

TO

/2

TO

IN

C

LU

D E

FL

O

W M

ET

ER

S

C O

M

PR

ES

S O

R S A

N D

A

IR

D R

YE

R S I

N D

ES

C R

IP

TI

O

N

6" TYP.

4'-4"

2'-11"

2'-6" TYP.

1'-6"

2'-6"

Ø10"

AIR COMPRESSOR

03-C-310

AIR DRYER

03-DR-310

8'-3"

3'-0" MINUMUM

6" MIN

8'-3"

15'-0"

15'-0"

AIR COMPRESSOR

03-C-310

1'-6"

EDGE OF STAIR

PLATFORM

AIR RECIEVER

03-TK-310

AIR PLUMBING

CABINET

03-APC-300

MOTOR CONTROLLER

COMPRESSOR

DISCONNECT

SWITCH

AIR

COMPRESSOR

03-C-310

AIR

RECEIVER

03-TK-310

AIR DRYER

03-DR-310

OIL/WATER

SEPARATOR

03-U-310

D

C

PILOT PRESSURE

TANK 03-T-320

(WALL-MOUNTED)

Ø2'-6"

1'-8" 5'-11"

3'-6"

2'-2"

6'-8"

4'-0"

2'-6"

AIR PLUMBING

CABINET 03-APC-300

(FLOOR-MOUNTED)

CONTINUED FROM

214-D-60544

24" MANHOLE

AIR DRYER

DISCONNECT

SWITCH

OIL/WATER

SEPARATOR

COOLING WATER

DISCHARGE

CONTINUED ON

214-D-60544

GOOSENECK AT

TOP OF PIER

(NOTE 5) TOP OF PIER

EL. 585.00'

TOP OF SECOND

LEVEL EL. 542.75'

CONTINUED IN

DETAIL 1

EQUIPMENT CHAMBER

EL. 534.50'

PILOT PRESSURE

TANK 03-T-320

NOTE 6

TOP OF PIER EL.

585.00'

24" MANHOLE

STAIRS (NOTE 7)

NOTE 3EQUIPMENT CHAMBER

EL. 534.50'

AIR DRYER

DISCONNECT

SWITCH

COMPRESSOR

DISCONNECT

SWITCH

MOTOR

CONTROLLER

TOP OF SECOND

LEVEL EL. 542.75'

CONTINUED IN

SECTION D

12"

12"

A

LW

A

YS

T H

IN

K

S A

FE

TY

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

C A D

S

YS

TE

M

A ut oC A D

4.

2S

LM

S T

EC

H

C A D

F

IL

EN

A M

E N

EW

I

N S

TA

LL

A

TI

O N

.D W

G

LA

S T

S A V

ED

D A

TE

-0 5-

LA

S T

S A V

ED

B Y

M

LA

Z A N

A S

¦D_DT¦

¦STATUS¦

C

EN

TR

A L

V A

LL

EY

P

R O

JE

C T

FR

IA

N T

D

IV

IS

IO

N

FR

IA

N T

D A M

O B

ER

M

EY

ER

C

R

ES

T G

A

TE

S C O

M

PR

ES

S O

R S

YS

TE

M R

EP

LA

C

EM

EN

T

AIR COMPRESSOR

EQUIPMENT CHAMBER

NEW INSTALLATION

DETAIL DRAWING

DENVER, CO

214-D-60546

2025-02-28

DESIGNED

DRAWN

CHECKED

TECH. APPR.

APPROVED

PEER REVIEWER

£TT£

£AT£

£AA£

£TA£

M. LAZANAS

A. WOODRUFF

D. SALINAS, P.E.

J. HAMMOND, P.E.

M. DIUBALDO, P.E.

AIR COMPRESSOR EQUIPMENT CHAMBER

60544

NOT TO SCALE

NOTES

1. Detail is typical for both Gate 1 and 3 equipment chambers.

See drawings 214-D-60525 thru 214-D-60532 for equipment tag numbers for Gate 1.

2. Equipment dimensions shown are maximum allowable footprints. See specifications for more details.

3. Drain cooling water outlet to open trench drain. Coordinate location with COR.

4. 6" PVC Sch 40 air intake pipe with gooseneck at top of pier.

Install bird screen on gooseneck in accordance with Specifications.

5. 4" PVC Sch 40 deflate air exhaust with gooseneck at top of pier. Install bird screen on gooseneck in accordance with Specifications.

6. Air intake pipe terminates in equipment chamber with square to round duct fitting. Pipe provides makeup air to the equipment chamber space.

7. Stairs to be reinstalled after commissioning of air compressor system.

8. See 214-D-60543 for general notes and reference drawings.

EQUIPMENT CHAMBER RIGHT SIDE VIEWD NOT TO SCALE

EQUIPMENT CHAMBER LEFT SIDE VIEWC NOT TO SCALE

R

EV

N O

¦R_DT¦ £RA£

-0

5-

D

M

D

IU

B A

LD

O

P.

E.

A D

D

ED

N O

TE

C O

N D

U

IT

T O

D R

YE

R A

N D

C O

N D

U

IT

T O

C O

M

PR

ES

S O

R M

O

TO

R D

IS

C O

N N

EC

T

A N

D C

O N

TR

O

LL

ER

EPU

UPS

TROUBLE

A

SYSTEM ON

BATTERY

POWER

A

CREST

GATE 1

DEFLATE

WARNING

A

LOW

RECEIVER

PRESSURE

A

LOW PILOT

PRESSURE

A

EQUIPMENT

ERROR

A

PLC

ERROR

A

CREST

GATE 3

MAN AUTO

DEFLATE

WARNING

A

LOW

RECEIVER

PRESSURE

A

LOW PILOT

PRESSURE

A

EQUIPMENT

ERROR

A

PLC

ERROR

A

AUTO

DIALER

APC 1

INFLATE SOLENOID A

01-SV-119G

INFLATE SOLENOID B

01-SV-120G

DEFLATE SOLENOID A

01-SV-126

01-SV-127

G

DEFLATE SOLENOID B

01-SV-128

01-SV-129

G

SET PRESSURE

REGULATOR KNOB

01-PCV-114

BLADDER

PRESSURE

01-PI-103

SET PRESSURE

01-PI-102

INLET PRESSURE

01-PI-100

APC 3

INFLATE SOLENOID A

03-SV-319G

INFLATE SOLENOID B

03-SV-320G

DEFLATE SOLENOID A

03-SV-326

03-SV-327

G

DEFLATE SOLENOID B

03-SV-328

03-SV-329

G

SET PRESSURE

REGULATOR KNOB

03-PCV-314

BLADDER

PRESSURE

03-PI-303

SET PRESSURE

03-PI-302

INLET PRESSURE

03-PI-300

01-CP-100

OIT

01-APC-100

03-APC-300

CWP

05-CWP-510

START

BL

STOP

RE

RUN

R

STANDBY

G

LOW

PRESSURE

A

MOTOR

OVERLOAD

A

PIA-510 XA-510

H O A

XE-510

PIL-101 PAL-110

PIL-301 PAL-310

MAN AUTO

DESIGNED

DRAWN

CHECKED

TECH. APPR.

APPROVED

PEER REVIEWER

£TT£

£AT£

£AA£

£TA£

DAVID SALINAS

ASHLEY WOODRUFF

ALDO ARMAS

DAVID SALINAS, P.E.

ELIZABETH MORLEY, P.E.

A

LW

A

YS

T H

IN

K

S A

FE

TY

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

C A D

S

YS

TE

M

A ut oC A D

4.

2S

LM

S T

EC

H

C A D

F

IL

EN

A M

E

4- D

-6

.D

W G

LA

S T

S A V

ED

D A

TE

-0 4-

LA

S T

S A V

ED

B Y

A W

O O

D R U

FF

¦D_DT¦

¦STATUS¦

C

EN

TR

A L

V A

LL

EY

P

R O

JE

C T

FR

IA

N T

D

IV

IS

IO

N

FR

IA

N T

D A M

O B

ER

M

EY

ER

C

R

ES

T G

A

TE

S C O

M

PR

ES

S O

R S

YS

TE

M R

EP

LA

C

EM

EN

T

GATES 1 AND 3

CONTROL SYSTEM DRUM

GATE GALLERY

LAYOUT DIAGRAM

DENVER, CO

214-D-60536

2025-02-28

NOTES

1. Drawings are based on "Typical" equipment information and do not represent final design information or drawing details.

Contractor to update and complete design as required.

R

EV

N O

¦R_DT¦ £RA£

-0

5-

D

D

S A

LI

N A S

P.

E.

U

PD

A

TE

D M

A N

A

U

TO

S W

IT

C H

ES

O

N E

PU

MANUAL MODE

LOW PILOT PRESSURE

LOW RECEIVER PRESSURE

AIR DRYER RUNNING

IN

UPS TROUBLE 01-CP-100

80-132 VAC

DISCRETE INPUT

SLOT 1

IN SELECTOR SWITCH

IN AUTO HS-1101

IN LOW SOLENOID

PILOT PRESSURE 2

IN LOW RECEIVER TANK

PRESSURE PSL-1103

IN UPS STATUS ON

BATTERY 01-CP-1004

IN AIR DRYER 01-DR-110

IS RUNNING5

IN

G

G

G

R

R

R

R

RELAY

SOLENOID 01-SV-120

INFLATE

RELAY

SOLENOID 01-SV-119

INFLATE

RELAY

SOLENOID 01-SV-127

DEFLATE

RELAY

SOLENOID 01-SV-126

DEFLATE

INFLATE

INFLATE

SOLENOID 01-SV-119

DEFALTE

SOLENOID 01-SV-127

DEFLATE

SOLENOID 01-SV-126

DEFLATE

WARNING 01-CP-100

PLC ERROR 01-CP-100

EQUIPMENT

SOLENOID 01-SV-120

ERROR 01-CP-100

LOW PILOT SOLENOID

PRESSURE 01-CP-100

12-28 VDC

DISCRETE OUTPUT

SLOT 2

OUT

OUT

OUT

OUT

OUT

OUT

OUT

OUT

IN

IN

IN

IN

IN

IN

IN

IN

IN

IN

IN

IN

IN

IN

IN

IN

IN

UPS TROUBLE

UPS STATUS ON BATTERY

SPARE

SPARE

SPARE

SPARE

SPARE

SPARE

SPARE

SPARE

SPARE

SPARE

SPARE

SPARE

SPARE

SPARE

SPARE

SPARE

OUT

OUT

OUT

OUT

OUT

OUT

OUT

OUT

OUT

OUT

OUT

OUT

OUT

OUT

OUT

OUT

R

RECEIVER TANK LOW

PRESSURE 01-CP-100

SPARE

SPARE

SPARE

SPARE

SPARE

SPARE

SPARE

SPARE

SPARE

SPARE

XE-110

YIA-110

PIL-101

PIL-110

YE-110

YIR-111

ZO-115

ZO-114

ZO-110

ZO-111

XA-110

XA-111

XA-112

PIL-121

PIL-122

SPARE

G

RELAY

SOLENOID 01-SV-129

DEFLATE

RELAY

SOLENOID 01-SV-128

DEFLATE

DEFALTE

SOLENOID 01-SV-129

DEFLATE

SOLENOID 01-SV-128

ZO-112

ZO-113

SPARE

SPARE

SPARE

AIR DRYER ALARM

AIR DRYER 01-DR-110

ALARM/MALFUNCTION

XA-111

DESIGNED

DRAWN

CHECKED

TECH. APPR.

APPROVED

PEER REVIEWER

£TT£

£AT£

£AA£

£TA£

DAVID SALINAS

ASHLEY WOODRUFF

ALDO ARMAS

DAVID SALINAS, P.E.

ELIZABETH MORLEY, P.E.

A

LW

A

YS

T H

IN

K

S A

FE

TY

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

C A D

S

YS

TE

M

A ut oC A D

4.

2S

LM

S T

EC

H

C A D

F

IL

EN

A M

E

4- D

-6

.D

W G

LA

S T

S A V

ED

D A

TE

-0 4-

LA

S T

S A V

ED

B Y

A W

O O

D R U

FF

¦D_DT¦

¦STATUS¦

C

EN

TR

A L

V A

LL

EY

P

R O

JE

C T

FR

IA

N T

D

IV

IS

IO

N

FR

IA

N T

D A M

O B

ER

M

EY

ER

C

R

ES

T G

A

TE

S C O

M

PR

ES

S O

R S

YS

TE

M R

EP

LA

C

EM

EN

T

CONTROL SYSTEM

GATE 1 PLC I/O

SCHEMATIC

DENVER, CO

214-D-60537

2025-02-28

NOTES

1. Drawings are based on "Typical" equipment information and do not represent final design information or drawing details.

Contractor to update and complete design as required.

R

EV

N O

¦R_DT¦ £RA£

-0

5-

D

D

S A

LI

N A S

P.

E.

U

PD

A

TE

D I

N

PU

T 1, A D

D

ED

D R

YE

R S T

O I

N

PU

TS

A N

D

SLOT 3

ANALOG INPUT

FROM 24 VDC

POWER SUPPLY

BLADDER

PRESSURE A PT-111

PIR-111

SIGNAL

4-20mA

SIGNAL

4-20mA

SIGNAL

4-20mA

SIGNAL

4-20mA

SIGNAL

4-20mA

BLADDER

PRESSURE B PT-121

PIR-121

BLADDER

PRESSURE C PT-131

PIR-131

BLADDER

PRESSURE D PT-141

PIR-141

GATE

INCLINOMETER A

ZG-111

SIGNAL

4-20mA

SIGNAL

4-20mA

GATE

INCLINOMETER B

ZG-121

RESERVOIR WATER LEVEL

LT-111

SPARE

CH1

+24V

0V

CH2

CH3

CH4

CH5

CH6

CH7

CH8

CH1

+24V

0V

CH2

CH3

CH4

CH5

CH6

CH7

CH8

SLOT 4

ANALOG INPUT

FROM 24 VDC

POWER SUPPLY

SPARE

SPARE

SPARE

SPARE

SPARE

SIGNAL

4-20mA FLOW METER 01-FE-110

FIT-110

SIGNAL

4-20mA FLOW METER 01-FE-120

FIT-120

SIGNAL

4-20mA RESERVOIR WATER LEVEL

SECONDARY

LT-121

DESIGNED

DRAWN

CHECKED

TECH. APPR.

APPROVED

PEER REVIEWER

£TT£

£AT£

£AA£

£TA£

DAVID SALINAS

ASHLEY WOODRUFF

ALDO ARMAS

DAVID SALINAS, P.E.

ELIZABETH MORLEY, P.E.

A

LW

A

YS

T H

IN

K

S A

FE

TY

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

C A D

S

YS

TE

M

A ut oC A D

4.

2S

LM

S T

EC

H

C A D

F

IL

EN

A M

E

4- D

-6

.D

W G

LA

S T

S A V

ED

D A

TE

-0 4-

LA

S T

S A V

ED

B Y

A W

O O

D R U

FF

¦D_DT¦

¦STATUS¦

C

EN

TR

A L

V A

LL

EY

P

R O

JE

C T

FR

IA

N T

D

IV

IS

IO

N

FR

IA

N T

D A M

O B

ER

M

EY

ER

C

R

ES

T G

A

TE

S C O

M

PR

ES

S O

R S

YS

TE

M R

EP

LA

C

EM

EN

T

CONTROL SYSTEM

GATE 1 PLC I/O

SCHEMATIC

DENVER, CO

214-D-60538

2025-02-28

NOTES

1. Drawings are based on "Typical" equipment information and do not represent final design information or drawing details.

Contractor to update and complete design as required.

R

EV

N O

¦R_DT¦ £RA£

-0

5-

D

D

S A

LI

N A S

P.

E.

A D

D

ED

R

ES

ER

V O

IR

W

A

TE

R L

EV

EL

S A

N D

F

LO

W M

ET

ER

S

MANUAL MODE

LOW PILOT PRESSURE

LOW RECEIVER PRESSURE

IN

80-132 VAC

DISCRETE INPUT

SLOT 1

IN SELECTOR SWITCH

IN AUTO HS-1101

IN LOW SOLENOID

PILOT PRESSURE2

IN LOW RECEIVER TANK

PRESSURE 03-TK-3203

IN UPS STATUS ON

BATTERY 01-CP-1004

IN

IN

G

G

G

A

A

A

A

RELAY

SOLENOID 03-SV-320

INFLATE

RELAY

SOLENOID 03-SV-319

INFLATE

RELAY

SOLENOID 03-SV-327

DEFLATE

RELAY

SOLENOID 03-SV-326

DEFLATE

INFLATE

INFLATE

SOLENOID 03-SV-319

DEFALTE

SOLENOID 03-SV-327

DEFLATE

SOLENOID 03-SV-326

DEFLATE

WARNING 01-CP-100

PLC ERROR 01-CP-100

EQUIPMENT ERROR 01-CP-100

SOLENOID 03-SV-320

XA-312

LOW PILOT SOLENOID

PRESSURE 01-CP-100

12-28 VDC

DISCRETE OUTPUT

SLOT 2

OUT

OUT

OUT

OUT

OUT

OUT

OUT

OUT

IN

IN

IN

IN

IN

IN

IN

IN

IN

IN

IN

IN

IN

IN

IN

IN

IN

UPS TROUBLE

UPS STATUS ON BATTERY

SPARE

SPARE

SPARE

SPARE

SPARE

SPARE

SPARE

SPARE

SPARE

SPARE

SPARE

SPARE

SPARE

OUT

OUT

OUT

OUT

OUT

OUT

OUT

OUT

OUT

OUT

OUT

OUT

OUT

OUT

OUT

OUT

A

RECEIVER TANK LOW

PRESSURE 01-CP-100

SPARE

SPARE

SPARE

SPARE

SPARE

SPARE

SPARE

SPARE

SPARE

SPARE

UPS TROUBLE 01-CP-100

XE-310

YIA-310

PIL-301

PIL-310

YE-310

COOLING WATER LOW PRESSURE

COOLING WATER LOW

PRESSURE PSL-510

PIL-510

ZO-315

ZO-314

ZO-310

ZO-311

XA-310

XA-311

PIL-321

PIL-322

COOLING WATER PRESSURE HIGH

COOLING WATER HIGH

PRESSURE PSH-510

PIH-510

A

RELAY

SOLENOID 03-SV-329

DEFLATE

RELAY

SOLENOID 03-SV-328

DEFLATE

DEFALTE

SOLENOID 03-SV-329

DEFLATE

SOLENOID 03-SV-328

ZO-312

ZO-313

WATER PUMP

COOLING

COOLING WATER

PUMP RUN 05-CWP-510

YIR-510

A

COOLING WATER PUMP

MOTOR OVERLOAD 05-CWP-510

A

COOLING WATER PUMP

PRESSURE HIGH/LOW 05-CWP-510

XA-510

PIA-510

COOLING WATER PUMP

MOTOR OVERLOAD 05-CWP-510

IEH-510

COOLING WATER PUMP

SELECTOR SWITCH 05-CWP-510

XE-510

COOLING WATER MOTOR OVERLOAD

COOLING WATER MOTOR OVERLOAD

AIR DRYER RUNNING

AIR DRYER ALARM

AIR DRYER 03-DR-310

IS RUNNING

YIR-311

AIR DRYER 03-DR-310

ALARM/MALFUNCTION

XA-311

DESIGNED

DRAWN

CHECKED

TECH. APPR.

APPROVED

PEER REVIEWER

£TT£

£AT£

£AA£

£TA£

DAVID SALINAS

ASHLEY WOODRUFF

ALDO ARMAS

DAVID SALINAS, P.E.

ELIZABETH MORLEY, P.E.

A

LW

A

YS

T H

IN

K

S A

FE

TY

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

C A D

S

YS

TE

M

A ut oC A D

4.

2S

LM

S T

EC

H

C A D

F

IL

EN

A M

E

4- D

-6

.D

W G

LA

S T

S A V

ED

D A

TE

-0 4-

LA

S T

S A V

ED

B Y

A W

O O

D R U

FF

¦D_DT¦

¦STATUS¦

C

EN

TR

A L

V A

LL

EY

P

R O

JE

C T

FR

IA

N T

D

IV

IS

IO

N

FR

IA

N T

D A M

O B

ER

M

EY

ER

C

R

ES

T G

A

TE

S C O

M

PR

ES

S O

R S

YS

TE

M R

EP

LA

C

EM

EN

T

CONTROL SYSTEM

GATE 3 PLC I/O

SCHEMATIC

DENVER, CO

214-D-60539

2025-02-28

NOTES

1. Drawings are based on "Typical" equipment information and do not represent final design information or drawing details.

Contractor to update and complete design as required.

R

EV

N O

¦R_DT¦ £RA£

-0

5-

D

D

S A

LI

N A S

P.

E.

U

PD

A

TE

D I

N

PU

T

S W

IT

C H

A D

D

ED

A

IR

D R

YE

R

TO

I N

PU

TS

1.

SLOT 3

ANALOG INPUT

FROM 24 VDC

POWER SUPPLY

BLADDER

PRESSURE A

PIR-311

SIGNAL

4-20mA

SIGNAL

4-20mA

SIGNAL

4-20mA

SIGNAL

4-20mA

SIGNAL

4-20mA

BLADDER

PRESSURE B

PIR-321

BLADDER

PRESSURE C

PIR-331

BLADDER

PRESSURE D

PIR-341

GATE

INCLINOMETER A

ZG-311

SIGNAL

4-20mA

SIGNAL

4-20mA

GATE

INCLINOMETER B

ZG-321

RESERVOIR WATER LEVEL

LT-321

SPARE

CH1

+24V

0V

CH2

CH3

CH4

CH5

CH6

CH7

CH8

CH1

+24V

0V

CH2

CH3

CH4

CH5

CH6

CH7

CH8

SLOT 4

ANALOG INPUT

FROM 24 VDC

POWER SUPPLY

SPARE

SPARE

SPARE

SPARE

SPARESPARE

SIGNAL

4-20mA FLOW METER 03-FE-310

FIT-310

SIGNAL

4-20mA FLOW METER 03-FE-320

FIT-320

DESIGNED

DRAWN

CHECKED

TECH. APPR.

APPROVED

PEER REVIEWER

£TT£

£AT£

£AA£

£TA£

DAVID SALINAS

ASHLEY WOODRUFF

ALDO ARMAS

DAVID SALINAS, P.E.

ELIZABETH MORLEY, P.E.

A

LW

A

YS

T H

IN

K

S A

FE

TY

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

C A D

S

YS

TE

M

A ut oC A D

4.

2S

LM

S T

EC

H

C A D

F

IL

EN

A M

E

4- D

-6

.D

W G

LA

S T

S A V

ED

D A

TE

-0 4-

LA

S T

S A V

ED

B Y

A W

O O

D R U

FF

¦D_DT¦

¦STATUS¦

C

EN

TR

A L

V A

LL

EY

P

R O

JE

C T

FR

IA

N T

D

IV

IS

IO

N

FR

IA

N T

D A M

O B

ER

M

EY

ER

C

R

ES

T G

A

TE

S C O

M

PR

ES

S O

R S

YS

TE

M R

EP

LA

C

EM

EN

T

CONTROL SYSTEM

GATE 3 PLC I/O

SCHEMATIC

DENVER, CO

214-D-60540

2025-02-28

NOTES

1. Drawings are based on "Typical" equipment information and do not represent final design information or drawing details.

Contractor to update and complete design as required.

R

EV

N O

¦R_DT¦ £RA£

-0

5-

D

D

S A

LI

N A S

P.

E.

A D

D

ED

R

ES

ER

V O

IR

W

A

TE

R L

EV

EL

A N

D F

LO

W

M

ET

ER

01-PLC-110 OIT

EXISTING PANEL (NOTE 4)

ELECTRONIC PROCESSING UNIT (EPU)

MULTIMEDIA

INTERFACE

PLC

OIT

SYMBOLS

Serial cable

SERIAL

Programmable Logic Controller

Operator Interface Terminal

EXPLANATION

PLC

OIT

LEGEND

Multimedia Interface

03-PLC-310

SERIAL

DRUM GATE

SERIAL

Future CVACS

AUTO DIALER

TELEPHONE

AUTO DIALER

Existing CVACS

Telephone cable

SERIAL

03-C-310

01-C-110

DESIGNED

DRAWN

CHECKED

TECH. APPR.

APPROVED

PEER REVIEWER

£TT£

£AT£

£AA£

£TA£

DAVID SALINAS

ASHLEY WOODRUFF

ALDO ARMAS

DAVID SALINAS, P.E.

ELIZABETH MORLEY, P.E.

A

LW

A

YS

T H

IN

K

S A

FE

TY

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

C A D

S

YS

TE

M

A ut oC A D

4.

2S

LM

S T

EC

H

C A D

F

IL

EN

A M

E

4- D

-6

.D

W G

LA

S T

S A V

ED

D A

TE

-0 4-

LA

S T

S A V

ED

B Y

A W

O O

D R U

FF

¦D_DT¦

¦STATUS¦

C

EN

TR

A L

V A

LL

EY

P

R O

JE

C T

FR

IA

N T

D

IV

IS

IO

N

FR

IA

N T

D A M

O B

ER

M

EY

ER

C

R

ES

T G

A

TE

S C O

M

PR

ES

S O

R S

YS

TE

M R

EP

LA

C

EM

EN

T

CONTROL SYSTEM

NETWORK DIAGRAM

DENVER, CO

214-D-60541

2025-02-28

1. Drawings are based on "Typical" equipment information and do not represent final design information or drawing details. Contractor to update and complete design as required.

2. System I/O not shown.

3. Government furnished telephone.

4. Drum gate PLC is not part of the scope. Connection only to pass through bladder pressures, gate inclinometer, and water level information.

NOTES

R

EV

N O

¦R_DT¦ £RA£

-0

5-

D

D

S A

LI

N A S

P.

E.

A D

D

ED

C O

M

PR

ES

S O

R S A

N D

T H

EI

R S

ER

IA

L C O

N N

EC

TI

O N

DESIGNED

DRAWN

CHECKED

TECH. APPR.

APPROVED

ADMIN APPROVAL - Materials Engineer

A

LW

A

YS

T H

IN

K

S A

FE

TY

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

LAR M TA IOCE N

C A D

S

YS

TE

M

A ut oC A D

3.

0S

LM

S T

EC

H

C A D

F

IL

EN

A M

E

4- D

-6

-R

D -1

.D W

G

LA

S T

S A V

ED

D A

TE

-1 1-

LA

S T

S A V

ED

B Y

S

PR

O C H

A S K A

C

EN

TR

A L

V A

LL

EY

P

R O

JE

C T

FR

IA

N T

D

IV

IS

IO

N

FR

IA

N T

D A M

LO

C A

TI

O N

M A P

LOCATION MAP

DENVER, CO 2019-11-01

R el ea se d

DESIGNED

DRAWN

CHECKED

TECH. APPR.

APPROVED

ADMIN APPROVAL - Materials Engineer

A

LW

A

YS

T H

IN

K

S A

FE

TY

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

LAR M TA IOCE N

C A D

S

YS

TE

M

A ut oC A D

3.

0S

LM

S T

EC

H

C A D

F

IL

EN

A M

E

4- D

-6

-R

D -1

.D W

G

LA

S T

S A V

ED

D A

TE

-1 1-

LA

S T

S A V

ED

B Y

S

PR

O C H

A S K A

C

EN

TR

A L

V A

LL

EY

P

R O

JE

C T

FR

IA

N T

D

IV

IS

IO

N

FR

IA

N T

D A M

S

IT

E U

S E

PL

A N

SITE USE PLAN

DENVER, CO 2019-11-06

R el ea se

1.50"

34.00"

0.75"

.0

0"

G O

V

ER

N M

EN

T

TI

TL

E B

LO

C K

S ee

N ot e

See Note 4

Trim line, see Note 5

Trim line, see Note 5

See Note 2

0.

0.

SHEET

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

PR

O

JE

C T

N A M

E D

IV

IS

IO

N

CITY, STATE

PRJ-STA-SEQ

YYYY-MM-DD

NUMBER

DRAWN

ACCEPTED

BUREAU OF RECLAMATION

U.S. DEPARTMENT OF THE INTERIOR

YAKIMA PROJECT

KENNEWICK DIVISION

DRAWN

MANUFACTURER OR CONTRACTOR

ACCEPTED

TITLE

1. Government will provide contractor with an electronic AutoCAD template to be used by manufacturer for submittal of manufacturer's/contractors drawing in Government format.

2. The manufacturer's title block and drawing revisions as a result of the submittal process, may be located anywhere outside of the trim lines. The location shown on this drawing is the Government's preferred area.

3. The manufacturer shall show the Government solicitation/specification number, the manufacturer's name, drawing and sheet number in this area.

4. Government drawing number(s) will be issued at the end of the submittal process and drawing will be entered into the Government's electronic drawing system by the Government.

5. Trim lines shall be shown on all submitted drawings.

NOTES

AL

W

AY

S

TH

IN

K

SA

FE

TY

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

S

TA

N D

A R D

D R A W

IN

G

S

S

TA

N D

A R D

A N

D T

YP

IC

A L

D

ES

IG

N

S

G O

V

ER

N M

EN

T

D R A W

IN

G

F O

R M

A T

DRAWING BORDER,

SAMPLE TITLE BLOCK,

AND SIGNATURE LINES

DENVER, CO

40-D-7102

DESIGNED

DRAWN

CHECKED

TECH. APPR.

APPROVED

ADMIN APPROVAL -

S. NITTA

S. NITTA

D. CRAWFORD

-1 2-

D

E.

M en dl in

U

PD

A

TE

D T

IT

LE

B

LO

C K A

N D

S

IG

N A

TU

R E

LI

N

ES

-0 3-

D

B ar th el

R od ne y

J P.

E.

U

PD

A

TE

D T

IT

LE

B

LO

C K A

N D

S

IG

N A

TU

R E

LI

N

ES

-0 4-

D

U

PD

A

TE

D D

R A W

IN

G

T O

C U

R R

EN

T D

R A W

IN

G

R

EC

O R D

S S

YS

TE

M

M

IN

O R R

EV

IS

IO

N

S

1. Information Management Handbook (IMH - 2020), Chapter 2, Section 9.A.4 - "Sheet Border" and Figures G2, G3, and G4.

REFERENCE

R. BARTHEL, P.E.

R.W. LAFOND, P.E.

Re le as ed

B

C

D

5 4

3 2 1

A

B

3 2

C

D

ALWAYS THINK SAFETY

Re le as ed

LAR M TA IOCE N

el ea se

File details come from the government source that posted it. Updated .