Amendment_0001_to_140R2026B0002_0001.pdf

PDF 30 MB Posted

Attached to
Friant Dam Compressor System Replacement Federal contract opportunity
Solicitation number
140R2026B0002
Issued by
Department of the Interior Bureau of Reclamation

About this file

This is an amendment to a federal solicitation that extends the proposal due date and incorporates updated documentation for the Friant Dam Compressor System Replacement project. The amendment, issued by the Department of the Interior Bureau of Reclamation, revises the proposal submission deadline to August 6, 2026, at 4:00 p.m. PST. The work scope involves the removal and disposal of existing compressors, air dryers, and related equipment from the Obermeyer Crest Gates at Friant Dam, followed by the furnishing and installation of a new Electronic Processing Unit (EPU) Control Cabinet, a new communication card, and miscellaneous associated items.

The amendment incorporates three substantive additions: an attached site visit sign-in sheet for potential bidders, responses to inquiries submitted by prospective contractors, and Attachment J4 containing General Decision Number CA20260018, the prevailing wage rate determination dated July 14, 2026. The inclusion of the prevailing wage determination indicates that this project is subject to prevailing wage requirements under federal law, which contractors must factor into their pricing and labor planning. No specific contract vehicle type, set-asides, or award timeline information is detailed within this amendment document.

View the file

Other files for this federal contract opportunity

Other files attached to Friant Dam Compressor System Replacement, newest first.
File Type Posted
Sol_140R2026B0002_Amd_0002.pdf PDF
Amendment_0002_to_140R2026B0002_0002.pdf PDF
Sol_140R2026B0002_Amd_0001.pdf PDF
Attachment_J2_-_Drawings_11x17.pdf PDF
Sol_140R2026B0002.pdf PDF
Solicitation_140R2026B0002.pdf PDF
Attachment_J1_-_Specifications.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: is not is required copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7.ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

PAGESOF

Contractor

The hour and date specified for receipt of Offers to sign this document and return

Rosana Yousefgoarji

See continuation page

Bureau of Reclamation Mid-Pacific Region Regional Office Division of Acquisition Services 2800 Cottage Way, Room E-1815 Sacramento CA 95825-1898

R20

140R2026B0002

07/23/2026

06/30/2026

1 2

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES

NAME OF OFFEROR OR CONTRACTOR

SUPPLIES/SERVICES

(B)

UNIT

(D)

UNIT PRICE

(E)

AMOUNT

(F)

OPTIONAL FORM 336 (4-86)

Sponsored by GSA FAR (48 CFR) 53.110

ITEM NO.

(A)

QUANTITY

(C)

NSN 7540-01-152-8067

140R2026B0002/0001

The Solicitation cited in block 9A above, Friant Dam Gate Compressor System Replacement is hereby amended.

Purpose: This amendment hereby incorporates the following:

1. Extend the offer due date to August 06, 2026, at 4:00 p.m. from July 30, 2026, at 5:00 p.m.

2. Site visit sign in sheet.

3. Provide answers to inquirer questions

4. Attachment J4-General Decision Number:

CA20260018 Wage Rate Determination dated

7/14/2026

Notifies the offerors that offers should be submitted electronically to Marianna Mezentseva at: marianna_mezentseva@ios.doi.gov. Please note that no hard copy of the offers should be submitted.

The date and time for receipt of offers is hereby EXTENDED to August 06, 2026, at 4:00 p.m. from July 30, 2026, at 5:00 p.m.

The offeror must acknowledge this amendment by submitting a signed copy of this SF30 along with their proposal.

Title: Friant Dam Gate Compressor System Replacement Solicitation No. 140R2026B0002 Amendment No. 0001

Contractor’s Pre-bid Questions

1. Question: Will the Contractor be permitted to use its own certified operator to operate the existing bridge crane, or will Government/Reclamation personnel be required to operate it on the Contractor's behalf?

Response: The existing bridge crane is not available for contractor use. See Specification Section 26 05 04, Part 2.01.

2. Question: Please confirm whether any of the work areas under this are classified as confined spaces or permit required confined spaces.

Response: No work areas are considered confined spaces or permit required confined spaces.

3. Question: Please confirm that the Contractor’s designated Safety Representative can also hold the role of Superintendent.

Response: See Specification Section 01 35 30, Part 1.03A.1.

4. Question: Are other projects anticipated to take place in proximity to the project work area during the interruption of service window (September 1 through December 31) in 2027? If so, please provide additional information regarding such projects such that the Contractor team may complete evaluation of the coordination considerations.

Response: No.

5. Question: Drawing 214-D-60533 details the Contractor use area adjacent to the parking area. Are there adjacent or nearby electrical hookups for Contractor use with a jobsite office trailer? If so, please advise regarding specific location.

Response: See Specification Section 01 51 00, Part 1.03.

6. Question: The project Specifications 03 20 60 detail both adhesive anchors and expansion anchors, as well as both stainless steel and carbon steel options. Please confirm galvanized expansion anchors are suitable for use throughout the project scope, or clarify if adhesive anchors and/or stainless steel anchors are required.

Response: Galvanized expansion anchors are not suitable for all project scope requirements.

Stainless steel expansion anchors or adhesive anchors are required for items listed under Specification Section 05 50 00, Part 1.01.A.1.a.3. See Specification Section 03 20 60, Part 1.01.A.1 for items where galvanized expansion anchors are acceptable.

7. Question: Drawing 214-D-60545 section view B highlights the typical inflate/deflate manifold section, which includes callout for (2) 2” ball check valves and (1) 2” ball valve. Please clarify whether the (1) 2” ball valve should be a brass ball valve or stainless steel ball valve. If stainless steel, please clarify the intended stainless steel ball valve specifications.

Response: See Specification Section 22 05 23, Parts 2.01, 2.02, 2.03, 2.04, and 2.05.

140R2026B0002
Amendment of solicitation/modification of contract
Contract ID code
Amendment/modification number
Effective date
Requisition/purchase requisition number
Project number
Issued by
Code
Administered by
Code
Name and address of contractor
Code
Facility code
Amendment of solicitation number
Dated
Modification of contract/order number
Dated
This item only applies to amendments of solicitations
Accounting and appropriation data
This item applies only to modifications of contracts/orders.
This change order is issued pursuant to:
The above numbered contract/order is modified to reflect the administrative changes
This supplemental agreement is entered into pursuant to authority of:
Other
Important:
Description of amendment/modification
Name and title of signer
Contractor/offeror
Date signed
Name and title of contracting officer
Signature of Contracting Officer
Date signed
Previous edition unusable
Standard form 30 (rev. 11/2016)
Continuation sheet
Reference Number
Name of Offeror or Contractor
OPTIONAL FORM 336 (4-86))

Sponsored by GSA FAR (48 CFR) 53.110

Sign in Sheet Site Visit Friant 260708 (1)
Questions and Answers 2026.0723
CA20260018 7.14.26

File details come from the government source that posted it. Updated .