This is an Amendment No. 0004 to Solicitation No. 140R2026B0001 for the Folsom Dam Vessel Exclusion Barrier (VEB) and Debris Boom project issued by the Bureau of Reclamation, Mid-Pacific Region. The amendment modifies the original solicitation dated 08/03/2026 and was issued on 06/29/2026. The solicitation requires design, fabrication, and installation of a vessel exclusion barrier system at Folsom Dam in California that functions as both a vessel barrier and debris boom. The barrier must consist of modular floating units with floatation assemblies, debris capture assemblies, anchor/mooring systems, gate assemblies, connection assemblies, and visual/lighted warning systems. The new VEB must be certified to either ASTM F2766-11 standard or NAVSEA standards at minimum Level C (600,000 ft-lbf kinetic energy, equivalent to an 8,500 lb boat at 40 knots). Critical design requirements include minimum 50-year design life for new features, 20-year life for wearing parts, functionality between 350-475 feet water elevation, and ability to withstand 60 mph winds with 75 mph gusts, 5-foot waves, and 7-10 knot currents. The contractor must provide spare module-to-module connectors and spare modules totaling at least 40 linear feet, with 44 warning lights and 22 warning signs spaced appropriately. Work is restricted to 7:00 AM to 4:30 PM Monday through Friday, excluding federal holidays, and must accommodate golden mussel quarantine requirements beginning May 14, 2025. The successful offeror is not responsible for certifying the existing VEB portion remaining in place. Buy American Act requirements apply per FAR 52.225-11 Alternate I.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

�������������
����������
��
���������������
�����������
������������
���������
��������������
��
�
������ ��!"#$%&'��!�(�%&�")*+�,$'-./'+0�0���'�&')'#1'-�"0�02'�3$")'�-'4#.+"0'-�!�&�02'�&')'#30��!��!!'&4�3&#�&�0��02'�2�%&�"+-�-"0'�43')#!#'-�/"(�&'4%$0�#+�&'5')0#�+��!�(�%&��!!'& ��#�����6������������

�����6������

��������������
��

����������6��������� �� ������

78��9:;<=>?@>A� ���� � ���� �����B������� �������� �� ��������

?:7@C:7@>�<D�E<F9G9>?>9<@H:<C9D9G?>9<@�<D�G<@>=?G> � ��)�+0&")0�#-�)�-'I ��"/'+-/'+0J/�-#!#)"0#�+�+%/�'& K ��'!!')0#1'�-"0' L ��&'M%#4#0#�+J3%&)2"4'�&'M%#4#0#�+�+%/�'& � ��3&�5')0�+%/�'&�NOP�QRRSTUQVSWXY "-/#+#40'&'-��(�NOP�Z[\W]�[\Q̂�O[W_�̀X)�-'

E>?@C?=C�D<=:�ab�c=7d8�eeHfbegh�3�������������.4"�!"&��L��)!&���K ILK

!")#$#0(�)�-' �i" ��"/'+-/'+0��!�4�$#)#0"0#�+�+%/�'&i� ��-"0'-�Njkk�Olkm�nnX�o" ��/�-#!#)"0#�+��!�)�+0&")0J�&-'&�+%/�'&�o� ��-"0'-�Njkk�Olkm�npXee8��>q9E�9>7:�<@Fr�?;;F97E�><�?:7@C:7@>E�<D�E<F9G9>?>9<@E���������0��� ��6��

�����������
�#����L ����s�

� ��s �

�I ��"))�%+0#+.�"+-�"33&�3&#"0#�+�-"0"�NOP�]WtuT]WvX ���������� ��� w��������

���������������������������wea8��>q9E�9>7:�?;;F97E�<@Fr�><�:<C9D9G?>9<@E�<D�G<@>=?G>EH<=C7=E8�9>�:<C9D97E�>q7�G<@>=?G>H<=C7=�@x:y7=�?E�C7EG=9y7C�9@�9>7:�ez8)2')*��+'" ��02#4�)2"+.'��&-'&�#4�#44%'-�3%&4%"+0�0����NjRWUTP{�Qu[\Z]T[{X�02'�)2"+.'4�4'0�!�&02�#+�#0'/��L�"&'�/"-'�#+�02'�)�+0&")0��&-'&���������+%/�'&�#+�#0'/��o" � ��02'�"��1'�+%/�'&'-�)�+0&")0J�&-'&�#4�/�-#!#'-�0��&'!$')0�02'�"-/#+#40&"0#1'�)2"+.'4�N|uU\�Q|�U\Q̂}W|�T̂�RQ{T̂}�ZPPTUW~�������QRR]ZR]TQ[TẐ�vQ[Q~�W[U���4'0�!�&02�#+�#0'/��L��3%&4%"+0�0��02'�"%02�&#0(��!�!"&�LK �oK��� ) ��02#4�4%33$'/'+0"$�".&''/'+0�#4�'+0'&'-�#+0��3%&4%"+0�0��"%02�&#0(��!�- ���02'&�NjRWUTP{�[{RW�ZP�_ZvTPTUQ[TẐ�Q̂v�Qu[\Z]T[{X
's����

�����6����������

����
��������������
�������
�#���i"�����o"��
��������������

������� ��) ��-"0'�4#.+'-��" ��+"/'�"+-�0#0$'��!�4#.+'&�Nl{RW�Z]�R]T̂[X ��) ��-"0'�4#.+'-��" ��+"/'�"+-�0#0$'��!�)�+0&")0#+.��!!#)'&�Nl{RW�Z]�R]T̂[X�L ��-'4)&#30#�+��!�"/'+-/'+0J/�-#!#)"0#�+���]}Q̂T�Wv�V{�����|WU[TẐ�\WQvT̂}|~�T̂USuvT̂}�|ZSTUT[Q[TẐ�UẐ[]QU[�|uV�WU[�_Q[[W]��\W]W�PWQ|TVSW�X

3".'� ��#44%'-��( )�-' � ��+"/'�"+-�"--&'44��!�)�+0&")0�&�N�u_VW]~�|[]WW[~�UZû[{~�j[Q[W�Q̂v��O���ZvWX ���

��� ��)�+0&")0�&J�!!'&�&NjT}̂Q[u]W�ZP�RW]|Ẑ�Qu[\Z]T�Wv�[Z�|T}̂X ��� ��%+#0'-�40"0'4��!�"/'&#)"NjT}̂Q[u]W�ZP��Ẑ[]QU[T̂}��PPTUW]X�]W�TZu|�WvT[TẐ�ûu|QVSW

3".'4�!

�
����

0��������

�����
�����������
�

¦§̈©ª§�«¬�©®̄ª°ª±²«³�µ́¶·̧¹ºµ»µº�¼½¾µ¿À�ÁÂÃÄÅÆÇÈ�ÉÊÊÄËÂ�ÌÍÎÍÏÍÐÑ�ÐÒ�ÓÔÕÖÍÏÍ×ÍÐÑ�ØÙÚÎÍÔÙÏ�ÛÜÝÝ�Þßààáâã�äáåæ�çßßè�éêëÜëì�íîïðîñòóôõ�ö������������� �

�"�����#�$�%&�''(� )*+,!��-./0.123�45��������� )+����!�67�889

����<6)9*98*86=*+9,<

>?@AB@BCD@@@>E@@@?� �

FGH�IJKLMLNONLJP�MLNHQ�LP�RKJMS�TU�ORJVHW�XJKYJZ�[OZ�\HYYHK�]̂MK_YLJP�̀OaaLHa�OPQ�[HRaLY�J̀JZ�LY�GHaHRb�OZHPQHQc�d_aeJYHf�FGLY�OZHPQZHPN�GHaHRb�LPMJaeJaONHY�NGH�gJKKJhLPifdaHj̀LQ�k_HYNLJPY�OPQ�UPYhHaYlHZJVH�IeHMLgLMONLJP�IHMNLJP�mn�no�nm�j�pYH�Jg�ILNH�OPQ�aHeKOMH�hLNG�mn�no�nm�j�pYH�Jg�ILNHj�UZHPQZHPN�qJc�mmmolHZJVH�IeHMLgLMONLJP�IHMNLJP�mn�no�nr�j�sJaS�lHYNaLMNLJPY�OPQ�aHeKOMH�hLNG�mn�no�nr�j�sJaS�lHYNaLMNLJPYj�UZHPQZHPN�qJc�mmmolHZJVH�IeHMLgLMONLJP�IHMNLJP�tu�vT�tm�j�\HYYHK�]̂MK_YLJP�̀OaaLHa�OPQ�[HRaLY�̀JJZ�OPQ�aHeKOMH�hLNG�tu�vT�tm�j�\HYYHK�]̂MK_YLJP�̀OaaLHa�OPQ�[HRaLY�̀JJZj�UZHPQZHPN�qJc�mmmolHZJVH�IeHMLgLMONLJP�IHMNLJP�ur�mm�mm�j�[aOhLPiY�OPQ�aHeKOMH�hLNG�ur�mm�mm�j�[aOhLPiYj�UZHPQZHPN�qJc�mmmo�lHZJVH�[hi�owujrmwjxmttt�OPQ�aHeKOMH�hLNG�[hi�owujrmwjxmtttjUZHPQ�mmmolHZJVH�[hi�owujrmwjxmttu�OPQ�aHeKOMH�hLNG�[hi�owujrmwjxmttujUZHPQ�mmmoyPMJaeJaONH�[hi�zjnmmvjUZHPQ�mmmoFGH�QONH�OPQ�NLZH�gJa�aHMHLeN�Jg�JggHaY�LY�GHaHRb�pq{|Uqz][�OPQ�aHZOLPY�U_i_YN�nmW�rmrxW�ON�ntfmm�ecZc�FGH�JggHaJa�Z_YN�OMSPJhKHQiH�NGLY�OZHPQZHPN�Rb�Y_RZLNNLPi�O�YLiPHQ�MJeb�Jg�NGLY�IXtm�OKJPi�hLNG�NGHLa�eaJeJYOKc

Folsom Dam Vessel Exclusion Barrier (VEB) and Debris Boom

Solicitation Number: 140R2026B0001

Pre-Bid Questions and Answers 1

Question 1: Does the BOR have a list of VEB systems that are certified to ASTM F2766?

Question 1 Response: No

Question 2: Is the Bureau of Rec requesting Evidence/Certification of testing prior to award?

Question 2 Response: Yes, see the revised section 35 79 30 requirements, with content requiring coordination with the COR for certification activities removed.

Question 3: Is the BOR only considering VEB that have already achieved certification of ASTM

F2766?

Question 3 Response: Yes, the New VEB shall all-ready be certified. See revised section 35 79

30, which requires NAVSEA certification or certification in accordance with ASTM F2766-11.

Question 4: Is the BOR willing to allow the certification process/timeline to be included in the procurement?

Question 4 Response: No, Reclamation does not plan to extend the offer due date of August 10, 2026, at 13:00 pm. Offerors shall provide this certification as part of their Offer in accordance with Section I, WBR 1452.237-80.

Question 5: Will the Bureau of Rec consider an equal or better alternative to the VEB at Folsom

Auxiliary Dam?

Question 5 Response: Yes, provided the VEB meets contract drawing, specification and certification requirements.

Question 6: Although computer simulation modeling is not listed in ASTM F2766 as a method of certification, it is accepted throughout the NAVSEA and DoN community for barrier testing.

Request that modeling be accepted by the Bureau of Rec for its certification.

Question 6 Response: See the response to Question 3.

Question 7: Timing of ASTM F2766-11 Certification Reference: Price Schedule CLIN 13 and

Section I (WBR 1452.237-80) Description: There is a contradiction regarding the timing of the barrier certification. CLIN 13 lists "Certification" as a post-award lump-sum pay item. However, Section I indicates that proof of ASTM F2766-11 certification must be provided "as part of any contractor proposal." Question: Please clarify if the physical crash-test certification must be fully completed and submitted with the pre-bid proposal, or if this is a post-award requirements implied by CLIN 13.

Question 7 Response: See the responses to Questions 2 and 3.

Question 8: Power Source for Warning Lights and Signage Reference: Price Schedule CLINs 11 and 12 Description: The solicitation requires 44 Warning Lights and 22 Warning Signage units, but does not provide an electrical infrastructure CLIN. Question: Are the warning lights and signage units assumed to be self-powered (e.g., solar or battery-operated)? If they require hardwired continuous shore power, will an electrical infrastructure/trenching CLIN be added to the schedule?

Question 8 Response: Refer to Specification Section 35 79 30 – 2.03 P and Q requirements.

Question 9: Missing Demolition and Salvage Ownership Instructions Reference: Price Schedule

CLIN 3 (Selective Site Demolition) Description: CLIN 3 requires the contractor to "remove and salvage part of the existing barrier." Question: Will the NDA-protected drawings explicitly distinguish which elements are to be removed versus salvaged? Furthermore, who assumes ownership of the salvaged materials (e.g., Owner-Retained vs. Contractor Disposal),and where on-site are salvaged items to be turned over?

Question 9 Response: Refer to Specification Section 02 41 13 – 1.02 A requirements.

Question 10: Pricing Allocation for Spare Module Hardware Reference: Price Schedule CLINs 7 and 10 Description: The solicitation requires the provision of spare connectors and "the required hardware for use." However, CLINs 7 and 10 only provide unit pricing for the parts themselves.

Question: Should the cost of the "required hardware for use" be distributed within the unit prices for the Spare Connectors (CLINs 7 and 10), or will a separate line item be created for the hardware?

Question 10 Response: Include hardware costs for Spare Module-to-Module connectors with

CLIN 7. Include hardware costs for the spare module with CLIN 10.

Question 11: Pricing for Clump Anchors and Buoys Reference: Brief Description of Work and

Price Schedule CLIN 9 Description: The Brief Description of Work requires "clump anchors, buoys and moorings," but the pricing schedule only includes a line item for "Moorings"(CLIN

9). Question: Should the costs for clump anchors and buoys be lumped into the CLIN

9"Moorings" price, or were line items for anchors and buoys inadvertently omitted?

Question 11 Response: Yes, refer to Specification Section 35 79 30 1.01 E requirements.

Question 12: Definition of Government Established Working Hours Reference: Site Access and

Deliveries Description: The IFB restricts personnel access and deliveries outside of the

"Government's established working hours," but does not define those hours. Question: Please clearly define the "Government's established working hours" so bidders can accurately account for standard shifts versus necessary overtime.

Question 12 Response: See revised section 01 14 12 requirements.

Question 13: Clarification of Operations, Storage, and Parking Areas Reference: Price Schedule

CLIN 1 (Mobilization) and Site Security Requirements Description: The Site Security

Requirements severely restrict on-site parking and staging, but CLIN 1 requires pricing for

Mobilization and Preparatory Work. Question: Will the NDA-protected drawings include a designated site plan showing the allowable limits for contractor operations, material staging, and any permissible parking areas at the dam?

Question 13 Response: See Drawing sheet 485-208-60335 for Contractor Area of Use. Also, refer to Specifications Section 01 14 10 requirements.

Question 14: Project Plan Layout Dwg 60330 Sheet 4 shows the east end of the NEW VEB terminating in the area of the east buoy. The dwg also shows the existing barrier still in place and terminating at the same eastern buoy. Is this accurate?

Question 14 Response: Yes, both the existing barrier and the New VEB connect to the existing east flotation buoy. New Moorings shall support loads for the New VEB independent of the existing East Buoy mooring. See the revised section 35 79 30.

Question 15: Is the Bureau of Rec intending the contractor leave the east string of the existing

PSB 600in place?

Question 15 Response: Yes

Question 16: Is the new VEB plan to terminate at the shore near the rip rap or if not where does the Bureau of Rec intend to terminate the east end of the New VEB?

Question 16 Response: See the response to question 14.

Question 17: How will compliance with CUI Document requirements including CMMC, C3PAO and Level 2 self-assessment be confirmed?

Question 17 Response: The Non-disclosure Agreement identifies the specification and drawings as CUI. The CMMC, C3PAO and Level 2 Self-assessment do not apply to this project.

Questions 18: CUI document management requires strict safeguarding and distribution controls.

A major part of compliance as it relates to document management requires that documents are properly marked as CUI, including proper indicators on the CUI information. Please verify what parts of the specifications and drawings are considered CUI and re-issue the CUI documents with the correct markings and through proper channels.

Question 18 Response: The Non-disclosure Agreement identifies the entire specification and drawings as CUI.

Questions 19: CLIN Item 2 is for a Contract Documents Management System. Please describe how the Contract Document Management System will function with CUI Documentation, where

CUI Documents will be held if not with the Document Management system since it will not be a secure storage area, and how Bureau intends to communicate given CUI status.

Question 19 Response: CDMS security shall be in accordance with section 01 31 30, 1.05, D.

Question 20: Specification section 35 79 30, Part 2, Paragraph A states that the new system shall have a minimum design life of 50 years given proper maintenance. Manufactures would consider period replacement of wearing parts as portion of proper maintenance. Does the Bureau consider replacement of wear parts and pieces proper maintenance?

Question 20 Response: Yes, wearing parts shall last at-least 20 prior to requiring replacement.

See the revised section 35 79 30.

Question 21: Is it the Bureaus intent to match the existing auxiliary spillway barrier design so that parts and pieces are interchangeable between the two barriers / locations?

Question 21 Response: See the response to question 5.

Question 22: Drawings show moorings designed with chain and wire rope with contractors engineer to confirm compliance. Given the design life requirements, the entirety of the mooring system should be made with chain. If wire rope is allowed, the design life must include considerations that replacement of those components will be required. Please confirm wire rope is acceptable. If so, confirm that replacement is considered proper maintenance.

Question 22 Response: See the response to question 20.

Question 23: Please confirm Buy America requirements for all components, including chain.

Question 23 Response: Buy America Act requirements will be in accordance with Section I, FAR

52.225-11 Buy American – Construction Materials Under Trade Agreements – Alternate I.

Question 24: Please provide an anticipated water level for all contractors to plan for installation means and methods. Water level will determine access, how far cranes need to reach from staging areas and what size crane is needed, and depths of dive activities. These considerations and more carry large price variations and contractors should be bidding on set parameters for equal comparison.

Question 24 Response: See the attached added informational drawing with showing seasonal variation of storage frequency. Reservoir elevations vary greatly by season and year.

Reclamation does not guarantee any specific pool elevation.

Question 25: If the contractor plans to utilize barrier sections of multiple sizes (For example: 10 ft and 40 ft barrier sections) what size spare should be provided?

Question 25 Response: The spare module or modules shall be one or more barrier sections totaling at-least 40 linear ft. of barrier.

Question 26: Specifications state the barrier sections that have been removed will be brought to a BOR area that is to be determined. Please provide the address of the salvage area so that freight costs can be calculated.

Question 26 Response: Removed barrier sections shall be relocated to BOR area that is to be determined within 1.5 miles from the top of Folsom Dam and within Central California Area

Office facility.

Question 27: Sheet 3 shows a contractor use area near the Auxiliary Dam. Sheets C-201 and C-

611 show a temporary ramp for access for the on-shore anchor installation. However, sheet 3 does not show this temporary ramp area as a contractor use area. Please confirm that the area near the onshore anchor is approved for contractor use and provide parameter for the amount of space contractors may use.

Question 27 Response: See revised section 01 14 10, 1.04 and drawing 485-208-60335 which includes a Contractor Use Area on top of the Right Wing Dam.

Question 28: Please verify what boat launch is available for equipment mobilization. Will any boat slips be available to contractor during the period of performance? If so, where would the location be?

Question 28 Response: See revised section 01 14 10.

Question 29: Can the existing HDPE auxiliary pump system that is currently staged at the specific laydown yard be moved prior to on-site work to allow more room for barrier fabrication and installation.

Question 29 Response: No. The Contractor’s Area of Use near the warehouse location will be free of HDPE auxiliary pump system piping.

Question 30: Please elaborate further explain inspection/dog inspection requirements of contractor equipment during the project. Will vehicles and watercraft require daily inspection?

Question 30 Response: Vehicles and watercraft requiring access to secure areas including the

VEB, top of dam or Contractor use areas coming from outside Folsom Dam’s secured area require daily K9 inspection consistent with section 01 35 50, 1.02, F.

Question 31: Spec section 35 79 30 Part 2 describes debris curtains and module to module connections as supplied by J.F. Brennen Company, or equal. Please further expand on how equivalency will be measured in terms of compliance with ASTM F2766-11.

Question 31 Response: See responses to questions 3 and 5.

Question 32: Barrier certification requires the barrier to be certified to ASTM F2766-11

Standard Test Method for Boat Barriers. The existing system has been tested in a live action simulation. Will “equal” barrier parts as described in 35 79 30 Part 2 that have not been tested in real world simulations be required to produce test results from a simulation to show compliance with the Standard Test Method for Boat Barriers?

Question 32 Response: See the response to question 3.

Question 33: The limitations on subcontracting is not listed as a proposal submission requirement however it is included as an attachment. Is it required to be submitted with the proposal?

Question 33: The limitation on subcontracting worksheet shall be submitted with the Offer.

Question 34: Attachment titled Specification No. 20-C0939, Page 73 of 148, paragraph 1.02 references a Permit to Work. Will the Central California Area Office (CCAO) permit be submitted and obtained by the contractor or the Bureau.

Question 34 Response: See section 01 41 26.

Question 35: Attachment titled IFB_140R2026B0001 page 47 or 127 Paragraph (d) Vessel

Exclusion Barriers, indicates Proof of certification for Barrier to be submitted with proposal.

The barrier construction and installation is a bidder design item. Can the proof of certification be submitted after award and when the system design has been completed?

Question 35 Response: See the response to question 2.

Question 36: Please provide the design calculations, shop drawings, and installation plan & drawings for the existing VEB, mooring system, buoys and connection to the dam.

Question 36 Response: This information is identified as proprietary on drawings.

Question 37: Please provide the coordinates and quantity of the existing mooring anchors.

Question 37 Response: The existing VEB has three mooring anchors located approximately at the following coordinates:

1. Northing: 2021682; Easting: 6802012

2. Northing: 2021247; Easting:6802792

3. Northing: 2020849; Easting: 6803428

Question 38: Is the existing VEB and mooring system certified to meet or exceed ASTM F2766-

11 Standard Metho for Boat Barriers? If not, is the successful bidder responsible for improving

& certifying the remaining?

Question 38 Response: The successful Offeror is not responsible for certifying the portion of the existing VEB to remain in-place.

Question 39: For installation of the new onshore anchor, is rip rap expected to be encountered below El. 478 ft?

Question 39 Response: Rip rap is not expected to be encountered below elevation 478’ at the approximate location of the onshore anchor.

Question 40: Has the BOR made any prearrangement or agreements with the local state agencies so that contractors are allowed to utilize the nearby public boat ramps to mobilize/demobilize their marine equipment?

Question 40 Response: No

Question 41: Does the BOR maintain or have access to its own boat ramp at Folsom Lake? If so, are the bidders allowed to utilize that ramp for this project?

Question 41 Response: Reclamation does not maintain its own boat ramp at Folsom Lake.

Question 42: The solicitation does not appear to clearly identify domestic sourcing requirements for the Vessel Exclusion Barrier system and associated components. Please clarify whether all materials and manufactured products incorporated into this project—including, but not limited to, flotation modules, connectors, cables, anchors, hardware, gate assemblies, and other fabricated components—must be manufactured in the United States in accordance with the Buy

American Act (FAR 52.225-9), Buy America requirements, or any other domestic preference statutes. If foreign-manufactured components are permissible, please identify any applicable restrictions, certification requirements, or percentage-of-domestic-content thresholds. If certain proprietary vessel barrier components are only available from foreign manufacturers, will the

Government consider them acceptable if they otherwise meet all technical and performance requirements, or will a Buy American Act waiver be required prior to bid submission?

Question 42 Response: See the response to question 23.

Folsom Dam Vessel Exclusion Barrier and Debris Boom

American River Div ision- Central Valley Project - California

Amendment No. 0004

Solicitation No. 140R2026B0001

Specifications No. 20-C0939

Use of Site

01 14 10 - 1

SECTION 01 14 10

USE OF SITE

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. Cost:

1. Include in prices offered in the Price Schedule for other items of work.

1.02 REFERENCE STANDARDS

A. Bureau of Reclamation (Reclamation)

1. Cleaning Manual-2012 Inspection and Cleaning Manual for Equipment and Vehicles to Prevent the Spread of Invasive Species (Technical memorandum No. 86-68220-07-05) 2012 Edition

Available online at:

http://www.usbr.gov/mussels/prevention

1.03 SUBMITTALS

A. Submit the following in accordance with Section 01 33 00 - Submittals.

B. RSN 01 14 10-1, Land Use and Landscape Rehabilitation Plan:

1. For each Contractor use site on Government land.

a. Show use location and extent of impact. Uses include but are not limited to the following:

1) Buildings and service areas including offices, shops, warehouses, storage areas, fuel and oil storage areas, and fabrication yards.

2) Parking areas and haul routes.

3) Utilities including air, power, and water lines; fire hydrants; and compressor station.

4) First-aid facilities.

5) Areas for processing, storing, and disposing of waste materials from construction operations.

6) Temporary fences.

b. Describe methods to preserve, protect, and repair, vegetation (such as trees, shrubs, and grass) and other landscape features on or adjacent to http://www.usbr.gov/mussels/prevention

Amendment No. 0004

Solicitation No. 140R2026B0001

Specifications No. 20-C0939

Use of Site

01 14 10 - 2 jobsite, which are not to be removed and which do not interfere with work required under this contract. Include methods to mark work area limits, protect disturbed areas, and prevent erosion.

c. Describe methods to protect, and repair if damaged, existing improvements and utilities at or near jobsite.

d. Describe methods for removing temporary structures and facilities, cleanup, and rehabilitating site after completion of construction activities.

2. Submit revised drawings of changes in use of Government land made during design and erection stages or after use of Government land is in operation.

1.04 PROJECT CONDITIONS

A. The Contractor will have limited access to the dam road in the vicinity of the dam. See

Area of Use drawing 485-208-60335.

1. Coordinate and submit requirements as required by the Folsom Lake State Park

Authority for launching vessels and potentially floating in materials for the barrier system.

2. Materials can be dropped off to the reservoir by a crane on the contractor area of use as per the approved plan.

3. Contractor is allowed access on top of dam for lowering and removal of materials from the top of the dam.

a. Duration for lowering materials from the top of the dam to be 5 days maximum.

b. Duration for removal of material from the top of the dam to be 2 days maximum.

c. Maintain one lane of traffic open during operation on the top of the dam except as approved by COR.

d. Coordinate activities on top of dam with COR a minimum of 3 weeks in advance.

B. Due to concerns of spreading of the highly invasive golden mussels, beginning May 14, 2025, all trailered or motorized vessels entering Folsom Lake will be required to have a quarantine, and/or decontamination seal intact and verified prior to entering the water.

Refer to the California State Park Golden Mussel Prevention Program for the mandatory decontamination, quarantine and inspection information.

C. When private land is used for construction facilities, or other construction purposes, make necessary arrangements associated with use of private land.

D. Other Contractors that work on the Folsom Dam Raise Project will be present during construction. Do not interfere with work of other contractors or the Government in vicinity, or with reservations made by the Government for use of such land. In case

Amendment No. 0004

Solicitation No. 140R2026B0001

Specifications No. 20-C0939

Use of Site

01 14 10 - 3 coordination is needed with other contractors, notify the COR to begin the communication between two parties.

E. Areas on Government land which will be obliterated by permanent construction or inundated by reservoir may be used where use of such land will be discontinued and construction facilities, materials, equipment, and rubbish and waste materials will be removed to avoid interference with work in such areas or with filling of reservoir.

F. Housing for construction personnel will not be permitted on Government land, except housing for guards or watchmen as may be approved by COR.

G. Temporary construction roads are not allowed.

H. The Government will require that access be maintained through the area during the entire period of construction.

I. Cooperate with COR to minimize conflict, and to facilitate Government operations.

J. Schedule and coordinate the Work to accommodate Government and other contractor traffic patterns.

K. The Contractor shall protect the government Property. The Contractor at no cost to the Government shall repair any damage to Government Property attributable to Contractor operations. The Contractor shall protect all installed and existing materials during all operations. Any excess material shall be removed.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

3.01 CLEANING

A. Construction equipment:

1. Before bringing on site, clean construction equipment to remove dirt, vegetation, and other organic material to prevent introduction of terrestrial and aquatic noxious weeds, and invasive plant and animal species.

2. Contractor cleaning procedures shall result in equipment being cleaned as well or better than the procedures described in Cleaning Manual.

3. COR will inspect construction equipment following procedures described in

Cleaning Manual before allowing equipment onsite and prior to watercraft or floated material entering the reservoir.

Amendment No. 0004

Solicitation No. 140R2026B0001

Specifications No. 20-C0939

Use of Site

01 14 10 - 4

3.02 RESTORATION

A. Restore Contractor use areas to pre-construction condition.

END OF SECTION

Amendment No. 0004

Solicitation No. 140R2026B0001

Specifications No. 20-C0939

Work Restrictions

01 14 12 - 1

SECTION 01 14 12

WORK RESTRICTIONS

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. Cost:

1. Include in prices offered in the Price Schedule for other items of work.

1.02 WORK RESTRICTIONS

A. Allowable in-water work dates: Refer to Section H - Special Contract Requirements for specific dates and times.

B. Onsite work activities shall occur between 7:00 AM and 4:30 PM Monday through

Friday excluding Federal Holidays or as approved by COR.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

Amendment No. 0004

Solicitation No. 140R2026B0001

Specifications No. 20-C0939

Work Restrictions

01 14 12 - 2

This page intentionally left blank.

Amendment No. 0004

Solicitation No. 140R2026B0001

Specifications No. 20-C0939

Vessel Exclusion Barrier and Debris Boom

35 79 30 - 1

SECTION 35 79 30

VESSEL EXCLUSION BARRIER AND DEBRIS BOOM

PART 1 GENERAL

1.01 MEASUREMENT AND PAYMENT

A. Vessel Exclusion Barrier with Debris Boom:

1. Payment: Lump-sum price offered in the Price Schedule.

a. Includes the cost of designing, furnishing and installing the following:

1) All modules along the length of the barrier and any attachments necessary but not limited to debris curtain, fence post and fence netting.

2) Includes all module-to-module connectors.

b. Does not include the Gate module, mooring buoy, onshore and offshore anchors and their corresponding chains and ropes.

B. Gate Module:

1. Payment: Lump-sum price offered in the Price Schedule.

a. Includes cost of designing, furnishing, and installing the gate module and any attachments necessary but not limited to, debris curtain, fence post, fence netting, and gate control system.

C. Spare Module-to-module Connectors:

1. Measurement: Number of spare module-to-module connectors provided.

2. Payment: Unit price per spare connector offered in the Price Schedule.

a. Includes furnishing and delivery of the material.

D. Onshore Anchor:

1. Payment: Lump-sum price offered in the Price Schedule.

a. Includes cost of furnishing, and installing the necessary onshore anchor at the right-wing side of the dam.

E. Moorings:

1. Payment: Lump-sum price offered in the Price Schedule.

a. Includes designing, furnishing, installing moorings, offshore anchors, buoys, and sinkers and other components such as chains and ropes.

Amendment No. 0004

Solicitation No. 140R2026B0001

Specifications No. 20-C0939

Vessel Exclusion Barrier and Debris Boom

35 79 30 - 2

F. Spare Module:

1. Measurement: Number of spare modules provided.

2. Payment: Unit price per spare module offered in the Price Schedule.

a. Includes furnishing and delivery of the material.

G. Warning Lights:

1. Measurement: Number of warning lights installed.

2. Payment: Unit price per warning light offered in the Price Schedule.

H. Warning Signage:

1. Measurement: Number of warning signage installed.

2. Payment: Unit price per warning signage offered in the Price Schedule.

I. Certification:

1. Payment: Lump-sum price offered in the Price Schedule.

a. Includes any activities involve on providing the required certification.

1.02 REFERENCE STANDARDS

A. ASTM International (ASTM)

1. ASTM A36/A36M-08 Carbon Structural Steel

2. ASTM A153/A153M-05 Zinc-Coating (Hot-Dip) on Iron and Steel

Hardware

3. ASTM A276-08a Stainless Steel Bars and Shapes

4. ASTM A307-14 Carbon Steel Bolts, Studs, and Threaded

Rod 60 000 PSI Tensile Strength

5. ASTM A760/A760M-06 Corrugated Steel Pipe, Metallic - Coated for

Sewers and Drains AASHTO No. M36/M 36M

6. ASTM B695-04 Coatings of Zinc Mechanically Deposited

Iron and Steel

7. ASTM F667B06 Large Diameter Corrugated Polyethylene

Tubing and Fittings

8. ASTM F2766-11 Standard Test Method for Boat Barriers

Amendment No. 0004

Solicitation No. 140R2026B0001

Specifications No. 20-C0939

Vessel Exclusion Barrier and Debris Boom

35 79 30 - 3

B. Chain Link Fence Manufacturers Institute (CLFMI)

1. CLFMI 2445-97 Product Manual

C. Federal Specifications (FS)

1. FS RR-C-271D(1) Chains and Attachments, Welded and Weldless

2. FS RR-W-410F Wire Rope and Strand

1.03 SUBMITTALS

A. Submit the following in accordance with Section 01 33 00 - Submittals.

B. RSN 35 79 30-1, Design Calculations:

1. Calculations or certification demonstrating the adequacy of system to resist the required loading determined by the designer and the specification.

a. Module-to-module connectors

b. Offshore anchors.

c. Connection to the existing east buoy and its anchor.

d. See section 35 79 30-3.03 for vessel loading requirements.

C. RSN 35 79 30-2, Shop Drawings and Manufacturer Recommendations:

1. Shop drawings of the layout and all construction installation details, including materials lists and manufacturer’s installation recommendations.

D. RSN 35 79 30-3, Approval Data:

1. Manufacturer’s and/or materials product data for the following:

a. Floats.

b. Chain, connecting links, and shackles.

c. Debris curtain.

d. Warning/Navigation lights.

e. Warning signage

f. Offshore Anchors.

g. Gate system.

h. Onshore Anchor product data to be submitted under RSN 31 68 00-2, Installation Plan and Approval Data.

Amendment No. 0004

Solicitation No. 140R2026B0001

Specifications No. 20-C0939

Vessel Exclusion Barrier and Debris Boom

35 79 30 - 4

E. RSN 35 79 30-4, Installation Procedures:

1. Installation Plan of onshore anchor to be submitted under RSN 31 68 00-2, Installation Plan and Approval Data.

2. Include step-by-step procedures on installing the barrier.

3. If using a crane, its location, the weights it will carry, and the crane load chart.

4. Logistics such as locations on where the trucks will off-load the materials and other machinery necessary for the contract.

5. Details and specifications of the boats that will be used, location on where they will be launched and dock location during non-working hours.

6. Details of the Barge and where it will dock or be moored at during non-working hours.

F. RSN 35 79 30-5, Weld Test Data:

1. Welder Certifications

2. Welding Procedure Specifications

G. RSN 35 79 30-6, Weld Inspection and Test Results:

H. RSN 35 79 30-7, Barrier Certification

1.04 DELIVERY, STORAGE AND HANDLING

A. Deliver, transport and store according to the manufacturer’s recommendations.

PART 2 PRODUCTS

2.01 Technical and Design Requirements

A. The Vessel Exclusion Barrier and Debris Boom

1. The portion of the barrier to be replaced will be dual purpose. It will function as a vessel barrier and debris boom.

2. The Vessel Exclusion Barrier and Debris Boom will need at least the following six components:

a. Floatation Assembly

b. Capture Assembly (For Debris)

c. Anchor/Mooring System

d. Gate Assembly

e. Connection Assembly (for attaching modules together)

Amendment No. 0004

Solicitation No. 140R2026B0001

Specifications No. 20-C0939

Vessel Exclusion Barrier and Debris Boom

35 79 30 - 5

f. Visual and Lighted Warning

3. The barrier shall consist of modular units constructed from unsinkable floatation units.

4. The replaced barrier to be fully functional between the 350 ft and 475 ft of water elevation.

5. At 350 ft of water elevation and lower, the barrier connection to the dam shall be removable.

6. The barrier loading design shall be inclusive of winds, wave force, debris loading and current loading when all spillways and penstocks are fully operational.

a. The system shall withstand winds up to 60 mph with 75 mph gusts, wave height of 5 feet, currents at 7-10 knots, ice, hail, and occasional snow.

b. The system shall be designed for ambient temperature changes ranging from 25 to 115 degrees Fahrenheit.

7. The design of the barrier shall be such that if one module is structurally damaged or requires repair or replacement, it will not require the removal and reinstallation of more than one damaged section.

8. The barrier shall remain intact and afloat after being impacted by the designated threat vessel.

9. The system shall have a minimum life design provided proper maintenance requirements are met:

a. New features to have a minimum design life of 50 years.

b. Wearing parts shall last at least 20 years prior to requiring replacement.

1) Wire Rope

2) Module-to-Module connection

3) Transition (pup) net

10. The barrier system shall be designed such that the new moorings shall support the loads of the new barrier independent of the existing East Buoy Mooring.

B. Floats:

1. The floats shall be designed to carry the weight of the barrier system.

2. The floats shall be designed to withstand impacts with riprap and conditions were it may rest entirely on riprap due to low and fluctuating water elevations.

C. Debris Curtain as supplied by JF Brennan Company, 4411 DuPont Court, Ventura, CA, or equal with the following essential characteristics:

1. The Debris Curtain needs to be permanently attached to the new barrier system and is NOT allowed to be a separate system.

Amendment No. 0004

Solicitation No. 140R2026B0001

Specifications No. 20-C0939

Vessel Exclusion Barrier and Debris Boom

35 79 30 - 6

2. Debris curtain: Suspended from the floats by means of 6,000 lb. test strength screw pin shackles or other equivalent strength anchoring devices.

3. The anchoring device shall be capable of supporting at least four times the debris curtain weight when hanging out of water.

4. The debris curtain shall also cover the gap between the modules.

5. Individual debris curtains:

a. Match length of the module

b. Provide a minimum of 2-foot-deep debris curtain, as shown on the drawing sheet 485-208-60332.

c. Curtains shall be of sufficient weight to hang vertically once installed.

d. Lash individual curtain panels to adjacent panels with maximum 3-foot-long galvanized-steel cables or chains.

D. Module-to-Module connectors as supplied by JF Brennan Company, 4411 DuPont Court, Ventura, CA, or equal with the following essential characteristics:

1. Interconnecting plates, bars, or channel members:

a. Designed to transfer forces between modules, a minimum tension of 3000 pounds or the design loads, whichever is greater.

2. The connection shall be designed such that in case one module is damaged and requires repair or replacement, single module can be removed and replaced.

3. The modules shall be connected such that the clear spacing between them shall not exceed 24 inches.

4. Cables, bolts, fittings, and all load bearing connections shall be designed with a factor of safety of 4.

5. All mechanical connections shall operate without binding.

6. The connections shall have a feature that allows adjustments of barrier components to compensate for the effects of sag and/or creep.

E. Fence Post Connection:

1. The fence post connection system to the module truss should be the same for all the fence post across the whole length of the barrier.

2. The fence post connection to the module truss shall be readily and easily replaceable in case it gets damaged.

F. Offshore Anchors:

1. The chains or ropes connecting the offshore anchors to the buoys should be able to adjust with the varying water elevation on the dam.

Amendment No. 0004

Solicitation No. 140R2026B0001

Specifications No. 20-C0939

Vessel Exclusion Barrier and Debris Boom

35 79 30 - 7

G. Onshore Anchors:

1. An onshore anchor shall be placed on the right-wing dam. See Section 31 68 00 – Onshore Anchor for more details.

H. Warning Lights: shall be spaced not greater than 30-ft apart along the entire length of the barrier

I. Warning Signage: shall be spaced not greater than 60-ft apart along the entire length of the barrier.

J. Vessel Gate:

1. To facilitate passage of authorized Vessels/equipment through barrier, an operable ‘gate’ shall be provided for use by authorized staff. This gate shall be movable using water-based equipment only.

2. The gate shall provide one 20-foot-wide opening to allow easy passage of authorized Vessels with a draft of 5-ft (min).

3. The gate section and connections of the gate section to the remainder of the barrier shall provide the same capacity and performance as the rest of the module.

4. The gate closure mechanism shall be provided with a tamper-proof lock and lock enclosure (shroud).

5. The gate shall be designed so that while it is open, the overall barrier configuration and the relative positions of the adjacent barrier modules will remain unchanged under all environmental site-conditions.

6. The gate shall be provided with a method/mechanism which will hold the gate in the open position and still maintain the barrier configuration.

7. Gate shall be designed for operation by a single person on a work boat.

8. Any individual tools or equipment required to operate the gate shall not exceed 40 lbs. Any special tooling or equipment required to remove, replace or operate the gate shall be provided for under this contract.

9. Any powered equipment associated with the gate operation shall have an independent, dedicated power source capable of providing power required for a minimum of five (5) gate operations (opening and closing) before recharging or re-fueling.

10. Testing of the opening/closing of the Gate assembly shall be done during commissioning at the site. The test shall demonstrate the mechanism and procedures for opening and closing the gate assembly and shall record the time required to perform these operations. The vendor shall supply a recommended procedure for the commissioning and identify and provide for any equipment and tooling needed for opening and closing the gate assembly.

Amendment No. 0004

Solicitation No. 140R2026B0001

Specifications No. 20-C0939

Vessel Exclusion Barrier and Debris Boom

35 79 30 - 8

K. Spare Module:

1. Length should match the length of modules used on the system.

2. Provide a minimum of 40ft in total length of the spare module.

2.02 ECOLOGICAL REQUIREMENTS

1. Detail shall avoid the use of sharp edges and other physical features that will endanger the wildlife.

2.03 MATERIALS

A. Pontoons:

1. Fabricated from an outer shell of pontoon steel pipe, ASTM A760, galvanized steel pipe.

2. Flotation material:

a. Polystyrene foam stabilized with an ultraviolet ray inhibitor meeting requirements of ASTM F667.

b. Inner foam core: No voids which could fill with water and reduce buoyancy.

c. Material should be water and abrasion resistant.

3. Size: 18-inch inside diameter minimum, tubular units.

4. Other material proposal aside from listed above is allowed subject to COR approval.

B. Debris Curtain:

1. PVC-coated galvanized 3-inch by 5-inch mesh, No. 9-gauge (0.148-inch-diameter coated wire) chain link fencing material conforming to CLFMI 2445. Other curtain configuration is allowed subject to COR approval.

C. Module-to-module Connections:

1. Connect adjacent floats/modules as detailed on the drawing sheets 485-208-60331 and 485-208-60332.

2. Interconnecting plates, bars, or channel members: Galvanized.

3. Miscellaneous metal fasteners, pins, connectors, etc.: Galvanized Steel.

D. Onshore anchor: See Section 31 68 00 – Onshore Anchor.

E. Gate Assembly: Gate Steel Components shall be galvanized steel.

F. Fence Post and its connection hardware: Galvanized steel.

Amendment No. 0004

Solicitation No. 140R2026B0001

Specifications No. 20-C0939

Vessel Exclusion Barrier and Debris Boom

35 79 30 - 9

G. Transition (pup) nets: Pup nets cover the gaps between modules. The pup nets must consist of the following or better materials at a minimum:

1. 6 each 1-1/8-inch DIA International Orange 12 plait nylon line with UV light protection for the horizontals

2. 3 each ¾ inch DIA International Orange 12 plait nylon line with UV light protection for the verticals

3. 12 each screw pin anchor shackles per pup net

H. Chain: Federal Specification RR-C-271D, Type I, Class 4 G43, hot-dipped galvanized in accordance with ASTM A153.

I. Bolt Type Anchor Shackle:

1. Federal Specification RR-C-271D Type IVA, Grade B, Class 3, hot-dipped galvanized in accordance with ASTM A153.

J. Structural Steel: ASTM A36.

K. Arc-welding Electrodes:

1. The electrode, electrode-flux combination, or grade of weld metal shall have a minimum tensile strength of 70,000 pounds per square inch.

2. All electrodes, electrode-flux combinations, or weld metal shall be in accordance with applicable AWS specifications and shall be suitable for the position and other conditions of intended use.

L. Master Links: Type A-342 Weldless Alloy Master Link manufactured by Crosby Group Inc., PO Box 3128, Tulsa OK 74101-3128, or equal, having the following essential characteristics:

1. Hot-dipped galvanized in accordance with ASTM A153.

2. Working load limit: 20,000 pounds.

M. Connecting Link: Federal Specification RR-C-271D, Type XIV, hot-dipped galvanized in accordance with ASTM A153.

N. Connecting Ring:

1. Federal Specification RR-C-271D, Type VI, hot-dipped galvanized in accordance with ASTM A153.

2. Working load limit: Not less than 6500 pounds.

O. Wire Rope: Federal Specification RR-W-410D, Type I, Class 3, Construction 6x37, drawn galvanized extra-improved plow steel.

Amendment No. 0004

Solicitation No. 140R2026B0001

Specifications No. 20-C0939

Vessel Exclusion Barrier and Debris Boom

35 79 30 - 10

P. Warning Lights: Red flashing beacon, solar powered, low maintenance type of the best marine-grade construction as supplied by Sealite, 61 Business Park Drive, Tilton, New Hampshire 03276, or equal with the following essential characteristics:

1. Meet United States Coast Guard requirements for Aid to Navigation lights.

2. Solar panels and battery packs: Solar charging shall be designed to fully recharge a depleted battery pack within two average Folsom solar days during the winter months (November through February).

3. Battery life: should last a minimum of at least 100 hours of operation without the need to recharge.

Q. Signs: shall read “Danger – Restricted Area – No Entry” and be accompanied by international “No Entry” graphic.

1. The visuals shall be legible during daylight at least 200 ft away.

R. Anchor Rod: ASTM A276 type 316.

S. Master Links Connecting Link: Federal Specification RR-C-271D, Type XIV, hot-dipped galvanized in accordance with ASTM A153.

T. Tie Clips: hot-dipped galvanized in accordance with ASTM A153.

U. Other Hardware:

1. Bolts, nuts, washers, cotter pins, screws, and other hardware: galvanized products suitable for required application.

2.04 CONTRACTOR SOURCE QUALITY TESTING

A. Inspect component parts and welds to determine conformance to drawings, procedures, overall workmanship, weld contours, weld size, and any other pertinent items.

B. Shop Welds:

1. Perform Inspections and tests in accordance with AWS D1.1

2. Notify COR 14 days in advance of tests. A representative may witness tests as directed by the COR.

3. Submit weld test data and results under RSN 35 79 30-6.

Amendment No. 0004

Solicitation No. 140R2026B0001

Specifications No. 20-C0939

Vessel Exclusion Barrier and Debris Boom

35 79 30 - 11

PART 3 EXECUTION

3.01 INSTALLATION

A. Vessel Exclusion and Debris Boom:

1. Install components in accordance with the manufacturer’s written recommendations and the drawings.

B. All netting between fence posts will be tightened and adjusted to present a continuous barrier.

C. Coat on-site welds with Surface Tolerant Epoxy Primer such as Epoxy Mastic Aluminum

II or Sherloxane 800 by Sherwin Williams or equal.

1. Follow manufacturer’s surface preparation and application instructions.

3.02 CONTRACTOR FIELD QUALITY TESTING

1. Field Welds:

a. Perform inspections and tests in accordance with AWS D1.1.

b. A representative may witness tests as directed by the COR.

2. Submit weld inspection reports under RSN 35 79 30-6, Weld Inspection and Test Results.

3.03 BARRIER CERTIFICATION

A. The barrier will need to be either certified according to ASTM F2766-11 “Standard Test

Method for Boat Barriers” or under NAVSEA Standard Items meeting the minimum requirements:

1. The barrier needs to be rated at least Level C (600,000 ft-lbf of Kinetic Energy).

This is equivalent to an 8,500 lbm boat at the speed of 40 knots.

B. Deleted.

Amendment No. 0004

Solicitation No. 140R2026B0001

Specifications No. 20-C0939

Vessel Exclusion Barrier and Debris Boom

35 79 30 - 12

American River Division- Central Valley Project - California

Amendment No. 0004

Solicitation No. 140R2026B0001

Specifications No. 20-C0939

Drawings

52 00 00 - 1

SECTION 52 00 00

DRAWINGS

PART 1 GENERAL

1.01 DISCREPANCIES, ERRORS, OR OMISSIONS

A. Inform the CO of discrepancies discovered on drawings in accordance with clause at

FAR 52.236-21, Specifications and Drawings for Construction.

B. In accordance with clause at FAR 52.236-21, Specifications and Drawings for

Construction, in case of discrepancies, written specifications take precedence over drawings unless otherwise specified.

1.02 PROJECT CONDITIONS

A. Where there are differences as determined by the CO between details and dimensions shown on drawings and details and dimensions of existing features at jobsite, use details and dimensions of existing features at jobsite.

1.03 SPECIFICATION DRAWINGS

A. Some drawings show details of fabrication or other details and specifications which are not a part of work under this contract. Disregard specifications and details shown on these drawings which are not applicable to work under this contract.

B. Reference drawings referred to on specification drawings and not considered necessary for contract purposes are not included in specifications.

1.04 INFORMATION DRAWINGS

A. Drawings marked "For Information Only" in the drawing list are included to show existing features about which knowledge is required to perform work under this contract.

These drawings do not show work to be performed under this contract.

B. Refer to 1.02 Project conditions.

1.05 COPIES OF DRAWINGS

A. One set of full-size (22 inches by 34 inches) drawings, except standard drawings, will be furnished to the Contractor.

B. Upon request, additional half-size (11 inches by 17 inches) copies of standard drawings will be furnished to the Contractor.

Amendment No. 0004

Solicitation No. 140R2026B0001

Specifications No. 20-C0939

Drawings

52 00 00 - 2

1.06 LIST OF DRAWINGS

A. Drawings listed in Table 52 00 00A - List of Drawings are made a part of Section C -

Description/Specifications.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

Amendment No. 0004

Solicitation No. 140R2026B0001

Specifications No. 20-C0939

Drawings

52 00 00 - 3

Table 52 00 00A - List of Drawings

Sheet

No.

Drawing No. Title

1 485-208-60334 Project Location Map

2 485-208-60333 Index Sheet and General Notes – Revision 2

3 485-208-60335 Area of Use – Revision 1

4 485-208-60330 Project Plan Layout - Revision 3

5 485-208-60332 Barrier and Debris Boom Details – Revision 1

6 485-208-60331 Anchor and Connector Details – Revision 2

7 485-208-60337 Anchor Location Photos

Information Drawings:

8 485-D-1294-RD-1 Main Concrete Dam elevations

9 485-D-3405 Geological Map and Geological Section A-A’

Army Corps of Engineers Drawings:

10 B-006 Bureau of Reclamation Boreholes 2004 Sheet 6

11 B-010 USACE Boreholes 2018 Sheet 3

12 B-018 USACE Boreholes 2018 Sheet 11

13 B-019 USACE Boreholes 2018 Sheet 12

14 C-201 Excavation and Fill Plan and Profile

15 C-611 Cross Sections STA 284+00 to 285+00

16 G-1007 Seasonal Variation of Storage Frequency

Standard Drawings:

40-D-7102 Government Drawing Format - Drawing Border, Sample

Title Block and Signature Lines

Amendment No. 0004

Solicitation No. 140R2026B0001

Specifications No. 20-C0939

Drawings

52 00 00 - 4

A

LW

A

YS

T H

IN

K

S A

FE

TY

SHEET

D

C

B

A

D

C

B

A

B U

R

EA

U O

F R

EC

LA

M

A

TI

O N

U .S

D

EP

A R

TM

EN

T

O F

TH

E

IN

TE

R

IO

R

C A D

S

YS

TE

M

A ut oC A D

5.

0S

LM

S T

EC

H

C A D

F

IL

EN

A M

E

5-

8-

3-

R D

-2 .D

W G

LA

S T

S A V

ED

D A

TE

-0 7-

LA

S T

S A V

ED

B Y

R M

IL

LA

R

ES

¦D_DT¦

¦STATUS¦

C

EN

TR

A L

V A

LL

EY

P

R O

JE

C T

A M

ER

IC

A N

R

IV

ER

D

IV

IS

IO

N

FO

LS

O M

D A M

V

ES

S

EL

E X C

LU

S

IO

N B

A R R

IE

R A N

D D

EB

R

IS

B O

O M

INDEX SHEET AND

GENERAL NOTES

SACRAMENTO, CA

485-208-60333

2024-12-18

DESIGNED

DRAWN

CHECKED

TECH. APPR.

APPROVED

ADMIN APPROVAL

£TT£

£AT£

£AA£

£TA£

RFM

RFM

SC

Millares, Rico F P.E.

Good, Darryl R P.E.

SHEET INDEX

FOLSOM DAM

VESSEL…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .