Amendment_0001_to_140R2025Q0055_0001.pdf
PDF 6 MB Posted
- Attached to
- Battle Creek Salmon and Steelhead Restoration
- Solicitation number
- 140R2025Q0055
About this file
This file is an Amendment (Amendment 0001) to a federal solicitation for the Battle Creek Salmon and Steelhead Restoration Project, Phase 2 Environmental Compliance and Support Services. The solicitation (No. 140R2025Q0055) is issued by the Bureau of Reclamation and seeks a contractor to support environmental compliance for a comprehensive salmon and steelhead habitat restoration project in Battle Creek, California. The amendment provides answers to contractor questions, includes a Clean Water Act Section 404 permit, and updates wage rate determinations for Tehama and Shasta counties.
Key project details include restoring approximately 48 river miles of salmon and steelhead habitat, with Phase 2 focusing on South Fork Battle Creek and covering approximately 19 river miles. The project involves modifications to hydroelectric project facilities, including dam removals, fish screen and ladder installations, and canal modifications. Preconstruction surveys have been completed, and the environmental contractor will be responsible for surveys encompassing project and access road areas. The offer due date remains unchanged, and the amendment specifies that the Reclamation archeologist will conduct cultural monitoring, and WEAT (Weekly Environmental Awareness Training) will not require Spanish translation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140R2025Q0055 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Sacramento CA 95825-1898 2800 Cottage Way, Room E-1815
R20
Division of Acquisition Services Regional Office Mid-Pacific Region Bureau of Reclamation
07/10/20250001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
07/10/2025
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
A. TITLE: Battle Creek Salmon and Steelhead Restoration Project, Phase 2 Environmental
Compliance and Support Services
B. PURPOSE: The purpose of this amendment is to provide answers to inquirer questions, provide the CWA Section 404 permit, and provide the updated wage rate determinations.
C. DESCRIPTION: This amendment hereby incorporates the following:
1) Attachment 5 - Questions and Answers #1-7
2) Attachment 6 - CWA Section 404 permit
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Roxana Ahola
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140R2025Q0055/0001
3) Updated Wage Determinations:
Tehama 2015-5627 effective July 8, 2025
Shasta 20185-5627 effective July 8, 2025
D. The offer due date and time remains unchanged.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
Attachment 5
Title: Battle Creek Salmon and Steelhead Restoration Project, Phase 2 Environmental Compliance and Support Services
Solicitation No. 140R2025Q0055 Amendment No. 001
Pre-Proposal Contractor’s Questions
No. Questions and Responses
1. May we review the 404 permit for this project?
Response: A copy of the authorized CWA Section 404, Nationwide Permit for South Diversion Dam/South Canal is included in this amendment.
2. Does the 48 river miles figure refer specifically to the Phase 2 project limits, or does it represent the total length of the overall restoration project, including Phases 1A, 1B, and 2? If it refers to the overall project, what is the river mile length for Phase 2 alone?
Response: The Battle Creek Salmon and Steelhead Restoration Project (Restoration Project) spans a total length of 48 miles, including Phases 1A, 1B, and 2. Phase 2 focuses on the restoration of South Fork Battle Creek, covering approximately 19 river miles from its confluence with main stem Battle Creek to the limit of anadromy at Panther Grade Falls.
3. The scope notes that preconstruction surveys were completed for the South Dam and Canal Removal Project. Were these protocol-level surveys or general clearance surveys?
Response: The completed preconstruction surveys were protocol-level surveys.
For details, refer to the Performance Work Statement (PWS) Attachment 3 – Restoration Project Environmental Implementation Plan, Volume 1.
4. In Attachment No. 2, on page 18 under South Dam and Canal Removal Construction, the boxes under Task 1a Preconstruction Survey are greyed out for Jan–Mar and Apr–Jun. Do these indicate that clearance surveys are not required because preconstruction surveys have already been completed for the dam and canal?
Response: No, preconstruction surveys are separate from clearance surveys, as described in the PWS Task 1A requirements. For more details, refer to the
Attachment 5
PWS Attachment 3 – Restoration Project Environmental Implementation Plan. Generally, the greyed-out cells indicate the timeframe to conduct the relevant subtasks in alignment with the expected construction schedule.
5. Is the Environmental Contractor responsible for cultural monitoring under this contract?
Response: The Phase 2 project sites have been surveyed and archeological cleared. Reclamation archeologist will conduct cultural monitoring, if needed.
6. Does the WEAT (Weekly Environmental Awareness Training) require Spanish translation?
Response: No.
7. Are preconstruction or clearance surveys required for the access roads?
Response: Surveys shall encompass all identified project/contractor use areas, including the identified private access roads, but excluding public roads.
DEPARTMENT OF THE ARMY
U.S. ARMY CORPS OF ENGINEERS, SACRAMENTO DISTRICT
1325 J STREET
SACRAMENTO CA 95814-2922
February 21, 2024
Regulatory Division (SPK-2007-00465)
U.S. Bureau of Reclamation Attn: Mr. Jesse Castro 2800 Cottage Way, CGB-200 Sacramento, California 95825-1898 jcastro@usbr.gov
Dear Mr. Castro:
We are responding to your December 5, 2023, pre-construction notification for a Department of the Army (DA) permit for the South Diversion Dam / South Canal project.
The 59.70-acre project site is located on South Fork Battle Creek in an unincorporated area, Latitude 40.36869°, Longitude -121.79799°, Tehama County, California.
Based on the information you provided to this office, the South Diversion Dam / South Canal project involves the discharge of dredged and/or fill material into waters of the U.S. This includes the placement of: 1,440 cubic yards (CY) of permanent fill material (cobble/gravel extracted from the dam) in approximately 0.69 acre (300 linear feet) of perennial stream downstream of the dam location to enhance the aquatic environment; 10 CY of permanent fill (concrete) in approximately 0.001 acre (8 linear feet) of perennial stream to plug the South Canal intake [aka Tunnel #1 inlet];
22,000 CY of permanent fill material (local material) in approximately 3.61 acres (19,604 linear feet) of human-made canal to backfill South Canal; and 1,700 CY of permanent fill material (cobble and sediment accumulation behind the dam) in approximately 0.276 acre (500 linear feet) of perennial stream to establish a pilot channel and enhance the aquatic environment. Additionally, the project includes the placement of: 60 CY of temporary fill (local material) in approximately 0.018 acre (400 linear feet) of perennial stream to build a temporary deflector berm/coffer dam;
350 CY of temporary fill (local earth/rock and three pipes) in approximately 0.103 acre (200 linear feet) of perennial stream to prepare a temporary creek crossing; and 530 CY of temporary fill (local material, one pipe, and 10 CY gravel) in approximately
0.006 acre (80 linear feet) of intermittent stream to temporarily re-establish an access road at a washout crossing. The above activities are subject to Section 404 of the Clean Water Act.
The proposed activities would be conducted in accordance with the Clean Water Act Section 404 Nationwide Permit Preconstruction Notification Package for the South Diversion Dam/South Canal Removal Project (SPK-2007-00465) plans dated November 2023.
Attachment 6
-2-
We have determined that activities in waters of the U.S. associated with the project are authorized by Nationwide Permit (NWP) 27, Aquatic Habitat Restoration, Enhancement, and Establishment Activities; and NWP 33, Temporary Construction, Access, and Dewatering. You must comply with all terms and conditions of the NWP and applicable regional conditions. Enclosed is information about the NWP terms and conditions (Enclosure 1). You should pay particular attention to General Conditions 2, 3, 6, 12, 13, 17, 18, 21, and 25. In addition, your work must comply with the following special conditions:
1. You shall implement the enclosed January 25, 2003, Memorandum of Agreement
(MOA), entitled Memorandum of Agreement Among the Bureau of Reclamation, the Federal Energy Regulatory Commission and the California State Historic Preservation Office Regarding the Battle Creek Salmon and Steelhead Restoration Project, Shasta and Tehama Counties, California, and signed by these entities, in its entirety. The Bureau of Reclamation has been designated the lead federal agency responsible for implementing and enforcing the MOA as signed. If you fail to comply with the implementation and associated enforcement of the MOA, this office may determine that you are out of compliance with the conditions of your permit/verification and suspend the verification.
Suspension may result in modification or revocation of the authorized work.
2. This Corps permit does not authorize you to take an endangered species, in particular valley elderberry longhorn beetle (Desmocerus californicus dimorphus), California red-legged frog (Rana draytonii), Sacramento winter-run Chinook salmon (Oncorhynchus tshawytscha), Central Valley spring-run Chinook salmon (Oncorhynchus tshawytscha), and Central Valley steelhead (Oncorhynchus mykiss). In order to legally take a listed species, you must have separate authorization under the Endangered Species Act (ESA) (e.g., an ESA Section 10 permit, or a Biological Opinion (BO) under ESA Section 7, with "incidental take" provisions with which you must comply).
The enclosed U.S. Fish and Wildlife Service (USFWS) BO (Number 1-1-04-F-0190, dated June 20, 2005) and Re-initiation of Formal Consultation letter (Number 1-1-04-F-0190-R1, dated October 14, 2016), and National Marine Fisheries Service (NMFS) BO (Number 151422SWRl999SA 1277:MET, dated June 22, 2005), contain mandatory terms and conditions to implement the reasonable and prudent measures that are associated with "incidental take" that is also specified in the BOs. Your authorization under this Corps permit is conditional upon your compliance with all of the mandatory terms and conditions associated with "incidental take" of the attached BOs, which terms and conditions are incorporated by reference in this permit. Failure to comply with the terms and conditions associated with incidental take of the BOs, where a take of the listed species occurs, would constitute an unauthorized take, and it would also constitute non-compliance with your Corps permit. The USFWS and the NMFS are the appropriate authority to determine compliance with the terms and conditions of their BOs, and with the ESA.
To ensure your project complies with the Magnuson-Stevens Fishery Conservation and Management Act, you must implement all of the mitigating measures and Essential Fish Habitat Recommendations identified in the above NMFS document, including those ascribed to the Corps therein.
3. Incidents where any individuals of Sacramento winter-run Chinook salmon, Central Valley spring-run Chinook salmon, and Central Valley steelhead listed by National Oceanic and Atmospheric Administration (NOAA) Fisheries under the Endangered Species Act appear to be injured or killed as a result of discharges of dredged or fill material into waters of the United States or structures or work in navigable waters of the United States authorized by this NWP shall be reported to NOAA Fisheries, Office of Protected Resources at (301) 713-1401 and the Regulatory Office of the Sacramento District of the U.S. Army Corps of Engineers at (916) 557-5250. The finder should leave the plant or animal alone, make note of any circumstances likely causing the death or injury, note the location and number of individuals involved and, if possible, take photographs. Adult animals should not be disturbed unless circumstances arise where they are obviously injured or killed by discharge exposure, or some unnatural cause. The finder may be asked to carry out instructions provided by NOAA Fisheries, Office of Protected Resources, to collect specimens or take other measures to ensure that evidence intrinsic to the specimen is preserved.
4. Prior to initiation of construction activities in waters of the U.S. authorized by this verification, you shall notify this office in writing of the anticipated start date for the work.
No later than 10 calendar days following completion of construction activities in waters of the U.S. authorized by this verification, you shall notify this office in writing that construction activities have been completed.
5. You shall comply with all terms and conditions of the enclosed February 1, 2024, Section 401 Battle Creek Hydroelectric Project: Phase 2 No Regrets Water Quality Certification.
6. Prior to initiation of any construction activities in waters of the U.S. authorized by this verification, you shall install construction best management practices (BMPs) as identified in the November 2023, Clean Water Act Section 404 Nationwide Permit Preconstruction Notification Package for the South Diversion Dam/South Canal Removal Project (SPK-2007-00465), prepared by Stantec Consulting Services Inc., which is hereby incorporated by reference as a condition of this verification. You shall ensure the BMPs are inspected bi-weekly and maintained in good condition while ground disturbing activities are occurring, until construction activities in waters of the U.S. authorized by this verification are complete. All BMPs shall remain until construction activities are completed and all disturbed soils are stabilized.
Within 30 days after completion of the authorized work, you must sign the enclosed Compliance Certification and return it to this office.
-4-
This verification is valid until March 14, 2026, when the existing NWPs are scheduled to be modified, reissued, or revoked. Furthermore, if you commence or are under contract to commence this activity before the date the NWP is modified, reissued, or revoked, you will have 12 months from the date of the modification, reissuance or revocation to complete the activity under the present terms and conditions. Failure to comply with the general and regional conditions of this NWP, or the project-specific special conditions of this authorization, may result in the suspension or revocation of your authorization.
We would appreciate your feedback on this permit action including your interaction with our staff and processes. For more information about our program or to complete our Regulatory Program national customer service survey, visit our website at www.spk.usace.army.mil/Missions/Regulatory.aspx.
Please refer to identification number SPK-2007-00465 in any correspondence concerning this project. If you have any questions, please contact Christy Morgan at our Sacramento Regulatory Division, 1325 J Street, Room 1827, Sacramento, California 95814-2922, by email at Christy.M.Morgan@usace.army.mil, or telephone at
(916) 557-7505.
Sincerely, Shannon Morgan Senior Project Manager Nevada Section
Enclosures cc:
Paul Hann, State Water Resources Control Board, paul.hann@waterboards.ca.gov Parker Thaler, State Water Resources Control Board, parker.thaler@waterboards.ca.gov Rajaa Hassan, State Water Resources Control Board, Rajaa.Hassan@Waterboards.ca.gov Trang Nguyen, U.S. Bureau of Reclamation, trangnguyen@usbr.gov Brett Hanshew, Sequoia Ecological Consulting, bhanshew@sequoiaeco.com
COMPLIANCE CERTIFICATION
Permit File Name: South Diversion Dam / South Canal
Action ID: SPK-2007-00465
Nationwide Permit Numbers: 27, Aquatic Habitat Restoration, Enhancement, and Establishment Activities; and 33, Temporary Construction, Access, and Dewatering
Permittee: U.S. Bureau of Reclamation
Attn: Mr. Jesse Castro 2800 Cottage Way, CGB-200 Sacramento, California 95825-1898
County: Tehama County
Date of Verification: February 21, 2024
Within 30 days after completion of the activity authorized by this permit, sign this certification and return it to the following address:
U.S. Army Corps of Engineers Sacramento District 1325 J Street, Room 1827 Sacramento, California 95814-2922 SPKRegulatoryMailbox@usace.army.mil
Please note that your permitted activity is subject to a compliance inspection by a U.S.
Army Corps of Engineers representative. If you fail to comply with the terms and conditions of the permit your authorization may be suspended, modified, or revoked. If you have any questions about this certification, please contact the U.S. Army Corps of Engineers.
I hereby certify that the work authorized by the above-referenced permit, including all the required mitigation, was completed in accordance with the terms and conditions of the permit verification.
Permittee Signature Date
BUILDING STRONG®
U.S. ARMY CORPS OF ENGINEERS – SACRAMENTO DISTRICT
1325 J ST. – SACRAMENTO, CA 95814
www.spk.usace.army.mil www.facebook.com/sacramentodistrict www.youtube.com/sacramentodistrict www.twitter.com/USACESacramento www.f lickr.com/photos/sacramentodistrict
2021 Nationwide Permit Summary 33 CFR Part 330; Issuance of Nationwide Permits – February 25, 2022
27. Aquatic Habitat Restoration, Enhancement, and Establishment Activities. Activities in waters of the United States associated with the restoration, enhancement, and establishment of tidal and non-tidal wetlands and riparian areas, the restoration and enhancement of nontidal streams and other non-tidal open waters, and the rehabilitation or enhancement of tidal streams, tidal wetlands, and tidal open waters, provided those activities result in net increases in aquatic resource functions and services.
To be authorized by this NWP, the aquatic habitat restoration, enhancement, or establishment activity must be planned, designed, and implemented so that it results in aquatic habitat that resembles an ecological reference. An ecological reference may be based on the characteristics of one or more intact aquatic habitats or riparian areas of the same type that exist in the region. An ecological reference may be based on a conceptual model developed from regional ecological knowledge of the target aquatic habitat type or riparian area.
To the extent that a Corps permit is required, activities authorized by this NWP include, but are not limited to the removal of accumulated sediments; releases of sediment from reservoirs to maintain sediment transport continuity to restore downstream habitats; the installation, removal, and maintenance of small water control structures, dikes, and berms, as well as discharges of dredged or fill material to restore appropriate stream channel configurations after small water control structures, dikes, and berms are removed; the installation of current deflectors; the enhancement, rehabilitation, or re-establishment of riffle and pool stream structure; the placement of in-stream habitat structures; modifications of the stream bed and/or banks to enhance, rehabilitate, or re-establish stream meanders; the removal of stream barriers, such as undersized culverts, fords, and grade control structures; the backfilling of artificial channels; the removal of existing drainage structures, such as drain tiles, and the filling, blocking, or reshaping of drainage ditches to restore wetland hydrology; the installation of structures or fills necessary to restore or enhance wetland or stream hydrology; the construction of small nesting islands; the construction of open water areas; the construction of oyster habitat over unvegetated bottom in tidal waters; coral restoration or relocation activities; shellfish seeding; activities needed to reestablish vegetation, including plowing or discing for seed bed preparation and the planting of appropriate wetland species; re-establishment of submerged aquatic vegetation in areas where those plant communities previously existed; reestablishment of tidal wetlands in tidal waters where those wetlands previously existed; mechanized land clearing to remove non-native invasive, exotic, or nuisance vegetation; and other related activities. Only native plant species should be planted at the site.
This NWP authorizes the relocation of non-tidal waters, including non-tidal wetlands and streams, on the project site provided there are net increases in aquatic resource functions and services. Except for the relocation of non-tidal waters on the project site, this NWP does not authorize the conversion of a stream or natural wetlands to another aquatic habitat type (e.g., the conversion of a stream to wetland or vice versa) or uplands.
Changes in wetland plant communities that occur when wetland hydrology is more fully restored during wetland rehabilitation activities are not considered a conversion to another aquatic habitat type. This NWP does not authorize stream channelization. This NWP does not authorize the relocation of tidal waters or the conversion of tidal waters, including tidal wetlands, to other aquatic uses, such as the conversion of tidal wetlands into open water impoundments.
Compensatory mitigation is not required for activities authorized by this NWP since these activities must result in net increases in aquatic resource functions and services.
Reversion. For enhancement, restoration, and establishment activities conducted:
(1) In accordance with the terms and conditions of a binding stream or wetland enhancement or restoration agreement, or a wetland establishment agreement, between the landowner and the U.S. Fish and Wildlife Service (FWS), the Natural Resources Conservation Service (NRCS), the Farm Service Agency (FSA), the National Marine Fisheries Service (NMFS), the National Ocean Service (NOS), U.S. Forest Service (USFS), or their designated state cooperating agencies;
(2) as voluntary wetland restoration, enhancement, and establishment actions documented by the NRCS or USDA Technical Service Provider pursuant to NRCS Field Office Technical Guide standards; or
(3) on reclaimed surface coal mine lands, in accordance with a Surface Mining Control and Reclamation Act permit issued by the Office of Surface Mining Reclamation and Enforcement (OSMRE) or the applicable state agency, this NWP also authorizes any future discharge of dredged or fill material associated with the reversion of the area to its documented prior condition and use (i.e., prior to the restoration, enhancement, or establishment activities).
The reversion must occur within five years after expiration of a limited term wetland restoration or establishment agreement or permit, and is authorized in these circumstances even if the
ENCLOSURE 1
Attachment 6 http://www.spk.usace.army.mil/ http://www.facebook.com/sacramentodistrict http://www.youtube.com/sacramentodistrict http://www.twitter.com/USACESacramento http://www.flickr.com/photos/sacramentodistrict discharge of dredged or fill material occurs after this NWP expires. The five-year reversion limit does not apply to agreements without time limits reached between the landowner and the FWS, NRCS, FSA, NMFS, NOS, USFS, or an appropriate state cooperating agency. This NWP also authorizes discharges of dredged or fill material in waters of the United States for the reversion of wetlands that were restored, enhanced, or established on prior-converted cropland or on uplands, in accordance with a binding agreement between the landowner and NRCS, FSA, FWS, or their designated state cooperating agencies (even though the restoration, enhancement, or establishment activity did not require a section 404 permit). The prior condition will be documented in the original agreement or permit, and the determination of return to prior conditions will be made by the Federal agency or appropriate state agency executing the agreement or permit. Before conducting any reversion activity, the permittee or the appropriate Federal or state agency must notify the district engineer and include the documentation of the prior condition. Once an area has reverted to its prior physical condition, it will be subject to whatever the Corps Regulatory requirements are applicable to that type of land at the time. The requirement that the activity results in a net increase in aquatic resource functions and services does not apply to reversion activities meeting the above conditions.
Except for the activities described above, this NWP does not authorize any future discharge of dredged or fill material associated with the reversion of the area to its prior condition. In such cases a separate permit would be required for any reversion.
Reporting. For those activities that do not require pre-construction notification, the permittee must submit to the district engineer a copy of:
(1) The binding stream enhancement or restoration agreement or wetland enhancement, restoration, or establishment agreement, or a project description, including project plans and location map;
(2) the NRCS or USDA Technical Service Provider documentation for the voluntary stream enhancement or restoration action or wetland restoration, enhancement, or establishment action; or
(3) the SMCRA permit issued by OSMRE or the applicable state agency.
The report must also include information on baseline ecological conditions on the project site, such as a delineation of wetlands, streams, and/or other aquatic habitats. These documents must be submitted to the district engineer at least 30 days prior to commencing activities in waters of the United States authorized by this NWP.
Notification: The permittee must submit a pre-construction notification to the district engineer prior to commencing any activity (see general condition 32), except for the following activities:
(1) Activities conducted on non- Federal public lands and private lands, in accordance with the terms and conditions of a binding stream enhancement or restoration agreement or wetland enhancement, restoration, or establishment agreement between the landowner and the FWS, NRCS, FSA, NMFS, NOS, USFS or their designated state cooperating agencies;
(2) Activities conducted in accordance with the terms and conditions of a binding coral restoration or relocation agreement between the project proponent and the NMFS or any of its designated state cooperating agencies;
(3) Voluntary stream or wetland restoration or enhancement action, or wetland establishment action, documented by the NRCS or USDA Technical Service Provider pursuant to NRCS Field Office Technical Guide standards; or
(4) The reclamation of surface coal mine lands, in accordance with an SMCRA permit issued by the OSMRE or the applicable state agency.
However, the permittee must submit a copy of the appropriate documentation to the district engineer to fulfill the reporting requirement. (Authorities: Sections 10 and 404).
Note: This NWP can be used to authorize compensatory mitigation projects, including mitigation banks and in-lieu fee projects. However, this NWP does not authorize the reversion of an area used for a compensatory mitigation project to its prior condition, since compensatory mitigation is generally intended to be permanent.
A. Regional Conditions
1. Regional Conditions for California
2. Regional Conditions for Nevada and Utah
B. Nationwide Permit General Conditions Note: To qualify for NWP authorization, the prospective permittee must comply with the following general conditions, as applicable, in addition to any regional or case-specific conditions imposed by the division engineer or district engineer.
Prospective permittees should contact the appropriate Corps district office to determine if regional conditions have been imposed on an NWP. Prospective permittees should also contact the appropriate Corps district office to determine the status of Clean Water Act Section 401 water quality certification and/or Coastal Zone Management Act consistency for an NWP. Every person who may wish to obtain permit authorization under one or more NWPs, or who is currently relying on an existing or prior permit authorization under one or more NWPs, has been and is on notice that all of the provisions of 33 CFR 330.1 through 330.6 apply to every NWP authorization. Note especially 33 CFR 330.5 relating to the modification, suspension, or revocation of any NWP authorization.
1. Navigation.
(a) No activity may cause more than a minimal adverse effect on navigation.
(b) Any safety lights and signals prescribed by the U.S. Coast Guard, through regulations or otherwise, must be installed and maintained at the permittee's expense on authorized facilities in navigable waters of the United States.
(c) The permittee understands and agrees that, if future operations by the United States require the
Attachment 6 https://www.spk.usace.army.mil/Portals/12/documents/regulatory/nwp/2021-nwps/2022.02.25-Final-All-NWP-RCs-CA-SPK-Only.pdf https://www.spk.usace.army.mil/Portals/12/documents/regulatory/nwp/2021-nwps/2022.02.25-Final-All-NWP-RCs-UT-NV.pdf removal, relocation, or other alteration, of the structure or work herein authorized, or if, in the opinion of the Secretary of the Army or his or her authorized representative, said structure or work shall cause unreasonable obstruction to the free navigation of the navigable waters, the permittee will be required, upon due notice from the Corps of Engineers, to remove, relocate, or alter the structural work or obstructions caused thereby, without expense to the United States. No claim shall be made against the United States on account of any such removal or alteration.
2. Aquatic Life Movements. No activity may substantially disrupt the necessary life cycle movements of those species of aquatic life indigenous to the waterbody, including those species that normally migrate through the area, unless the activity's primary purpose is to impound water. All permanent and temporary crossings of waterbodies shall be suitably culverted, bridged, or otherwise designed and constructed to maintain low flows to sustain the movement of those aquatic species. If a bottomless culvert cannot be used, then the crossing should be designed and constructed to minimize adverse effects to aquatic life movements.
3. Spawning Areas. Activities in spawning areas during spawning seasons must be avoided to the maximum extent practicable. Activities that result in the physical destruction (e.g., through excavation, fill, or downstream smothering by substantial turbidity) of an important spawning area are not authorized.
4. Migratory Bird Breeding Areas. Activities in waters of the United States that serve as breeding areas for migratory birds must be avoided to the maximum extent practicable.
5. Shellfish Beds. No activity may occur in areas of concentrated shellfish populations, unless the activity is directly related to a shellfish harvesting activity authorized by NWPs 4 and 48, or is a shellfish seeding or habitat restoration activity authorized by NWP 27.
6. Suitable Material. No activity may use unsuitable material (e.g., trash, debris, car bodies, asphalt, etc.). Material used for construction or discharged must be free from toxic pollutants in toxic amounts (see section 307 of the Clean Water Act).
7. Water Supply Intakes. No activity may occur in the proximity of a public water supply intake, except where the activity is for the repair or improvement of public water supply intake structures or adjacent bank stabilization.
8. Adverse Effects From Impoundments. If the activity creates an impoundment of water, adverse effects to the aquatic system due to accelerating the passage of water, and/or restricting its flow must be minimized to the maximum extent practicable.
9. Management of Water Flows. To the maximum extent practicable, the pre-construction course, condition, capacity, and location of open waters must be maintained for each activity, including stream channelization, storm water management activities, and temporary and permanent road crossings, except as provided below. The activity must be constructed to withstand expected high flows. The activity must not restrict or impede the passage of normal or high flows, unless the primary purpose of the activity is to impound water or manage high flows. The activity may alter the pre-construction course, condition, capacity, and location of open waters if it benefits the aquatic environment (e.g., stream restoration or relocation activities).
10. Fills Within 100-Year Floodplains. The activity must comply with applicable FEMA-approved state or local floodplain management requirements.
11. Equipment. Heavy equipment working in wetlands or mudflats must be placed on mats, or other measures must be taken to minimize soil disturbance.
12. Soil Erosion and Sediment Controls. Appropriate soil erosion and sediment controls must be used and maintained in effective operating condition during construction, and all exposed soil and other fills, as well as any work below the ordinary high water mark or high tide line, must be permanently stabilized at the earliest practicable date. Permittees are encouraged to perform work within waters of the United States during periods of low-flow or no-flow, or during low tides.
13. Removal of Temporary Fills. Temporary structures must be removed, to the maximum extent practicable, after their use has been discontinued. Temporary fills must be removed in their entirety and the affected areas returned to pre-construction elevations. The affected areas must be revegetated, as appropriate.
14. Proper Maintenance. Any authorized structure or fill shall be properly maintained, including maintenance to ensure public safety and compliance with applicable NWP general conditions, as well as any activity-specific conditions added by the district engineer to an NWP authorization.
15. Single and Complete Project. The activity must be a single and complete project. The same NWP cannot be used more than once for the same single and complete project.
16. Wild and Scenic Rivers.
(a) No NWP activity may occur in a component of the National Wild and Scenic River System, or in a river officially designated by Congress as a “study river” for possible inclusion in the system while the river is in an official study status, unless the appropriate Federal agency with direct management responsibility for such river, has determined in writing that the proposed activity will not adversely affect the Wild and Scenic River designation or study status.
(b) If a proposed NWP activity will occur in a component of the National Wild and Scenic River System, or in a river officially designated by Congress as a “study river” for possible inclusion in the system while the river is in an official study status, the permittee must submit a pre-construction notification (see general condition 32). The district engineer will coordinate the PCN with the Federal agency with direct management responsibility for that river.
Permittees shall not begin the NWP activity until notified by the district engineer that the Federal agency with direct management responsibility for that river has determined in writing that the proposed NWP activity will not adversely affect the Wild and Scenic River designation or study status.
(c) Information on Wild and Scenic Rivers may be obtained from the appropriate Federal land management agency responsible for the designated Wild and Scenic River or study river (e.g., National Park Service, U.S. Forest Service, Bureau of Land Management, U.S. Fish and Wildlife Service). Information on these rivers is also available at: https://www.rivers.gov/.
17. Tribal Rights. No activity or its operation may impair reserved tribal rights, including, but not limited to, reserved water rights and treaty fishing and hunting rights.
18. Endangered Species.
(a) No activity is authorized under any NWP which is likely to directly or indirectly jeopardize the continued existence of a threatened or endangered species or a species proposed for such designation, as identified under the Federal Endangered Species Act (ESA), or which will directly or indirectly destroy or adversely modify designated critical habitat or critical habitat proposed for such designation. No activity is authorized under any NWP which “may affect” a listed species or critical habitat, unless ESA section 7 consultation addressing the consequences of the proposed activity on listed species or critical habitat has been completed. See 50 CFR 402.02 for the definition of “effects of the action” for the purposes of ESA section 7 consultation, as well as 50 CFR 402.17, which provides further explanation under ESA section 7 regarding “activities that are reasonably certain to occur” and “consequences caused by the proposed action.”
(b) Federal agencies should follow their own procedures for complying with the requirements of the ESA (see 33 CFR 330.4(f)(1)). If pre-construction notification is required for the proposed activity, the Federal permittee must provide the district engineer with the appropriate documentation to demonstrate compliance with those requirements. The district engineer will verify that the appropriate documentation has been submitted. If the appropriate documentation has not been submitted, additional ESA section 7 consultation may be necessary for the activity and the respective federal agency would be responsible for fulfilling its obligation under section 7 of the ESA.
(c) Non-federal permittees must submit a pre-construction notification to the district engineer if any listed species (or species proposed for listing) or designated critical habitat (or critical habitat proposed such designation) might be affected or is in the vicinity of the activity, or if the activity is located in designated critical habitat or critical habitat proposed for such designation, and shall not begin work on the activity until notified by the district engineer that the requirements of the ESA have been satisfied and that the activity is authorized. For activities that might affect Federally-listed endangered or threatened species (or species proposed for listing) or designated critical habitat (or critical habitat proposed for such designation), the pre-construction notification must include the name(s) of the endangered or threatened species (or species proposed for listing) that might be affected by the proposed activity or that utilize the designated critical habitat (or critical habitat proposed for such designation) that might be affected by the proposed activity. The district engineer will determine whether the proposed activity “may affect” or will have “no effect” to listed species and designated critical habitat and will notify the non-Federal applicant of the Corps’ determination within 45 days of receipt of a complete pre-construction notification. For activities where the non- Federal applicant has identified listed species (or species proposed for listing) or designated critical habitat (or critical habitat proposed for such designation) that might be affected or is in the vicinity of the activity, and has so notified the Corps, the applicant shall not begin work until the Corps has provided notification that the proposed activity will have “no effect” on listed species (or species proposed for listing or designated critical habitat (or critical habitat proposed for such designation), or until ESA section 7 consultation or conference has been completed. If the non-Federal applicant has not heard back from the Corps within 45 days, the applicant must still wait for notification from the Corps.
(d) As a result of formal or informal consultation or conference with the FWS or NMFS the district engineer may add species-specific permit conditions to the NWPs.
(e) Authorization of an activity by an NWP does not authorize the “take” of a threatened or endangered species as defined under the ESA. In the absence of separate authorization (e.g., an ESA Section 10 Permit, a Biological Opinion with “incidental take” provisions, etc.)
from the FWS or the NMFS, the Endangered Species Act prohibits any person subject to the jurisdiction of the United States to take a listed species, where "take" means to harass, harm, pursue, hunt, shoot, wound, kill, trap, capture, or collect, or to attempt to engage in any such conduct. The word “harm” in the definition of “take'' means an act which actually kills or injures wildlife. Such an act may include significant habitat modification or degradation where it actually kills or injures wildlife by significantly impairing essential behavioral patterns, including breeding, feeding or sheltering.
(f) If the non-federal permittee has a valid ESA section 10(a)(1)(B) incidental take permit with an approved Habitat Conservation Plan for a project or a group of projects that includes the proposed NWP activity, the non-federal applicant should provide a copy of that ESA section 10(a)(1)(B) permit with the PCN required by paragraph (c) of this general condition. The district engineer will coordinate with the agency that issued the ESA section 10(a)(1)(B) permit to determine whether the proposed NWP activity and the associated incidental take were considered in the internal ESA section 7 consultation conducted for the ESA section 10(a)(1)(B) permit. If that coordination results in concurrence from the agency that the proposed NWP activity and the associated incidental take were considered in the internal ESA section 7 consultation for the ESA section 10(a)(1)(B) permit, the district engineer does not need to conduct a separate ESA section 7 https://www.rivers.gov/ consultation for the proposed NWP activity. The district engineer will notify the non-federal applicant within 45 days of receipt of a complete pre-construction notification whether the ESA section 10(a)(1)(B) permit covers the proposed NWP activity or whether additional ESA section 7 consultation is required.
(g) Information on the location of threatened and endangered species and their critical habitat can be obtained directly from the offices of the FWS and NMFS or their world wide web pages at https://www.fws.gov/ or https://www.fws.gov/ipac/ and https://www.fisheries.noaa.gov/topic/endangered-species-conservation respectively.
19. Migratory Birds and Bald and Golden Eagles. The permittee is responsible for ensuring that an action authorized by an NWP complies with the Migratory Bird Treaty Act and the Bald and Golden Eagle Protection Act. The permittee is responsible for contacting the appropriate local office of the U.S.
Fish and Wildlife Service to determine what measures, if any, are necessary or appropriate to reduce adverse effects to migratory birds or eagles, including whether "incidental take" permits are necessary and available under the Migratory Bird Treaty Act or Bald and Golden Eagle Protection Act for a particular activity.
20. Historic Properties.
(a) No activity is authorized under any NWP which may have the potential to cause effects to properties listed, or eligible for listing, in the National Register of Historic Places until the requirements of Section 106 of the National Historic Preservation Act (NHPA) have been satisfied.
(b) Federal permittees should follow their own procedures for complying with the requirements of section 106 of the National Historic Preservation Act (see 33 CFR 330.4(g)(1)). If pre-construction notification is required for the proposed NWP activity, the Federal permittee must provide the district engineer with the appropriate documentation to demonstrate compliance with those requirements. The district engineer will verify that the appropriate documentation has been submitted. If the appropriate documentation is not submitted, then additional consultation under section 106 may be necessary. The respective federal agency is responsible for fulfilling its obligation to comply with section 106.
(c) Non-federal permittees must submit a pre-construction notification to the district engineer if the NWP activity might have the potential to cause effects to any historic properties listed on, determined to be eligible for listing on, or potentially eligible for listing on the National Register of Historic Places, including previously unidentified properties. For such activities, the pre-construction notification must state which historic properties might have the potential to be affected by the proposed NWP activity or include a vicinity map indicating the location of the historic properties or the potential for the presence of historic properties.
Assistance regarding information on the location of, or potential for, the presence of historic properties can be sought from the State Historic Preservation Officer, Tribal Historic Preservation Officer, or designated tribal representative, as appropriate, and the National Register of Historic Places (see 33 CFR 330.4(g)). When reviewing pre-construction notifications, district engineers will comply with the current procedures for addressing the requirements of section 106 of the National Historic Preservation Act. The district engineer shall make a reasonable and good faith effort to carry out appropriate identification efforts commensurate with potential impacts, which may include background research, consultation, oral history interviews, sample field investigation, and/or field survey. Based on the information submitted in the PCN and these identification efforts, the district engineer shall determine whether the proposed NWP activity has the potential to cause effects on the historic properties. Section 106 consultation is not required when the district engineer determines that the activity does not have the potential to cause effects on historic properties (see 36 CFR 800.3(a)). Section 106 consultation is required when the district engineer determines that the activity has the potential to cause effects on historic properties. The district engineer will conduct consultation with consulting parties identified under 36 CFR 800.2(c) when he or she makes any of the following effect determinations for the purposes of section 106 of the NHPA: no historic properties affected, no adverse effect, or adverse effect.
(d) Where the non-Federal applicant has identified historic properties on which the proposed NWP activity might have the potential to cause effects and has so notified the Corps, the non-Federal applicant shall not begin the activity until notified by the district engineer either that the activity has no potential to cause effects to historic properties or that NHPA section 106 consultation has been completed. For non-federal permittees, the district engineer will notify the prospective permittee within 45 days of receipt of a complete pre-construction notification whether NHPA section 106 consultation is required. If NHPA section 106 consultation is required, the district engineer will notify the non-Federal applicant that he or she cannot begin the activity until section 106 consultation is completed. If the non-Federal applicant has not heard back from the Corps within 45 days, the applicant must still wait for notification from the Corps.
(e) Prospective permittees should be aware that section 110(k) of the NHPA (54 U.S.C. 306113) prevents the Corps from granting a permit or other assistance to an applicant who, with intent to avoid the requirements of section 106 of the NHPA, has intentionally significantly adversely affected a historic property to which the permit would relate, or having legal power to prevent it, allowed such significant adverse effect to occur, unless the Corps, after consultation with the Advisory Council on Historic Preservation (ACHP), determines that circumstances justify granting such assistance despite the adverse effect created or permitted by the applicant. If circumstances justify granting the assistance, the Corps is required to notify the ACHP and provide documentation specifying the circumstances, the degree of damage to the integrity
Attachment 6 https://www.fws.gov/ https://www.fws.gov/ipac/ https://www.fisheries.noaa.gov/topic/endangered-species-conservation https://www.fisheries.noaa.gov/topic/endangered-species-conservation of any historic properties affected, and proposed mitigation.
This is the start of the file's text. The full file is on GovTribe.