C05_05__Industry_Questions_-_Government_Response_0009.pdf
PDF 72 KB Posted
- Attached to
- Nimbus Station Service Replacement
- Solicitation number
- 140R2024Q0080
About this file
This document is a set of industry questions and the government's responses regarding a federal contract opportunity for the Nimbus Station Service Replacement project.
The key details are:
- The industry asked about breaker settings, panelboard specifications, and close-coupling of transformers, and the government provided responses. The government stated that breaker settings will be set by the Bureau of Reclamation, the panelboards shall be 3-phase, and the medium voltage switchgear units will not be close-coupled.
- The related federal contract opportunity is for the Nimbus Station Service Replacement project, solicited by the Department of the Interior's Bureau of Reclamation. The solicitation number is 140R2024Q0080.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Question # Industry Questions
1 LVA cannot provide breaker settings below 80A. So please let me know how you want to proceed with this issue having (10) breakers on the lineup.
Do you know the amperage breakers needed for the panelboard D1A/bus 1 & 2 ? LVA only provided single phase panelboard within the switchgear.
3 Will you be close coupling transformer to U1a (52A)?
4 Will you be close coupling transformer to U2A (52B)?
5 Does customer maybe plan to have SWGR as Main-Tie-Main and close couple to MCC?
Government Response
1. Breaker settings will be set by BOR.
2. Breaker ratings are shown on 485-D-60882. Panelboards shall be 3 phase.
3. U1A (MV switchgear) to be located on generator floor in same location as existing. U1A will not be close coupled to K1B or K1C because they are on different elevations.
4. U2A (MV switchgear) to be located on generator floor in same location as existing. U2A will not be close coupled to K1B or K1C because they are on different elevations.
5. D1A has will have a main-tie-main scheme. Equipment shall be close coupled similar to layout shown on 485-D- 60897.
File details come from the government source that posted it. Updated .