Amendment_1_Q_A_Attachment_140R2022Q0110_0001.pdf

PDF 97 KB Posted

Attached to
J. F. Carr Lube Oil Replacement
Solicitation number
140R2022Q0110
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INTERIOR REGION 10 • CALIFORNIA-GREAT BASIN

CALIFORNIA*, NEVADA*, OREGON*

* PARTIAL

steves@usbr.gov

United States Department of the Interior

BUREAU OF RECLAMATION

California Great Basin Region

2800 Cottage Way Sacramento, California 95825-1898

RE: 140R2022Q0110, Amendment 1, Questions & Answers Attachment

Q: Is there an elevator to get supplies from ground level to the oil tank room?

A: No, there are stairs or there is a crane support for heavier items per the statement of work.

Q: The table on page 6, #1 includes removing 200 gallons of oil that are in the dirty oil storage tank and the 2873 per unit. Can these be done at the same time using the same truck?

A: Yes. But the limit to the dirty oil tank is 3000 gallons, so some oil will have to be removed from the tank and loaded onto the oil truck before the unit is completely emptied or else it will overfill the dirty oil tank.

Q: Are there PCBs in the oil?

A: The attached oil sample report was taken on 08/11-2022. Samples taken from Unit 1 and Unit 2 Guide Bearings. Sample results show Aroclor 1254 at levels between .710 -

.734 mg/Kg or ppm. So the level of PCBs are less than 1 ppm but they are present.

mailto:steves@usbr.gov

File details come from the government source that posted it. Updated .