5 Technical Exhibit 2_0001.pdf
PDF 156 KB Posted
- Attached to
- Columbia Mowry O&M Services Federal contract opportunity
- Solicitation number
- 140R2021Q0022
About this file
This technical exhibit outlines performance requirements for operation and maintenance services for Columbia Mowry facilities. Key requirements include government liaison, maintenance records, pest management, terrestrial and aquatic weed control, rodent and insect control, riprap, berms and ditches, paved and unpaved roads, signs and reflectors, gates, fence repairs, guardrails, electrical maintenance, pumping plant operations, and contingency plan updates. Daily, weekly, and monthly maintenance tasks are specified. The related federal contract opportunity is solicitation number 140R2021Q0022 issued by the Department of the Interior Bureau of Reclamation for Columbia Mowry O&M Services. Interested offerors are invited to submit proposals to provide operation and maintenance services for the specified Columbia Mowry facilities.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140R2021Q0022_Amd_0002.pdf | ||
| 6 OMS Roads Berms and Ditches Exh 232021_0001.pdf | ||
| 4 Techincal Exhibit 1_0001.pdf | ||
| 8 Subcontracting Plan Worksheet_0001.docx | DOCX document | |
| 2 Performance Work Statement Modification_0302021_0001.pdf | ||
| 3 Maintenance Schedule_0001.pdf | ||
| 7 Wage Determination_0001.pdf | ||
| 1 Columbia Mowry Price Schedule_0001.xlsx | XLSX spreadsheet | |
| Sol_140R2021Q0022_Amd_0001.pdf | ||
| Sol_140R2021Q0022.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Requred
Task Standard
Acceptable
Quality Surveillance
Date of
Inspection Comments
5.1 Government Liaison
5.2 Maintenance Records
5.3 Pest Management
5.4 Terrestrial Weed Control
5.5 Aquatic Weed Control
5.6 Rodent Control
5.7 Insect Control
5.8 Riprap
5.9 Berms and Ditches
5.10 Paved and Unpaved Roads
5.10.1 Signs/Reflectors
5.11 Gates
5.12 Fence Repairs
5.13 Guardrails
Requred
Task Standard
Acceptable
Quality Surveillance
Date of
Inspection Comments
5.14 Electrical Maintenance
5.14.2 Cleanliness
5.14.3 Dryness
5.14.4 Tightness
5.14.5 Friction Prevention
5.14.6 Buses & Connections
5.14.8 Main Disconnect
Contracts & Supports
5.14.9 Instruments & Relay
Mounted Devices
Requred
Task Standard
Acceptable
Quality Surveillance
Date of
Inspection Comments
5.15.2 Daily Maintenance Requirements
PERFORMANCE REQUIREMENTS FOR O&M OF COLUMBIA MOWRY FACILITIES
PERFORMANCE REQUIREMENTS FOR O&M OF COLUMBIA MOWRY FACILITIES
PERFORMANCE REQUIREMENTS FOR O&M OF COLUMBIA MOWRY FACILITIES
5.15.3 Pumping Plant C‐North C‐South
5.1.5 Pumping Plant 'A'
5.3.11 Gates
5.3.12 Fences
Requred
Task Standard
Acceptable
Quality Surveillance
Date of
Inspection Comments
DJP
4.1 Update Contingency Plan
4.2 Pest Management
4.3 Berms and Ditches, Roads, Gates, and
Fences
BB Limited
4.1 Update Contingency Plan
4.2 Pest Management
4.3 Berms and Ditches, Roads, Gates, and
Fences
Farmers
4.1 Update Contingency Plan
4.2 Pest Management
4.3 Berms and Ditches, Roads, Gates, and
Fences
Wonderful
4.1 Update Contingency Plan
4.2 Pest Management
4.3 Berms and Ditches, Roads, Gates, and
Fences
Baker Brothers
4.1 Update Contingency Plan
4.2 Pest Management
4.3 Berms and Ditches, Roads, Gates, and
Fences
Baker Farming
4.1 Update Contingency Plan
4.2 Pest Management
4.3 Berms and Ditches, Roads, Gates, and
Fences
PERFORMANCE REQUIREMENTS FOR NEWLY ACQUIRED AREAS OPTIONS
File details come from the government source that posted it. Updated .