4 Techincal Exhibit 1_0001.pdf
PDF 98 KB Posted
- Attached to
- Columbia Mowry O&M Services Federal contract opportunity
- Solicitation number
- 140R2021Q0022
About this file
This technical exhibit outlines performance requirements and quality assurance surveillance for operations and maintenance services for Columbia Mowry distribution facilities. The contractor shall respond to emergencies in a timely manner and complete all work according to industry standards, properly following procedures 100% of the time. Preventative maintenance is subject to random inspection while repairs, maintenance items, deferred maintenance, new construction and upgrades will be inspected periodically. Surveillance methods include monthly review of documentation and periodic on-site inspections.
The related federal contract opportunity is a solicitation from the Department of the Interior Bureau of Reclamation to provide Columbia Mowry operations and maintenance services. The solicitation number is 140R2021Q0022 and seeks to award a contract for these services.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140R2021Q0022_Amd_0002.pdf | ||
| 6 OMS Roads Berms and Ditches Exh 232021_0001.pdf | ||
| 8 Subcontracting Plan Worksheet_0001.docx | DOCX document | |
| 2 Performance Work Statement Modification_0302021_0001.pdf | ||
| 3 Maintenance Schedule_0001.pdf | ||
| 7 Wage Determination_0001.pdf | ||
| 1 Columbia Mowry Price Schedule_0001.xlsx | XLSX spreadsheet | |
| 5 Technical Exhibit 2_0001.pdf | ||
| Sol_140R2021Q0022_Amd_0001.pdf | ||
| Sol_140R2021Q0022.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 1a - PWS - Technical Exhibit 1 - QASP
Performance Requirements Summary For O&M of Columbia Mowry Distribution Facilities
Performance Requirements Summary
Performance Standard
Acceptable Quality Level
Method of Surveillance
1. Operations and Maintenance
1.1 Emergency Repairs Timely Response, Timely
Completion, Quality Work, Proper Procedures
100% Timely Response and Completion, Quality Work: Comply with industry standard (FIST) 100% of the time.
Proper Procedures: Industry Standard and Operation Manual are followed 100% of time.
100% Inspection - Each month, the COR, shall review the generated documentation and enter summary results of all work completed by the contractor into the Surveillance Activity Checklist.
Periodic Inspection - The COR will typically perform the periodic inspection on a monthly basis.
1.2 Preventive
Maintenance
Random Inspection
1.3 Repairs &
Maintenance Items
100% or Periodic Inspection
1.4 Deferred
Maintenance, New Construction and Upgrades
Periodic Surveillance
File details come from the government source that posted it. Updated .