2 Performance Work Statement Modification_0302021_0001.pdf
PDF 200 KB Posted
- Attached to
- Columbia Mowry O&M Services Federal contract opportunity
- Solicitation number
- 140R2021Q0022
About this file
This performance work statement outlines operations and maintenance services required for the Columbia Mowry Distribution Facilities. The contractor shall provide personnel, equipment, and supervision to perform preventative maintenance, emergency and non-emergency repairs, and operations activities on pumping plants, canals, pipelines, and associated infrastructure. Responsibilities include weed, rodent, and pest control; facility, gate, sign and fence maintenance; electrical, road, and equipment upkeep; and water distribution operations to meet customer orders during irrigation season. The contractor must also maintain newly acquired agricultural properties totaling over 2,000 acres, which contain roads, levees, ditches, fences and gates.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140R2021Q0022_Amd_0002.pdf | ||
| 6 OMS Roads Berms and Ditches Exh 232021_0001.pdf | ||
| 4 Techincal Exhibit 1_0001.pdf | ||
| 8 Subcontracting Plan Worksheet_0001.docx | DOCX document | |
| 3 Maintenance Schedule_0001.pdf | ||
| 7 Wage Determination_0001.pdf | ||
| 1 Columbia Mowry Price Schedule_0001.xlsx | XLSX spreadsheet | |
| 5 Technical Exhibit 2_0001.pdf | ||
| Sol_140R2021Q0022_Amd_0001.pdf | ||
| Sol_140R2021Q0022.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Performance Work Statement
Operation and Maintenance of the Columbia Mowry Distribution Facilities
1. SECTION C-1: SCOPE OF WORK
The Contractor shall provide all personnel, labor, materials, supplies, equipment (except for a Government-Furnished General Motors Truck with Boom (Section C-2, 2-3)) and supervision necessary to perform the operations, maintenance, and repair activities as required by this Performance Work Statement (PWS) on the following facilities:
• Columbia Main Pumping Plant
• Columbia Diversion Channel
• Columbia Delivery Canal
• Structures on Columbia Canal
• Columbia Re-lift Pump Plants A, B, C North and C South
• Pipelines located on discharges of Plants A, C North and C South
• Columbia Mowry Pumping Plant and Pipeline
• Former Mitigation Lands Trust Property (MLT), Former DJP Farm, LLC, and
Former Southern California Edison Property (SCE)
• Options for Newly Acquired Areas – Central California Irrigation District, BB
Limited, Farmers, Wonderful, Baker Brothers and Baker Farming Properties
The principal components of work to be performed by the Contractor shall consist of, but are not limited to, the following repair and maintenance activities:
Preventive Maintenance (PM) work and inspections, and corrective actions noted during
PM inspections; emergency/repairs and maintenance; and non-emergency/repairs and maintenance.
The operations, maintenance, and repair activities shall be performed on the abovementioned facilities and any associated feature such as, but not limited to, roads;
fences; drainage channels; pumps; signs; gates; bridges; buildings; and all associated mechanical and electrical equipment. Also included is weed, rodent abatement, emergency repairs, minor construction, and other items or services necessary to provide a complete and usable system and perform the work as defined in this PWS.
In the event there is no standard or procedure for a function, it shall be the responsibility of the Contractor to develop such standards and procedures subject to approval by the
Contracting Officer (CO) before the proposed standards and procedures are implemented by the Contractor. If the Contractor determines that established standards and procedures should be changed, such changes shall be requested in writing and provided to the CO through the Contracting Officer’s Representative (COR). Any changes must receive written approval from the CO before being implemented by the Contractor.
1.1. ADMINISTRATIVE
1.1.1. Administrative Support
The Contractor shall provide the necessary administrative support activities to fully carry out the operation and maintenance program for the facilities under this contract. This shall include, but not be limited to, the following administrative activities: budget; finance;
payroll; environmental quality; safety; personnel management; property management;
supply management; maintenance management; and a quality assurance program. All administrative activities shall be consistent with industry standards and performed as required.
1.1.2. Operations and Maintenance (O&M) Manager
The Contractor shall identify an O&M manager who will be responsible for the performance of the work. The name of this person and an alternate who will act for the
Contractor when the O&M manager is absent shall be designated in writing to the COR.
The O&M manager or alternate shall have full authority to act for the Contractor on all matters relating to daily operations of this maintenance service contract.
The O&M manager or alternate shall be available during normal business hours within 2 hours of notice to meet with Government personnel designated by the COR to discuss problem areas. After normal business hours the O&M manager or designated alternate shall be available within 4 hours of notice unless a shorter response time is required due to emergency conditions.
The O&M manager and alternate must have a strong command of the English language and be able to communicate both orally and in writing.
1.1.3. Employees
Contractor personnel shall present a professional appearance and be able to provide appropriate identification. This includes the display of proper identification by each employee.
All Contractor and subcontractor personnel shall be in compliance with all Federal and
State laws relative to citizenship.
1.1.4. Licenses
Contractor personnel shall have a valid State drivers licenses for the vehicles and/or heavy equipment they are operating. Contractor personnel shall be properly trained to stay current with applicable regulations governing safe equipment operation. Contractor personnel shall comply with all Federal, State, and local laws and regulations regarding pest management and the use of pesticides. The Contractor shall maintain a current list of all Contractor employees and their respective classifications, dates of certifications, and job descriptions of those certifications.
1.2. REPAIR AND MAINTENANCE ACTIVITIES (Order of Priority)
This paragraph is to establish a schedule of priorities to which the Contractor shall respond and follow in the accomplishment of the specific tasks covered under this contract. Once irrigation season begins, February through November, all delivery related work is on a 24/7 basis. Normal O&M can be done during daylight hours, but the after- hours are on-call, within half-hour response. This half-hour response time is to assure canals are stabilized and deliveries continue while repairs are completed
1.2.1. First Priority
Emergency Work: Continued execution and accomplishment of such work until the immediate emergency is resolved and until further written designation is provided by the
COR.
1.2.2. Second Priority
Repair and maintenance items which prevent normal operations and maintenance in progress as either by categorization; as they occur; or as designated by the Contractor and approved by the COR.
1.2.3. Third Priority
Identified in the approved PM schedule. PM Worksheets will be provided to the Contractor by the Government as part of this contract (Technical Exhibit 1).
1.2.4. Fourth Priority
Tasks listed in this PWS, which are not covered by the higher priorities shown above.
1.2.5. Task Prioritization
The Contractor shall maintain and/or repair the facilities under this agreement using the priorities established above. However, the Government reserves the right of re-establishing the priority schedule when deemed necessary.
1.3. CONTINGENCY PLAN
The Bureau of Reclamation (Reclamation) must plan in advance how it will meet mission requirements in event of a natural disaster, hazardous spill, national emergency, sabotage, or similar incident which would have a significant impact on the ability of the Reclamation
Facilities to meet established commitments. Reclamation must be able to react to such events without undue delay. Sudden or unusual events could result in a great impact on the performance and Contract requirements. As an aid to properly plan for such events, the
Contractor shall prepare and submit for approval a contingency plan using Emergency
Operation Plan for each facility. The Contractor shall outline in detail, the method(s) the
Contractor shall use in meeting Contract requirements in the following circumstances:
(a) A natural disaster which impacts the Contractor's ability to perform, affects public safety, and/or threatens Reclamation lands adjacent to the Mendota Dam or Mendota Pool;
(b) A breach in a levee, berm or ditch which impacts the Contractor's ability to perform, affects public safety, and/or threatens Reclamation lands adjacent to
Mendota Dam or Mendota Pool;
(c) A labor strike which impacts the Contractor's ability to perform;
(d) A hazardous spill which impacts the Contractor to perform, affects public safety, impairs Reclamation’s ability to meet water delivery contractual commitments;
(e) An incident which causes major damage which impacts the Contractor's ability to perform and
(f) Other unforeseen circumstances.
In all cases, the Contractor shall assume that Reclamation cannot provide supplemental forces and continues to need the same or additional performance under the Contract, which the Contractor must meet. This plan shall be submitted for review after the award.
1.3.1. Emergency Response
Response to emergency service calls outside of normal business hours shall not exceed four
(4) hours regardless of the time during the day or night, weekends or holidays.
Response to emergency service during normal business hours shall not exceed two (2) hours. Response is defined as having all personnel and equipment required to correct an emergency at the site of the emergency or at a pre-approved staging area, ready, willing, and able to perform the emergency work. The Contractor shall provide a draft emergency response plan prior to contract start date.
1.3.2. Emergency Services
On occasion, services may be required to support an activation or exercise of contingency plans outside the normal business hours described above. The Contractor's responsibilities for emergency support shall be in accordance with the contingency plan.
1.4. QUALITY CONTROL
The Contractor shall establish and maintain a complete Quality Control Plan (QCP) to assure the requirements of the Contract are provided as specified. One copy of the
Contractor's QCP shall be provided to the COR. The QCP must be provided to the COR no later than 30 days after the contract award date. The QCP shall be revised in a timely manner whenever changes to the plan occur. The QCP shall include:
(a) An inspection system covering all the services listed on the Performance
Requirements Summary. It must specify the areas to be inspected on either a scheduled or unscheduled basis, how often inspections will be accomplished, and the title of the individual(s) who will perform the inspection.
(b) The methods for identifying and preventing deficiencies in the quality of service performed before the level of performance becomes unacceptable or not in conformance with this Contract.
(c) A system for documenting all inspections conducted by the Contractor and, if necessary, the corrective action taken. The inspection documentation shall be made available to the COR monthly or upon request during the term of the
Contract.
(d) Preventive Maintenance work schedules shall be developed by the Contractor and submitted to the COR. These schedules shall be approved by the COR before being implemented. The CO or designated representative has the option of modifying or redirecting the work if it is determined in the best interest of the Government.
(e) A written work order status report shall be submitted to the COR by the 10th of each month. This report shall contain information on work accomplished during the previous month, major problems encountered, expected problems, administrative problems, and Maintenance Service Contract management problems.
Following award of the contract and prior to the approval of the QCP and work schedule, the Contractor shall perform work on first and second priority repairs (Paragraph 1.3.1 and
1.3.2) should an emergency occur.
1.5. QUALITY ASSURANCE
The COR will monitor the Contractor’s performance under this contract using the quality assurance procedures specified in the Performance Requirements Summary of the PWS
(Technical Exhibit 2).
1.5.1. Performance Evaluation Meetings
The O&M manager shall meet at least weekly with the COR during the first month of the contract. Meetings shall be as often as necessary thereafter as determined by the COR.
However, a meeting shall be held whenever a Contract Discrepancy Report (CDR) is issued. The Contractor shall provide written minutes of these meetings and the minutes shall be signed by the COR and O&M manager for concurrence.
1.5.2. Performance Assessment Plan
(a) Monitoring Performance. During the course of the evaluation period, the COR will track Contractor performance. Interim (mid-term) evaluations may be provided to identify strengths and weaknesses in the Contractor's performance during the period being evaluated. At the end of the period, the COR will assess the Contractor's performance in accordance with the Quality Assurance Surveillance Plan (QASP) and report to the CO. Government personnel may observe, photograph, or otherwise record Contract operations. However, these personnel shall not interfere with
Contractor performance.
(b) Contractor Self-Assessment. Following each evaluation period, the Contractor may provide a written self-assessment of its performance to the COR to be considered in its report to the CO. The self-assessment shall be submitted not later than 5 working days after the end of each evaluation period. The self-evaluation shall not exceed 1 page per Performance Requirements Summary (PRS) element. The self-assessment shall address both the strengths and weaknesses of the Contractor's performance during the evaluation period. Where deficiencies in performance are noted, the
Contractor shall describe the actions planned or taken to correct such deficiencies and avoid their recurrence. The self-assessment itself will NOT be the basis for the payment determination.
(c) COR Recommendation. The COR will consider all evaluations and any other pertinent information, including Contractor self-assessment, and will prepare a report to the CO with findings and recommendations. The Contractor will be provided a copy of the draft findings and recommendations of the COR and will be afforded the opportunity to identify factual errors. The COR's draft recommendation is not subject to negotiation and the COR will not engage in discussions with the Contractor. Any errors identified by the Contractor will be addressed by the COR in its final report.
The Contractor will be provided a copy of the final COR report at the same time the report is submitted to the CO.
(d) Payment Determination. The CO may meet with the COR to discuss the COR's report. The Contracting Officer will make a final determination in writing as to the percentage of work successfully completed, and the resulting payment to be made. A copy of the determination will be provided to the Contractor no later than 45 calendar days after the end of the period being evaluated. All CO decisions regarding payment deduction are unilateral decisions made solely at the discretion of the
Government.
(e) Deduction. Notwithstanding any other clause of this contract, deduction of the
Disincentive will be made within the later of 60 days after the end of the evaluation period or 30 days after receipt of an approved invoice.
(f) The QASP is one evaluation method the government uses to surveillance performance to determine whether the Contractor meets the standards of performance as defined in the PWS. The absence of a QASP for any contract requirement, however, shall not detract from its enforceability or limit the rights or remedies of the government under any other provision of the contract in determining the quality of the Contractor performance.
1.6. PHYSICAL SECURITY
The Contractor shall be responsible for safeguarding all Government property provided for
Contractor use or under their control. This includes the responsibility of the Contractor to control access to secured areas as well as securing all facilities after normal business hours.
1.6.1. Key Control
The Contractor shall establish and implement methods of ensuring that all keys issued to the Contractor by the Government are not lost, misplaced, issued to or used by unauthorized personnel. It is the responsibility of the Contractor to prohibit the use of keys issued by the
Government by any persons other than the Contractor’s employees. The Contractor shall develop procedures covering key control that shall be included in the QCP.
1.7. HOURS OF OPERATION
1.7.1. Normal Business Hours
Maintenance work shall be accomplished during the Contractor’s normal working hours.
The Contractor’s normal working hours shall be from 7:00 AM to 3:30 PM Monday through Friday.
All emergency maintenance or repair work shall be accomplished whenever required and shall be completed without interruption, notwithstanding normally scheduled working hours, weekends or holidays. All emergency work shall be performed in compliance with Section 1.4.
1.8. CONSERVATION OF UTILITIES
The Contractor shall minimize the waste of electricity and water. The Contractor shall be directly responsible for instructing employees in utility conservation practices.
Mechanical equipment and control systems should be set in accordance with Federal directives. Hydraulic systems shall be designed and installed to minimize the potential for having an effect on the environment.
When water is no longer needed, water faucets or valves shall be turned off. All leaking faucets, and valves, etc., shall be repaired promptly.
1.9. SAFETY REQUIREMENTS
Department of Labor Code of Federal Regulations Title 29 and other Federal, State and local government safety standards shall apply in its entirety to the Contractor. Examples of applicable safety standards are OSHA 29 CFR 1910, OSHA 29 CFR 1926, California Title
19, "Public Safety", California Title 8, "General Industry Safety Orders", and 41 CFR, Subpart B, "Public Contracts, General Safety and Health Standards." In addition to the above, the Contractor should also use the “RECLAMATION SAFETY AND HEALTH
STANDARDS” for reference (The yellow book).
1.9.1. Safety of the Public
Roads, subject to interference by the work, shall be kept open or suitable detours shall be provided and maintained by the Contractor. The Contractor shall provide, erect, and maintain all necessary barricades, suitable and sufficient flasher lights, flaggers, danger signals, signs, and shall take all necessary precautions of the work and the safety of the public. Such work shall be done in accordance with all applicable State, Federal, and local regulations.
Roads closed to traffic shall be protected by effective barricades on which shall be placed acceptable warning and detour signs. All barricades and obstructions shall be illuminated at night, and all lights shall be lighted from sunset until sunrise.
Specific signs, barricades, and flagmen requirements are detailed in the American National
Standards Institute "Manual on Uniform Traffic Control Devices for Streets and Highways"
(ANSI D6.1). The Contractor must conform to these standards and all other applicable
Federal, State and County regulations.
1.9.2. Safety and Health
The Contractor is responsible for being cognizant of and insuring compliance with the following requirements:
(a) The Contractor shall not require, or allow any employee, engaged in the performance of this Contract to work under conditions which are unsanitary, hazardous, or dangerous to their health or safety, as determined under safety and health standards promulgated by the Secretary of Labor under Section 107 of the Contract Work Hours and Safety Standards Act
(40 U.S.C. 327 et seq.) as amended and other Federal, State and applicable local government safety standards. The worker is ultimately responsible for their own safety and shall not be required to perform work they believes to be unsafe.
(b) The Contractor shall fully comply with Federal, State and local government safety and health standards and amendments or revisions thereto in effect on the date of the contract. Federal Standards are available from the
Government Printing Office in Washington D.C. Construction Safety and
Health Standards promulgated by the Secretary of Labor may be obtained from any regional or area office of the Occupational Safety and Health
Administrative of the U.S. Department of Labor. State of California
Standards is available through Barclays Law Publishers, San Francisco, CA.
Such responsibility shall apply to both the Contractor operations and those of their subcontractors. When violations of the safety and health requirements contained in these specifications of standards referenced in Subparagraph 1.9.2.a and 1.9.2.b are called to their attention by the COR or designated representatives, the Contractor shall immediately correct the conditions to which attention has been directed. Such notice, either verbal or written, when served on the Contractor or designated representative(s), shall be deemed sufficient. In the event the Contractor fails or refuses to promptly comply with the compliance directive issued, the CO or designated representative may issue a written order to stop all or any part of the work. When satisfactory corrective action is taken, a written order to resume work will be issued. The Contractor shall not be entitled to any extension of time, or to any claim for damage or to additional compensation by reason of either the directive or the stop order. Failure of the CO or designated representative to order discontinuance of any or all of the Contractor’s operations will not relieve the Contractor of his responsibility for the safety of personnel and property. The rights and remedies of the
Government provided in this paragraph are in addition to any other rights and remedies provided by law or under this contract.
1.9.3. Safety Program
The Contractor shall submit, 14 days after award, in writing a proposed safety program as required in CAL-OSHA Standards, as prescribed in SB 198, Chapter 1359, Labor Code
6401.7 based on anticipated operations, maintenance, and construction activities as related to safety and health standards.
In the event there is a conflict between the requirements contained in the Contractor’s approved safety program, governmental safety and health codes, and standards, including the U.S. Department of Labor Construction Safety and Health Standards, promulgated under Section 107 of the Contract Work Hours and Safety Standards Act (40 U.S.C. 327 et seq.), as amended, the more stringent requirement will prevail.
1.9.4. Safety Records
The Contractor shall maintain an accurate record of, and shall report to the COR in the manner prescribed by the COR, all cases of death, lost-time accidents, vehicle accidents, occupational diseases, or traumatic injury to employees or the public involved, and any property or equipment damage incident to the performance of work under this contract.
1.10. PUBLIC CONTACT
Where possible, Contractor personnel should develop positive working relationships with adjacent landowners within their area of responsibility.
Contractor personnel shall inform any trespassers along the right-of-way, of hazards and when necessary request trespassers to leave restricted areas immediately.
When Contractor personnel are confronted with media inquiries, the O&M manager shall refer all media inquiries to the COR.
When Contractor personnel encounter emergency personnel, policemen or firemen along the right-of-way responding to an emergency, Contractor personnel shall notify the O&M manager. The O&M manager shall keep the COR informed of all emergencies occurring along the right-of-way and/or on Reclamation facilities.
1.11. MODIFICATIONS TO EXISTING EQUIPMENT
Any modifications made to existing equipment that will affect the operation and/or control of the equipment being modified, require changes or revisions be made to existing drawings, or require generation of a new drawing will need prior approval from the COR.
1.12. HAZARDOUS MATERIALS AND HAZARDOUS RESPONSE
The Contractor shall conform to all Reclamation, Federal, State, and local regulations in the use and disposal of hazardous materials and hazardous waste. The Contractor shall provide the appropriate response to any emergency involving hazardous materials at any of the facilities covered by this contract. The Contractor shall provide proof/certification of its personnel qualified to work with hazardous materials and wastes to Reclamation. The
Contractor shall notify Reclamation immediately upon discovering a release of hazardous waste into the environment.
Examples of Federal regulations on hazardous materials are found in the following:
1. 40 CFR 100-399 (Water Quality Programs, Pesticides and Hazardous Waste)
2. OSHA 29 CFR 1910.120 (Hazardous Waste Operations and Emergency
Response); 29 CFR 1910.120 (Hazard Communication)
3. 49 CFR 172 (Subpart B – Tables off Hazardous Materials)
Examples of State regulations on hazardous materials are:
1. California Title 22 (Environmental Health)
2. California Title 26 (Toxics)
SECTION C-2
2. SECTION C-2: SERVICES
This section describes the Services that shall be required as part of this contract.
2.1. TRAINING
The Government will provide Contractor personnel onsite training in the applicable
Government materials and regulations as required by the COR. This includes methods for obtaining supplies in accordance with Government procedures. This training shall be provided by the Government as determined necessary by the Contractor or by the
Government.
2.2. GOVERNMENT SURPLUS MATERIALS AND EQUIPMENT
The Contractor shall be authorized to screen government surplus materials and equipment for use in support of the scope of this contract. The COR will review and approve/disapprove all requests for the transfer of government surplus materials and equipment to the Contractor.
2.3. GOVERNMENT-FURNISHED EQUIPMENT
The Government will provide furnished equipment for Operations and Maintenance of the
Columbia Mowry Facilities under the provisions of FAR 45.000 to provide and use
Government-Furnished property in the contract. Specific equipment includes, but not limited to, PCN 015191, License l471583, Truck, General Motors, 8-cylinder, gas, 4x2, with boom, 2.5 ton, 34,000 GVW (Truck).
No major repairs will be made to the Truck without approval of the COR. Upon completion of Contract for Operations and Maintenance, the Truck will be returned to the Government in a like condition with consideration given for normal wear and tear. Monthly usage and mileage (trip sheet) will be reported monthly to the Government to reflect mileage, operational hours used, gasoline, and repairs and/or maintenance costs.
SECTION C-3
3. SECTION C-3: GENERAL TASKS and SPECIFIC WORK
3.1. GOVERNMENT LIAISON
The COR shall act as the liaison between the Reclamation and other Federal, State, and local agencies, private individuals, and or entities for planning and related activities which affect the facilities designated in this contract. The Contractor activities shall include the following:
Review and comment on planning documents, including preliminary and final designs, preliminary and final development plans, environmental documents, and other documents relating to Federal, State, and local planning procedures. A copy of the Contractor's comments shall be forwarded to the COR, participate as appropriate with Federal, State, and local agencies, or private individuals and entities. The Contractor shall keep the COR informed of these activities and prepare such emergency preparedness plans and other plans as may be required by various Government agencies. The Contractor shall furnish copies of any such plans to the COR.
3.2. MAINTENANCE RECORDS
Any maintenance performed by government forces on equipment or facilities described under this contract will be documented on the appropriate Preventive Maintenance worksheet.
3.3. PEST MANAGEMENT
Pest management activities performed on, in, or around all lands, facilities and appurtenant structures designated in this contract shall include but are not limited to the following:
Terrestrial weed control, Aquatic pest control, Rodent control, and Insect and invertebrate control.
Johnson grass (Sorghum halepense), Russian knapweed (Centraurea repens), groundsel
(Senecio vulgaris), redstem filaree (Erodium circutarium), Russian thistle (Salsola pestifer), Bermuda grass (Cynodondactylon), and turkey mullein (Eremocarpus setigerus), are but a few of the commonly encountered noxious and troublesome agricultural weed pests.
Filamentous green algae (Cladophora spp., Ulothrix sp., Oedogonium spp., etc.), blue-green algae (Anabaena spp., Phormidium spp., etc.), American pondweed (Potamogeton nodosus), waterweed (Elodea canadensis) and Asiatic clam (Corbicula fluminea) are but a few of the commonly encountered and edemic aquatic pests.
Ground squirrels (Spermophilus beecheyi and Spermophilus beldingi) are some, but not all, of the most commonly encountered and troublesome vertebrate (rodent) pests.
Black widow spiders (Lactrodectus mactans), yellowjacket wasps (Vespula maculifrons), and mud-dauber wasps (Sceliphron caementraioum) are three examples of some of the more bothersome insects and invertebrates.
When deemed appropriate, necessary and/or in keeping with CO objectives, all lands, facilities and associated features designated in this contract shall be subject to some form of pest management. The types of detailed features requiring some form of pest management consist of but are not limited to the following: maintenance and operations roads, canal banks, levees, ditches, right-of-way areas, maintenance and equipment yards, borrow areas, fence lines, building perimeters and sumps.
During all phases and sub-tasks of the pest management program, all applicable Federal, State and local laws, regulations, ordinances and guidelines shall be followed by the
Contractor. These phases and sub-tasks include the following (not an exhaustive list):
Procurement, transportation and storage of pest control materials; Planning, documentation, registration and certification procedures for any and all pest control activities; Proper and applicable safety procedures and equipment; Initiation, application and monitoring of pest control activities, materials, and their residues.
3.4. TERRESTRIAL WEED CONTROL
All terrestrial weed control activities by the Contractor shall be compatible and complementary with the onsite and adjacent land uses and cultural practices.
Overall, these activities will provide or help provide for a safe working environment in, on, and around all facilities designated in this contract. In addition, these activities will minimize (or exclude whenever possible) any negative impacts on the efficient operation and maintenance of said facilities. The Contractor shall perform weed control on the facilities designated in this Contract based on the intended or present land use.
All efforts should be made to plan discing or mowing activities from September 1 to
February 15 to avoid disturbance to nesting migratory birds. If discing and mowing is needed during the nesting bird season the Contractor will coordinate with the COR to ensure that the appropriate environmental monitoring can be performed prior to the treatment of terrestrial weeds.
3.4.1. Joints and Cracks
Joints and cracks on all structures designated in this contract shall be kept vegetation-free by the Contractor.
3.4.2. Channel Banks
The channel banks shall, whenever practicable, be maintained by the Contractor in such a way that noxious and troublesome agricultural weeds are controlled or excluded. A complex or monoculture of grasses and/or herbaceous plants compatible to adjoining land uses is to be left for purposes of erosion control. When this primary goal/standard cannot be effectuated for reasons such as, but not limited to climate, soil type, or weed diversity, then all noxious and troublesome agricultural weeds shall be controlled or excluded. The weed pests shall be temporarily or permanently excluded from propagating and proliferating on said site. The weed pests shall be controlled in such a manner that they do not:
Significantly hinder, foul, plug, destroy, encroach upon, cover, or interfere with any
Reclamation facilities and; Impact, in any deleterious, competitive, or harmful manner on the adjoining land uses.
3.4.3. Roads
All roads shall be maintained by the Contractor in a vegetation-free state.
3.4.4. Right-of-Ways
The Contractor shall maintain Reclamation right-of-way in such a manner that all noxious and troublesome agricultural pests are controlled or excluded.
3.4.5. Areas Where Vegetation is Excluded
Maintenance yards, buildings and facility perimeters, parking lots, and any other areas designated in this Contract that require the total exclusion of vegetation shall be maintained in such a state by the Contractor.
3.4.6. Treatment of Terrestrial Weeds in Specific Areas
Terrestrial weeds shall be treated to industry standards on, though not limited to, the following:
• Lands adjacent to the Columbia Main Pumping Plant, Columbia Canal diversion facilities, and the associated roads;
• The former MLT property;
• The former DJP Farm, LLC property; and
• The former SCE property.
All efforts should be made to plan discing or mowing activities from September 1 to
February 15 to avoid disturbance to nesting migratory birds. If discing and mowing is needed during the nesting bird season the Contractor will coordinate with the COR to ensure that the appropriate environmental monitoring can be performed prior to the treatment of terrestrial weeds.
3.5. AQUATIC WEED CONTROL
The water conveyance facilities designated in this contract shall be maintained by the
Contractor free of algae, aquatic weeds and other aquatic pests to such an extent that the flow capacities, applicable water quality, design capabilities and characteristics, operations, and maintenance of the facilities are not infringed upon nor adversely impacted. The aquatic pest shall also be maintained so that said pests do not adversely affect the water users and recipients, and other Parties and entities that receive the services and goods provided by Reclamation.
The aquatic pest control activities shall be in accordance with, and compatible to, all various uses for which the water has been contracted and been made available.
3.6. RODENT CONTROL
Rodent populations on all lands and facilities designated in this contract shall be controlled by the Contractor at population levels that do not pose a safety hazard to the O&M work force, Reclamation facilities and the general public. In addition, the rodent populations shall be reduced to levels that do not:
Interfere with any other operation and maintenance functions; significantly degrade or threaten the structural integrity and physical appearance of the facility; degrade the safety and structural integrity of all operations and maintenance roads; and serve as a "core" population that could infest and establish other populations on adjacent lands.
3.7. INSECT CONTROL
The Contractor shall minimize the insect and invertebrate pests at the facilities designated in this contract that pose a nuisance of safety hazard to individuals temporarily occupying or working in and around those structures or; have the potential to destroy, degrade, infest, impair, or adversely alter the inherent integrity, consistency, utility, and effectiveness of any material comprising the structures themselves, or contained within, on, or around said structures.
3.8. RIPRAP
Riprapping for erosion protection and control may be required on any of the structures associated with the facilities designated in this contract. These structures include, but are not limited to; channel embankments, bridge abutments, gate structures and drainage structures.
3.8.1. Riprap Inspection and Repair
The Contractor shall provide routine inspection of channel and drainage systems and other pertinent facilities for need of additional riprap or repair of existing riprap as per requirements of the Government.
When voids occur in the riprap, the Contractor shall fill these voids.
The principal components of the maintenance work performed on the riprap consist of but are not limited to the following:
Grading, slide repair, placement of riprap, hauling and excavation.
3.9. LEVEES, DITCHES, BERMS AND DRAINS
Levees, berms, ditches and drains for effective surface water management may be present on the margins of property adjacent to Mendota Pool or where land may have been used for agricultural production. These structures are present on the former MLT, DJP Farm, LLC, and SCE properties.
3.9.1. Levees, Ditches, Berms and Drains Inspection and Repair
At least once a month, the Contractor shall inspect levees, ditches, berms and drains for seeps, flooding, or other unexpected movement of water out of or into the ditches and levees on the subject property. If unexpected water is discovered, the Contractor will notify the COR.
During high water season and floods the Contractor shall increase the inspection rounds. If unexpected water is discovered, the Contractor will notify the COR.
3.9.1.1. Minor Leaks
The Contractor will repair minor leaks. Minor leaks are considered any repair that can be completed in two days with standard equipment.
The principal components of the maintenance work performed on ditches and berms consists of, but are not limited to, the following:
Grading, slide repair, placement of riprap, hauling and excavation.
3.9.1.2. Major Leaks
The Contractor will repair major leaks. Major leaks will be reported to the COR and response to a major leak will be included in the Contractor’s Contingency Plan as described in Section 1.3. A repair of a major leak will occur in close coordination with the COR.
3.10. PAVED AND UNPAVED ROADS
The Contractor shall be required to maintain two types of operating and maintenance roadways at the facilities designated in this contract. The types of roadways are paved roadways and unpaved (dirt) roadways.
The principal components of the maintenance work performed on the roadways consist of the following work, but not limited to: blading; crack sealing; filling potholes; dust control;
sweeping; weed control; watering; sloping; surfacing; sealing; and material hauling.
3.10.1. Paved Road Standards
(a) The Contractor shall repair all roadway potholes prior to the rainy season (generally the rainy season is November 1 through March 1).
(b) After the rainy season, the Contractor shall repair damaged road areas in a manner which allows safe passage on the roadway for any maintenance or inspection activities.
(c) During the rainy season, the Contractor shall keep the road passable for operations and maintenance vehicles and equipment.
(d) All cracks that develop a gap wider than 1/2" shall be sealed with a Reclamation approved crack sealant.
(e) The Contractor shall resurface the asphalt road surfaces on an as needed basis or as directed by the COR.
3.10.2. Unpaved (Dirt) Roads Standards
The roads shall be maintained passable for operation and maintenance equipment and free of weeds and grasses.
3.10.3. Signs and Reflectors
All signs are installed to provide warning, instruction, location and direction.
Principal components of the maintenance work performed on signs consist of the following work, but not limited to: installing, repairing, replacing, and painting.
The Contractor shall inspect all signs annually and repair, replace or paint as required. The
Contractor shall maintain painted signs, so they are bright and readable from 100 feet.
3.11. GATES
Gates can vary from standard chain-link with 3-strand barbed wire top, double opening, pipe gates, chain link gates to standard barbed wire, wood post stock fence gates, Texas gates, wood gates, etc. They shall vary in height and width depending on need.
The Contractor shall annually inspect and replace, repair, paint and lubricate as required to keep gates in good operating condition.
3.11.1. Typical Maintenance
The principal components of the maintenance work performed on gates consist of, but are not limited to, the following work:
Adjusting swing; repairing; replacing; painting; repairing or replacing reflectors; repairing or replacing locking system; lubricating; and painting.
Gates shall be replaced, repaired and maintained by the Contractor to Bureau standards. The
Contractor may contact the COR to request these standards.
3.11.2. Access to the Columbia Mowry Facility
Typically, gates are located at the entrance to the facilities. The exception is the Columbia
Mowry Facilities where the facilities are first accessed through a private, automatic opening gates, located east of the pumping facilities. Reclamation will be notified of any change in the combination currently in use. Once at the pumping facility site, the gates are a standard chain-link gate.
3.12. FENCES
This covers all fencing surrounding work areas which include system structures and maintenance yards. Types of fences in place in this contract are barbed wire, 4-strand or 5-strand with steel and wood posts and chain link ranging from a height of 4 feet to 8 feet with 3-strand barbed wire top.
The Contractor shall inspect fences around the contract facilities monthly and repair, replace and paint as required.
3.12.1. Typical Maintenance
The principal components of the maintenance work performed on fences consist of, but are not limited to, the following work:
Repair; replacement; removal; and painting.
Fences shall be replaced, repaired and maintained by the Contractor to Bureau standards.
The Contractor may contact the COR to request these standards.
3.13. GUARDRAIL
Guardrails are used to provide protection to structures, to equipment, to keep vehicles out of the river or channels and for employee safety. Typical locations are where roads cross the river or channels where a road dead-ends into the river or drain and where operating roads go by structures or stationary equipment. Guardrail may be made of the following materials and combinations of pipe, wood and metal.
The Contractor shall inspect annually and repair, replace, and paint reflectors as required.
3.13.1. Typical Maintenance
The principal components of the maintenance work performed on guardrail consist of the following work but is not limited to:
Repairing, replacing, painting, and constructing as requested.
3.14. ELECTRICAL MAINTENANCE
3.14.1. General
The main electrical components for the electrical maintenance of the facilities consist, of but are not limited to, the following: new construction; maintenance; repairing; conduit, single-phase and three-phase motors; switches; control panels; secondary contacts and wiring; batteries: power and control circuits; lighting systems
To assure high quality service, the Contractor shall have a definite maintenance schedule, including preventive maintenance, systematically followed. Operating and local conditions vary to such an extent that the schedule shall be prepared to suit the conditions. However, the maintenance schedule for individual devices, such as circuit breakers, relays, batteries, meters, etc., shall be based upon current industry standards.
To safeguard against equipment failure, the electricians and technicians will regularly service the electrical equipment. The frequency of inspections is a variable, but this program shall be planned and carried out as scheduled. This is a basic requirement of any maintenance program which is aimed at preventing unscheduled outages.
3.14.2. Cleanliness
Dirt is a principal cause of electrical failure; it's a day-to-day accumulation of normal atmospheric particles, lint, chemicals, or metallic particles from associated motors, oil mist, and vapors. These deposits, if allowed to accumulate, will contaminate electrical equipment and cause failures. During the performance of routine preventive maintenance, the
Contractor shall keep all electrical equipment clean.
The Contractor shall maintain electrical machinery as clean as practical.
3.14.3. Dryness
Electrical apparatus operates best in a dry atmosphere for several reasons. Humidity can cause copper, aluminum, iron, or alloyed parts to oxidize. A buildup of oxides, if caused by caustic fumes, or acids, can destroy metal and affect electrical connections and contacts.
Heavy accumulation of oxides shall be removed and severely corroded parts replaced. High humidity results in free moisture condensing on the equipment. This can cause short circuiting and immediate failure. The Contractor shall control humidity, if possible, because moisture can increase dirt buildup on electrical parts; this can lead to failure. For humid applications, the safest course is to use equipment designed to operate under high moisture conditions. In most cases, this shall require waterproof enclosures.
The Contractor shall keep all electrical apparatus as dry as practical.
3.14.4. Tightness
Certain components of electrical equipment operate with high-speed movement. This is particularly true of contactors or other control devices, which cause wear of moving parts and other control devices. Appreciable imbalance tends to create vibrations in the equipment and loosen hardware and other parts. Imbalance is frequently increased by external vibrations set up by unrelated machinery. Continued vigilance shall be necessary to deter wear and loosening of apparatus parts or connections. Routine servicing shall include a check for tightness of accessible hardware and bolted parts as a simple precautionary measure. On rotating apparatus, vibration can cause mechanical damage and if allowed to become excessive, can affect the alignment and cause bearing failures, loosening of coils or support generally follows. Any electrical apparatus using bearings is vulnerable in this respect.
The Contractor shall keep all electrical apparatus connections as tight as possible.
3.14.5. Friction Prevention
The Contractor shall promote the prevention of friction in all electrical devices
3.14.6. Buses and Connections
The Contractor shall inspect for systems that indicate overheating or weakened insulation.
3.14.7. Meter Readings
The Contractor shall maintain and track all meter readings
3.14.8. Main Disconnect Contacts and Supports
Each breaker is removed from its housing and all circuits and exposed primary contacts and their supports are de-energized. The Contractor shall inspect for abnormal wear or overheating and wipe clean with the proper solvent recommended by the manufacturer. If discoloration is noted on the surfaces, it is not harmful, unless corrosion due to atmospheric conditions is severe, leaving deposits on the surfaces. All deposits shall be removed by rubbing with a clean cloth (don't use emery cloth or file). If the contacts are severely burned, new contacts shall be installed. Each breaker is checked (service while it is out of the housing) and if need be, replace breakers with the type recommended.
3.14.8.1. Secondary Disconnecting Contacts
All secondary disconnecting contacts shall be inspected for abnormal wear, fatigue, or overheating. Contacts will be replaced if necessary, otherwise they are treated the same as main disconnecting contacts.
3.14.8.2. Secondary Wiring Connections
All wiring connections shall be checked for tightness and at terminal blocks where circuits leave the switchgear. The Contractor shall make sure that all secondary wiring connections are properly connected to the switchgear ground bus where indicated. Look for broken wire strands and pinched or damaged insulation.
3.14.9. Instruments, Relays and Relay Mounted Device
Individual devices shall be maintained by the Contractor according to the specified instructions supplied for each device. All relay covers are to be removed and the interior inspected for dust or dirt. The contacts on control switches, transfer switches, and instrument switches, shall be inspected by the Contractor.
All instruments, relays and relay-mounted devices shall be inspected for proper operation during routine maintenance procedures and repair or replaced when necessary.
3.14.10. Ventilation
The air space under outdoor switchgears is necessary for the entrance of ventilating air; it must be clear of leaves, debris, or obstruction.
All labyrinths, grillwork, and air passages shall be checked for obstructions and accumulation of dirt.
3.14.11. Lubrication
In general, there is nothing that requires lubrication in the stationary housings. However, the main disconnecting finger and stationary contacts are to be cleaned periodically and kept dry. Vaseline or grease shall not be applied to any of the contacts surface.
The lubrication of the draw-out breakers are to be maintained in accordance with the manufacturer's instruction manual.
3.14.12. Renewable Parts
When parts are ordered, all necessary information shall be included, all information can be found on the nameplate, or from equipment records. Parts may consist of: bearings, motors, pumps, valves, and seals.
3.14.13. General Scheduled Inspections and Maintenance
The switchgear installation shall be given a thorough cleaning and maintenance check twice a year. This shall be done at the beginning of the water year and towards the middle of the water delivery season.
3.15. OPERATIONS AND MAINTENANCE OF THE COLUMBIA MOWRY
DISTRIBUTION FACILITY
General the Contractor shall operate pumps at various locations as described below. Pumps shall be maintained in good working order so as not to cause an interruption in service. The
Contractor is responsible for the following:
3.15.1. Start-Up of Pumps
The following is to be inspected prior to initial start-up each year: Electrical panels, clean out spiders, wasps, etc., check fuses and wires and replace where needed; and oil units as needed.
3.15.2. Daily Maintenance Requirements
Checking oil drippers for leaks and excessive flow; maintaining all oil supply tanks-at least
80% full at start-up, refill as necessary, cleaning all trash racks, inspecting oil dripper units at each pump for proper operation and leaks, keeping area inside pump station clean of debris and oil, maintaining all security gates, signs, etc., repair/replace as required and completing and filling out maintenance logs.
3.15.3. Pumping Plant “C” North, “C” South
Locking off power to pumps during non-delivery periods, “C” North discharge ditch should be inspected daily when operating; flap valve needs to be maintained in good working order. Since “C” South distribution line is underground and subject to farm implement damage, the Contractor should inspect line frequently for breaks or damage.
The special notices regarding the operation of Pumping Plan “C” North, consist of, but are not limited to, the following:
(a) Automatic liquid level control sensors are set and not to be adjusted;
(b) Automatic liquid level control sensors should be lubricated as often as necessary to…