This amendment to a solicitation provides additional questions and answers and incorporates specification section 09 96 20 into the solicitation for the Antioch Fish Release Site Replacement project. Key details include requirements for coatings and surface preparation of steel piles, caps, pipe supports and other miscellaneous metalwork. Acceptable coating materials and systems are specified, along with performance testing protocols and acceptance criteria. PVC pipe is also to be coated with a waterborne acrylic system. The date and time for receipt of offers remains unchanged as December 23, 2020 at 2:00 p.m.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140R2020R0010_Amd_0003.pdf | ||
| Sol_140R2020R0010_Amd_0002.pdf | ||
| Amendment No. 0002 Solicitation No. 140R2020R0010_0002.pdf | ||
| Amendment No. 0001 for Solicitation No. 140R2020R0010_0001.pdf | ||
| Sol_140R2020R0010_Amd_0001.pdf | ||
| Solicitation No 140R2020R0010 Drawings Part 1 of 3.pdf | ||
| Specifications Part 3 of 4.pdf | ||
| Specifications Part 2 of 4.pdf | ||
| Solicitation No 140R2020R0010 Drawings Part 3 of 3.pdf | ||
| Specifications Part 1 of 4.pdf | ||
| Solicitation No 140R2020R0010 Drawings Part 2 of 3.pdf | ||
| Specifications Part 4 of 4.pdf | ||
| Solicitation No 140R2020R0010.pdf | ||
| Sol_140R2020R0010.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140R2020R0010 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Sacramento CA 95825-1898 2800 Cottage Way, Room E-1815
R20
Division of Acquisition Services Regional Office Mid-Pacific Region Bureau of Reclamation
20-C089912/18/20200003
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
11/09/2020
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
A. TITLE: Antioch Fish Release Site Replacement
B. PURPOSE: The purpose of this amendment is to incorporate additional Questions & Answers and to incorporate specification section 09 96 20 Amendment No. 0003 into the solicitation.
The date and time for receipt of offers is hereby UNCHANGED and remains December 23, 2020 at 2:00 p.m.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Sarah Rall
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
Amendment No. 0003 to Solicitation No. 140R2020R0010
Antioch Fish Release Site Replacement Delta Division Central Valley Project, California
Questions and Answers
1. Sheet 863-208-60105 Note 4 discusses buoys with anchoring mechanism are located in the drawing. Neither the set of drawings nor the specification show any buoys with anchoring system. Please clarify if the buoys with anchoring system are requirements to this contract; if they are, please provide sufficient information.
Answer: No permanently anchored buoys are required for this project.
2. Reference drawing 863-208-60113, Detail 2 and Note 8 show Pipe Saddle, bolts and fastener are stainless steel. Specification section 09 63 20 -12 Coatings, Tabulation 2, states that pipe saddle and associated fasteners shall be coated with Epoxy/ Polysiloxane. Please clarify the coating requirement.
Answer: Drawing 863-208-60113, and the drawing package in general, dictate the specific materials required for parts. Stainless steel parts shall not be coated. Galvanized carbon steel parts shall not otherwise be coated. Only non-galvanized, carbon steel parts shall be coated.
Revised Specification Section 09 96 20 has been updated to clarify and is attached
Solicitation No. 140R2020R0010 Amendment No. 0003
Central Valley Project, California Specifications No. 20-C0899
Coatings
09 96 20 - 1
SECTION 09 96 20
COATINGS
PART 1 GENERAL
1.01 MEASUREMENT AND PAYMENT
A. Cost: Include in prices offered schedule for other items of work.
1.02 REFERENCE STANDARDS
A. All references below are to be the current adopted edition at the time of solicitation for this contract.
B. ASTM International (ASTM)
1. ASTM C 920 Elastomeric Joint Sealants
2. ASTM D 870 Testing Water Resistance of Coatings Using
Water Immersion
3. ASTM D 1002 Apparent Shear Strength of Single-Lap-Joint
Adhesively Bonded Metal Specimen by Tension Loading (Metal-to-Metal)
4. ASTM D 2794 Resistance of Organic Coatings to the Effects of Rapid Deformation (Impact)
5. ASTM D 4060 Abrasion Resistance of Organic Coatings by the Taber Abraser
6. ASTM D 4285 Indicating Oil or Water in Compressed Air
7. ASTM D 4541 Pull-Off Strength of Coatings Using
Portable Adhesion Testers
8. ASTM D 5894 Cyclic Salt Fog/UV Exposure of painted
Metal, (Alternating Exposures in a Fog/Dry Cabinet and a UV/Condensation Cabinet)
9. ASTM G 8 Cathodic Disbonding of Pipeline Coatings
C. International Organization For Standardization (ISO)
1. ISO 8502-3 Assessment of dust on Steel Surface
Prepared for Painting (Pressure-Sensitive Tape Method)
D. The Society for Protective Coatings (SSPC)/NACE International (NACE)
1. SSPC-AB1 Mineral and Slag Abrasives
09 96 20 - 2
2. SSPC-AB2 Cleanliness of Recycled Ferrous Metallic Abrasives
3. SSPC-AB3 Newly Manufactured or Re-Manufactured Steel Abrasives
4. SSPC-Guide 15 Field Methods for Retrieval and Analysis of Soluble Salts on Substrates and Other Nonporous Substrates
5. SSPC-PA1 Shop, Field, and Maintenance Painting of Steel
6. SSPC-PA2 Measurement of Dry Paint Thickness with Magnetic Gages
7. SSPC-QP1 Evaluating Painting Contractors (Field Application to Complex Industrial Structures)
8. SSPC-QP3 Evaluating the Qualification of Shop Painting Contractors
9. SSPC-SP1 Solvent Cleaning
10. SSPC-SP5/NACE 1 White Metal Blast Cleaning
11. SSPC-VIS1 Guide and Reference Photographs for Steel
Surfaces Prepared by Abrasive Blast Cleaning
12. SSPC Paint Manual Volume 1, Good Painting Practices, Fourth Edition 2002
13. NACE SP 0188 Discontinuity (Holiday) Testing of New Protective Coatings on Conductive Substrates
14. NACE SP 0287 Field Measurement of Surface Profile of Abrasive Blast Cleaned Steel Surfaces Using a Replica Tape
1.03 SUBMITTALS
A. Submit the following in accordance with Section 01 33 00 - Submittals.
B. RSN 09 96 20-1, Approval Data:
1. For each coating material:
a. Manufacturer’s product data, application, and SDS sheets.
b. Supplier’s name, address, and phone number.
09 96 20 - 3
c. Identification of “Items to be coated” including sub-letter and sub-number listed in Coating Tabulations.
2. For each caulk and filler:
a. Manufacturer’s product data, application, and SDS sheets.
b. Supplier’s name, address, and phone number.
c. Identification of areas of use including sub-letter and sub-number listed in
Coating Tabulations.
3. For each substituted coating material “equal” to specified product in Coating
Tabulation:
a. List of not less than 3 similar successful material applications:
1) Project name, location, type of structure, and application dates.
2) Owner’s name, address, and telephone number.
b. Certification that material meets or exceeds specified requirements:
1) Manufacturer’s certification including technical representative’s signature and date of signature.
2) Independent laboratory’s certified test reports.
C. RSN 09 96 20-2, Final Approval Data:
1. For each coating material and thinner:
a. Purchase orders including order number, date, manufacturer’s designated product name, batch number(s), and quantity purchased.
D. RSN 09 96 20-3, Paint Chip Samples:
1. Color chip samples approximately 4 by 6 inch.
2. Label each sample to include manufacturer’s designated product name, color, and gloss.
E. RSN 09 96 20-4, Qualifications:
1. Coating contractor. Provide one of the following:
a. Current SSPC-QP1 or SSPC-QP3 certification.
b. List of not less than three comparable jobs for each coating type including owner’s name, address, and telephone numbers.
2. Coating applicator. Provide one of the following:
a. Current Coating Application Specialist (CAS).
b. Letter from coatings manufacture/supplier that applicator is trained by the coatings manufacture/supplier.
c. Coatings supplier technician trains coating foreman/crew at the job site.
09 96 20 - 4
3. Coating inspector:
a. The contractor or third party inspector shall be trained and knowledgeable in the coatings application.
b. Provide calibrated inspection instruments and demonstrate use if required by COR.
c. Current Level 2 or 3 certification for NACE Certified Coatings Inspector
(CIP) or SSPC Protective Coatings Inspector (PCI).
d. List of not less than five years of comparable jobs including project description, location, and owner’s name, address, and telephone number.
F. RSN 09 96 20-5, Quality Control Plan:
1. Quality Control Manager:
a. Name and title.
2. Quality Control Procedure:
a. Quality control plan.
b. Procedure for addressing identified non-conformities.
G. RSN 09 96 20-6, Contractor Quality Testing Report:
1. Comprehensive report of daily quality control test reports.
1.04 DELIVERY, STORAGE, HANDLING
A. Deliver materials to jobsite in original, undamaged, unopened containers labeled with manufacturer’s name, designated product name, batch number, date of manufacture, and any special instructions.
B. Deliver materials in containers not larger than 5 gallons as packaged by manufacturer unless suitable equipment is provided at jobsite to handle and thoroughly mix materials in larger containers.
C. Store coating materials and thinners in accordance with the manufacturer's recommendations, and as a minimum, store off the ground, under cover, and at 50 to 95 degrees F.
D. Do not use coating material which has exceeded manufacturer’s specified storage stability period (shelf life).
1.05 AMBIENT CONDITIONS
A. Maintain environmental conditions to meet coating manufacturer’s requirements during surface preparation, coating application, and curing period. Provide heating or cooling, and dehumidification as needed. Complete curing before placing the coating systems into service.
09 96 20 - 5
B. Coatings shall be applied when the substrate surface temperature is 5 degrees F or more above the dew point temperature and for at least 8 hours after application.
PART 2 PRODUCTS
2.01 EQUIPMENT
A. Surface preparation and spray application equipment:
1. Sized in accordance with coating manufacturer’s recommendations.
2. Provide:
a. Pressure gauges and pressure regulators.
b. Air supply lines free from oil and moisture.
2.02 ABRASIVES
A. Mineral and slag abrasives: Meets SSPC-AB1, type I (natural minerals) and type II (slags), class A.
B. SSPC-AB2 for recycled cleanliness.
C. SSPC-AB3 Class I (steel) or II (iron) for angular shaped grit. Shot abrasives are not acceptable.
D. Commercially available products or processes to render the hazardous waste stream non-hazardous and not exceeding toxicity threshold limits.
2.03 COATINGS
A. Specified in Coating Tabulations:
1. Apply only one coating system per option in Coating Tabulations.
2. Apply compatible products of same manufacturer for coating system components.
B. Volatile Organic Compounds (VOC): Do not exceed maximum permitted by Federal, State, and local air pollution control regulations as supplied in container or by addition of thinner material.
C. Factory color or tint only. Do not color or tint at jobsite.
D. Use manufacturer’s recommended thinners for coating materials.
E. Do not use accelerator products unless approved by COR.
09 96 20 - 6
2.04 FILLERS AND CAULKS
A. Caulks:
1. Coating manufacturer’s standard or compatible caulk material.
2. Polyurethane, silicone, or silicone acrylic caulk material: Meets or exceeds
ASTM C 920 type S or M, grade NS, class 25, suitable for water immersion service.
B. Fillers:
1. Carboguard 501, as manufactured by Carboline, www.carboline.com.
2. Devmat 142HB, as manufactured by International Paint, www.international-pc.com.
3. PPG Amercoat 114 A, as manufactured by PPG, www.ppgpmc.com.
4. Steel Seam FT910, as manufactured by Sherwin Williams, www.sherwin-williams.com.
5. Surfacing Epoxy Series 215, was manufactured by Tnemec, www.tnemec.com.
6. Provide one of the above fillers, or equal with following essential characteristics:
a. Coating manufacturer’s standard filler material.
b. Approved use by manufacturer.
2.05 MISCELLANEOUS MATERIALS
A. Deionized Water.
B. Chlor-Rid as manufactured by Chlor-Rid, www.Chlorid.com, C. HoldTight 102 as manufactured by Holdtight Solutions, www.holdtight.com, D. Chlor-Gone, as manufactured by Aquron, www.aquron.com
E. Provide one of the above salt removers, or equal with following essential characteristics:
1. Commercially available additive for soluble salt removal;
2. Water soluble.
3. Biodegradable.
4. Zero volatile organic compounds.
http://www.holdtight.com/ http://www.aquron.c/
09 96 20 - 7
PART 3 EXECUTION
3.01 PROTECTION OF ADJACENT SURFACES
A. Remove, mask, or otherwise protect items or surfaces not coated from contamination and damage during cleaning and coating operations.
B. Examples include protecting mating and machined surfaces, mechanical and electrical equipment (open or enclosed), instruction and similar plates, and wet and newly coated surfaces.
3.02 SURFACE PREPARATION
A. Remove or repair surface irregularities and impart profile as specified:
1. Welds:
a. Welds: Smooth and continuous.
b. Weld spatter, slag, buckshot, laminations, and slivers: remove and grind smooth.
c. Undercuts and porosity: Fill with weld material and grind smooth.
d. Projections, sharp edges, high points, fillets, and corners: Grind smooth to a radius of at least 1/16-inch.
2. Substrate defects:
a. Pitting, gouges, scratches, porosity, and similar:
1) Grind smooth.
2) Defects exceeding 20 percent reduction in wall thickness require weld repairs.
3. Grind full length of edges and corners smooth to a radius of at least 1/16-inch.
B. Surface preparation method:
1. See Coating Tabulations.
2. Compare prepared steel surfaces to following visual reference photographs for allowable visible contaminants and stains in accordance with SSPC-VIS1 for abrasive blast cleaning.
3. Assessment of dust contaminants:
a. Perform clear tape test method in accordance with ISO 8502-3.
b. Perform three tests per shift.
c. Acceptance Criteria: Degree of cleanliness shall meet Class 3.
09 96 20 - 8
C. Surface profile:
1. Prepare as specified in Coating Tabulations.
2. Where not specified, prepare in accordance with manufacturer’s instructions for metallic substrates or existing coating surfaces and service environment.
3. Where manufacturer’s instructions do not specify a surface profile, prepare blasted surfaces for Immersion Service Environments perform in accordance with angular profile 3 mil or greater and less than specified millage of first applied coat.
4. Inspect surface profile in accordance with NACE SP 0287:
a. Use replica tape suitable for surface profile depth range.
b. Perform at least two tests per 1,000 square feet.
D. Soluble salts:
1. Measure concentration of chlorides, nitrates and sulfates in accordance with SSPC
Guide 15.
2. Perform at least two tests per 1,000 square feet of surface area. Include corrosion pit areas.
3. Acceptance criteria: Do not exceed 3 micrograms per square centimeter for chlorides and 5 micrograms per square centimeter for nitrates and sulfates.
E. Re-clean or perform additional surface preparation of contaminated surfaces before coating application.
3.03 COMPRESSED AIR EQUIPMENT
A. Keep air compressor and spray application equipment lines free of oil and moisture during work.
B. Compressed air quality:
1. Perform tests in accordance with ASTM D4285.
2. Perform test at the beginning of every shift.
3.04 FILLERS AND CAULK APPLICATION
A. Caulk areas including crevices, gaps, plate seams, skip welds, and conduit penetrations.
B. Fill areas including prepared pits, cavitation, and/or porosity, plate seams, and gaps at bolts and rivets.
C. Apply in a uniform texture, neatness, and color matched appearance.
09 96 20 - 9
D. Apply in accordance with manufacturer’s instructions and achieve tight bond to substrate or previous coats.
3.05 COATING APPLICATION
A. Stripe coat:
1. Brush apply stripe coat to each epoxy coat applied.
2. Apply stripe coat prior to spray application of the primer, when practical.
3. Apply to edges, corners, interior angles, pits, plate seams, crevices, rivets, nuts, threads, bolts, washers, welds, and similar features.
B. Apply number of coats and coating thickness specified in Coating Tabulations.
1. Alternate coat colors to differentiate between coats.
2. Apply in accordance with manufacturer’s instructions.
3. Apply in accordance with SSPC PA1.
C. Prevent overspray or dry spray. When such conditions occur, clean surfaces prior to application of subsequent coats.
D. Re-clean contaminated surfaces between coats.
E. Dry Film Thickness (DFT):
1. After each coat, inspect hardened coating system for DFT compliance in accordance with SSPC PA2.
2. Acceptance Criteria: no single spot measurement less than 80 percent minimum or in excess of 120 percent maximum specified.
F. Discontinuity (Holiday) Testing: Inspect in accordance with NACE SP 0188: Use maximum test voltage for DFT as recommended by coating manufacturer to prevent coating damage.
G. Coating Adhesion: Test in accordance with ASTM D4541 at the direction of the COR.
3.06 CONTRACTOR FIELD QUALITY TESTING
A. Inspection Equipment:
1. Calibrate inspection devices and equipment in accordance with the manufacturer’s instructions.
2. Verify calibration prior to every use.
B. Qualified personnel shall conduct tests and sign reports.
1. Perform tests in presence of the COR:
09 96 20 - 10
2. Provide rigging for COR to observe inspections.
C. Make daily reports for review by the COR, including:
1. Date of work.
2. Description of areas and work performed.
3. Environmental conditions.
4. Results from the following quality control tests:
a. Soluble salt.
b. Surface profile.
c. Visual comparison of prepared surfaces.
d. Assessment of dust contaminants.
e. Compressed air quality.
f. Dry film thickness (DFT).
g. Discontinuity (Holiday) testing.
h. Coating adhesion testing (when directed by the COR).
D. Final inspection will take place after repairs, but before placing into service.
3.07 REPAIR AND REMEDIAL WORK
A. Repair defective or damaged areas of coatings in accordance with coating manufacturer’s recommendations.
09 96 20 - 11
3.08 COATING TABULATIONS
Tabulation No. 1
Items to be coated:
a. Interior and exterior of valves
b. Interior and exterior of pumps
c. Magnetic flow meters
d. Fish screen frames
e. Adjustable spool piece
Notes:
1. Commercial components shall be coated with manufacture’s standard surface preparation and applied permanent coating system that meets the following:
a. 10-year corrosion-free protection without significant defects stored in atmospheric exposure.
b. Color and gloss shall be manufacturer’s standard unless specified below or in color schedule.
c. Unexposed interior surfaces of cabinets, enclosures, and equipment shall be given the manufacturer’s standard permanent coated finish.
2. Shop or field coating to meet one or more of following application alternatives:
a. Alternative 1 – Baked-on, coil, extrusion, or fusion bonded that consists of 1 or more coats of
UV stable system.
b. Alternative 2 – Complete shop applied permanent 3-coat system that consists of 1-prime coat and 2-finish coats.
c. Alternative 3 – Shop applied primer and field finish coating system that consists of: 2-mil
DFT primer, minimum, with 2-field finish coats compatible with shop applied primer as specified below in coating material options.
Tab AE-02.DOCX
09 96 20 - 12
Tabulation No. 2
a. Interior and exterior surfaces of steel piles and caps.
b. Non-galvanized carbon steel pipe supports, connection brackets, and pipe saddles.
Notes:
1. Do not paint aluminum-brass, bronze, and stainless-steel metalwork.
2. Coat miscellaneous metalwork not otherwise tabulated.
3. Coat all associated fasteners to include nuts, bolts, washers, and exposed anchors after assembly.
4. Caulk all crevice corrosion areas including the connection brackets, pipe saddles, and pipe support after assembly. May require a caulk that can be applied underwater.
5. Use isolation devices between all dissimilar metals.
Coating materials – Option 1 Epoxy/ Polysiloxane
Number and thickness of coats
Surface preparation method
PPG:
Amerlock 2 or 400/ PSX 700
Sherwin Williams:
Duraplate 235/ Polysiloxane
XLE 80
Color: brown Final color to be approved by
COR
3 or more base coats, apply at 6 to 8 mils DFT per coat, plus two stripe coats.
1 or more topcoats, apply at 3 to 7 mils DFT per coat.
Total coating system excluding stripe coats: 21-mil DFT, min; 31-mil DFT, max.
SSPC-SP1 followed by:
for steel:
SSPC-SP5/NACE 1
2-4 mil surface profile
Follow manufacturer’s surface preparation and application instructions to apply subsequent coats
PERFORMANCE REQUIREMENTS:
Testing Protocol Acceptance Criteria
Fresh/deionized water immersion test, ASTM D 870:
passes, 2 years test with water at ambient temperature, no blisters on scribed or unscribed sides.
Dilute Harrison immersion test, Modified
ASTM D 870:
passes, 2 years test with water at ambient temperature, no blisters on scribed or unscribed sides.
Abrasion resistance, ASTM D 4060, CS- 17 wheel, 1,000 cycles, 1-kg load:
Epoxy: 100 milligram loss or less
Direct impact, ASTM D 2794: 30 inch-pounds
Pulloff adhesion, ASTM D 4541, annex A2, type II tester:
1000 psi or greater
Cyclic testing salt fog/UV, ASTM D 5894: 1/4 inch or less undercutting at 3000 hrs
Cathodic disbondment, ASTM G 8: 1/4 inch or less disbondment 120 day test
Tab IE-01.DOCX
09 96 20 - 13
Tabulation No. 3
a. PVC Pipe
Coating materials – Waterborne acrylic
Number and thickness of coats
Surface preparation method
Prime or spot repair Carboline:
Carbocrylic 3358/ Carbocrylic
International Paint:
Devflex 4020PF DTM/ Devflex
4216HP
Sherwin Williams:
Pro Industrial Procryl Universal Acrylic Primer series B66- W00310/ Pro Industrial Procryl DTM Acrylic
Color and gloss: White semi-gloss
1 or more prime coats, apply at 2 to 3 mils DFT per coat, plus stripe coats.
1 or more finish coats, apply at 2 to 3 mils DFT per coat.
Total system excluding stripe coats:
4-mil DFT, minimum 6-mil DFT, maximum
Plastic substrates: lightly abrade by SSPC-SP2 followed by SSPC-SP1 to remove all dust.
PERFORMANCE REQUIREMENTS:
Testing Protocol Acceptance Criteria
Abrasion resistance, ASTM D 4060, CS-17 wheel, 1,000 cycles, 1-kg load:
250 milligram loss or less
Direct impact, ASTM D 2794: 140 inch-pounds for waterborne acrylics
Pulloff adhesion, ASTM D 4541, annex A2, type II tester:
500 psi or greater for waterborne acrylics
Tab AE-02.DOCX
END OF SECTION
09 96 20 - 14