Table 3 Revision_2.3.2020_0002.xlsx

XLSX spreadsheet 15 KB Posted

Attached to
Geophysical Logging and Testing - Shasta Dam & Res Federal contract opportunity
Solicitation number
140R2020Q0045
Issued by
Department of the Interior Bureau of Reclamation

View the file

Other files for this federal contract opportunity

Other files attached to Geophysical Logging and Testing - Shasta Dam & Res, newest first.
File Type Posted
SDREP Gallery_0002.png PNG image
Sol_140R2020Q0045_Amd_0002.pdf PDF
Amendment 0001_140R2020Q0045_0001.pdf PDF
Sol_140R2020Q0045_Amd_0001.pdf PDF
PWS Table 3 - Shasta Borehole Geophysics - 2020Jan17_0001.pdf PDF
Combined Synopsis.140R2020Q0045.pdf PDF
Wage Determination 2015-5628.pdf PDF
Sol_140R2020Q0045.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table 3 Table 3 -- Shasta Dam Borehole Geophysical Logging Requirements Rev. 2020-Feb-02

GEOPHYSICAL LOGGING
TripItemField Exploration Request (FER)Drill HoleLocationGallery Elevation (floor)Gallery
Block No.Angle
from VerticalDrilled
DepthNominal Borehole DiameterConcrete IntervalBedrock IntervalCasing IntervalIntervalNominal Dilatometer DepthsOBI & ABI
TeleviewersCaliperFull Wave SonicBorehole DeviationRemarksNotes
(ft.)(ft.)(ft.)(ft.)(ft.)(ft.)
A1GeotechnicalDH-20-304crest - Left Wing Dam----0100NQ
76 mm / 3 innone25 - 1000 - 3030 -10035, 50, 65, 80
[1]XXXXRequires NQ hole centralizers[1] Final dilatometer test depths will be chosen on site after examination of televiewer logs. 20MP's minimim dilatometer performane rating.
B4GeotechnicalDH-19-307crest - Right Abutment----0150NQ
76 mm / 3 in0 - 1
(asphalt & fill)1 - 1500 - 3030 - 15035, 50, 75, 96
[1]XXXXRequires NQ hole centralizers[1] Final dilatometer test depths will be chosen on site after examination of televiewer logs. 20MP's minimim dilatometer performane rating
C5GeotechnicalADH-20-302crest - Right Abutment----15150NQ
76 mm / 3 in0 - 22 -1500 - 55 -15030, 50, 75, 96
[1]XX--XRequires NQ hole centralizers[1] Final dilatometer test depths will be chosen on site after examination of televiewer logs. 20MP's minimim dilatometer performane rating
D13ConcreteDH-18-19gallery - Main Dam - left section88017018.3153 mm / 6 in0 - 1515 - 18.3--0 - 18.3--X------Requires 6-inch hole centralizers
D14ConcreteDH-18-20gallery - Main Dam - left section75027020.5153 mm / 6 in0 - 17.817.8 - 20.5--0 - 20.5--X------Requires 6-inch hole centralizers
D15ConcreteDH-18-21gallery - Main Dam - left section65034028.9153 mm / 6 in0 - 23.323.3 - 28.9--0 - 28.9--X------Requires 6-inch hole centralizers
D16ConcreteDH-18-22gallery - Main Dam - right section72550019.4153 mm / 6 in0 - 16.316.3 - 19.4--0 - 19.4--X------Requires 6-inch hole centralizers
D17ConcreteDH-18-23gallery - Main Dam - right section75064031.8153 mm / 6 in0 - 28.228.2 - 31.8--0 - 31.8--X------Requires 6-inch hole centralizers
D18ConcreteDH-18-24gallery - Main Dam - right section93069010.5153 mm / 6 in0 - 6.36.3 - 10.5--0 - 10.5--X------Requires 6-inch hole centralizers
D19ConcreteDH-18-28NOT DRILLED
D20ConcreteDH-18-29Agallery - Right Wing Dam102572020.9153 mm / 6 in0 - 14.214.2 - 20.9--0 - 20.9--X------Requires 6-inch hole centralizers
D21ConcreteDH-18-30gallery - Right Wing Dam102573010.2153 mm / 6 in0 - 3.83.8 - 10.2--0 - 10.2--X------Requires 6-inch hole centralizers