Table 3 Revision_2.3.2020_0002.xlsx

XLSX spreadsheet 15 KB Posted

Attached to
Geophysical Logging and Testing - Shasta Dam & Res
Solicitation number
140R2020Q0045
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table 3 Table 3 -- Shasta Dam Borehole Geophysical Logging Requirements Rev. 2020-Feb-02

GEOPHYSICAL LOGGING
TripItemField Exploration Request (FER)Drill HoleLocationGallery Elevation (floor)Gallery
Block No.Angle
from VerticalDrilled
DepthNominal Borehole DiameterConcrete IntervalBedrock IntervalCasing IntervalIntervalNominal Dilatometer DepthsOBI & ABI
TeleviewersCaliperFull Wave SonicBorehole DeviationRemarksNotes
(ft.)(ft.)(ft.)(ft.)(ft.)(ft.)
A1GeotechnicalDH-20-304crest - Left Wing Dam----0100NQ
76 mm / 3 innone25 - 1000 - 3030 -10035, 50, 65, 80
[1]XXXXRequires NQ hole centralizers[1] Final dilatometer test depths will be chosen on site after examination of televiewer logs. 20MP's minimim dilatometer performane rating.
B4GeotechnicalDH-19-307crest - Right Abutment----0150NQ
76 mm / 3 in0 - 1
(asphalt & fill)1 - 1500 - 3030 - 15035, 50, 75, 96
[1]XXXXRequires NQ hole centralizers[1] Final dilatometer test depths will be chosen on site after examination of televiewer logs. 20MP's minimim dilatometer performane rating
C5GeotechnicalADH-20-302crest - Right Abutment----15150NQ
76 mm / 3 in0 - 22 -1500 - 55 -15030, 50, 75, 96
[1]XX--XRequires NQ hole centralizers[1] Final dilatometer test depths will be chosen on site after examination of televiewer logs. 20MP's minimim dilatometer performane rating
D13ConcreteDH-18-19gallery - Main Dam - left section88017018.3153 mm / 6 in0 - 1515 - 18.3--0 - 18.3--X------Requires 6-inch hole centralizers
D14ConcreteDH-18-20gallery - Main Dam - left section75027020.5153 mm / 6 in0 - 17.817.8 - 20.5--0 - 20.5--X------Requires 6-inch hole centralizers
D15ConcreteDH-18-21gallery - Main Dam - left section65034028.9153 mm / 6 in0 - 23.323.3 - 28.9--0 - 28.9--X------Requires 6-inch hole centralizers
D16ConcreteDH-18-22gallery - Main Dam - right section72550019.4153 mm / 6 in0 - 16.316.3 - 19.4--0 - 19.4--X------Requires 6-inch hole centralizers
D17ConcreteDH-18-23gallery - Main Dam - right section75064031.8153 mm / 6 in0 - 28.228.2 - 31.8--0 - 31.8--X------Requires 6-inch hole centralizers
D18ConcreteDH-18-24gallery - Main Dam - right section93069010.5153 mm / 6 in0 - 6.36.3 - 10.5--0 - 10.5--X------Requires 6-inch hole centralizers
D19ConcreteDH-18-28NOT DRILLED
D20ConcreteDH-18-29Agallery - Right Wing Dam102572020.9153 mm / 6 in0 - 14.214.2 - 20.9--0 - 20.9--X------Requires 6-inch hole centralizers
D21ConcreteDH-18-30gallery - Right Wing Dam102573010.2153 mm / 6 in0 - 3.83.8 - 10.2--0 - 10.2--X------Requires 6-inch hole centralizers

File details come from the government source that posted it. Updated .