PWS Table 3 - Shasta Borehole Geophysics - 2020Jan17_0001.pdf

PDF 52 KB Posted

Attached to
Geophysical Logging and Testing - Shasta Dam & Res
Solicitation number
140R2020Q0045
Issued by

View the file

Other files

File Type Posted
Table 3 Revision_2.3.2020_0002.xlsx XLSX spreadsheet
SDREP Gallery_0002.png PNG image
Sol_140R2020Q0045_Amd_0002.pdf PDF
Amendment 0001_140R2020Q0045_0001.pdf PDF
Sol_140R2020Q0045_Amd_0001.pdf PDF
Combined Synopsis.140R2020Q0045.pdf PDF
Wage Determination 2015-5628.pdf PDF
Sol_140R2020Q0045.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table 3 -- Shasta Dam Borehole Geophysical Logging Requirements Rev 2020-Jan-17

Main Dam Gallery Drill Planned Logging Angle Nominal Nominal OBI & Full

Geotechnical / Left Wing Dam Hole Depth Interval from Borehole Dilatometer ABI Wave Borehole Trip Item Concrete Right Wing Dam Number (ft) (ft) vert Diam Depths (ft) Televiewers Caliper Sonics Deviation Remarks Notes

A. 1. Geotechnical LWD DH-18-304 80 10-80 0 NQ 76mm 30, 40, 48

[1] X X X X requires NQ hole centralizers

[1] - Final dilatometer test depths will be chosen on-site after examination of the televiewer logs. 20MPa minimum dilatometer performance rating.

B. 4. Geotechnical RWD DH-18-307 150 0-150 0 NQ 76mm 30, 50, 75, 96 [1] X X X X requires NQ hole centralizers

[1] - Final dilatometer test depths will be chosen on-site after examination of the televiewer logs. 20MPa minimum dilatometer performance rating.

C. 5. Geotechnical RWD ADH-18-302 150 0-150 15 NQ 76mm 30, 50, 75, 96 [1] X X -- X requires NQ hole centralizers

[1] - Final dilatometer test depths will be chosen on-site after examination of the televiewer logs. 20MPa minimum dilatometer performance rating.

D. 13. Concrete Gallery DH-2018-19 30 [2] 0-30 [2] 0 6-inch

153mm -- X -- -- -- requires 6" hole centralizers [2] Approx. 20' thru concrete and 10' through rock (varies).

D. 14. Concrete Gallery DH-2018-20 30 [2] 0-30 [2] 0 6-inch

153mm -- X -- -- -- requires 6" hole centralizers [2] Approx. 20' thru concrete and 10' through rock (varies).

D. 15. Concrete Gallery DH-2018-21 30 [2] 0-30 [2] 0 6-inch

153mm -- X -- -- -- requires 6" hole centralizers [2] Approx. 20' thru concrete and 10' through rock (varies).

D. 16. Concrete Gallery DH-2018-22 30 [2] 0-30 [2] 0 6-inch

153mm -- X -- -- -- requires 6" hole centralizers [2] Approx. 20' thru concrete and 10' through rock (varies).

D. 17. Concrete Gallery DH-2018-23 30 [2] 0-30 [2] 0 6-inch

153mm -- X -- -- -- requires 6" hole centralizers [2] Approx. 20' thru concrete and 10' through rock (varies).

D. 18. Concrete Gallery DH-2018-24 30 [2] 0-30 [2] 0 6-inch

153mm -- X -- -- -- requires 6" hole centralizers [2] Approx. 20' thru concrete and 10' through rock (varies).

D. 19. Concrete Gallery - RWD DH-2018-28 30 [2] 0-30 [2] 0 6-inch

153mm -- X -- -- -- requires 6" hole centralizers [2] Approx. 20' thru concrete and 10' through rock (varies).

D. 20. Concrete Gallery - RWD DH-2018-29 30 [2] 0-30 [2] 0 6-inch

153mm -- X -- -- -- requires 6" hole centralizers [2] Approx. 20' thru concrete and 10' through rock (varies).

D. 21. Concrete Gallery - RWD DH-2018-30 30 [2] 0-30 [2] 0 6-inch

153mm -- X -- -- -- requires 6" hole centralizers [2] Approx. 20' thru concrete and 10' through rock (varies).

Geophysical Logs

D:\Shasta 2020\Geoph Contract\Shasta Borehole Geophysics Table 3 - contract requirements 2020Jan17.xlsx

Sheet1

File details come from the government source that posted it. Updated .