This document contains a price schedule and solicitation details for a federal contract opportunity to replace bridge cranes at the Grand Coulee Dam Left and Right Powerhouses. The price schedule lists line item numbers, descriptions of supplies and services, quantities, and spaces for unit prices and totals. Items include removing existing bridge cranes from the left powerhouse, furnishing and installing new bridge cranes, and optional items to adjust or replace runway rails in the right powerhouse. The related solicitation is identified as number 140R1022B0001 for bridge crane replacements at Grand Coulee Dam, issued by the Bureau of Reclamation within the Department of the Interior. Pricing is to be provided by the contractor for the fixed-price line items in the schedule. Optional additional work is also specified relating to runway rail adjustments or replacement in the right powerhouse.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Grand Coulee Left and Right Powerhouses Bridge Crane Replacement Amendment No. 002

Price Schedule (Revised)

B - 3

PRICE SCHEDULE

CLIN Type Section Supplies or Services Quantity and Unit

Unit Price

Amount

12 C 41 22 20 Remove Bridge Cranes in

LPH

2 Each $ $

13 S 41 22 20 Furnish Bridge Cranes in

LPH

2 Each $ $

14 C 41 22 20 Install Bridge Cranes in

LPH

2 Each $ $

TOTAL FOR PRICE SCHEDULE $_________________

OPTIONAL PRICE SCHEDULE A

and Unit

Unit Price

Amount

1 C 41 22 20 Adjustment of Runway Rails in RPH (Optional)

For the lump sum of $

TOTAL FOR OPTIONAL PRICE SCHEDULE A $_________________

OPTIONAL PRICE SCHEDULE B

and Unit

Unit Price

Amount

1 C 41 22 20 Remove and Replace Runway Rails in RPH (Optional)

For the lump sum of $

TOTAL FOR OPTIONAL PRICE SCHEDULE B $_________________