Attachment_10_-_Q_A_Summary_0002.pdf
PDF 111 KB Posted
- Attached to
- REPLACE AND HARDEN CANA BOARDWALKS Federal contract opportunity
- Solicitation number
- 140PS124R0009
About this file
This document is a Questions and Answers (Q&A) Summary for Solicitation #140PS124R0009, Amendment #0002, related to the replacement of the Canaveral National Seashore (CANA) boardwalks.
The key details include:
- The minimum font size is 10 Times New Roman with 0.25-inch margins, and covers/TOC/tabs do not count against the page count.
- The 4-page limit for Subfactor 3B - Safety includes the OSHA 300A logs and the resume for the Site Safety Manager, per Amendment 0001.
- The "General References" and "Report on Subcontracting" forms referenced in the Volume II instructions were provided with the initial solicitation package.
- The Government has provided an updated set of drawings (Attachment 12) to address formatting errors in the original Statement of Work.
This Q&A Summary does not provide details on the required products or services, response dates, award dates, pricing terms, set asides, or federal agency involvement. It is focused on addressing specific questions and clarifications related to the solicitation requirements and documentation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_12_-_Drawings_0002.pdf | ||
| Sol_140PS124R0009_Amd_0002.pdf | ||
| Attachment_9_-_Site_Visit_Roster_0002.pdf | ||
| Attachment_11_-_SOW_Addendum_0002.pdf | ||
| Attachment_6_-_Site_Visit_Roster_0001.pdf | ||
| Sol_140PS124R0009_Amd_0001.pdf | ||
| Attachment_7_-_General_References_Form_0001.pdf | ||
| Attachment_8_-_Q_A_Summary_0001.pdf | ||
| Attachment_3_-_Construction_Wage_Decision_(FL2020232).pdf | ||
| Attachment_4_-_Limitation_on_Subcontracting_Report.xlsx | XLSX spreadsheet | |
| Attachment_5_-_Past_Performance_Questionnaire.docx | DOCX document | |
| Attachment_6_-_Project_Experience_Questionnaire.docx | DOCX document | |
| Sol_140PS124R0009.pdf | ||
| Attachment_1_-_Statement_of_Work.pdf | ||
| Attachment_2_-_Drawings.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 10 Solicitation #: 140PS124R0009
Amendment #: 0002 CANA – Boardwalk Replacement
Questions and Answers listed below:
Question Answer
Is there a minimum font/margin size for this submission?
The minimum font size is 10 Times New Roman with .25 margins.
Do covers, TOC, and tabs count against the page count?
Covers, TOC, and tabs do not count against page counts.
Will the government please clarify if the four-page limit for Subfactor 3B – Safety includes the OSHA 300A logs, and the resume for the Site Safety Manager?
This question was answered via Amendment 0001.
Please see amendment 0001 to Solicitation 140PS124R0009 posted on SAM.gov.
The Volume II instructions state to complete and submit the attached “General References” form, but the form is not attached. Can the government please send the form?
This question was answered via Amendment 0001.
Please see amendment 0001 to Solicitation 140PS124R0009 posted on SAM.gov.
The Volume II instructions state to complete and submit the attached “Report on Subcontracting” form, but the form is not attached. Can the government please send the form?
This question refers to Attachment 4 provided with the initial solicitation package. Please see Solicitation 140PS124R0009 posted on SAM.gov.
The following sheets in the statement of work have glitches. Sheet 13 of 34 (Subsheet S11), Sheet 18 of 34 appears to be missing information, Sheet 20 of 34 appears to be missing information, Sheet 23 of 34 is blank, Sheet 25 of 34 is blank. Does the government intend to provide an updated SOW without these errors?
The Government provides “Attachment 12 – Drawings” to remove the formatting errors.
Sheet 13 of 34 (3/S11 & 4/S11) have images (that look like an error when drawings were converted to PDF, blocking the measurement references. This doesn’t allow the contractor to accurately perform construction take-offs to gather costs. Please see the referenced picture attached. Will NPS be issuing a revised set of drawings for the Perdido Key basis of design?
The Government provides “Attachment 12 – Drawings” to remove the formatting errors.
Page 18 of 34. This sheet does not provide a reference to any drawings. Please confirm that the table “Approximate number of components” is the only intended information provided to the contractor on page 18 or 34 of the SOW.
The Government provides “Attachment 12 – Drawings” to remove the formatting errors.
Page 20 of 34. This sheet is blank, and no information has been populated on the PDF.
Please confirm that there is no information on page 20 of 34 of the SOW for the contractor to be aware of for this project.
Attachment 10 Solicitation #: 140PS124R0009
Amendment #: 0002 CANA – Boardwalk Replacement
Page 23 of 34. This sheet is blank, and no information has been populated on the PDF.
Please confirm that there is no information on page 20 of 34 of the SOW for the contractor to be aware of for this project.
Page 25 of 34. This sheet is blank, and no information has been populated on the PDF.
Please confirm that there is no information on page 20 of 34 of the SOW for the contractor to be aware of for this project.