A06_Specifications.pdf
PDF 314 KB Posted
- Attached to
- EO14398 CABIN KITS - GLBA
- Solicitation number
- 140P9726Q0067
About this file
This is a Technical Specifications document for a federal supply contract issued by the National Park Service, Glacier Bay National Park and Preserve, for the supply of cedar cabin kits (Contract Number 341854).
The contract requires the vendor to provide two complete building kits, each approximately 376 square feet, with pre-cut materials for cabin construction. Each cabin shall be 18'x22' with laminated red cedar timber tongue and groove exterior walls matching an existing structure at Bartlett Cove Campground. The buildings must be designed for a roof snow load of 120 psf, basic wind speed of 112 mph (Exposure D), and floor live load of 40 psf. The vendor is responsible for providing all materials for walls, wall coverings, columns, roof structure, roofing, floor structure and flooring, windows, doors, fasteners, adhesives, and structural connectors for the above-grade construction; the NPS will provide foundation system materials and perform all construction. Roofing shall be classic brown 26-gauge standing seam metal with 1" rib and 16" wide panels over 2x6 tongue and groove decking with ice and water shield underlayment. Interior and exterior trim shall be clear cedar, windows shall be vinyl double-glazed with cedar trim, doors shall be solid core exterior grade with satin chrome hardware, and flooring shall be commercial-grade luxury vinyl planks. Each cabin includes a covered porch approximately 5'x4'. Cabin Kit 2 shall be a mirror image of Cabin Kit 1. The vendor must submit structural, erection, materials submittals, and shop drawings for NPS approval within two weeks of receipt before shipment. The complete package must be prepped for barge or overland shipment with FOB delivery to Glacier Bay National Park, 1 Park Road, Gustavus, Alaska 99826, no later than February 28, 2027, Monday-Friday 7am-4pm. The vendor shall provide complete building fabrication instructions and drawings and shall warrant the building and hardware for one year on function with free parts, plus pass-down manufacturer warranties on windows and doors if available.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Glacier Bay National Park and Preserve
1 Park Road Gustavus, AK 99826
Supply Cedar Cabin Kits
341854
NATIONAL PARK SERVICE
REGION 11 ALASKA
National Park Service, Glacier Bay National Park & Preserve, Technical Specifications Attachment
Supply Cedar Cabin Kits
1. General Description of Needed Equipment: The scope of this supply contract shall be to provide two complete building kits approximately 376sqft each with pre-cut materials for construction of the buildings as shown on the drawings. The vendor shall be responsible for providing all materials for the construction of all components of the buildings. The construction of these cabins shall be the responsibility of the NPS. To qualify for consideration, for each of the following Items (Sections
2.1 thru 4) shall be met or bettered. All specified materials and equipment shall be shipped to
Gustavus, Alaska 99826.
2. Salient Characteristics:
2.1. Cedar Cabin Kit 1:
2.1.1. Provide complete building kit with pre-cut materials for construction of the buildings as shown on the drawing. The vendor shall be responsible for providing all materials necessary to construct the walls (both exterior and interior) and wall coverings, columns, roof structure, roofing, floor structure and flooring, windows, doors, and all necessary fasteners, adhesives and structural connectors to complete the construction of the above grade portion of the building, in accordance with all structural requirements. The National
Park Service shall be responsible for purchasing materials for the foundation system and the ramp materials and for all construction of the Cabins.
2.1.2. The exterior walls shall be of laminated red cedar timber tongue and groove construction to match the existing toilet building at the Bartlett Cove Campground. Photographs of this existing building are available upon request.
2.1.3. The building shall be designed for a roof snow load of 120 psf, a basic wind speed (3 second gust) of 112 mph, Exposure D, and a floor live load of 40 psf. In addition to the design of the building, the vendor shall identify and provide the structural hardware required to fasten the specified building to the foundation to accommodate these loads.
2.1.4. Foundation will consist of pressure treated 6”x12” beans on 4’ centers. Final configuration will be made when Vendors drawings are excepted. Foundation will be provided by NPS
2.1.5. . The overall dimensions of the buildings (based on dimensions to exterior walls, not columns) shall be 18’x22’, with an area of approximately 376sqft. See concept pictures for reference.
2.1.6. The roofing shall be classic brown 26 gauge standing seam metal with a 1” tall rib and 16” wide panels over 2x6 Tongue and Groove Roof Decking. Underlayment shall consist of a self-adhering, rubberized asphalt membrane “ice and water shield”. Roof shall be supported by Glue laminated beans and exterior wall structure.
2.1.7. The doors shall be solid core exterior grade with Satin Chrome knob and hinges. Trim shall be Cedar. (see door and window table)
2.1.8. Windows shall Vinyl Double Glazed Windows with Ext. Cedar Trim (see door and window table)
2.1.9. All interior trim shall be clear cedar
2.1.10. The floor system shall consist of 2x6 joists spaced at 16” on center with 3/4” plywood subfloor. Rim joist shall be pressure treated. The floor finish shall be commercial grade luxury vinyl planks.
2.1.11. Cabin Shall be provided with a covered porch approximately 5’x4’ off the entry doorway, supporting post shall be pressure treated.
2.2. Cedar Cabin Kit 2
2.2.1. Vendor shall provide a second cabin with all specifications listed above but be a mirror image of cabin 1.
3. Manuals: The vendor shall provide complete and concise building fabrication instructions and drawings for each cabin to ensure that the building is constructed in accordance with the manufacturer’s requirements.
4. Warranty: The building and hardware shall have a one-year warranty on the function of the unit and free parts. All window and doors shall have a pass down warranty from the manufacturer if available
5. Submittals Prior to shipping of the specified materials and equipment, the vendor shall submit structural, erection and materials submittals for the building and shop drawings for review by the NPS. The NPS shall review and approve (or not approve, as appropriate) the submittals within two weeks of receipt. Only after all submittals have been approved shall the vendor ship all specified items to the site.
6. Shipping and Delivery:
Entire package shall be prepped for barge or overland shipment. Complete FOB shipping address shall be to: The National Park Service, Glacier Bay National Park, 1 Park Road, Gustavus AK 99826.
FOB Delivery shall be completed no later than February 28, 2027. Delivery days and hours are Monday- Friday 7am-4pm.
File details come from the government source that posted it. Updated .