This document is an amendment to Solicitation 140P9724R0002 issued by the Department of the Interior National Park Service Alaska Region to replace fuel tanks at the Eagle Airstrip in Alaska. The amendment addresses vendor questions and updates Sections 52.211-10 and Section J, Attachments A and B. Key details include:
The solicitation is being amended to allow either rectangular or cylindrical fuel tanks, with a preference for a sloped tank with a low point sump and a ground-level water draw hand pump. Internal tank coating is preferred to meet aviation standards, though ATA 103 is no longer a requirement. The fuel monitoring system should be a basic system to track agency fuel usage. The proposal due date has been extended to May 27, 2024. The period of performance is 365 days after contract award, with the goal of installing the tanks prior to winter if possible. Contractors are responsible for all permitting under state jurisdiction. Specific technical requirements, pricing, and set-aside information are included in the related federal contract opportunity document.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P9724R0002_Amd_0003.pdf | ||
| B09b_Attach_B_rev5-13_0002.pdf | ||
| B09b_Attach_A_rev5-13_0002.pdf | ||
| Sol_140P9724R0002_Amd_0001.pdf | ||
| B08e_Attach_C.pdf | ||
| B08k_Attach_I.pdf | ||
| B08g_Attach_E.docx | DOCX document | |
| Sol_140P9724R0002.pdf | ||
| B08f_Attach_D.pdf | ||
| B08j_Attach_H.pdf | ||
| B08d_Attach_B.pdf | ||
| B08h_Attach_F.docx | DOCX document | |
| B08i_Attach_G.pdf | ||
| B08c_Attach_A.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140P9724R0002 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PAK
Anchorage AK 99501-2327 240 W. 5th Ave, Room 114 NPS, ARO - Alaska Regional Office
04/17/20240002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
04/17/2024
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Replace Existing Fuel Tanks - Construction, Eagle, AK Yukon Charlie Nat'l Park, AK 99738
THE PURPOSE OF THIS AMENDMENT IS TO ANSWER VENDOR QUESTIONS, UPDATE 52.211-10 AND SECTION J
ATTACH A AND B.
Q1: Do you want these tanks to be rectangular like in the photos? Another option is cylindrical.
A1: If the tanks meet standard design and/or aviation specs than there is no real preference, the thought behind round was the ability to shed snow better.
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Tyler Groves
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 6
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140P9724R0002/0002
Q2: Do you want the tank sloped with a low point sump?
A2: This would be preferred but please compare costs with other means of draining.
Q3: Do you want a water draw hand pump at ground level piped to the low point, so that any water that collects can be removed from tank?
A3: If left as a top fill this would be preferred
Q4: Do you want internal tank coating? Since we cannot use a floating suction in this size tank, this would be best practice if system in not ATA
103.
A4: ATA 103 does not need to be met, but we need to try and get as close as possible for the jet fuel tank. DOI does have 2k tanks that have floating suction but do not meet ATA103 and that is fine. Also having an internal coating would be preferred if it meets aviation standards.
Q5: What is the basis of design for the meter or what would you want to see us use?
A5: The meter should just be something that tracks gallons used, this does not need to be complicated or transmitted to any other device.
The NPS wants a deceives that tracks agency usage since many agencies will be drawing fuel form these tanks. We need the meter /counter that can be reset and is visible for the end user during filling and the fuel monitoring/ keytrol type system referenced is intended to be a basic system that lets specified users (FWS, BLM, NPS, ETC) pump fuel under their meter and have an accurate total consumption to complement the hard copy turned in for specific planes or fleet vehicles.
Q6: Would it be possible to push the bid due date due to the number of questions we have moving around that are unanswered, please. A couple of weeks would be good.
A6: The proposal due date is being pushed out 1 additional week, May 27, 2024.
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
3 6
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140P9724R0002/0002
Q7: Lastly, I hear that there are answers to some other questions regarding the keytrol, etc. Where can I find this information or amendments?
A7: All Q&A is posted to amendments and can be found in SAM.gov with all other docs for
140P9724R0002.
Q8: Define extent of electrical scope of work to
¿supply power for future tanks¿. Reference Item
No. 1 in the Scope of Work project description.
Is this power for Bid Item No. 0003 and Bid Item
No. 0005 or is it only for the 100LL tank associated with Bid Item No. 0003? Is all of this cost to be included in Bid Item No. 0001? YUCH ¿
Eagle Airport Future Fuel Tank configuration Plan only shows ¿electrical tie in¿ to the 100LL tank.
A8: Electrical should be bid for all 3 pads in
CLIN 1, please break it out in your cost so it is easily understood.
Q9: In the Project Description Tank Fabrication
Appurtenances there is reference to the ¿keytrol type monitoring system.¿ Is this the same system as the ¿fuel monitoring system¿ of 01 10 00
1.2.B.1?
A9: Correct this would be the same, this should be a simple system that the NPS can use to track what agencies are using fuel.
Q10: Referencing ATA-103, will all three of these tanks be required to have floating suction, internal ladder, 2 access manways, and 1 in 20 floor slope?
A10: ATA 103 should only apply to the aviation tanks, but we will be changing that verbiage to at a minimum the tanks need to meet aviation standards and if cost effective having ATA 103 items would be preferred. Like a floating suction for the jet A tank. But complying to ATA 103 will no longer be a requirement.
Q11: 52.236-7 states that Contractor is responsible for all costs associated with permitting. Who¿s jurisdiction does this installation fall under, federal, state, or other?
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
4 6
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140P9724R0002/0002
A11: It is the state.
Q12: Solicitation states 213 calendar days from notice to proceed after allowing not less than 60 calendar days for Government to accept offer for offers due 5/20/2024 and the solicitation also says that the period of performance is 05/01/2024 to 11/20/2024 and delivery is 11/30/2024;
mathematically impossible to achieve 11/30/2024 with 213 calendar days from NTP.
Scope of Services page 1 says that the performance period is ¿365 days after date of contract award¿ while page 7 says ¿contract is to be substantially complete by estimated September
6th, 2024.¿
Section 01 10 00 states ¿Work shall be completed within 213 calendar days of the start date provided on the Notice to Proceed.¿
52.211-10 states ¿complete the entire work ready for use not later than November 30, 2024.¿ It will be expensive and impractical to extend the performance period into the winter months as provided for in Alternate 1 Section F ¿
Deliveries or Performance.
A12: Due to long periods of review these dates have shifted. The goal would be to get this award and installed this summer. The NPS understands lead times and that there is a process to procure these items. The PoP will be 365 days, but we would like the tanks to be installed this summer/fall to have operational fuel systems next season if possible.
Q13: The SoW specifies that they would like the new tanks to be ATA Specification 103 in accordance with NFPA 30. However in order to reach that specification we would need to implement a floating suction system within the tank which isn't possible in the 2,000 Gal tanks the SoW requests. Would it be possible to either have the SoW switched to a 6,000 Gal tank so that we may reach the ATA specification. Or have the
ATA specification removed so that we may install the 2,000 GAL tanks.
A13: Meeting ATA 103 will be removed but if possible, meeting certain requirements would
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
5 6
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140P9724R0002/0002 still be preferred like floating suction in the
2k tank. This prevents water from being pumped into the planes.
Q14: The tanks shall incorporate a fuel monitoring system capable of functioning in a remote environment for tracking multiple agencies fuel use. (Because the system is in a remote location and the internet may or may not be available how will it be managed and what are they wanting to capture i.e. employee#, plane, entity? Will the capture info using USB).
A14: The park is not looking for an overly complicated system, this system does not need to talk via Wi-Fi and would be a local system of record. Many agencies will use these pumps so a way to track usage per agency is what the park is looking for.
Q15: All tanks will need to be around 20-35 GPM at the nozzle, this is with a 100ft hose length.
Existing power at the hanger is 120v. (Because there is 220 Available, it is advisable to go with a Red Jacket submersible pump (220v) to get the minimum 20 gpm thru a 1¿ 100¿ hose) is this acceptable?
A15: Any method that fits within the parameters of the SOW and the new data of having 220v on site could be a viable option. Note this system is for aircraft and needs to be rated for such usage.
Q16: SF1442 states the POP to be 05/01/2024 to
11/30/2024 do you still anticipate being able to accomplish this project during that time frame.
A16: The PoP will change based on award, it would be nice if we could still install before winter, but the NPS fully understand that if this is not possible than there will be a shift in PoP.
Please bid and price out according to a reasonable timeline.
Q17: Have you considered the long lead time of
AST fire guard tanks, of 12-14 weeks for manufacturing?
A17: The NPS understands there are long lead times and the time it takes to procure items, this project has shifted. We would like an
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
6 6
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140P9724R0002/0002 installation before winter but if not possible than we will shift the Pop. Currently we will have a 365 PoP but with expectation of installation prior to winter if possible. If not than we understand.