Sol_140P8626Q0002_Amd_0001.pdf
PDF 88 KB Posted
- Attached to
- Supply & Deliver Diesel to Alcatraz, GOGA
- Solicitation number
- 140P8626Q0002
About this file
This document is a Standard Form 30 Amendment of Solicitation/Modification of Contract for a diesel fuel supply and delivery contract to Alcatraz, issued by the National Park Service (NPS), Pacific West Region - Golden Gate National Recreation Area (GOGA MABO). The amendment includes responses to four key questions about the fuel delivery, clarifying technical details such as the 1,200-foot linear distance from intake to tank, an elevation change of 40-50 vertical feet, fuel line pressure specifications (maximum 50 psi, recommended 30-40 psi), and confirmation of a 1,000-gallon minimum order quantity (MOQ). The period of performance is from 01/01/2026 to 06/25/2026, with the amendment dated 12/08/2025 and effective on 12/01/2025.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B08_Attachment_3_Site_Visit_Sign_In_Sheet_140P8626Q0002_0001.pdf | ||
| Sol_140P8626Q0002.pdf | ||
| B08_Attachment_1_Scope_of_Work_140P8626Q0002.docx | DOCX document | |
| B08_Attachment_2_Technical_Info_Form-Past_Performance_140P8626Q0002.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140P8626Q0002 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PPG
San Francisco CA 94123 Building 201, Fort Mason
NPS, PWR - GOGA MABO
12/08/20250001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
12/01/2025
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Supply & Deliver Diesel to Alcatraz, GOGA
This Amendment 0001 is to include questions and answers, and the site visit sign-in sheet.
No other changes have been made.
Question 1:
How many linear feet is it from the intake to the tank?
Answer 1:
Approximately 1,200 feet.
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Mickey Chisolm
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140P8626Q0002/0001
Question 2:
What is the elevation change from the intake to the tank?
Answer 2:
The change in elevation from the connection point up to the tank is approximately 40 to 50 vertical feet upward.
Question 3:
Please confirm only a 30 to 40 psi pump is needed to send fuel from the intake to the tank.
Answer 3:
The fuel line is rated for a maximum of 50 psi; a
30 - 40 psi should be sufficient.
Question 4:
Please confirm the MOQ as confirmed onsite is
1,000 gallons per delivery.
Answer 4:
Yes, MOQ is 1,000 gallons per the Scope of Work.
Period of Performance: 01/01/2026 to 06/25/2026
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
File details come from the government source that posted it. Updated .