Sol_140P8625Q0059_Amd_0001.pdf

PDF 92 KB Posted

Attached to
MARIN HEADLANDS FORCED MAIN REPAIRS Federal contract opportunity
Solicitation number
140P8625Q0059
Issued by
Department of the Interior National Park Service Pacific West Region

About this file

This document is an Amendment (Amendment 001) to a federal solicitation for Marin Headlands Forced Main Repairs by the National Park Service (NPS). The amendment provides detailed responses to 11 vendor questions regarding the project, including technical specifications such as existing pipe pressure (less than 100psi), pipe type (6" Schedule 40 PVC), and work performance details. Key clarifications include: the system will remain live during repairs, work can be done at night with a potential 3-4 hour shutdown, compaction testing is contractor's responsibility, and no bypass pumping is needed - instead a Vactor truck will be used for pumping. The amendment also notes that no as-built drawings are required for close-out documents, and the work involves removing and replacing a double cleanout with a straight pipe section. The solicitation is issued by NPS PWR - GOGA MABO, located in Building 201, Fort Mason, San Francisco, CA, with the Contracting Officer Patty Payne and Contracting Officer's Representative Tommy Daigle providing contact information.

View the file

Other files for this federal contract opportunity

Other files attached to MARIN HEADLANDS FORCED MAIN REPAIRS, newest first.
File Type Posted
Sol_140P8625Q0059_Amd_0002.pdf PDF
Section_J_-_Att_No__005_Forced_Main_Sign_In_Sheet_7-1-25_0001.pdf PDF
Section_J_-_Att_No__007_Vactor_Bunker_Road_0001.png PNG image
Section_J_-_Att_No__006_Double_Cleanout_0001.png PNG image
Sol_140P8625Q0059.pdf PDF
Section_J_-_Att_No__003_Technical_Information_doc.pdf PDF
Section_J_-_Att_No__004_WD___CA20250007_Main_County_.pdf PDF
Section_J_-_Att_No__001_SOW.pdf PDF
Section_J_-_Att_No__002_Map.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140P8625Q0059 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

PPG

San Francisco CA 94123 Building 201, Fort Mason

NPS, PWR - GOGA MABO

07/02/20250001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

06/25/2025

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of this Amendment 001 is to Upload the site visit sign in sheet (Section J- Att

No. 005), Photos of the site (Section J - Att No. 006, and 007), and to answer vendor questions.

Question 1. Do we know the pressure of the existing pipe? 100psi 250psi?

Answer Question 1. Less than 100psi

Question 2. What type of Pipe and fittings are currently in place? DI? PVC? SDR? What pressure pipe and fittings are we to use?

Answer Question 2. Main is 6" Schedule 40 PVC

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Patty Payne

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140P8625Q0059/0001

Question 3. Can you provide the AS-builts as mentioned in the background paragraph?

Answer Question 3. Photos to be attached showing construction

Question 4. Does the system need to remain live?

Answer Question 4. System will remain live

Question 5. It mentions a bypass will need to be installed, do you know how far the by pass will need to pump? This is needed to size the bypass pumps?

Answer Question 5. No Bypass needed - Rather

Vactor truck pumping

Question 6. Is the contractor to take care of the compaction testing?

Answer Question 6. Yes

Question 7. The SOW mentions the break is at the double clean out? are we to replace any other

Pipe other than the double clean out?

Answer Question 7. Double cleanout to be removed and replaced with straight pipe section

Question 8. Can the work be done at night?

Answer Question 8. Yes

Question 9. Since this is force main can how long can the system be shut down for and at what approx. times? Is this or can this be done at night?

Answer Question 9. Night would be preferred as system can shutdown longer 3-4 hours. Main Forced

Main will still need to be back drained and

Vactor pumped out of hole.

Question 10. Since this is a double clean out does it make sense to install a new vault and maintain the double clean out for future use?

(this is more of an Idea or is something that you might want to consider)

Answer Question 10. No new double cleanout, no vaults or boxes, Straight buried pipe as mentioned before.

Question 11. Do we need to provide drawings or asbuilts for close out documents?

Answer Question 11. No

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

3 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140P8625Q0059/0001

Contracting Officer: Patty Payne Email:

patty_payne@nps.gov Phone: 559-730-6435

COR: Tommy Daigle, Email: thomas_daigle@nps.gov, Phone: 415-5313076

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

File details come from the government source that posted it. Updated .