This document is an Amendment (Amendment 001) to a federal solicitation for Marin Headlands Forced Main Repairs by the National Park Service (NPS). The amendment provides detailed responses to 11 vendor questions regarding the project, including technical specifications such as existing pipe pressure (less than 100psi), pipe type (6" Schedule 40 PVC), and work performance details. Key clarifications include: the system will remain live during repairs, work can be done at night with a potential 3-4 hour shutdown, compaction testing is contractor's responsibility, and no bypass pumping is needed - instead a Vactor truck will be used for pumping. The amendment also notes that no as-built drawings are required for close-out documents, and the work involves removing and replacing a double cleanout with a straight pipe section. The solicitation is issued by NPS PWR - GOGA MABO, located in Building 201, Fort Mason, San Francisco, CA, with the Contracting Officer Patty Payne and Contracting Officer's Representative Tommy Daigle providing contact information.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P8625Q0059_Amd_0002.pdf | ||
| Section_J_-_Att_No__005_Forced_Main_Sign_In_Sheet_7-1-25_0001.pdf | ||
| Section_J_-_Att_No__007_Vactor_Bunker_Road_0001.png | PNG image | |
| Section_J_-_Att_No__006_Double_Cleanout_0001.png | PNG image | |
| Sol_140P8625Q0059.pdf | ||
| Section_J_-_Att_No__003_Technical_Information_doc.pdf | ||
| Section_J_-_Att_No__004_WD___CA20250007_Main_County_.pdf | ||
| Section_J_-_Att_No__001_SOW.pdf | ||
| Section_J_-_Att_No__002_Map.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140P8625Q0059 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PPG
San Francisco CA 94123 Building 201, Fort Mason
NPS, PWR - GOGA MABO
07/02/20250001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
06/25/2025
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this Amendment 001 is to Upload the site visit sign in sheet (Section J- Att
No. 005), Photos of the site (Section J - Att No. 006, and 007), and to answer vendor questions.
Question 1. Do we know the pressure of the existing pipe? 100psi 250psi?
Answer Question 1. Less than 100psi
Question 2. What type of Pipe and fittings are currently in place? DI? PVC? SDR? What pressure pipe and fittings are we to use?
Answer Question 2. Main is 6" Schedule 40 PVC
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Patty Payne
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140P8625Q0059/0001
Question 3. Can you provide the AS-builts as mentioned in the background paragraph?
Answer Question 3. Photos to be attached showing construction
Question 4. Does the system need to remain live?
Answer Question 4. System will remain live
Question 5. It mentions a bypass will need to be installed, do you know how far the by pass will need to pump? This is needed to size the bypass pumps?
Answer Question 5. No Bypass needed - Rather
Vactor truck pumping
Question 6. Is the contractor to take care of the compaction testing?
Answer Question 6. Yes
Question 7. The SOW mentions the break is at the double clean out? are we to replace any other
Pipe other than the double clean out?
Answer Question 7. Double cleanout to be removed and replaced with straight pipe section
Question 8. Can the work be done at night?
Answer Question 8. Yes
Question 9. Since this is force main can how long can the system be shut down for and at what approx. times? Is this or can this be done at night?
Answer Question 9. Night would be preferred as system can shutdown longer 3-4 hours. Main Forced
Main will still need to be back drained and
Vactor pumped out of hole.
Question 10. Since this is a double clean out does it make sense to install a new vault and maintain the double clean out for future use?
(this is more of an Idea or is something that you might want to consider)
Answer Question 10. No new double cleanout, no vaults or boxes, Straight buried pipe as mentioned before.
Question 11. Do we need to provide drawings or asbuilts for close out documents?
Answer Question 11. No
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
3 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140P8625Q0059/0001
Contracting Officer: Patty Payne Email:
patty_payne@nps.gov Phone: 559-730-6435
COR: Tommy Daigle, Email: thomas_daigle@nps.gov, Phone: 415-5313076