This document is a Standard Form 30 Amendment of Solicitation/Modification of Contract for elevator repair services at Fort Mason Building 201, GOGA (Golden Gate National Recreation Area). Amendment 0001 revises the Statement of Work, includes a Revised Price Schedule, and modifies contract line-item number descriptions based on vendor questions. Key changes include replacing the HPV600 board with a compatible HPV900, installing roller guides due to rail conditions, and modifying specific repair tasks for the elevator.

The contract period of performance is from 06/20/2025 to 07/25/2025. The amendment addresses four specific vendor questions, including options for change orders, board replacement recommendations, and guide rail modifications. The contract line items (CLINs) have been updated to reflect: removing and disposing of the existing HPV600 and installing a new HPV900, removing and replacing worm shaft seals, re-lining brake shoes, and replacing slide guide inserts with roller guide inserts. All work is to be completed in accordance with the revised Statement of Work.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140P8625Q0055 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

PPG

San Francisco CA 94123 Building 201, Fort Mason

NPS, PWR - GOGA MABO

004401902406/06/20250001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

05/29/2025

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

This Amendment 0001 is to revise Attachment 1 Statement of Work, include Attachment 4

Revised Price Schedule, revise contract line-item number descriptions, post answers to questions obtained from interested vendors, and include the site visit sign-in sheet.

No other changes have been made.

Question 1: Can a $0 bid be submitted for repairs? As it would be best to replace component for option.

Answer: Based on this feedback, the Statement of Work has been revised. Additionally, please use the revised price schedule. See Amendment 0001 for further information.

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Quinn Rankin

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140P8625Q0055/0001

Question 2: Are there options for change orders if additional components are found needing replacement for elevator to function safely?

Answer: Change orders may be possible only under certain circumstances and with advance authorization.

Question 3: In SOW 4.0/a. it calls for the HPV600 board to be repaired. The manufacturer does not repair these boards as they have been superseded twice and are currently working with the HPV 900.

As repairing the existing board would be labor intensive and put NPS 2 supersedure¿s behind the industry standard, may this CLIN be changed to

"remove and dispose of the existing HPV600 and install a new compatible HPV900 or manufacturers recommended and integrate into the existing elevator controls system."?

Answer: Based on this feedback, the Statement of

Work has been revised. Additionally, please use the revised price schedule. See Amendment 0001 for further information.

Question 4: In SOW 4.0/d., it calls for the replacement of the elevator guides and cleaning and filing the rails. May roller guides be installed due to the condition of the rails?

Answer: Based on this feedback, the Statement of

Work has been revised. Additionally, please use the revised price schedule. See Amendment 0001 for further information.

Period of Performance: 06/20/2025 to 07/25/2025

Change Item 00010 to read as follows(amount shown is the obligated amount):

00010 Remove and dispose of existing HPV600 and install new compatible HPV900; integrate into existing controls system in accordance with (IAW)

Statement of Work

Product/Service Code: J035

Product/Service Description: MAINT/REPAIR/REBUILD

OF EQUIPMENT- SERVICE AND TRADE EQUIPMENT

Change Item 00020 to read as follows(amount shown is the obligated amount):

Continued ...

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

3 3

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140P8625Q0055/0001

00020 Remove worm shaft/remove old packing/seals and install new seals IAW Statement of Work

Product/Service Code: J035

Product/Service Description: MAINT/REPAIR/REBUILD

OF EQUIPMENT- SERVICE AND TRADE EQUIPMENT

Change Item 00030 to read as follows(amount shown is the obligated amount):

00030 Remove brake shoes and re-line, disassemble & clean components and re-install IAW Statement of

Work

Product/Service Code: J035

Product/Service Description: MAINT/REPAIR/REBUILD

OF EQUIPMENT- SERVICE AND TRADE EQUIPMENT

Change Item 00040 to read as follows(amount shown is the obligated amount):

00040 Clean, fill rails, and replace all four (4) slide guides inserts with roller guides inserts IAW

Statement of Work

Product/Service Code: J035

Product/Service Description: MAINT/REPAIR/REBUILD

OF EQUIPMENT- SERVICE AND TRADE EQUIPMENT

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

File details come from the government source that posted it. Updated .