Sol_140P8625Q0051_Amd_0003.pdf
PDF 88 KB Posted
- Attached to
- REPLACE ELECTRICAL AND WATER HEATERS IN PARK HOUSI Federal contract opportunity
- Solicitation number
- 140P8625Q0051
About this file
This document is an Amendment (Amendment 003) to a federal solicitation for electrical and water heater replacement work at park housing. The amendment addresses four specific contractor questions related to electrical work requirements: (1) breaker specifications, clarifying that GFCI/AFCI breakers are required with Combination Arc Fault Circuit Interrupters (CAFCI) acceptable; (2) confirming surge protection devices are required per NEC 230.67 for all new panels; (3) indicating no plumbing or electrical plans are available; and (4) noting that the only project walk-through occurred on May 19. The solicitation is issued by the National Park Service (NPS) Pacific West Region - Golden Gate National Recreation Area (GOGA MABO), located in Building 201, Fort Mason, San Francisco, California, with a solicitation number of 140P8625Q0051 and an effective date of 05/24/2025.
View the file
Other files for this federal contract opportunity
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140P8625Q0051 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PPG
San Francisco CA 94123 Building 201, Fort Mason
NPS, PWR - GOGA MABO
05/24/20250003
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
05/09/2025
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of Amendment 003 is to answer questions.
Question 1. Under panelboards and metering spec 2.8 (Building 937) it mentions all new breakers to be arc fault and GFCI. Adding arc fault and or GFCI breakers in place of the standard existing breakers may result in unwanted nuisance tripping due to the unknown nature of existing interior wiring. We suggest following NEC standards for any new circuits and associated breakers but install new standard breakers for the existing loads. Please advise.
Answer Question 1. GFCI/AFCI breakers are required. GFI outlets may be used instead of breakers. For situations in which existing circuits have a shared neutral, a two-Pole
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Patty Payne
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140P8625Q0051/0003
Combination Arc Fault Circuit Interrupters
(CAFCI) is acceptable.
Question 2. Standard NEC requirement is to install surge protection devices at panels if not at main service. It wasn't in the spec but should be included as part of this project for all new panels. Please advise.
Answer question 2. Yes, surge protection is required per NEC 230.67
Question 3. Can you please provide the plans for the plumbing and electrical jobs?
Answer question 3. No plans are available.
Question 4. Are you taking appointments to check out the job?
Answer question 4. No. The only project walk was on 19 May.