This document is Amendment 001 to solicitation 140P8625Q0008, providing answers to vendor questions about interior tank cleaning services for the National Park Service Pacific West Region at Fort Mason in San Francisco. The amendment clarifies key technical details about the concrete water tanks: they are 20 feet high square tanks measuring approximately 100'x100', divided into two 200,000-gallon sections for a total capacity of 400,000 gallons per tank. The tanks are above-ground with 30"x30" access hatches in good condition.
The tanks were last cleaned in 2023 and contain less than 50 gallons of sludge. They have sprayed-on interior coatings over concrete but no liner. The work requires diving services with divers being disinfected with CL2 before entry and using NSF-rated equipment for potable water. The tanks will remain full and operational during service. Access is available via road for 24' trailers and 4WD trucks, and 110V power is available at each tank location. Past performance with potable water tanks is acceptable in lieu of AWWA certifications. The amendment effective date is 01/14/2025.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P8625Q0008_Amd_0002.pdf | ||
| Section_J_-_Att_No__008_Tank_Photos_0001.pdf | ||
| Section_J_-_Att_No__006_WD_2015-5725_Marin_County.pdf | ||
| Section_J_-_Att_No__001_Contract_Price_Schedule.xlsx | XLSX spreadsheet | |
| Section_J_-_Att_No__003_Tank_Locations.pdf | ||
| Section_J_-_Att_No__005_Google_Maps_Cronkhite_Tank.pdf | ||
| Section_J_-_Att_No__002_Reservoir_Cleaning_SOW.pdf | ||
| Sol_140P8625Q0008.pdf | ||
| Section_J_-_Att_No__007_Experience_and_PP_Form.pdf | ||
| Section_J_-_Att_No__004_Google_Maps_Baker_Tank.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140P8625Q0008 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PPG
San Francisco CA 94123 Building 201, Fort Mason
NPS, PWR - GOGA MABO
01/14/20250001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
01/04/2025
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this Amendment 001 is to answer vendor questions.
Question 1. Do you have drawings or more accurate dimensions of each tank (height, Width, Depth,)
Answer Question 1. 20 feet high, Concrete square, 100'x100' approximate.
Question 2. Are the access hatches up at the top in good condition and if so, what are the sizes of them?
Answer Question 2. Yes, good condition 30"x30"
Question 3. Do you have a map of the Fort Barry Tank?
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Patty Payne
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 4
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140P8625Q0008/0001
Answer Question 3. See Section J - Attachment 008
Question 4. Are they all accessible via road/dirt road to get a truck and trailer to them?
Answer Question 4. Yes
Question 5. Is there a usable power supply at each tank?
Answer Question 5. Yes 110v
Question 6. The scope is a little confusing as it says to disinfect the tanks however they are to be done full, so there will be no need to disinfect as we will not be emptying them. Can you confirm this? or was there a certain method of disinfecting that would be preferred?
Answer Question 6. Divers must be disinfected by spraying down with CL2 before entry. All gear must be NSF rated for potable water. Tanks will not be drained.
Question 7. Do you know if these tanks are lined with a liner? That would be different from a sprayed-on coating.
Answer Question 7. No liner, just sprayed on coating over concrete interiors.
Question 8. All tanks must be full for us to service. Can that be accomplished?
Answer Question 8. Yes, tanks will be full and in operation.
Question 9. Do you need certifications/certificates from the AWWA proving training and qualifications or is adequate past performance acceptable?
Answer Question 9. Past performance with potable water tanks is acceptable.
Question 10. Of what material are the tanks made?
Answer Question 10. Concrete
Question 11. What are the dimensions of the tanks
(diameter, height, length, and width)? Is each hatch opening at least 20" X 20", without obstructions that would prevent entry?
Answer Question 11. 20 feet high, Concrete square, 100'x100' approximate. Yes, opening hatch at least 20"x20"
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
3 4
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140P8625Q0008/0001
Question 12. What type-construction-location
(on-grade, below grade, standpipe, elevated, steel welded, steel bolted, concrete, buried, semi buried, ellipsoidal, witches hat, pedestal or clearwell) of tanks are they?
Answer Question 12. Concrete, above ground
Question 13. When were the tanks last inspected and cleaned?
Answer Question 13. 2023
Question 14. Are there any photos of the tanks?
Answer Question 14. See Section J - Attachment 008
Question 15. Can you provide the size and depth of each reservoir tank?
Answer Question 15. 20 feet high, Concrete square, 100'x100' approximate.
Question 16. Is there an estimated amount of gallons of sludge per location?
Answer Question 16. Less than 50 gallons, tanks were cleaned in 2023 and still in good shape.
Question 17. Are the dimensions of the tanks listed? If so, where are they located? If they are not listed what are the dimensions? Note:
Gleaning the information if necessary from the drawings is especially difficult and if this is the information to be drawn upon, please write out specifically in words the numbers needed for a bid. Another note: This information is used to determine the square footage and cubic yards of the tank thus a determination can be made as to how long the project will take which can affect cost greatly.
Answer Question 17. 20 feet high, Concrete square, 100'x100' approximate. 400,000-gallon square tanks split into half, 200,000 gallons each side.
Question 18. Are the concrete tanks above or below ground?
Answer Question 18. Above
Question 19. What is the size of the hatches for diver access? Are they at least 24"?
Answer Question 19. Yes, at least 24"x 24"
Question 20. Can a 24' trailer and 4WD truck get
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
4 4
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140P8625Q0008/0001 up to the tanks, if so, how far away?
Answer Question 20. Yes, 4wd trucks and trailers
24' have made it to the tanks in the past.
Contracting Officer: Patty Payne Email:
patty_payne@nps.gov Phone: 559-730-6435
Requestor: Tommy Daigle, Email:
thomas_daigle@nps.gov Phone: 415-531-3076
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
File details come from the government source that posted it. Updated .