MMB_2nd_Floor_Murals_Pre-Bid_Site_Visit_Notes_and_Q-A_0001.pdf
PDF 128 KB Posted
- Attached to
- SAFR MARITIME MUSEUM MURAL MAINTENANCE
- Solicitation number
- 140P8624Q0050
About this file
This document contains the pre-bid site visit notes and questions and answers for the SAFR Bathhouse Mural Cleaning & Preservation project, solicitation number 140P8624Q0050. The project is for maritime mural maintenance at the San Francisco Maritime National Historical Site, managed by the Department of the Interior National Park Service Pacific West Region.
The key details include: The project scope involves cleaning and preserving murals on the 2nd floor of the Maritime Museum building, including tile murals in the veranda, stairwells, and lobby. The site visit covered observations of the murals and addressed specific questions, such as the exclusion of lobby stairwells and the low north wall of the veranda from the scope, and the lack of required COVID-19 precautions. The document does not include a Performance Work Statement or Statement of Objectives, but rather captures the pre-bid site visit discussion.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
United States Department of the Interior
NATIONAL PARK SERVICE
SAN FRANCISCO MARITIME NATIONAL HISTORICAL PARK
2 MARINA BLVD. BUILDING E, 2ND FLOOR
SAN FRANCISCO, CALIFORNIA 94123
IN REPLY REFER TO:
RFP #140P8624Q0050 SAFR Bathhouse Mural Cleaning & Preservation
PRE-BID SITE VISIT
DATE:
July 3, 2024
PREPARED BY:
Todd Bloch
ATTENDEES:
• Todd Bloch, PM, San Francisco Maritime NHP
• Hazel Bess, Museum Technician, San Francisco Maritime NHP
• See attached Sign-In Sheet
July 3, 2024 Site Visit Notes (all attendees)
Attendees met in the lobby of the Museum Building at 9:00 AM. The group observed the murals.
The group moved to the Veranda and observed the tile murals on the wall and in the stairwells and the area at the top of the east stairs where tile has apparently separated from the wall.
Questions and Answers:
Q. Are there any known areas in the lobby of canvas separating from the plaster wall?
A. No. The scope of work does not include reattachment of canvas if found; the scope only includes identifying if any areas of separating canvas are found during examination.
Q. Does the scope include any work in the interior lobby stair wells?
A. No; all lobby work is within the lobby proper.
Q. Does the scope include the low wall on the north side of the veranda stairwells (which is white tile only with no mural/graphics)?
A. No; the half height wall is not included in the scope. Only the tile areas with murals/graphics are included in the scope, including the south wall from the second level to the first level and the wall above the lower landing of the stairs. See the Second Floor plan drawing in the Scope of Work package.
Q. Will we need to provide floor coverings as this project requires a scissor lift?
A. Scissor lifts must have rubber/soft non-scratching wheels; floor protection is thus not required.
Q. Do we still need a note about Covid-19 precautions in this policy?
No, Requirement doesn’t require any COVID precautions or measures.
End of Pre-Bid Site Visit Notes