Questions_and_Answers_for_Site_Visit_June_6_0003.pdf

PDF 71 KB Posted

Attached to
Wastewater Removal and Water Deliveries for Alcatr
Solicitation number
140P8624Q0036
Issued by

About this file

This document is a set of Questions and Answers related to a site visit for a federal contract opportunity for Wastewater Removal and Water Deliveries for Alcatraz Island.

The key details are:

  • The contract will require a qualified water treatment specialist to draw daily water samples, monitor chlorine residuals, and conduct monthly bacteriological testing.
  • Work is to be conducted during normal operating hours of 9am-6pm, 362 days per year.
  • The due date for responses to the Request for Quote (RFQ) is Monday, June 17, 2024 at 12:00 Pacific Time.
  • Potable water tanks are located approximately 200 feet from the disconnects, and wastewater holding tanks are approximately 700 feet from the disconnects.
  • The agency issuing the contract is the Department of the Interior National Park Service.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions and Answers for Site Visit June 6, 2024

Question 1: Does the contractor test the water everyday? If so, does this happen before we load off?

Answer 1: C.87.1.2. Initial Report and Development of Program

The Contractor must provide a qualified water treatment specialist to draw a set of water samples daily. Chlorine residuals shall be monitored and recorded daily at various sampling points throughout the retention and on vessel delivery system. Bacteriological sampling shall be done monthly.

Question 2: What time should the work be conducted?

Answer 2: Alcatraz Island is open 362 days of the year, work is to be conducted within normal working hours, 9am-6pm.

Question 3: Please provide current Ferry Boat Schedule?

Answer 3: Please see attachment to this amendment.

Question 4: What does the current company use a vessel or barge?

Answer 4: Vessel

Question 5: When is the RFQ due date?

Answer 5: Monday, June 17, 2024 at 12:00 Pacific Time.

Question 6: What are the holding tanks, is it gravity fed or a pump up?

Answer 6: pumped up.

Question 7: How far does contractor have to pump water to?

Answer 7: Potable water tanks are about 200ft from disconnects.

Waste water holding tanks are ~700ft from the disconnects