140P8621R0013_-_Prebid_Questions_and_Answers_0001.pdf

PDF 63 KB Posted

Attached to
NIKE SITE DEFERRED MAINTENANCE AT FORT BARRY
Solicitation number
140P8621R0013
Issued by

About this file

This document contains pre-bid questions and answers related to Solicitation Number 140P8621R0013 for repair and correction of deferred maintenance at the historic NIKE Site at Fort Barry for the Department of the Interior National Park Service Pacific West Region. Paint at the work sites is presumed to contain lead and the project includes disposal of miscellaneous metals painted with lead-based paint. The contractor will be responsible for characterization of any waste generated. The park will sample and test roofing materials affected by the project for asbestos prior to construction start.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1) Are there any hazardous materials present in the work areas?

Paint is presumed to be lead based paint. Lead based paint removal is limited to "loose and flakey" on buildings with paint coatings in good condition so paint chips generated by the project will be minimal. Project includes disposal of miscellaneous metals presumed to be painted with lead based paint. Contractor is responsible for characterization of waste generated by the project. The park will sample, and test roofing affected by the project for asbestos in the work area prior to the start of construction.