1) Does any part of the bridge between Building E and Building D Paint?
No, it will not be painted.
2) Do the "Landmark Building E" and "No Parking" stencils need to be replaced after they are painted over?
Yes, they must be painted. See Section 1.1, A, vi “The surfaces to be prepared and painted include: All painted signage on the building and loading docks.”
3) Please confirm that only the west elevation receives concrete repair.
Correct.
4) Some of the corbels are in relatively good shape except for some cracks. Can epoxy injection repairs be performed in lieu of concrete repairs at these locations?
That would depend on the epoxy product and its intended use.
5) If aerial lifts are utilized on project, will we be able to park them overnight at project? Also, will there be a contractor staging area?
Yes. Yes.
6) If new rebar dowels are added per the details, will X-ray scanning to locate rebar be necessary before drilling?
Yes, we are not technical experts in concrete repair, however as this is a historic building the least destructive methods will need to be used.
7) Refer to spec section 4.2.C “Submit evidence showing Contractor’s employees have knowledge of OSHA standards for working with lead in construction procedures.” Please advise as to the requirements for this section.
Proof that your employees have training that makes them qualified to safely work around lead paint Lead in Construction (osha.gov).
8) Please provide a quantity for concrete repair in Square Footage.
The site is open to the public, the only major repairs will be on the west side. Most of the repairs are on the underside of the awning where degraded concrete has fallen off and the rebar has been exposed.
9) Does the unpainted railing on Building E paint?
No paint on the unpainted rail, just cleaning up the rust.
https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.osha.gov%2Fsites%2Fdefault%2Ffiles%2Fpublications%2Fosha3142.pdf&data=04%7C01%7CKyle_Daniska%40nps.gov%7Cceaf374a374d46f59f8408d8f8b44546%7C0693b5ba4b184d7b9341f32f400a5494%7C0%7C0%7C637532800460517699%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C1000&sdata=ZIPI%2FeUJK3Ml5vHQ3IKNImxZae4oRPc3gYXtvJ37K8s%3D&reserved=0