140P8621R0001 - Revised Div 1 Spec Pg 17_0001.pdf
PDF 175 KB Posted
- Attached to
- LODGEPOLE VISITOR CENTER ELECTRICAL UPGRADE Federal contract opportunity
- Solicitation number
- 140P8621R0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 140P8621R0001 - Prebid Questions and Answers_0001.pdf | ||
| 140P8621R0001 - Site Visit Sign-in Sheet_0001.pdf | ||
| Sol_140P8621R0001_Amd_0001.pdf | ||
| 140P8621R0001 - AV Cut Sheets_0001.pdf | ||
| Section J Att 005 - General Decision No. CA21.pdf | ||
| Section J Att 003 - Specifications - Volume 2 of 2.pdf | ||
| Section J Att 006 - Past Performance Questionnaire.pdf | ||
| Section J Att 004 - Drawings.pdf | ||
| Section J Att 001 - Contract Price Schedule.pdf | ||
| Section J Att 007 - General References.pdf | ||
| Section J Att 002 - Specifications - Volume 1 of 2.pdf | ||
| Sol_140P8621R0001.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEKI 208302 01 27 00 - 7
DEFINITION OF CONTRACT LINE ITEMS
equipment as shown on the drawings.
2. Measurement for payment will be based upon completion by unit.
3. Payment will be made at the contract unit price.
K. Contract Line Item No. 11 W.M. Duplex Outlets for AV Equipment:
1. This item consists of:
a. Purchasing and installing wall mounted duplex outlets for audiovisual equipment as shown on the drawings.
L. Contract Line Item No. 12 Telephone Outlets:
a. Purchasing and installing telephone outlets as shown on the drawings.
M. Contract Line Item No. 13 W.M. Duplex Convenience Outlet:
a. Purchasing and installing wall mounted duplex convenience outlets as shown on the drawings.
N. Contract Line Item No. 14 W.M. Duplex/USB Port Combo Outlets:
a. Purchasing and installing wall mounted duplex and USB Port combo outlets as shown on the drawings.
O. Contract Line Item No. 15 Demo and Reroute Existing Sub-panel:
a. Conducting a study to determine the active loads in both the Sub-panel and Panel C.
b. Removing the existing sub-panel that is fed from Panel C and rerouting the determined active loads back to existing panel C.
2. Measurement for payment will be based upon completion by lump sum.
3. Payment will be made at the contract lump sum price.
P. Contract Line Item No. 16 Patching and Repair of Floor or Wall Openings:
a. Patching and repair of any openings in the floors or walls that were made to complete any work under this contract.
2. Measurement for payment will be based upon completion by lump sum.
3. Payment will be made at the contract lump sum price.