Attachment 1 - Contract Price Schedule with BID OPTIONS.xlsx_0002.pdf

PDF 131 KB Posted

Attached to
SEKI BIG STUMP LEACH FIELD REPLACEMENT
Solicitation number
140P8620Q0040
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT LINE

ITEM NUMBER

(CLIN)

CONTRACT LINE ITEM (CLI) TITLE QUANTITY

UNIT OF

MEASURE

UNIT PRICE TOTAL PRICE

1 Mobilization/Demobilization 1 Lump Sum $ ‐

2 Site clearing 1 Lump Sum $ ‐

Excavation and Demo of existing

Drainage Field 1 Lump Sum $ ‐

Demo and Abandonment of secondary Septic Tanks & Pipes 1 Lump Sum $ ‐

5 Hard Rock Excavation 1 Cubic Yard $ ‐

4" PVC Sanitary Piping (including exc and backfill) 125 Linear Feet $ ‐

4" Gravity Cleanouts/Inspection

Ports 9 Each $ ‐

8 4" PVC Ball Valves 5 Each $ ‐

9 2'x2' Concrete Distribution Box 1 Each $ ‐

10 Drainage Field Drain Rock 235 Square Yard $ ‐

11 Geotextile Fabric 1380 Square Feet $ ‐

4" Perforated PVC Drainage Field

Piping 460 Linear Feet $ ‐

13 Revegetation 1 Lump Sum $ ‐

14 Replace 5' wide Concrete Sidewalk 70 Linear Feet $ ‐

Bid Option A: Supply and install

Picnic tables 9 Each $ ‐

Bid Option B: Supply and install

Grills 7 Each $ ‐

Bid Option C: Supply and install

Utility Tables 7 Each $ ‐

Bid Option D: Supply and install Hot

Coal Bins 4 Each $ ‐

Bid Option E: Supply and install

Shelters 2 Each $ ‐

TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Numbers 15 through 19) ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐

TOTAL PROPOSED PRICE ‐ BASE PLUS ALL OPTIONS (Contract Line Item Numbers 1 through 19) ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐

All measurement and payment information is included in the project specifications, Section 01 27 00.

TOTAL BASE BID PRICE (Contract Line Item Numbers 1 through 14) ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐

CONTRACT PRICE SCHEDULE

REQUEST FOR QUOTATION (RFQ) NUMBER: 140P8620Q0040

PARK ‐ PMIS: SEQUOIA & KINGS CANYON NATIONAL PARKS ‐ 285691 & 306256

DEVELOPED AREA: GRANT GROVE

PROJECT TITLE: LEACH FIELD REPLACEMENT FOR BIG STUMP PICNIC AREA WASTEWATER SYSTEM

Notice: Refer to FAR Clause 52.217‐5, Evaluation of Options, as prescribed in FAR 17. Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items. Failure to do so may render the proposal unacceptable. On lump‐sum line items, provide the total price only. For all unit‐priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts govern. Round totals and extended prices to whole dollars. The Government reserves the right to award any or no options at or after the time of award. At the option of the Government, the period for exercise of options at the proposed prices shall extend 180 calendar days from the date of award. Pricing will be evaluated based on what is determined to be the best value to the Government. Options may be exercised in any combination, order, or grouping deemed in the judgment of the Contracting Officer to offer the best value to the Government.

SEKI – 285691 306256 CONTRACT PRICE SCHEDULE ‐ 2

File details come from the government source that posted it. Updated .