Attachment 1 - Contract Price Schedule with BID OPTIONS.xlsx_0002.pdf
PDF 131 KB Posted
- Attached to
- SEKI BIG STUMP LEACH FIELD REPLACEMENT
- Solicitation number
- 140P8620Q0040
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT LINE
ITEM NUMBER
(CLIN)
CONTRACT LINE ITEM (CLI) TITLE QUANTITY
UNIT OF
MEASURE
UNIT PRICE TOTAL PRICE
1 Mobilization/Demobilization 1 Lump Sum $ ‐
2 Site clearing 1 Lump Sum $ ‐
Excavation and Demo of existing
Drainage Field 1 Lump Sum $ ‐
Demo and Abandonment of secondary Septic Tanks & Pipes 1 Lump Sum $ ‐
5 Hard Rock Excavation 1 Cubic Yard $ ‐
4" PVC Sanitary Piping (including exc and backfill) 125 Linear Feet $ ‐
4" Gravity Cleanouts/Inspection
Ports 9 Each $ ‐
8 4" PVC Ball Valves 5 Each $ ‐
9 2'x2' Concrete Distribution Box 1 Each $ ‐
10 Drainage Field Drain Rock 235 Square Yard $ ‐
11 Geotextile Fabric 1380 Square Feet $ ‐
4" Perforated PVC Drainage Field
Piping 460 Linear Feet $ ‐
13 Revegetation 1 Lump Sum $ ‐
14 Replace 5' wide Concrete Sidewalk 70 Linear Feet $ ‐
Bid Option A: Supply and install
Picnic tables 9 Each $ ‐
Bid Option B: Supply and install
Grills 7 Each $ ‐
Bid Option C: Supply and install
Utility Tables 7 Each $ ‐
Bid Option D: Supply and install Hot
Coal Bins 4 Each $ ‐
Bid Option E: Supply and install
Shelters 2 Each $ ‐
TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Numbers 15 through 19) ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
TOTAL PROPOSED PRICE ‐ BASE PLUS ALL OPTIONS (Contract Line Item Numbers 1 through 19) ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
All measurement and payment information is included in the project specifications, Section 01 27 00.
TOTAL BASE BID PRICE (Contract Line Item Numbers 1 through 14) ‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐
CONTRACT PRICE SCHEDULE
REQUEST FOR QUOTATION (RFQ) NUMBER: 140P8620Q0040
PARK ‐ PMIS: SEQUOIA & KINGS CANYON NATIONAL PARKS ‐ 285691 & 306256
DEVELOPED AREA: GRANT GROVE
PROJECT TITLE: LEACH FIELD REPLACEMENT FOR BIG STUMP PICNIC AREA WASTEWATER SYSTEM
Notice: Refer to FAR Clause 52.217‐5, Evaluation of Options, as prescribed in FAR 17. Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items. Failure to do so may render the proposal unacceptable. On lump‐sum line items, provide the total price only. For all unit‐priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts govern. Round totals and extended prices to whole dollars. The Government reserves the right to award any or no options at or after the time of award. At the option of the Government, the period for exercise of options at the proposed prices shall extend 180 calendar days from the date of award. Pricing will be evaluated based on what is determined to be the best value to the Government. Options may be exercised in any combination, order, or grouping deemed in the judgment of the Contracting Officer to offer the best value to the Government.
SEKI – 285691 306256 CONTRACT PRICE SCHEDULE ‐ 2
File details come from the government source that posted it. Updated .