This is a Performance Work Statement (PWS) for prescribed fire support services at Yosemite National Park, revised August 31, 2026.

The U.S. Wildland Fire Service requests a Prescribed Fire Support Module (PFSM) for 46 days annually to implement prescribed burning operations on National Park Service-administered lands across Madera, Mariposa, Tuolumne, and Mono Counties in California. The contractor must provide a ten-person crew with four-wheel drive transportation, chainsaws, hand tools, water pumps, and communication equipment. Services are non-personal and include unit preparation using chainsaws and handtools; ignition of broadcast units and hand or machine piles using drip torches or fusees; holding operations during burn-down to prevent fire escape with a target of 80% or greater material consumption; and mop-up operations to extinguish smoldering material. All crew members must meet Firefighter Type 2 qualifications including ICS-100, L-180, S-130, and S-190 training certifications. One crew member must be English-fluent to receive instructions and communicate with supervisors. The government provides drip torches, burn fuel, prescribed burn unit maps, gate keys, and air quality clearance. Requests for module activation require minimum 48-hour advance notice. Each activation guarantees minimum payment for one travel day and one operational shift at full rate. Work occurs during 8 to 12-hour shifts, Monday through Friday, excluding federal holidays, with possible weekend/holiday work if documented as necessary. The contract period runs from October 1, 2026, through September 30, 2031, consisting of one base year and four option years. The Contracting Officer's Representative is Rob Winkler at Yosemite National Park Fire and Aviation (209-347-8854).

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Revision 1 08/31/2026

PWS 1.0 Background on the Government’s Requirement

US Wildland Fire Service, Yosemite National Park is requesting a Prescribed Fire Support Module forty-six (46) days annually to implement hand or machine pile ignitions, broadcast burn ignitions, unit or pile preparation, prescribed fire holding functions, and prescribed fire unit mop-up. Yosemite Fire and Hazard Fuels program has conducted extensive fuels reduction work which has created a need for prescribed burning and includes a backlog of machine and hand piles within NPS administered land.

Multiple broadcast and piled units would be burnt under the direction and supervision of USWFS Prescribed Fire Burn Boss and/ or Contracting Office Representative.

Services shall be non-personal. The Government shall neither supervise contractor employees nor control the method by which the contractor performs the required tasks. Under no circumstances shall the Government assign tasks to, or prepare work schedules for, individual contractor employees.

PWS 2.0 General Scope of Work

Prescribed Fire Modules may be ordered by the US Wildland Fire Service, Yosemite Fire for unit(s) when the Government is conducting prescribed fire operations and needs assistance in one or more prescribed fire related tasks. These operations include the following: prescribed burn preparation, ignition assistance, holding assistance, burned unit patrol, and mop-up of burned unit(s). Prescribed Fire Modules can be ordered for any one of the above operations, a combination, or all the operations.

Services required in the implementation of prescribed burning include:

• unit preparation using chainsaws and/ or handtools to cut and prune, construct handline or pull back around piles, limb reserve trees, trim resprouting vegetation near piles or unit boundaries;

• broadcast fire, hand or machine pile ignition using handheld drip torches or fusees;

• holding prescribed fire units during initial burn-down to ensure prescribed burn does not spread outside of established unit or control lines;

• chunking of or re-piling of burnt or burning material to promote complete combustion;

• mop-up using chainsaws and handtools to cut and/ or dig to extinguish smoking or smoldering material;

• and to suppress fire spread outside of prescribed fire units or controls lines using chainsaws or handtools to cut or dig control lines to stop undesired fire spread.

The contractor shall provide 46 days of Prescribed Fire Support Module to prep, ignite, hold, and mop-up broadcast, hand pile, or machine pile units upon request from USWFS Yosemite Fire, under the supervision and direction of assigned USWFS Prescribed Fire Burn Boss. The contractor is asked to provide costs for total 46 day annual periods, as well as a per-day rate for the defined service.

Place of Performance:

All prescribed burning operations will occur on Yosemite National Park administered public lands managed by the National Park Service in Madera, Mariposa, Tuolumne, and Mono Counties California.

Many established but independent fuels reduction units exist requiring prescribed burning within Yosemite National Park related to forestry, fuels reduction, and forest health projects.

Each unit location will require all identified tasks to accomplish broadcast, hand or machine pile prescribed burning. Each activation period of Prescribed Fire Support Module will begin with a briefing at a predetermined location where a designated, English speaking, module foreman will receive an in-depth operational briefing from USWFS/ DOI Contracting Officer’s Representative and/ or USWFS Prescribed Fire Burn Boss. At the briefing, the Government will provide the Contractor with the following:

A. Briefing on Prescribed Fire Plan and Objectives, Standards, and Assignments for preparation, ignition and holding assistance for prescribed fire operations.

B. Module Daily Shift Plan Objectives, Standards, and Assignments for patrol and mop-up assistance.

C. Communications instructions and chain of command.

D. Identification of any priorities or special considerations.

E. Safety concerns and issues.

F. Target Completion Time, anticipated length of activation.

Access to most fuels reduction units requires off-road travel with four wheel drive capability, especially during winter months or adverse weather conditions. Cross country foot travel up to one hour may also be required to access fuels reduction units, some units may also be located in steep or rugged terrain making cross county foot travel arduous. Navigation utilizing paper or digital maps during vehicle or foot travel is of critical importance to make access to project areas and during implementation of prescribed burning operations.

Period of Performance:

The period of performance shall be for one (1) Base Year and four (4) Option Years. The Period of Performance reads as follows:

Base Year:

October 1st 2026 (or time of award) through September 30th 2027

Option Year I:

October 1st 2027 through September 30th 2028

Option Year II October 1st 2028 through September 30th 2029

Option Year III:

October 1st 2029 through September 30th 2030

Option Year IV:

October 1st 2030 through September 30th 2031

PWS 3.0 Overall Objective(s)

The objective of this work is to provide Prescribed Fire Support Module for 46 days annually to implement prescribed burning tasks under the guidance of USWFS Prescribed Fire Burn Boss and/ or Contracting Officer’s Representative in multiple separate Yosemite National Park fuels reduction units.

PWS 4.0 Specific Tasks

Task 1: Preparation of prescribed burn units using chainsaws and handtools to create containment or holding lines, cut and prune pre-built piles, construct handline, pull back around hand piles, limb reserve trees, trim resprouting vegetation near piles or unit boundaries, or cut fallen dead vegetation to reduce the threat of prescribed burn escape.

Preparation for prescribed burning as directed by USWFS Prescribed Fire Burn Boss –

• Cut and Prune using chainsaws along unit boundaries and holding features, around or near pre-built fuels reduction piles to promote pile consumption and efficient burning.

• Construct handline using handtools along identified unit boundaries, around hand or machine piles to limit fire spread away from pre-built piles planned for immediate burning.

• Limb using chainsaws reserve trees adjacent to holding lines and near hand or machine piles to limit reserve tree mortality during burn operations.

• Trim using chainsaws or handtools resprouting vegetation adjacent to holding lines and near hand or machine piles to reduce risk of fire spread away from burn unit boundaries and piles planned for immediate ignitions.

• Cut using chainsaws fallen dead and downed vegetation to limit fire spread from prescribed unit boundary and away from piles into adjacent reserve/ downed heavy logs.

Task 2: Ignition of prescribed broadcast units, pre-built hand or machine piles using handheld firing devices such as Drip Torches or Fusees within identified prescribed burn units.

Ignition operations, under the direction and supervision of USWFS Prescribed Fire Burn Boss, will occur –

• After safety and operational briefing has been given to all assigned resources to communicate operational assignments, communication methods, work location, safety considerations, and emergency procedures.

• In a method and pace to ensure prescribed fire objectives are met and with a limited risk of prescribed fire escape.

• In coordination with other assigned resources including ignition personnel, engine crews, resource advisors, and firing or holding bosses.

• Overall goal to ignite 90% or greater of piles within targeted prescribed burn units

• Overall consumption goal of 80% or greater of piled material within ignited piles

Ignition operations will occur only when Prescribed fire burn plan environmental parameters are met – Temperature, wind speed/ direction, humidity, fuel moisture, and smoke dispersal. Ignition operations will be stopped under the direction of USWFS Prescribed Fire Burn boss as burn plan objectives are not met or within allowable ranges. Ignition personnel will immediately transition to holding or mop up tasks as directed by USWFS Burn Boss.

Task 3: Holding of prescribed fire piles or units during initial burn down phase

Holding operations may include:

• Monitoring prescribed burn consumption and communicating spread outside of holding lines or prescribed burn units

• Chunking or re-piling burning or partially burnt material to promote complete consumption.

PFSM chunking/ re-piling goal is to ensure 80% or greater consumption of total piled material and reduce the risk of fire spread from outside of pile perimeters.

• Patrolling unit boundaries or holding features for spot fires or fire growth outside of unit boundaries

• Done in coordination with other assigned resources such as ignition crews, engines or handcrews, resource advisors, and holding bosses.

• The use of handheld radios or other devices to communicate with prescribed burn overhead or leadership.

Task 4: Mop-up operations, under the direction of USWFS prescribed fire burn boss, will occur after initial burn down phase of prescribed burns and be used to limit unwanted fire growth, reduce smoke from burning material, limit impacts to standing or fallen reserve vegetation.

Mop-up tasks include the use of Chainsaws, handtools, and water delivery equipment to cut, dig, chop, and extinguish burning or smoldering material.

Mop-up can occur for one or more days following prescribed burn ignition operations. Mop-up will occur in each prescribed burn unit under the direction and discretion of USWFS Prescribed Burn Boss.

Prescribed Fire Support Modules will receive daily operational briefings during mop-up operations which communicate operational objectives, safety concerns, special considerations or specifications, and emergency procedures.

PWS 5.0 Delivery / Performance Schedule

Prescribed Fire Support Module Configuration The following are the descriptions of requirements for personnel, specialized equipment, minimum crew transportation.

Ten Person Crew Module

1. Ten (10) persons

2. Transportation – 2 or more vehicles, each with four-wheel drive capability

3. Equipment

Pulaski - 6 Shovel - 4

Backpack water pump/ Bladder Bag - 10 Chainsaws -4 Saw gas/ oil and supplies for up to a 12-hour shift, resupplied daily Programmable handheld radio or other agreed upon communication device - 2

Ordering Prescribed Fire Support Modules

USWFS/ NPS Contracting Officer Representative will contact the Contractor during the period of performance and request Prescribed Fire Module Support to Yosemite National Park. Requests will be placed a minimum of 48hrs in advance of the desired reporting time to Yosemite National Park, Mariposa County, , CA. Activations of PFSM may be requested longer than 48hrs in advance of reporting time but not less.

Basic ordering information such as desired module configuration and equipment configuration.

The Contractor will confirm the availability of desired crew configuration, Basic Firefighter training compliance of each activated crewmember, and communication method/ information for the primary crew leader for each Ten Person module.

Reporting instructions at the time of activation will include date, time and place to report for initial operational briefing. Initial activation may also include digital reference documents such as Maps, Incident Action Plans (IAP)s, or other special operational information.

Upon arrival and making contact with USWFS COR and/ or Prescribed Fire Burn Boss the PFSM will receive an in depth operational briefing regarding the planned prescribed burn to be implemented. This briefing will include:

• Operational objectives,

• Safety concerns,

• Prep/ Ignition/ Holding/ and Mop-up standards,

• Other assigned operational personnel

• Communication procedures, expectations, and reporting standards

• Logistical support or concerns

• Special resource considerations,

• Area and unit maps, access, and reporting instructions,

• Emergency procedures

• Expected length of assignment/ activation period

Government supplied equipment may be transferred to the contractor at the initial briefing or at the prescribed burn unit – Drip torches and Five-gallon slash mix cans or other similar prescribed burn equipment.

Minimum Activation Guarantee

Each PFSM activation will meet a minimum guaranteed duration regardless of continued burn operations. Minimum activation period will include,

• One day of full rate travel to reach the agreed upon reporting location – Yosemite National Park

• One day full rate Operational shift.

Scenarios in which the PFSM is activated but prescribed burn operations are not implemented based on weather conditions, smoke, resource concerns or other constraints the contractor/ PFSM will at a minimum be activated the identified two (2) full rate days.

Communication and Language requirements

As identified in PFSM Configuration and equipment section, each PFSM will have a minimum of One (1) handheld programmable radio or other agreed upon communication device. One PFSM module member is expected to operate the radio sufficiently to stay in communication with Prescribed Fire Burn Boss or other assigned Fireline Supervisor. USWFS COR or Prescribed Fire Burn Boss will ensure common radio frequencies are communicated and programmed into the provided radio equipment.

One PFSM Module member must speak, read and sufficiently communicate in English as to receive instructions, communicate with other resources/ supervisors, and relay critical instructions to non- English speaking module members in order to meet prescribed burn objectives.

Minimum Fireline Qualification Requirement

Each PFSM crewmember must meet minimum qualification standards for Firefighter Type 2, as identified by National Wildland Fire Coordinating Group (NWCG) Standards for Wildland Fire Position Qualifications, PMS 310-1, https://www.nwcg.gov/positions/fft2/position-qualification-requirements.

Basic Firefighter Training:

ICS-100, Introduction to ICS L-180, Human Factors in the Wildland Fire Service S-130, Firefighter Training S-190, Introduction to Wildland Fire Behavior

Each PFSM activation requires documentation of participant crewmember Basic Firefighting Training.

Personal Protective Equipment Personal protective equipment, including personal protective equipment for eyes, face, head, and extremities shall be provided, used, and maintained in a sanitary and reliable condition wherever it is necessary by reason of hazards or processes encountered in a manner capable of causing injury or impairment in the function of any part of the body. The contractor will provide training to their employees in the safe operation and use of equipment being used. Defective or damaged personal protective equipment shall not be used.

The contractor shall provide each employee who operates a chain saw, chain saw chaps and assure the chaps are worn during saw operations. The chaps shall cover the full length of the thigh to the top of the boot on each leg and be washed or replaced if they have any evidence of damage or heavily soiled with oil or lubricants.

https://www.nwcg.gov/positions/fft2/position-qualification-requirements

The contractor shall assure that each employee wears foot protection that provides adequate traction and ankle support and must meet NFPA-1977, Standard on Protective Clothing and Equipment for Wildland Firefighting.

The contractor shall assure that each employee wears flame resistant clothing, pants and long sleeve shirt, that that meet NFPA-1977, Standard on Protective Clothing and Equipment for Wildland Firefighting, when engaging in prescribed fire ignition, holding, and mop-up activities.

Mapping

Unit boundaries may not be marked. A shapefile and PDF Map of each prescribed burn unit area for GPS/ Avenza will be provided at the time of activation or at the initial Operational Briefing. Area and transportation maps will also be provided in order to access Prescribed Burn Units. PFSM must be able to navigate using map products both digital and on paper to reach prescribed burn units and during Prescribed Burn operations in order to ensure objectives are met.

PWS 6.0 Government-Furnished Property, Materials, Services

General:

The contractor shall provide all qualified/trained personnel, equipment and supplies (except those specified as Government furnished), tools, materials, supervision, transportation, lodging, and services necessary to perform wildfire hazard reduction through prescribed burning and mop-up operations, and related services.

The contractor shall furnish labor, supervision, transportation, operating supplies (except those specified as Government furnished) to perform work necessary to conduct prescribed fire preparation to include brushing/lopping/scattering/pruning for vegetation modification in preparation for prescribed burning, fuels pullback, ignition, holding, mop-up and patrol. The COR will describe the specific objectives of any operational duty, normally during a pre-operational briefing. The Contractor’s employees must meet the standard classifications of positions on prescribed burn projects as defined in the National Wildfire Coordinating Group National Incident Management System: Wildland Fire Qualifications System Guide (PMS 310-1, NFES 1414, October 2018, or latest version) which is available under “Publications” at the following website: https://www.nwcg.gov.

Government-Furnished Documents The Government shall provide the following documents:

Applicable prescribed burn unit maps with previously identified boundaries, applicable road numbers or names, critical holding points and locations specifying where work is to be completed, such as, hand pile ignition that will be provided to Contractor key personnel.

Government-Furnished Property The Contractor shall be liable for all loss or damage of Government-furnished property until return and COR acceptance of property. The Government will provide keys for locked Government gates in order to make access to prescribed burn units or identified work locations.

Government-Furnished Supplies https://www.nwcg.gov/

The Government shall provide the contractor with drip torches and burn fuel for refilling drip torches or other ignition devices.

Government-Furnished Services The Government shall provide the following services - The Government shall obtain prescribed burn clearance from the appropriate state air quality regulatory agency.

PWS 7.0 Security and Administrative Matters

Regular Work Hours:

The performance period established for this contract is based upon all work being conducted during work periods from 8 up to 12 hours in length (typically 0700-1900 hrs or less per operational shift) Monday through Friday, excluding government holidays. Consecutive operational days, including Saturday and Sunday, may be required if burn conditions and Government staffing allow. If Prescribed burning conditions require work outside regular hours, including Saturdays, Sundays, and government holidays, an agreement will be documented between the Contractor and Contracting Officer or Contracting Officer’s representative that justifies the need for extended staffing or shifts outside of base work days.

Federal Holidays:

The following Federal Legal Holidays are observed:

New Year’s Day Martin Luther King, Jr. Day President’s Day Memorial Day Juneteenth Independence Day Labor Day Columbus Day Veterans Day Thanksgiving Day Christmas Day

Fire Danger Season:

If the Contracting Officer Representative (COR) allows the Contractor to continue work during periods of declared fire danger or season, the Contractor shall comply with all applicable state laws relating to fire prevention and with all special conditions of work as directed by the COR.

Stop Work Orders:

The Contracting Officer, COR, or Contractor may stop performance due to the following:

a. Contractor has not maintained a safe work environment for their employees in accordance with the law. Work will not resume until the issue has been resolved in accordance with the contract’s terms and conditions. The Contracting Officer shall not make an equitable adjustment to the period of performance, delivery schedule, or the contract price.

b. Contractor has damaged Government property, defaced the landscape, or caused pollution.

Work will not resume until the Contractor has corrected all damages at no cost to the Government, and all issues have been resolved in accordance with the contract’s terms and conditions. The Contracting Officer shall not make an equitable adjustment to the period of performance, delivery schedule, or the contract price.

c. The Government discovers threatened, endangered, and sensitive species present in or adjacent to the project area. If work has not resumed within three days of stoppage, the Government and

Contractor will negotiate an equitable adjustment to the period of performance and/or delivery schedule.

d. The discovery of historical and archeological resources. If work has not resumed within three days of stoppage, the Government and Contractor will negotiate an equitable adjustment to the period of performance and/or delivery schedule.

e. Environmental hazard threatening the project area, such as a forest fire. If work has not resumed within three days of stoppage, the Government and Contractor will negotiate an equitable adjustment to the period of performance and/or delivery schedule.

PWS 8.0 Technical Exhibits and Definitions

Standard Definitions:

Physical Condition The Physical appearance of Federal equipment or facilities that considers cracks, chips, dents, abrasions, rust, corrosion, general cleanliness, vibration, operating temperature, and discoloration and other items as identified by the COR.. Physical condition may be determined by visual as well as diagnostic means.

Contracting Officer (CO) The Secretary of the Interior or designated authorized representative who is the only agent capable of signing a federal award or obligating funds.

Contracting Officer’s Representative (COR) The Contracting Officer’s designated representative as indicated in a delegation of authority letter.

Quality Assurance (QA) Surveillance of Contractor performance to determine performance requirements are met.

Performance Requirements Summary (PRS) (see Technical Exhibit below) The PRS identifies the key performance indicators of the Contract that will be evaluated by the Government to assure Contract performance standards are met by the Contractor.

Quality Control Those actions taken by the Contractor to control the production of goods or services so that they meet the requirements of the performance work statement.

Technical Definitions:

Prescribed Fire Support Module (PFSM) Incident Action Plan (IAP)

1. PROJECT LOCATION AND DESCRIPTION

Prescribed burn units and locations for burn implementation will vary. All prescribed fire units and work locations will take place on NPS administered public lands within Yosemite National Park.

Prescribed burn units are located in Madera, Mariposa, Tuolumne, and Mono counties in California.

Specific unit maps for each RX Burn Module activiation will be provided during initial in-briefing at a predetermined location by the Contracting Officer Representative and/ or USWFS Prescribed Fire Burn Boss.

INSPECTION AND ACCEPTANCE:

FAR 52.246-4: INSPECTION OF SERVICES--FIXED-PRICE (AUG 1996)

a. Definition. “Services”, as used in this clause, includes services performed, workmanship, and material furnished or utilized in the performance of services.

b. The Contractor shall provide and maintain an inspection system acceptable to the Government covering the services under this contract. Complete records of all inspection work performed by the Contractor shall be maintained and made available to the Government during contract performance and for as long afterwards as the contract requires.

c. The Government has the right to inspect and test all services called for by the contract, to the extent practicable at all times and places during the term of the contract. The Government shall perform inspections and tests in a manner that will not unduly delay the work.

d. If the Government performs inspections or tests on the premises of the Contractor or a subcontractor, the Contractor shall furnish, and shall require subcontractors to furnish, at no increase in contract price, all reasonable facilities and assistance for the safe and convenient performance of these duties.

e. If any of the services do not conform with contract requirements, the Government may require the Contractor to perform the services again in conformity with contract requirements, at no increase in contract amount. When the defects in services cannot be corrected by reperformance, the Government may—

1) Require the Contractor to take necessary action to ensure that future performance conforms to contract requirements; and

2) Reduce the contract price to reflect the reduced value of the services performed.

f. If the Contractor fails to promptly perform the services again or to take the necessary action to ensure future performance in conformity with contract requirements, the Government may—

1) By contract or otherwise, perform the services and charge to the Contractor any cost incurred by the Government that is directly related to the performance of such service; or

2) Terminate the contract for default.

CONTRACTOR INSPECTION PROCEDURES

(A) General Instructions

1) The Contractor shall conduct inspections of i.e., treatment units and record the results using procedures described herein. Inspections shall be maintained concurrent with contract work. Completed inspection forms shall be made available to the Government within 24 hours of completion of each i.e., treatment unit and will remain part of the permanent contract file.

2) By submission of inspection forms to the Government, the Contractor is considered to be certifying that the unit is satisfactorily completed and that the inspection forms reflect the work accomplished.

3) The Contractor shall submit legible inspection forms. Illegible and incomplete forms shall be returned to the Contractor for correction and re-submission.

4) In the event the Contractor falsifies inspection results, as determined by the Contracting Officer, the Government may declare the Contractor to be in default of the contract. Additionally, the Government may refer such falsifications to the US Attorney’s Office for possible prosecution pursuant to 18 U.S.C. 1001 (Falsification of Government Documents) or 18 U.S.C. 287 (Fraud).

GOVERNMENT INSPECTION PROCEDURES – COMPLIANCE INSPECTION:

(A) The COR, or a designated inspector, will conduct compliance inspections while work is in progress, usually daily at first, to assure that work is proceeding satisfactorily. Compliance inspections will be accomplished by 100 percent visual inspection of each treatment unit and will be based on adherence to the required specifications / cutting prescriptions. Prescribed fire operations will be overseen by an onsite USWFS Prescribed Fire burn boss at all times, this individual will act as a work leader during burn operations.

(B) The Contractor shall notify the COR when units are completed prior to his moving out of the general area.

Compliance inspections will be conducted within three (3) business days of completion of treatment units and the Contractor notified of any part of the unit(s) requiring additional work or rework.

Work will be accepted on the basis of visual inspection for compliance with specifications on areas reported as completed by the Contractor.

Work Tasks to be Performed

Acceptable Quality Level Method of Surveillance Consequences, Remedies, and/or Deduction(s)

Task(s) 1 – Preparation

2 – Ignition

3 – Holding

1. PFSM prepares broadcast units, hand or machine piles using chainsaws and handtools to cut and prune piles, construct handline or pull back around hand piles, limb reserve trees, trim resprouting vegetation near piles, or cut fallen dead vegetation to reduce the threat of prescribed burn escape.

2. Ignition of broadcast units, hand or machine pile using handheld firing devices such as Drip Torches or Fussees within identified prescribed pile burn units at a pace and intensity that meets burn objectives, limits risk of fire escape, ignites 90% or greater of unit piles, or broadcast unit objectives.

3. Holding of prescribed fire piles or units during initial burn down phase, chunking or re-piling burning or partially burnt material to promote 80% or greater consumption of total piled material. Patrol and reporting/ communication standards are met.

1. COR or

Prescribed Fire Burn Boss inspects preparation work on each prescribed burn unit to ensure standards are met

2. COR or

Burn Boss inspects ignition operations work on each prescribed burn unit to ensure standards are met.

3. COR or

Burn Boss inspects Holding and Chunking/ Re-piling work on each prescribed burn unit to ensure standards are met.

For 1 or first deficiency the COR and/ or Prescribed Fire Burn Boss will communicate specific deficiencies and desired improvements to meet acceptable standards. Documentation of communicated deficiency and outcome.

For standard configuration equipment or vehicle deficiencies 48hrs will be given to regain acceptable standards.

For 2 or second deficiency COR and Contractor will review written contract standards, briefing materials, and a 24hr timeline will be made to bring deficient activity or deliverable to acceptable standard. For standard configuration equipment or vehicle deficiencies 48hrs will be given to regain acceptable standards.

Incentives/Disincentives

a. Contractor will be required to rework the area at no additional cost to the Government

b. The Government will charge to the Contractor any additional cost of subsequent inspection of reworked area

c. Positive or negative Performance rating at the end of the contract

4 – Mop-up

4. Mop-up operations are used to limit unwanted fire growth, reduce smoke from burning material, limit impacts to non-piled standing or fallen reserve vegetation.

4. COR or

Burn inspects Mop-Up work on each prescribed burn unit to ensure standards are met.

COMMENCEMENT PROSECUTION, AND COMPLETION OF WORK

The Contractor shall be required to (a) commence work under this contract within 7 calendar days after the date the government and contractural mutually agree to (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than each applicable period of performance end date.

A post award conference with the successful quoter is required. It will be scheduled within 10 days after the date of contract award. The conference will be held at Yosemite National Park or via telephone if post-award conference does not coincide with prescribed burn module activation (209-347-8854).

8. CONTRACTING OFFICER’S REPRESENTATIVE:

Name: Rob Winkler Address: Yosemite National Park ATTN: Fire and Aviation

PO BOX 577 Yosemite, CA 95389 Robert_winkler@nps.gov

Telephone: 209-347-8854

PWS 1.0 Background on the Government’s Requirement
PWS 2.0 General Scope of Work
PWS 4.0 Specific Tasks

File details come from the government source that posted it. Updated .