B08_Attachment_7_RFI_Answers_Amendment_0003_0003.docx
DOCX document 14 KB Posted
- Attached to
- SHADE STRUCTURE DEMOLITION - CABR
- Solicitation number
- 140P8526Q0054
About this file
This file is an Amendment containing Request for Information (RFI) Answers for a small business set-aside solicitation for shade structure demolition at Cabrillo National Monument.
The amendment addresses two critical clarifications regarding the demolition scope. First, it resolves a discrepancy between specification sections regarding vertical support post termination height, confirming that posts shall be cut at 90 inches above finished grade (not the 72 inches stated in the selective demolition section). Second, it clarifies that the northern loop of the shade structure trail will be entirely closed to public access during the entire period of performance, with no site access permitted except for the contractor. The solicitation (140P8526Q0054) is a small business set-aside RFQ with a $19.0 million size standard under NAICS code 238910, with an estimated construction magnitude between $25,000 and $100,000. The Department of the Interior National Park Service is requesting quotes for complete demolition services including mobilization, labor, supervision, materials, equipment, transportation, site rehabilitation, cleanup, and demobilization. Proposals were due by 12:00 P.M. Pacific Daylight Time on June 18, 2026, with submission via email only to brian_roppolo@nps.gov. This amendment was posted to www.SAM.gov to provide answers to questions submitted by the June 4, 2026 deadline.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P8526Q0054_Amd_0003.pdf | ||
| Sol_140P8526Q0054_Amd_0002.pdf | ||
| B08_Attachment_6_SOW_Supplement_0002.docx | DOCX document | |
| Sol_140P8526Q0054_Amd_0001.pdf | ||
| B08_Attachment_5_Specifications_0001.pdf | ||
| B08_Attachment_2_CABR_shade_Stucture_SOW.docx | DOCX document | |
| Sol_140P8526Q0054.pdf | ||
| B08_Attachment_4_140P8526Q0054_Tech_Info_Form.docx | DOCX document | |
| B08_Attachment_1_Pricing_Schedule.docx | DOCX document | |
| B03_Attachment_3_Wage_Determination_CA20260001.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CABR Shade Demo 140P8526Q00524 – RFIs 6/2/2026
Question 1.
SECTION 01 11 00
1.1 PROJECT DESCRIPTION
states " existing vertical support posts, cut and finished 90” inches above existing grade” Where as
SECTION 02 41 19 — SELECTIVE DEMOLITION
2.3 SHADE STRUCTURE DEMOLITION
B. Post Termination "Structural posts shall be cut 6'-0" above finished grade” Will posts be terminated at 90” or 72” above finished grade?
Answer: The vertical post will be cut at 90"
Question 2. Will the entire trail be cordoned off from the public during the entire project POP or only areas immediately being worked ?
Answer: The shade structure is on a loop and the northern loop will be entirely closed off, there will be no access to the site other than for the contractor.