Contract_Price_Schedule_0001.pdf
PDF 82 KB Posted
- Solicitation number
- 140P8523R0012
About this file
This price schedule outlines line items for a roof replacement project at Capehart Housing units at Golden Gate National Recreation Area. The National Park Service solicits offers for base line items including hazardous material testing and abatement, installation of drip edge, roofing materials, roof foam, downspouts, and mobilization/demobilization. An optional line item includes painting of fascia and soffit. Offerors must submit pricing for all base and option line items. Pricing will be evaluated based on the total of all line items. The period to exercise options at the proposed prices extends 60 calendar days from award.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACT
LINE ITEM
(CLIN)
CLIN TITLE QUANTITY
UNIT OF
MEASURE
UNIT PRICE TOTAL PRICE
BASE
Hazardous material testing, perform hazardous materials abatement and disposal on wet pach compound and any ACM lead containing materials
9 per bldg
0020 Install new drip edge and flashing 3,150 LF
0030 Install new T&G board roofing at building 815a 400 sf
Install new Carlisle Roof foam 1" spray or John- Manville Corporation Specification No, 4GNG.
Replace all standard sheet metal pipe flashings and two-piece .025 vent flashing sets. Install new dropout drains. Install silicon cap sheet and pea gravel.
35,000 SF
Install new 3" galvinized aluminum downspouts, primed and painted.
32 LF
0060 Mobilization/Demobilization 1 LS
OPTION
0070 Paint Existing Fascia and Soffit 8,000 SF
CONTRACT PRICE SCHEDULE
SOLICITATION NUMBER: 140P8523R0012
PARK PMIS: 254311
CONTRACT NUMBER:
GRAND TOTAL PROPOSED BASE PRICE + Option -------------- CLIN 1 thru CLIN 7
Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items. Failure to do so may render the proposal unacceptable. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts govern. Round totals and extended prices to whole dollars. The Government reserves the right to award any or no options at or after the time of award. At the option of the Government, the period for exercise of options at the proposed prices shall extend 60 calendar days from the date of award. Pricing will be evaluated based on the total price of all line items to include any option line items.
PROJECT TITLE: Capehart Housing Roof Replacement - Units 800, 801, 805, 807, 808, 811, 815A, 818, 833
SUBTOTAL PROPOSED BASE PRICE CLIN 1 thru CLIN 5 -----------
PARK - PMIS
CPS - 1
Price Schedule
File details come from the government source that posted it. Updated .