03_Drawings.pdf
PDF 1 MB Posted
- Attached to
- Rehabilitate Two Digesters at El Portal Wastewater Treatmetn Plant for YOSE (140P8518R0002)
- Solicitation number
- 140P8518Q0049
About this file
03_Drawings
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Award_Notice_140P8518P0061.pdf | ||
| 04_SCA_Wage_Determination.pdf | ||
| 01_Price_Schedule.pdf | ||
| 02_Specifications.pdf | ||
| 06_Experience_and_Past_Performance_Form.pdf | ||
| 02_Specifications.pdf | ||
| 04_SCA_Wage_Determination.pdf | ||
| 03_Drawings.pdf | ||
| 05_FAR_52.212-3_Form.pdf | ||
| 01_Price_Schedule.pdf | ||
| 140P8518Q0049_Terms_and_Conditions.docx | DOCX document | |
| 140P8518Q0049_SF1449.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AutoCAD SHX Text
YOSEMITE
AutoCAD SHX Text
WEST
AutoCAD SHX Text
CAMP MATHER
AutoCAD SHX Text
HETCH
AutoCAD SHX Text
HETCHY
AutoCAD SHX Text
ROAD
AutoCAD SHX Text
JOHN MUIR TRAIL
AutoCAD SHX Text
MT. CONNESS
AutoCAD SHX Text
MT. DANA
AutoCAD SHX Text
MT.GIBBS
AutoCAD SHX Text
MT.LYELL
AutoCAD SHX Text
MARIPOSA COUNTY
AutoCAD SHX Text
MADERA COUNTY
AutoCAD SHX Text
TUOLUMNE
AutoCAD SHX Text
COUNTY
AutoCAD SHX Text
MONO COUNTY
AutoCAD SHX Text
SOUTH
AutoCAD SHX Text
ENTRANCE
AutoCAD SHX Text
MARIPOSA
AutoCAD SHX Text
GROVE
AutoCAD SHX Text
WAWONA
AutoCAD SHX Text
WAWONA
AutoCAD SHX Text
FISH CAMP
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
MT.
AutoCAD SHX Text
HOFFMAN
AutoCAD SHX Text
TUOLUMNE
AutoCAD SHX Text
PEAK
AutoCAD SHX Text
BALD
AutoCAD SHX Text
MT.
AutoCAD SHX Text V.C.
AutoCAD SHX Text
TUOLUMNE
AutoCAD SHX Text
MEADOWS
AutoCAD SHX Text
HETCH HETCHY
AutoCAD SHX Text
RESERVOIR
AutoCAD SHX Text
YOSEMITE
AutoCAD SHX Text
VILLAGE
AutoCAD SHX Text
YOSE
AutoCAD SHX Text
VALLEY
AutoCAD SHX Text
MITE
AutoCAD SHX Text V.C.
AutoCAD SHX Text
HQ.
AutoCAD SHX Text
AutoCAD SHX Text
EL CAPITAN
AutoCAD SHX Text
HALF
AutoCAD SHX Text
DOME
AutoCAD SHX Text
FOERSTER
AutoCAD SHX Text
PEAK
AutoCAD SHX Text
MERCED
AutoCAD SHX Text
PEAK
AutoCAD SHX Text
BUENA VISTA
AutoCAD SHX Text
PEAK
AutoCAD SHX Text
QUARTZITE
AutoCAD SHX Text
PEAK
AutoCAD SHX Text
MT. STARR
AutoCAD SHX Text
KING
AutoCAD SHX Text
RED
AutoCAD SHX Text
PEAK
AutoCAD SHX Text
LAKE
AutoCAD SHX Text
ELEANOR
AutoCAD SHX Text
BUCK CAMP
AutoCAD SHX Text
(SUMMER ONLY)
AutoCAD SHX Text
MERCED LAKE
AutoCAD SHX Text
(SUMMER ONLY)
AutoCAD SHX Text
BADGER
AutoCAD SHX Text
PASS
AutoCAD SHX Text
SKI AREA
AutoCAD SHX Text
HETCH
AutoCAD SHX Text
HETCHY
AutoCAD SHX Text
ENTRANCE
AutoCAD SHX Text
ARCH ROCK
AutoCAD SHX Text
ENTRANCE
AutoCAD SHX Text
STATION
AutoCAD SHX Text
EL PORTAL
AutoCAD SHX Text
PIONEER
AutoCAD SHX Text
YOSEMITE
AutoCAD SHX Text
HISTORY
AutoCAD SHX Text
CENTER
AutoCAD SHX Text
ROAD
AutoCAD SHX Text
ONE WAY
AutoCAD SHX Text
BEAR MT.
AutoCAD SHX Text
ACKERSON MT.
AutoCAD SHX Text
TIOGA PASS
AutoCAD SHX Text
ENTRANCE
AutoCAD SHX Text
CHERRY
AutoCAD SHX Text
LAKE
AutoCAD SHX Text
LEE VINING
AutoCAD SHX Text
TUOLUMNE CO.
AutoCAD SHX Text
MARIPOSA CO.
AutoCAD SHX Text
MONO CO.
AutoCAD SHX Text
TUOLUMNE CO.
AutoCAD SHX Text
GRAND CANYON
AutoCAD SHX Text
RIVER
AutoCAD SHX Text
TUO
AutoCAD SHX Text
UMNE
AutoCAD SHX Text
OF
AutoCAD SHX Text
THE
AutoCAD SHX Text
PACIFIC
AutoCAD SHX Text
CREST
AutoCAD SHX Text
TRAIL
AutoCAD SHX Text
TOIYABE
AutoCAD SHX Text
NATIONAL
AutoCAD SHX Text
FOREST
AutoCAD SHX Text
INYO
AutoCAD SHX Text
NATIONAL
AutoCAD SHX Text
FOREST
AutoCAD SHX Text
SIERRA
AutoCAD SHX Text
NATIONAL
AutoCAD SHX Text
FOREST
AutoCAD SHX Text
STANISLAUS
AutoCAD SHX Text
NATIONAL
AutoCAD SHX Text
FOREST
AutoCAD SHX Text
TWIN
AutoCAD SHX Text
LAKES
AutoCAD SHX Text
MERCED
AutoCAD SHX Text
RIVER
AutoCAD SHX Text
MONO
AutoCAD SHX Text
LAKE
AutoCAD SHX Text
TIOGA
AutoCAD SHX Text
FACILITIES ALONG
AutoCAD SHX Text
TIOGA ROAD
AutoCAD SHX Text
AVAILABLE IN
AutoCAD SHX Text
SUMMER ONLY
AutoCAD SHX Text
TO
AutoCAD SHX Text
CARSON CITY,
AutoCAD SHX Text
NEVADA
AutoCAD SHX Text
TO
AutoCAD SHX Text
BISHOP,
AutoCAD SHX Text
CALIFORNIA
AutoCAD SHX Text
TO
AutoCAD SHX Text
FRESNO
AutoCAD SHX Text
TO
AutoCAD SHX Text
MERCED
AutoCAD SHX Text
TO
AutoCAD SHX Text
OAKDALE
AutoCAD SHX Text
BIG OAK
AutoCAD SHX Text
FLAT
AutoCAD SHX Text
ENTRANCE
AutoCAD SHX Text
TILDEN
AutoCAD SHX Text
LAKE
AutoCAD SHX Text
KIBBIE
AutoCAD SHX Text
LAKE
AutoCAD SHX Text
BENSON
AutoCAD SHX Text
LAKE
AutoCAD SHX Text L
AutoCAD SHX Text
CHAIN
AutoCAD SHX Text
LAKES
AutoCAD SHX Text
LITTLE
AutoCAD SHX Text
YOSEMITE
AutoCAD SHX Text
VALLEY
AutoCAD SHX Text
(SUMMER ONLY)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
LAKE TAHOE
AutoCAD SHX Text
MONO
AutoCAD SHX Text
LAKE
AutoCAD SHX Text
YOSEMITE
AutoCAD SHX Text
NATIONAL
AutoCAD SHX Text
PARK
AutoCAD SHX Text
BISHOP
AutoCAD SHX Text
BRIDGEPORT
AutoCAD SHX Text
GARDNERVILLE
AutoCAD SHX Text
PLACERVILLE
AutoCAD SHX Text
MODESTO
AutoCAD SHX Text
NEVADA
AutoCAD SHX Text
CALIFORNIA
AutoCAD SHX Text
SEQUOIA-
AutoCAD SHX Text
KINGS CANYON
AutoCAD SHX Text
NATIONAL
AutoCAD SHX Text
PARK
AutoCAD SHX Text
CHERRY
AutoCAD SHX Text
LAKE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
MERCED
AutoCAD SHX Text
MARIPOSA
AutoCAD SHX Text
OAKHURST
AutoCAD SHX Text
SCALE OF MILES
AutoCAD SHX Text
SCALE OF KILOMETERS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SCALE OF MILES
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CAMPGROUND
AutoCAD SHX Text
INFORMATION CENTER
AutoCAD SHX Text
PICNIC AREA
AutoCAD SHX Text
RANGER STATION
AutoCAD SHX Text
PARK HEADQUARTERS
AutoCAD SHX Text
VISITOR CENTER
AutoCAD SHX Text
RIVER OR CREEK
AutoCAD SHX Text
PARKING
AutoCAD SHX Text
HQ.
AutoCAD SHX Text V.C.
AutoCAD SHX Text
LEGEND
AutoCAD SHX Text
COUNTY LINE
AutoCAD SHX Text
PAVED ROAD
AutoCAD SHX Text
PARK BOUNDARY
AutoCAD SHX Text
TRAIL
AutoCAD SHX Text
STATE LINE
AutoCAD SHX Text
UNESCO
AutoCAD SHX Text
YOSEMITE NATIONAL PARK
AutoCAD SHX Text
WORLD HERITAGE SITE
AutoCAD SHX Text
THIS PROJECT
AutoCAD SHX Text
PMIS/PKG NO.
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
OF
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
YOSE-185130
AutoCAD SHX Text Date
AutoCAD SHX Text
REVISION
AutoCAD SHX Text Sheet
AutoCAD SHX Text Mark
AutoCAD SHX Text Initial
AutoCAD SHX Text
EL PORTAL WWTP
AutoCAD SHX Text
MARIPOSA
AutoCAD SHX Text
CALIFORNIA
AutoCAD SHX Text
CONSTRUCTION DRAWINGS
AutoCAD SHX Text
PROJECT NO. 185130
AutoCAD SHX Text
TITLE OF DRAWING
AutoCAD SHX Text
UNITED STATES
AutoCAD SHX Text
DEPARTMENT OF THE INTERIOR
AutoCAD SHX Text
COUNTY
AutoCAD SHX Text
REGION
AutoCAD SHX Text
DENVER SERVICE CENTER
AutoCAD SHX Text
NATIONAL PARK SERVICE
AutoCAD SHX Text
STATE
AutoCAD SHX Text
EL PORTAL WWTP
AutoCAD SHX Text 02/2018
AutoCAD SHX Text
DIGESTER CLEANING
AutoCAD SHX Text
LOCATION WITHIN PARK
NAME OF PARK
GENERAL NOTES 1. THE PURPOSE OF THIS PROJECT IS TO CLEAN DIGESTERS #1 AND #2 LOCATED AT THE EL THE PURPOSE OF THIS PROJECT IS TO CLEAN DIGESTERS #1 AND #2 LOCATED AT THE EL PORTAL WASTEWATER TREATMENT PLANT (EPWWTP). OVER TIME, SAND AND DEBRIS ENTERED THE DIGESTERS, ACCUMULATED AND SETTLED OUT IN THE BOTTOM OF THE DIGESTERS, CHANGING THE WORKING VOLUME OF THE DIGESTER AND HAMPERING THE ABILITY TO MIX AND AGITATE THE MATERIALS EFFICIENTLY. 2. A PRE-BID WALK THROUGH WILL BE HELD AND ATTENDANCE IS ENCOURAGED BY ALL A PRE-BID WALK THROUGH WILL BE HELD AND ATTENDANCE IS ENCOURAGED BY ALL BIDDERS TO ANSWER QUESTIONS AND CLARIFY STAGING AND UTILITY CONNECTION LOCATIONS. SAMPLING OF DIGESTERS #1 AND #2 MATERIALS WILL BE ALLOWED AT THIS TIME. 3. CONTRACTOR SHALL TAKE ALL NECESSARY SAFETY PRECAUTIONS AND FURNISH AND INSTALL CONTRACTOR SHALL TAKE ALL NECESSARY SAFETY PRECAUTIONS AND FURNISH AND INSTALL ALL EQUIPMENT, LABOR, MATERIALS, APPURTENANCES, GAS DETECTORS, EXPLOSION PROOF VENTILATION EQUIPMENT, AND ALL OTHER SERVICES REQUIRED TO MEET SAFETY REQUIREMENTS IN ALL WORKING AREAS AT NO ADDITIONAL COST TO THE GOVERNMENT. 4. PRIOR TO THE CONTRACTOR STARTING WORK IN THE DIGESTERS, THE CONTRACTOR, PRIOR TO THE CONTRACTOR STARTING WORK IN THE DIGESTERS, THE CONTRACTOR, CONTRACTING OFFICER'S REPRESENTATIVE (COR), AND PLANT OPERATIONS MANAGER (OR THEIR DESIGNEE) SHALL MEET TO REVIEW THE CONTRACT SPECIFICATIONS, SPECIFIC HAZARDS AND SAFETY INFORMATION. PART OF THIS MEETING WILL INCLUDE VERIFYING THAT ALL DIGESTER VALVES, PUMPS, ETC., HAVE BEEN PROPERLY LOCKED AND TAGGED OUT FOR SAFETY. 5. IT IS THE CONTRACTOR'S RESPONSIBILITY TO INFORM THE COR AND EPWWTP OPERATORS OF IT IS THE CONTRACTOR'S RESPONSIBILITY TO INFORM THE COR AND EPWWTP OPERATORS OF ANY LEAKS OR RESIDUAL SLUDGE THAT MAY IMPOSE A PROBLEM OR SAFETY ISSUE. EPWWTP SLUDGE THAT MAY IMPOSE A PROBLEM OR SAFETY ISSUE. EPWWTP OPERATORS WILL BE RESPONSIBLE FOR CLOSING AND LOCKING ALL GAS AND SLUDGE LINES TO AND FROM THE DIGESTERS. 6. THE CONTRACTOR SHALL SUBMIT THE FOLLOWING ITEMS FOR APPROVAL TO THE COR PRIOR THE CONTRACTOR SHALL SUBMIT THE FOLLOWING ITEMS FOR APPROVAL TO THE COR PRIOR TO THE COMMENCEMENT OF ANY WORK: A. SITE HEALTH AND SAFETY PLAN. SITE HEALTH AND SAFETY PLAN. B. COPY OF THE COMPANY'S CONFINED SPACE ENTRY POLICY AND A STATEMENT CERTIFYING THAT ALL THE CONTRACTOR'S EMPLOYEES ENTERING THE DIGESTERS HAVE BEEN TRAINED IN CONFINED SPACE ENTRY, AND PROVIDE FORKLIFT AND CRANE CERTIFICATIONS IF REQUIRED. 7. CONTRACTOR SHALL BE AWARE OF THE USE OF SODIUM HYPOCHLORITE, HYDROGEN PEROXIDE, CONTRACTOR SHALL BE AWARE OF THE USE OF SODIUM HYPOCHLORITE, HYDROGEN PEROXIDE, FERRIC CHLORIDE, AND THE POTENTIAL PRESENCE OF HAZARDOUS GASES IN AND AROUND THE PLANT. 8. CONTRACTOR IS RESPONSIBLE FOR EVERY ASPECT OF HEALTH AND SAFETY ON THE CONTRACTOR IS RESPONSIBLE FOR EVERY ASPECT OF HEALTH AND SAFETY ON THE WORKSITE, INCLUDING THE HEALTH AND SAFETY OF SUBCONTRACTORS, SUPPLIERS, AND OTHER PERSONS ON THE WORKSITE. ALL CONTRACTOR EMPLOYEES SHALL WEAR ALL PERSONAL PROTECTIVE EQUIPMENT REQUIRED FOR THIS WORK BY OSHA, OTHER REGULATORY AGENCIES OR THE COR. 9. GAS DETECTORS SHALL BE USED AT ALL TIMES WHEN INSIDE CONFINED SPACE AREAS AND GAS DETECTORS SHALL BE USED AT ALL TIMES WHEN INSIDE CONFINED SPACE AREAS AND AS REQUIRED BY THE THE CONTRACTING OFFICER OR THEIR DESIGNEE. AT A MINIMUM, GAS DETECTORS SHALL DETECT CARBON MONOXIDE, OXYGEN, HYDROGEN SULFIDE, AND LOWER EXPLOSIVE LIMITS. 10. CONTRACTOR SHALL IMMEDIATELY INFORM EPWWTP OPERATORS, COR, AND CONTRACTING CONTRACTOR SHALL IMMEDIATELY INFORM EPWWTP OPERATORS, COR, AND CONTRACTING OFFICER OF ANY INJURY OR ACCIDENTS ENCOUNTERED DURING WORK HOURS. CONTRACTOR IS REQUIRED TO PROVIDE COPIES OF REPORTS AND OTHER DOCUMENTS RELATED TO ACCIDENTS AND INJURIES ENCOUNTERED DURING CONSTRUCTION WITHIN 24 HOURS OF THE INCIDENT. 11. CONTRACTOR SHALL SECURELY BLOCK ACCESS TO THE EMPTY DIGESTERS DURING THE CONTRACTOR SHALL SECURELY BLOCK ACCESS TO THE EMPTY DIGESTERS DURING THE CLEANING PROJECT NON-WORKING TIMES TO PREVENT UNAUTHORIZED ENTRY AND MINIMIZE RISKS. 12. UNTIL THE DIGESTER IS THOROUGHLY CLEANED AND VENTILATED BY THE CONTRACTOR, UNTIL THE DIGESTER IS THOROUGHLY CLEANED AND VENTILATED BY THE CONTRACTOR, THERE WILL BE GAS PRESENT. THIS MAY BE A COMBUSTIBLE GAS, COMPOSED PRINCIPALLY OF METHANE, WHICH MAY BE EXPLOSIVE WITH CERTAIN MIXTURES OF AIR. 13. DIGESTERS ARE CLASSIFIED AS CONFINED SPACES; STATE LAW AND EPWWTP'S POLICY ON DIGESTERS ARE CLASSIFIED AS CONFINED SPACES; STATE LAW AND EPWWTP'S POLICY ON CONFINED SPACES REQUIRE THE FOLLOWING NOTIFICATIONS AND SUBMITTALS: A. TWO-WEEK ADVANCE NOTIFICATION FROM THE CONTRACTOR FOR WORK WITHIN CONFINED TWO-WEEK ADVANCE NOTIFICATION FROM THE CONTRACTOR FOR WORK WITHIN CONFINED SPACES. B. SUBMITTAL OF CONTRACTOR'S CONFINED SPACE WORK PROCEDURES AND RESCUE PLAN SUBMITTAL OF CONTRACTOR'S CONFINED SPACE WORK PROCEDURES AND RESCUE PLAN (GOVERNMENT RESOURCES ARE NOT AVAILABLE TO PROVIDE RESCUE SERVICES). C. COMPLIANCE WITH ENTRY PERMIT PROCEDURES. COMPLIANCE WITH ENTRY PERMIT PROCEDURES. D. PARTICIPATION IN A HAZARD ASSESSMENT REVIEW OF PLANNED PRECAUTIONS. PARTICIPATION IN A HAZARD ASSESSMENT REVIEW OF PLANNED PRECAUTIONS. E. DEBRIEFING UPON COMPLETION OF THE CONFINED SPACE OPERATION. DEBRIEFING UPON COMPLETION OF THE CONFINED SPACE OPERATION. 14. THE CONTRACTOR SHALL PROVIDE ADEQUATE VENTILATION AT ALL TIMES AND COMPLY WITH THE CONTRACTOR SHALL PROVIDE ADEQUATE VENTILATION AT ALL TIMES AND COMPLY WITH ALL FEDERAL AND STATE REGULATIONS REGARDING WORKING IN A CONFINED SPACE. 15. COMPLIANCE WITH THE GENERAL INDUSTRY SAFETY ORDERS REMAINS THE CONTRACTOR'S COMPLIANCE WITH THE GENERAL INDUSTRY SAFETY ORDERS REMAINS THE CONTRACTOR'S RESPONSIBILITY. THE EPWWTP REVIEW IS FOR GENERAL COMPLIANCE AND COORDINATION ONLY. IN ACCORDANCE WITH THE GENERAL INDUSTRY SAFETY ORDERS, SECTION 5157(C) (8), THE EPWWTP WILL PROVIDE AVAILABLE INFORMATION TO THE CONTRACTOR FOR EACH CONFINED SPACE LOCATION. 16. THE IMPORTANCE OF WORKING IN CONFINED SPACES CANNOT BE OVER EMPHASIZED. DUE TO THE IMPORTANCE OF WORKING IN CONFINED SPACES CANNOT BE OVER EMPHASIZED. DUE TO THE CONTINUOUS FLOW OF SEWAGE AND CONTAMINANTS THAT MAY BE CONTAINED THEREIN, THE ATMOSPHERE MAY SUDDENLY AND UNPREDICTABLY BECOME LETHALLY HAZARDOUS. WHERE THERE IS CONFLICT BETWEEN APPLICABLE SAFETY ORDERS, LAWS, AND REGULATIONS AND POLICIES, THE MORE STRINGENT MEASURES SHALL APPLY. COMPENSATION FOR CONFINED SPACE ENTRY PROCEDURES AND SAFETY PROVISIONS SHALL BE INCLUDED IN BID ITEMS 1 AND 2. 17. CONTRACTOR SHALL BE ESPECIALLY CAREFUL TO AVOID FIRE HAZARDS WHEN WELDING, CONTRACTOR SHALL BE ESPECIALLY CAREFUL TO AVOID FIRE HAZARDS WHEN WELDING, CUTTING, AND EQUIPMENT FUELING. 18. CONTRACTOR SHALL FURNISH ALL SAFETY DEVICES, FIRE EXTINGUISHERS AND FIRE WATCH CONTRACTOR SHALL FURNISH ALL SAFETY DEVICES, FIRE EXTINGUISHERS AND FIRE WATCH PERSONNEL REQUIRED TO PROTECT THE WORK AND PROVIDE FOR A SAFE WORK SITE FOR WORKERS AND THE PUBLIC. 19. CONTRACTOR SHALL LEAVE AN OFF-SITE EMERGENCY TELEPHONE NUMBER SO THAT CONTACT CONTRACTOR SHALL LEAVE AN OFF-SITE EMERGENCY TELEPHONE NUMBER SO THAT CONTACT MAY BE MADE EASILY AT ALL TIMES IN CASE OF ERGENCIES. 20. THE FOLLOWING PARAGRAPH DOES NOT RELIEVE THE CONTRACTOR FROM ITS RESPONSIBILITY THE FOLLOWING PARAGRAPH DOES NOT RELIEVE THE CONTRACTOR FROM ITS RESPONSIBILITY FOR OBTAINING PRIOR APPROVAL FROM THE COR FOR CHEMICAL USAGE AND STORAGE WHEN OTHERWISE REQUIRED. THE CONTRACTOR SHALL PROVIDE FOUR (4) COPIES OF THE MATERIAL SAFETY DATA SHEETS (MSDS) TO THE COR FOR ALL CHEMICALS, INCLUDING POLYMERS USED DURING TO THE COR FOR ALL CHEMICALS, INCLUDING POLYMERS USED DURING THIS PROJECT AT LEAST THREE (3) DAYS PRIOR TO BRINGING THEM ON SITE. USE OF AT LEAST THREE (3) DAYS PRIOR TO BRINGING THEM ON SITE. USE OF ALL SUCH CHEMICALS AND DISPOSAL OF RESIDUES SHALL BE IN STRICT ACCORDANCE WITH THE PRINTED INSTRUCTIONS OF THE MANUFACTURER. 21. THE WORK UNDER THIS CONTRACT SHALL INCLUDE ALL LABOR, MATERIALS, CHEMICALS, THE WORK UNDER THIS CONTRACT SHALL INCLUDE ALL LABOR, MATERIALS, CHEMICALS, SUPPLIES, EQUIPMENT, PERMITS, TRANSPORTATION, AND OTHER INCIDENTALS REQUIRED FOR THE REMOVAL, SCREENING AND BIOSOLIDS DEWATERING OF ALL RESIDUALS PRESENT IN THE SCREENING AND BIOSOLIDS DEWATERING OF ALL RESIDUALS PRESENT IN THE DIGESTERS AND THE HIGH PRESSURE WATER CLEANING OF THE INTERIOR DIGESTERS CEILINGS, WALLS, FLOOR, AND PIPING. 22. THE MATERIAL IN THE DIGESTERS CONTAINS ORGANIC AND INORGANIC SOLIDS, GRIT, GREASE, THE MATERIAL IN THE DIGESTERS CONTAINS ORGANIC AND INORGANIC SOLIDS, GRIT, GREASE, SCUM, HAIR, PLASTICS, RAGS, SILT, SAND, DETACHED SURFACE LININGS AND OTHER MATERIAL NORMALLY FOUND IN THE DIGESTERS IN A MUNICIPAL WASTEWATER TREATMENT PLANT. THE CONTRACTOR SHOULD ANTICIPATE THICK HAIR MAT AND HEAVY CONCENTRATION OF GRIT ON THE DIGESTER FLOORS. CONTRACTOR SHALL ASSUME ALL RISKS AND RESPONSIBILITIES ASSOCIATED WITH THE REMOVAL AND DEWATERING OF ALL MATERIAL WITHIN THE DIGESTERS TO BE CLEANED REGARDLESS OF MATERIAL TYPE, NATURE, DENSITY, COARSENESS, PERCENT SOLIDS, AND QUANTITY. 23. ALL REQUIRED ROAD CROSSINGS FOR TEMPORARY PIPING SHALL BE CONSTRUCTED TO ALL REQUIRED ROAD CROSSINGS FOR TEMPORARY PIPING SHALL BE CONSTRUCTED TO MAINTAIN FLOW OF PLANT TRAFFIC PER COR APPROVAL. THE CONTRACTOR SHALL COORDINATE THE WORK OF THIS CONTRACT WITH THE WORK OF OTHER CONTRACTORS ON THE PROJECT SITE. COORDINATION ACTIVITIES INCLUDE, BUT ARE NOT LIMITED TO, THE SCHEDULING OF WORK AT INTERFACE LOCATIONS TO PERMIT ADJACENT OR CONNECTING WORK BY OTHER CONTRACTORS, PROVIDING NECESSARY SHOP DRAWING INFORMATION TO OTHER CONTRACTORS AND WORKING WITH OTHER CONTRACTORS TO CONDUCT FUNCTIONAL TESTING OF SYSTEMS AND START UP OF THE FACILITY WHEN NECESSARY. 24. CONTRACTOR SHALL LIMIT THE WORK AREA TO MINIMIZE THE CONFLICT WITH TREATMENT CONTRACTOR SHALL LIMIT THE WORK AREA TO MINIMIZE THE CONFLICT WITH TREATMENT PLANT OPERATION AND WITH OTHER CONTRACTORS WORKING ON THE SITE. ALL EQUIPMENT AND PIPING SHALL BE INSTALLED IN AN APPROVED MANNER AND ROUTE WITHOUT INTERFERENCE TO PLANT OPERATION AND TRAFFIC, PER COR APPROVAL. WHILE CONDUCTING CLEANING OPERATIONS, CONTRACTOR SHALL HAVE A RESPONSIBLE SUPERINTENDENT ON SITE. THIS PERSON SHALL HAVE THE AUTHORITY TO MAKE MANAGEMENT DECISION PERTAINING TO THE PROJECT. THE EQUIPMENT REQUIRED FOR THE REMOVAL AND PROCESSING OF THE DIGESTER RESIDUALS SHALL BE ATTENDED AT ALL TIMES WHILE IN OPERATION. 25. CONTRACTOR SHALL IMMEDIATELY NOTIFY THE COR AND EPWWTP OPERATORS IF ANY CONTRACTOR SHALL IMMEDIATELY NOTIFY THE COR AND EPWWTP OPERATORS IF ANY DAMAGED OR CORRODED STRUCTURES OR EQUIPMENT IS ENCOUNTERED IN THE DIGESTERS. 26. CARE SHALL BE TAKEN TO PRESERVE FOR REUSE, ANY EXISTING GASKETS AND SEALS. THE CARE SHALL BE TAKEN TO PRESERVE FOR REUSE, ANY EXISTING GASKETS AND SEALS. THE CONTRACTOR SHALL PROVIDE REPLACEMENT GASKETS AND SEALANTS IF DAMAGED BEYOND REUSE. THE GASKET MATERIAL IS FABRICATED FROM 1/4 INCH THICK HARD NEOPRENE RUBBER SHEET AND THE RTV SEALANT IS A SILICONE BASE. THE CONTRACTING OFFICER SHALL MAKE A FINAL DETERMINATION ON ACCEPTABLE REUSE OF GASKETS. 27. ONCE EACH DIGESTER IS MADE AVAILABLE TO THE CONTRACTOR, THE CONTRACTOR SHALL ONCE EACH DIGESTER IS MADE AVAILABLE TO THE CONTRACTOR, THE CONTRACTOR SHALL MOBILIZE AND REMOVE ALL NECESSARY EXISTING ROOF OR SIDE ACCESS COVERS AND FURNISH AND INSTALL ANY NECESSARY PUMPS, PIPING, ODOR CONTROL, AND VENTILATION EQUIPMENT. ADDITIONAL PURGE FANS MAY BE REQUIRED DURING THE CLEANING OPERATIONS. THE CONTRACTOR WILL PUMP THE DIGESTER SLUDGE FROM THE ROOF HATCHES TO LOWER THE INTERIOR SLUDGE LEVEL ENOUGH TO OPEN THE SIDE ACCESS HATCH. SLUDGE IN BOTH DIGESTERS SHALL BE ASSUMED TO HAVE EXTREMELY HIGH SAND AND GRIT CONTENT. IT IS EXPECTED THERE ARE MOUNDS UP TO 4 FEET DEEP OF MOSTLY SILT, GRIT AND SAND INSIDE THE DIGESTER. THE HIGH SAND CONTENT WILL CAUSE THE SLUDGE TO HAVE EXTREMELY HIGH SOLIDS CONTENT WHEN DEWATERED. 28. THE CLEANING PROCESS INCLUDES REMOVING ALL DEBRIS FOUND IN THE DIGESTERS. THE THE CLEANING PROCESS INCLUDES REMOVING ALL DEBRIS FOUND IN THE DIGESTERS. THE DEBRIS COULD BE LOCATED ANY PLACE IN THE DIGESTERS SUCH AS ON THE DIGESTERS WALLS, ENTWINED IN THE DRAFT TUBE AND ASSOCIATED SUPPORTS OR WRAPPED AROUND PIPING LOCATED IN THE DIGESTERS. 29. CONTRACTOR SHALL HOSE DOWN THE INTERIOR WALLS, CEILING, AND FLOOR. CONTRACTOR CONTRACTOR SHALL HOSE DOWN THE INTERIOR WALLS, CEILING, AND FLOOR. CONTRACTOR WILL COORDINATE OPERATIONS WITH EPWWTP STAFF. THE DIGESTERS SHALL BE CONSIDERED CLEANED WHEN NO VISIBLE RESIDUAL MATERIAL IS PRESENT ON THE DIGESTERS FLOOR AND SIDEWALLS. 30. THE CONTRACTOR SHALL SLURRY THE DIGESTERS MATERIAL AND THEN PUMP THE RESIDUALS THE CONTRACTOR SHALL SLURRY THE DIGESTERS MATERIAL AND THEN PUMP THE RESIDUALS (INCLUDING ANY WATER THAT THE CONTRACTOR INTRODUCES) FROM THE DIGESTERS TO THE 1/4 INCH SCREENER. THE SCREENED SLUDGE SHALL THEN BE PUMPED TO THE CONTRACTOR'S DEWATERING EQUIPMENT. 31. UPON COMPLETION OF CLEANING THE DIGESTERS THE CONTRACTOR SHALL RETURN THE WORK UPON COMPLETION OF CLEANING THE DIGESTERS THE CONTRACTOR SHALL RETURN THE WORK SITE TO ITS ORIGINAL CONDITION, REMOVING VENDOR'S SUPPLIED PIPING AND EQUIPMENT FROM THE WORK SITE AND REINSTALLING ALL ACCESS COVERS, GASKETS AND SEALANTS TO MEET THE CONTRACT OFFICERS OR DESIGNEE(S) APPROVAL. 32. SLURRY TRANSFER-THE SCREENED SLURRY MATERIAL WITH DIAMETER LESS THAN 1/4 INCH SLURRY TRANSFER-THE SCREENED SLURRY MATERIAL WITH DIAMETER LESS THAN 1/4 INCH -THE SCREENED SLURRY MATERIAL WITH DIAMETER LESS THAN 1/4 INCH SHALL BE PUMPED APPROXIMATELY 800 FEET TO THE DEWATERING STAGING AREA. 33. SLURRY DEWATERING-THE DEWATERING PROCESS IS TO REMOVE WATER FROM THE SCREENED SLURRY DEWATERING-THE DEWATERING PROCESS IS TO REMOVE WATER FROM THE SCREENED -THE DEWATERING PROCESS IS TO REMOVE WATER FROM THE SCREENED SLUDGE. THE RESULTING DEWATERED BIOSOLIDS MUST BE A MINIMUM OF 20% SOLIDS BY WEIGHT. THE DEWATERING PROCESS MAY BE ACCOMPLISHED WITH THE USE OF PORTABLE DEWATERING BELT, CENTRIFUGE SEPARATOR, OR OTHER AVAILABLE DEWATERING TECHNOLOGY. 34. DISPOSAL OF SEPARATED FLUID-THE FLUID SEPARATED DURING DEWATERING WILL BE DISPOSAL OF SEPARATED FLUID-THE FLUID SEPARATED DURING DEWATERING WILL BE -THE FLUID SEPARATED DURING DEWATERING WILL BE DISPOSED OF AT A NEARBY PLANT DRAIN. A DRAIN IS LOCATED APPROXIMATELY 40 FEET FROM THE STAGING AREA OF PROPOSED DEWATERING LOCATION. 35. DISPOSAL OF DEWATERED BIOSOLIDS-THE DEWATERED BIOSOLIDS SHALL BE TRANSFERRED DISPOSAL OF DEWATERED BIOSOLIDS-THE DEWATERED BIOSOLIDS SHALL BE TRANSFERRED -THE DEWATERED BIOSOLIDS SHALL BE TRANSFERRED TO THE APPROPRIATE LOCATION ON THE STAGING PAD BY THE CONTRACTOR. THIS MUST BE COORDINATED WITH EPWWTP OPERATORS FOR EXACT DUM0PING LOCATION. 36. SCREENINGS GREATER THAN 1/4 INCH-THE CONTRACTOR SHALL PROVIDE PORTABLE SCREENINGS GREATER THAN 1/4 INCH-THE CONTRACTOR SHALL PROVIDE PORTABLE -THE CONTRACTOR SHALL PROVIDE PORTABLE COLLECTION DUMPSTER BINS TO COLLECT SCREENINGS GREATER THAN 1/4 INCH. THE CONTRACTOR WILL BE RESPONSIBLE FOR THE HAULING, TRANSPORTATION AND DISPOSAL OF THE SCREENED MATERIAL FROM EPWWTP TREATMENT FACILITIES. ALL MATERIALS WILL BE DISPOSED OF OFF GOVERNMENT PROPERTY IN ACCORDANCE WITH ALL APPLICABLE LAWS AND REGULATIONS. 37. DEWATERED BIOSOLIDS-AFTER TRANSFER BY THE CONTRACTOR TO THE STAGING AREA, THE DEWATERED BIOSOLIDS-AFTER TRANSFER BY THE CONTRACTOR TO THE STAGING AREA, THE -AFTER TRANSFER BY THE CONTRACTOR TO THE STAGING AREA, THE DEWATERED BIOSOLIDS WILL BE PROCESSED AND DISPOSED OF BY THE CONTRACTOR. ALL MATERIALS WILL BE DISPOSED OF OFF GOVERNMENT PROPERTY IN ACCORDANCE WITH ALL APPLICABLE LAWS AND REGULATIONS. 38. THROUGHOUT THIS PROJECT, UNTIL FINAL ACCEPTANCE OF THE WORK BY THE CONTRACTING THROUGHOUT THIS PROJECT, UNTIL FINAL ACCEPTANCE OF THE WORK BY THE CONTRACTING OFFICER, THE CONTRACTOR SHALL KEEP THE WORKSITE AND OTHER AREAS USED BY IT IN A NEAT AND CLEAN CONDITION, AND FREE FROM ANY ACCUMULATION OF RUBBISH AND DEBRIS. THE CONTRACTOR SHALL DISPOSE OF ALL RUBBISH AND WASTE MATERIALS OF ANY NATURE OCCURRING AT THE WORKSITE AND SHALL ESTABLISH REGULAR INTERVALS OF COLLECTION AND DISPOSAL OF SUCH MATERIALS AND WASTE. 40. THE CONTRACTOR SHALL ALSO KEEP ITS HAUL ROADS FREE FROM DIRT, RUBBISH AND UNNECESSARY OBSTRUCTIONS RESULTING FROM ITS OPERATIONS. CARE SHALL BE TAKEN TO PREVENT SPILLAGE ON HAUL ROUTES. ANY SUCH SPILLAGE SHALL BE IMMEDIATELY CONTAINED AND REMOVED AND THE ARE CLEANED. STAGING EQUIPMENT, AND MATERIAL STORAGE SHALL BE CONFINED TO AREAS APPROVED BY THE COR AND AS DISCUSSED DURING THE PRE-CONSTRUCTION WALK THROUGH. 41. DISPOSAL OF ALL RUBBISH AND SURPLUS MATERIALS SHALL BE OFF THE SITE OF DISPOSAL OF ALL RUBBISH AND SURPLUS MATERIALS SHALL BE OFF THE SITE OF CONSTRUCTION, AT THE CONTRACTORS EXPENSE, IN ACCORDANCE WITH LOCAL, STATE, AND FEDERAL CODES AND ORDINANCES GOVERNING LOCATIONS AND METHODS OF DISPOSAL, AND IN CONFORMANCE WITH ALL APPLICABLE SAFETY LAWS, AND THE REQUIREMENTS OF THE OSHA SAFETY AND HEALTH STANDARDS FOR CONSTRUCTION. 42. ALL IMPACTED SUMPS AND MANHOLES ARE TO BE CLEANED AND FREE OF DEBRIS AT THE ALL IMPACTED SUMPS AND MANHOLES ARE TO BE CLEANED AND FREE OF DEBRIS AT THE COMPLETION OF THE PROJECT. ALL CLEANUP COST SHALL BE INCLUDED IN THE CONTRACTOR'S BID. 43. CONTRACTOR SHALL PROVIDE SPILL CONTAINMENT PLANS FOR THE ON-SITE ACTIVITIES. CONTRACTOR SHALL PROVIDE SPILL CONTAINMENT PLANS FOR THE ON-SITE ACTIVITIES. SPILLS OF ANY NATURE CAUSED BY THE ACTIVITIES OF THE CONTRACTOR SHALL BE CONTROLLED AND CLEANED IMMEDIATELY. THE SOLIDS SOURCE FOR THE DIGESTED SLUDGE MATERIAL HAS BEEN EXCLUSIVELY MUNICIPAL IN ORIGIN. 44. AFTER COMPLETION OF THE WORK, THE CONTRACTOR SHALL SUPPLY A STATEMENT THAT AFTER COMPLETION OF THE WORK, THE CONTRACTOR SHALL SUPPLY A STATEMENT THAT THEY HAVE COMPLIED WITH THE REQUIREMENTS OF THE CALIFORNIA DEPARTMENT OF HEALTH SERVICES, THE STATE WATER RESOURCES CONTROL BOARD, THE INTEGRATED WASTE MANAGEMENT BOARD, AND THE STATE AIR RESOURCES BOARD, OR ANY AGENCY NOT AFOREMENTIONED IN THE ABOVE DOCUMENT. 45. POWER-CONTRACTOR SHALL SUBMIT A WRITTEN ESTIMATE OF POWER NEEDS TO THE COR POWER-CONTRACTOR SHALL SUBMIT A WRITTEN ESTIMATE OF POWER NEEDS TO THE COR -CONTRACTOR SHALL SUBMIT A WRITTEN ESTIMATE OF POWER NEEDS TO THE COR FOR APPROVAL AND SHALL LIST THE ESTIMATED CONNECTIONS THAT REQUIRE POWER. THE CONTRACTOR SHALL NOT CONNECT WELDING MACHINES OR OTHER HIGH POWER USE LOADS TO THE SUPPLY. ALL ELECTRICAL WORK SHALL BE IN ACCORDANCE WITH THE CALIFORNIA ELECTRIC CODE AND THE APPLICABLE PROVISIONS OF THE CALIFORNIA ADMINISTRATIVE CODE. ALL TEMPORARY WIRING SHALL BE DONE WITH TYPE SO/PORTABLE CABLE. CONVENIENCE OUTLETS MAY BE USED WITH APPROVAL OF THE EPWWTP, BUT GFIS SHALL BE UTILIZED BETWEEN THE CONTRACTOR EQUIPMENT AND EPWWTP POWER SUPPLY. ALL LOCATIONS OF POWER CONNECTION WILL BE DISCUSSED DURING THE PRE-CONSTRUCTION WALK TROUGH. 46. WATER-EPWWTP WILL ALSO FURNISH TO THE CONTRACTOR REASONABLE QUANTITIES OF WATER-EPWWTP WILL ALSO FURNISH TO THE CONTRACTOR REASONABLE QUANTITIES OF -EPWWTP WILL ALSO FURNISH TO THE CONTRACTOR REASONABLE QUANTITIES OF POTABLE WATER FROM EXISTING OUTLETS WITHIN THE TREATMENT PLANT AS SPECIFIED IN THE PRE-START WALK THROUGH MEETING. THE CONVEYANCE SYSTEMS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND SHALL BE PROVIDED AT THE CONTRACTOR'S EXPENSE. THE CONTRACTOR SHALL INFORM THE COR IN WRITING OF ITS WATER NEEDS INCLUDING QUANTITY AND CONNECTION SIZE/TYPE. DURING THE PRE-CONSTRUCTION WALK-THROUGH THE COR SHALL IDENTIFY LOCATIONS AT WHICH CONNECTIONS MAY BE MADE. IF PLANT OPERATION NECESSITATES CHANGING THE CONNECTION LOCATIONS, THE CONTRACTOR SHALL DO SO AT THE COR'S REQUEST. 47. CONSULT WITH AND OBTAIN PRIOR APPROVAL FROM THE COR BEFORE COMMENCING WITH ANY CONSULT WITH AND OBTAIN PRIOR APPROVAL FROM THE COR BEFORE COMMENCING WITH ANY WORK. 48. CONTRACTOR SHALL PROVIDE AN ADEQUATE SUPPLY OF CLEAN, POTABLE DRINKING WATER CONTRACTOR SHALL PROVIDE AN ADEQUATE SUPPLY OF CLEAN, POTABLE DRINKING WATER FOR EMPLOYEES AT THE WORKSITE, WHICH SHALL BE DISPENSED THROUGH APPROVED SANITARY FACILITIES. WARNING-CONTRACTOR SHALL NOT USE ANY EPWWTP PIPELINE FOR SUPPLYING POTABLE WATER TO CONTRACTOR'S EMPLOYEES FOR DRINKING. PRIMARY DIGESTER DIMENSIONS DIAMETER: 40'-8" EXTERIOR WALL HEIGHT: APPROX. 23'-0" FROM GRADE SECONDARY DIGESTER DIMENSIONS DIAMETER: 30'-0" EXTERIOR WALL HEIGHT: APPROX. 21'-0" FROM GRADE
AutoCAD SHX Text SHEET INDEX SUB SUB SHEET SHEET TITLE SHEET TITLE SHEET TITLE TITLE 1 G1 COVER PAGE G1 COVER PAGE COVER PAGE 2 G2 INDEX/GENERAL NOTES G2 INDEX/GENERAL NOTES INDEX/GENERAL NOTES 3 G3 GENERAL NOTES CONT. G3 GENERAL NOTES CONT. GENERAL NOTES CONT. 4 G4 GENERAL NOTES CONT. G4 GENERAL NOTES CONT. GENERAL NOTES CONT. 5 G5 SITE LOCATION G5 SITE LOCATION SITE LOCATION CIVIL SHEETS 6 C1 PRIMARY DIGESTER FLOOR AND ROOF PLAN C1 PRIMARY DIGESTER FLOOR AND ROOF PLAN PRIMARY DIGESTER FLOOR AND ROOF PLAN 7 C2 PRIMARY DIGESTER SECTION VIEWS C2 PRIMARY DIGESTER SECTION VIEWS PRIMARY DIGESTER SECTION VIEWS 8 C3 SECONDARY DIGESTER FLOOR AND ROOF PLAN C3 SECONDARY DIGESTER FLOOR AND ROOF PLAN SECONDARY DIGESTER FLOOR AND ROOF PLAN 9 C4 SECONDARY DIGESTER SECTION VIEW C4 SECONDARY DIGESTER SECTION VIEW SECONDARY DIGESTER SECTION VIEW
AutoCAD SHX Text
OF
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
NO.
AutoCAD SHX Text
PKG.
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
TITLE OF SHEET
AutoCAD SHX Text
SUB SHEET NO.
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
TECH. REVIEW:
AutoCAD SHX Text
DRAWN:
AutoCAD SHX Text
DESIGNED:
AutoCAD SHX Text
EL PORTAL
AutoCAD SHX Text
YOSEMITE NATIONAL PARK
AutoCAD SHX Text
SHEET INDEX/GENERAL NOTES
AutoCAD SHX Text
EL PORTAL WWTP
AutoCAD SHX Text
RPH
AutoCAD SHX Text
CRK
AutoCAD SHX Text
RPH
AutoCAD SHX Text 02/2018
AutoCAD SHX Text G2
AutoCAD SHX Text
GENERAL NOTES 1. THE PURPOSE OF THIS PROJECT IS TO CLEAN DIGESTERS #1 AND #2 LOCATED AT THE EL THE PURPOSE OF THIS PROJECT IS TO CLEAN DIGESTERS #1 AND #2 LOCATED AT THE EL PORTAL WASTEWATER TREATMENT PLANT (EPWWTP). OVER TIME, SAND AND DEBRIS ENTERED THE DIGESTERS, ACCUMULATED AND SETTLED OUT IN THE BOTTOM OF THE DIGESTERS, CHANGING THE WORKING VOLUME OF THE DIGESTER AND HAMPERING THE ABILITY TO MIX AND AGITATE THE MATERIALS EFFICIENTLY. 2. A PRE-BID WALK THROUGH WILL BE HELD AND ATTENDANCE IS ENCOURAGED BY ALL A PRE-BID WALK THROUGH WILL BE HELD AND ATTENDANCE IS ENCOURAGED BY ALL BIDDERS TO ANSWER QUESTIONS AND CLARIFY STAGING AND UTILITY CONNECTION LOCATIONS. SAMPLING OF DIGESTERS #1 AND #2 MATERIALS WILL BE ALLOWED AT THIS TIME. 3. CONTRACTOR SHALL TAKE ALL NECESSARY SAFETY PRECAUTIONS AND FURNISH AND INSTALL CONTRACTOR SHALL TAKE ALL NECESSARY SAFETY PRECAUTIONS AND FURNISH AND INSTALL ALL EQUIPMENT, LABOR, MATERIALS, APPURTENANCES, GAS DETECTORS, EXPLOSION PROOF VENTILATION EQUIPMENT, AND ALL OTHER SERVICES REQUIRED TO MEET SAFETY REQUIREMENTS IN ALL WORKING AREAS AT NO ADDITIONAL COST TO THE GOVERNMENT. 4. PRIOR TO THE CONTRACTOR STARTING WORK IN THE DIGESTERS, THE CONTRACTOR, PRIOR TO THE CONTRACTOR STARTING WORK IN THE DIGESTERS, THE CONTRACTOR, CONTRACTING OFFICER'S REPRESENTATIVE (COR), AND PLANT OPERATIONS MANAGER (OR THEIR DESIGNEE) SHALL MEET TO REVIEW THE CONTRACT SPECIFICATIONS, SPECIFIC HAZARDS AND SAFETY INFORMATION. PART OF THIS MEETING WILL INCLUDE VERIFYING THAT ALL DIGESTER VALVES, PUMPS, ETC., HAVE BEEN PROPERLY LOCKED AND TAGGED OUT FOR SAFETY. 5. IT IS THE CONTRACTOR'S RESPONSIBILITY TO INFORM THE COR AND EPWWTP OPERATORS OF IT IS THE CONTRACTOR'S RESPONSIBILITY TO INFORM THE COR AND EPWWTP OPERATORS OF ANY LEAKS OR RESIDUAL SLUDGE THAT MAY IMPOSE A PROBLEM OR SAFETY ISSUE. EPWWTP SLUDGE THAT MAY IMPOSE A PROBLEM OR SAFETY ISSUE. EPWWTP OPERATORS WILL BE RESPONSIBLE FOR CLOSING AND LOCKING ALL GAS AND SLUDGE LINES TO AND FROM THE DIGESTERS. 6. THE CONTRACTOR SHALL SUBMIT THE FOLLOWING ITEMS FOR APPROVAL TO THE COR PRIOR THE CONTRACTOR SHALL SUBMIT THE FOLLOWING ITEMS FOR APPROVAL TO THE COR PRIOR TO THE COMMENCEMENT OF ANY WORK: A. SITE HEALTH AND SAFETY PLAN. SITE HEALTH AND SAFETY PLAN. B. COPY OF THE COMPANY'S CONFINED SPACE ENTRY POLICY AND A STATEMENT CERTIFYING THAT ALL THE CONTRACTOR'S EMPLOYEES ENTERING THE DIGESTERS HAVE BEEN TRAINED IN CONFINED SPACE ENTRY, AND PROVIDE FORKLIFT AND CRANE CERTIFICATIONS IF REQUIRED. 7. CONTRACTOR SHALL BE AWARE OF THE USE OF SODIUM HYPOCHLORITE, HYDROGEN PEROXIDE, CONTRACTOR SHALL BE AWARE OF THE USE OF SODIUM HYPOCHLORITE, HYDROGEN PEROXIDE, FERRIC CHLORIDE, AND THE POTENTIAL PRESENCE OF HAZARDOUS GASES IN AND AROUND THE PLANT. 8. CONTRACTOR IS RESPONSIBLE FOR EVERY ASPECT OF HEALTH AND SAFETY ON THE CONTRACTOR IS RESPONSIBLE FOR EVERY ASPECT OF HEALTH AND SAFETY ON THE WORKSITE, INCLUDING THE HEALTH AND SAFETY OF SUBCONTRACTORS, SUPPLIERS, AND OTHER PERSONS ON THE WORKSITE. ALL CONTRACTOR EMPLOYEES SHALL WEAR ALL PERSONAL PROTECTIVE EQUIPMENT REQUIRED FOR THIS WORK BY OSHA, OTHER REGULATORY AGENCIES OR THE COR. 9. GAS DETECTORS SHALL BE USED AT ALL TIMES WHEN INSIDE CONFINED SPACE AREAS AND GAS DETECTORS SHALL BE USED AT ALL TIMES WHEN INSIDE CONFINED SPACE AREAS AND AS REQUIRED BY THE THE CONTRACTING OFFICER OR THEIR DESIGNEE. AT A MINIMUM, GAS DETECTORS SHALL DETECT CARBON MONOXIDE, OXYGEN, HYDROGEN SULFIDE, AND LOWER EXPLOSIVE LIMITS. 10. CONTRACTOR SHALL IMMEDIATELY INFORM EPWWTP OPERATORS, COR, AND CONTRACTING CONTRACTOR SHALL IMMEDIATELY INFORM EPWWTP OPERATORS, COR, AND CONTRACTING OFFICER OF ANY INJURY OR ACCIDENTS ENCOUNTERED DURING WORK HOURS. CONTRACTOR IS REQUIRED TO PROVIDE COPIES OF REPORTS AND OTHER DOCUMENTS RELATED TO ACCIDENTS AND INJURIES ENCOUNTERED DURING CONSTRUCTION WITHIN 24 HOURS OF THE INCIDENT. 11. CONTRACTOR SHALL SECURELY BLOCK ACCESS TO THE EMPTY DIGESTERS DURING THE CONTRACTOR SHALL SECURELY BLOCK ACCESS TO THE EMPTY DIGESTERS DURING THE CLEANING PROJECT NON-WORKING TIMES TO PREVENT UNAUTHORIZED ENTRY AND MINIMIZE RISKS. 12. UNTIL THE DIGESTER IS THOROUGHLY CLEANED AND VENTILATED BY THE CONTRACTOR, UNTIL THE DIGESTER IS THOROUGHLY CLEANED AND VENTILATED BY THE CONTRACTOR, THERE WILL BE GAS PRESENT. THIS MAY BE A COMBUSTIBLE GAS, COMPOSED PRINCIPALLY OF METHANE, WHICH MAY BE EXPLOSIVE WITH CERTAIN MIXTURES OF AIR. 13. DIGESTERS ARE CLASSIFIED AS CONFINED SPACES; STATE LAW AND EPWWTP'S POLICY ON DIGESTERS ARE CLASSIFIED AS CONFINED SPACES; STATE LAW AND EPWWTP'S POLICY ON CONFINED SPACES REQUIRE THE FOLLOWING NOTIFICATIONS AND SUBMITTALS: A. TWO-WEEK ADVANCE NOTIFICATION FROM THE CONTRACTOR FOR WORK WITHIN CONFINED TWO-WEEK ADVANCE NOTIFICATION FROM THE CONTRACTOR FOR WORK WITHIN CONFINED SPACES. B. SUBMITTAL OF CONTRACTOR'S CONFINED SPACE WORK PROCEDURES AND RESCUE PLAN SUBMITTAL OF CONTRACTOR'S CONFINED SPACE WORK PROCEDURES AND RESCUE PLAN (GOVERNMENT RESOURCES ARE NOT AVAILABLE TO PROVIDE RESCUE SERVICES). C. COMPLIANCE WITH ENTRY PERMIT PROCEDURES. COMPLIANCE WITH ENTRY PERMIT PROCEDURES. D. PARTICIPATION IN A HAZARD ASSESSMENT REVIEW OF PLANNED PRECAUTIONS. PARTICIPATION IN A HAZARD ASSESSMENT REVIEW OF PLANNED PRECAUTIONS. E. DEBRIEFING UPON COMPLETION OF THE CONFINED SPACE OPERATION. DEBRIEFING UPON COMPLETION OF THE CONFINED SPACE OPERATION. 14. THE CONTRACTOR SHALL PROVIDE ADEQUATE VENTILATION AT ALL TIMES AND COMPLY WITH THE CONTRACTOR SHALL PROVIDE ADEQUATE VENTILATION AT ALL TIMES AND COMPLY WITH ALL FEDERAL AND STATE REGULATIONS REGARDING WORKING IN A CONFINED SPACE. 15. COMPLIANCE WITH THE GENERAL INDUSTRY SAFETY ORDERS REMAINS THE CONTRACTOR'S COMPLIANCE WITH THE GENERAL INDUSTRY SAFETY ORDERS REMAINS THE CONTRACTOR'S RESPONSIBILITY. THE EPWWTP REVIEW IS FOR GENERAL COMPLIANCE AND COORDINATION ONLY. IN ACCORDANCE WITH THE GENERAL INDUSTRY SAFETY ORDERS, SECTION 5157(C) (8), THE EPWWTP WILL PROVIDE AVAILABLE INFORMATION TO THE CONTRACTOR FOR EACH CONFINED SPACE LOCATION. 16. THE IMPORTANCE OF WORKING IN CONFINED SPACES CANNOT BE OVER EMPHASIZED. DUE TO THE IMPORTANCE OF WORKING IN CONFINED SPACES CANNOT BE OVER EMPHASIZED. DUE TO THE CONTINUOUS FLOW OF SEWAGE AND CONTAMINANTS THAT MAY BE CONTAINED THEREIN, THE ATMOSPHERE MAY SUDDENLY AND UNPREDICTABLY BECOME LETHALLY HAZARDOUS. WHERE THERE IS CONFLICT BETWEEN APPLICABLE SAFETY ORDERS, LAWS, AND REGULATIONS AND POLICIES, THE MORE STRINGENT MEASURES SHALL APPLY. COMPENSATION FOR CONFINED SPACE ENTRY PROCEDURES AND SAFETY PROVISIONS SHALL BE INCLUDED IN BID ITEMS 1 AND 2. 17. CONTRACTOR SHALL BE ESPECIALLY CAREFUL TO AVOID FIRE HAZARDS WHEN WELDING, CONTRACTOR SHALL BE ESPECIALLY CAREFUL TO AVOID FIRE HAZARDS WHEN WELDING, CUTTING, AND EQUIPMENT FUELING. 18. CONTRACTOR SHALL FURNISH ALL SAFETY DEVICES, FIRE EXTINGUISHERS AND FIRE WATCH CONTRACTOR SHALL FURNISH ALL SAFETY DEVICES, FIRE EXTINGUISHERS AND FIRE WATCH PERSONNEL REQUIRED TO PROTECT THE WORK AND PROVIDE FOR A SAFE WORK SITE FOR WORKERS AND THE PUBLIC. 19. CONTRACTOR SHALL LEAVE AN OFF-SITE EMERGENCY TELEPHONE NUMBER SO THAT CONTACT CONTRACTOR SHALL LEAVE AN OFF-SITE EMERGENCY TELEPHONE NUMBER SO THAT CONTACT MAY BE MADE EASILY AT ALL TIMES IN CASE OF ERGENCIES. 20. THE FOLLOWING PARAGRAPH DOES NOT RELIEVE THE CONTRACTOR FROM ITS RESPONSIBILITY THE FOLLOWING PARAGRAPH DOES NOT RELIEVE THE CONTRACTOR FROM ITS RESPONSIBILITY FOR OBTAINING PRIOR APPROVAL FROM THE COR FOR CHEMICAL USAGE AND STORAGE WHEN OTHERWISE REQUIRED. THE CONTRACTOR SHALL PROVIDE FOUR (4) COPIES OF THE MATERIAL SAFETY DATA SHEETS (MSDS) TO THE COR FOR ALL CHEMICALS, INCLUDING POLYMERS USED DURING TO THE COR FOR ALL CHEMICALS, INCLUDING POLYMERS USED DURING THIS PROJECT AT LEAST THREE (3) DAYS PRIOR TO BRINGING THEM ON SITE. USE OF AT LEAST THREE (3) DAYS PRIOR TO BRINGING THEM ON SITE. USE OF ALL SUCH CHEMICALS AND DISPOSAL OF RESIDUES SHALL BE IN STRICT ACCORDANCE WITH THE PRINTED INSTRUCTIONS OF THE MANUFACTURER. 21. THE WORK UNDER THIS CONTRACT SHALL INCLUDE ALL LABOR, MATERIALS, CHEMICALS, THE WORK UNDER THIS CONTRACT SHALL INCLUDE ALL LABOR, MATERIALS, CHEMICALS, SUPPLIES, EQUIPMENT, PERMITS, TRANSPORTATION, AND OTHER INCIDENTALS REQUIRED FOR THE REMOVAL, SCREENING AND BIOSOLIDS DEWATERING OF ALL RESIDUALS PRESENT IN THE SCREENING AND BIOSOLIDS DEWATERING OF ALL RESIDUALS PRESENT IN THE DIGESTERS AND THE HIGH PRESSURE WATER CLEANING OF THE INTERIOR DIGESTERS CEILINGS, WALLS, FLOOR, AND PIPING. 22. THE MATERIAL IN THE DIGESTERS CONTAINS ORGANIC AND INORGANIC SOLIDS, GRIT, GREASE, THE MATERIAL IN THE DIGESTERS CONTAINS ORGANIC AND INORGANIC SOLIDS, GRIT, GREASE, SCUM, HAIR, PLASTICS, RAGS, SILT, SAND, DETACHED SURFACE LININGS AND OTHER MATERIAL NORMALLY FOUND IN THE DIGESTERS IN A MUNICIPAL WASTEWATER TREATMENT PLANT. THE CONTRACTOR SHOULD ANTICIPATE THICK HAIR MAT AND HEAVY CONCENTRATION OF GRIT ON THE DIGESTER FLOORS. CONTRACTOR SHALL ASSUME ALL RISKS AND RESPONSIBILITIES ASSOCIATED WITH THE REMOVAL AND DEWATERING OF ALL MATERIAL WITHIN THE DIGESTERS TO BE CLEANED REGARDLESS OF MATERIAL TYPE, NATURE, DENSITY, COARSENESS, PERCENT SOLIDS, AND QUANTITY. 23. ALL REQUIRED ROAD CROSSINGS FOR TEMPORARY PIPING SHALL BE CONSTRUCTED TO ALL REQUIRED ROAD CROSSINGS FOR TEMPORARY PIPING SHALL BE CONSTRUCTED TO MAINTAIN FLOW OF PLANT TRAFFIC PER COR APPROVAL. THE CONTRACTOR SHALL COORDINATE THE WORK OF THIS CONTRACT WITH THE WORK OF OTHER CONTRACTORS ON THE PROJECT SITE. COORDINATION ACTIVITIES INCLUDE, BUT ARE NOT LIMITED TO, THE SCHEDULING OF WORK AT INTERFACE LOCATIONS TO PERMIT ADJACENT OR CONNECTING WORK BY OTHER CONTRACTORS, PROVIDING NECESSARY SHOP DRAWING INFORMATION TO OTHER CONTRACTORS AND WORKING WITH OTHER CONTRACTORS TO CONDUCT FUNCTIONAL TESTING OF SYSTEMS AND START UP OF THE FACILITY WHEN NECESSARY. 24. CONTRACTOR SHALL LIMIT THE WORK AREA TO MINIMIZE THE CONFLICT WITH TREATMENT CONTRACTOR SHALL LIMIT THE WORK AREA TO MINIMIZE THE CONFLICT WITH TREATMENT PLANT OPERATION AND WITH OTHER CONTRACTORS WORKING ON THE SITE. ALL EQUIPMENT AND PIPING SHALL BE INSTALLED IN AN APPROVED MANNER AND ROUTE WITHOUT INTERFERENCE TO PLANT OPERATION AND TRAFFIC, PER COR APPROVAL. WHILE CONDUCTING CLEANING OPERATIONS, CONTRACTOR SHALL HAVE A RESPONSIBLE SUPERINTENDENT ON SITE. THIS PERSON SHALL HAVE THE AUTHORITY TO MAKE MANAGEMENT DECISION PERTAINING TO THE PROJECT. THE EQUIPMENT REQUIRED FOR THE REMOVAL AND PROCESSING OF THE DIGESTER RESIDUALS SHALL BE ATTENDED AT ALL TIMES WHILE IN OPERATION. 25. CONTRACTOR SHALL IMMEDIATELY NOTIFY THE COR AND EPWWTP OPERATORS IF ANY CONTRACTOR SHALL IMMEDIATELY NOTIFY THE COR AND EPWWTP OPERATORS IF ANY DAMAGED OR CORRODED STRUCTURES OR EQUIPMENT IS ENCOUNTERED IN THE DIGESTERS. 26. CARE SHALL BE TAKEN TO PRESERVE FOR REUSE, ANY EXISTING GASKETS AND SEALS. THE CARE SHALL BE TAKEN TO PRESERVE FOR REUSE, ANY EXISTING GASKETS AND SEALS. THE CONTRACTOR SHALL PROVIDE REPLACEMENT GASKETS AND SEALANTS IF DAMAGED BEYOND REUSE. THE GASKET MATERIAL IS FABRICATED FROM 1/4 INCH THICK HARD NEOPRENE RUBBER SHEET AND THE RTV SEALANT IS A SILICONE BASE. THE CONTRACTING OFFICER SHALL MAKE A FINAL DETERMINATION ON ACCEPTABLE REUSE OF GASKETS. 27. ONCE EACH DIGESTER IS MADE AVAILABLE TO THE CONTRACTOR, THE CONTRACTOR SHALL ONCE EACH DIGESTER IS MADE AVAILABLE TO THE CONTRACTOR, THE CONTRACTOR SHALL MOBILIZE AND REMOVE ALL NECESSARY EXISTING ROOF OR SIDE ACCESS COVERS AND FURNISH AND INSTALL ANY NECESSARY PUMPS, PIPING, ODOR CONTROL, AND VENTILATION EQUIPMENT. ADDITIONAL PURGE FANS MAY BE REQUIRED DURING THE CLEANING OPERATIONS. THE CONTRACTOR WILL PUMP THE DIGESTER SLUDGE FROM THE ROOF HATCHES TO LOWER THE INTERIOR SLUDGE LEVEL ENOUGH TO OPEN THE SIDE ACCESS HATCH. SLUDGE IN BOTH DIGESTERS SHALL BE ASSUMED TO HAVE EXTREMELY HIGH SAND AND GRIT CONTENT. IT IS EXPECTED THERE ARE MOUNDS UP TO 4 FEET DEEP OF MOSTLY SILT, GRIT AND SAND INSIDE THE DIGESTER. THE HIGH SAND CONTENT WILL CAUSE THE SLUDGE TO HAVE EXTREMELY HIGH SOLIDS CONTENT WHEN DEWATERED. 28. THE CLEANING PROCESS INCLUDES REMOVING ALL DEBRIS FOUND IN THE DIGESTERS. THE THE CLEANING PROCESS INCLUDES REMOVING ALL DEBRIS FOUND IN THE DIGESTERS. THE DEBRIS COULD BE LOCATED ANY PLACE IN THE DIGESTERS SUCH AS ON THE DIGESTERS WALLS, ENTWINED IN THE DRAFT TUBE AND ASSOCIATED SUPPORTS OR WRAPPED AROUND PIPING LOCATED IN THE DIGESTERS. 29. CONTRACTOR SHALL HOSE DOWN THE INTERIOR WALLS, CEILING, AND FLOOR. CONTRACTOR CONTRACTOR SHALL HOSE DOWN THE INTERIOR WALLS, CEILING, AND FLOOR. CONTRACTOR WILL COORDINATE OPERATIONS WITH EPWWTP STAFF. THE DIGESTERS SHALL BE CONSIDERED CLEANED WHEN NO VISIBLE RESIDUAL MATERIAL IS PRESENT ON THE DIGESTERS FLOOR AND SIDEWALLS. 30. THE CONTRACTOR SHALL SLURRY THE DIGESTERS MATERIAL AND THEN PUMP THE RESIDUALS THE CONTRACTOR SHALL SLURRY THE DIGESTERS MATERIAL AND THEN PUMP THE RESIDUALS (INCLUDING ANY WATER THAT THE CONTRACTOR INTRODUCES) FROM THE DIGESTERS TO THE 1/4 INCH SCREENER. THE SCREENED SLUDGE SHALL THEN BE PUMPED TO THE CONTRACTOR'S DEWATERING EQUIPMENT. 31. UPON COMPLETION OF CLEANING THE DIGESTERS THE CONTRACTOR SHALL RETURN THE WORK UPON COMPLETION OF CLEANING THE DIGESTERS THE CONTRACTOR SHALL RETURN THE WORK SITE TO ITS ORIGINAL CONDITION, REMOVING VENDOR'S SUPPLIED PIPING AND EQUIPMENT FROM THE WORK SITE AND REINSTALLING ALL ACCESS COVERS, GASKETS AND SEALANTS TO MEET THE CONTRACT OFFICERS OR DESIGNEE(S) APPROVAL. 32. SLURRY TRANSFER-THE SCREENED SLURRY MATERIAL WITH DIAMETER LESS THAN 1/4 INCH SLURRY TRANSFER-THE SCREENED SLURRY MATERIAL WITH DIAMETER LESS THAN 1/4 INCH -THE SCREENED SLURRY MATERIAL WITH DIAMETER LESS THAN 1/4 INCH SHALL BE PUMPED APPROXIMATELY 800 FEET TO THE DEWATERING STAGING AREA. 33. SLURRY DEWATERING-THE DEWATERING PROCESS IS TO REMOVE WATER FROM THE SCREENED SLURRY DEWATERING-THE DEWATERING PROCESS IS TO REMOVE WATER FROM THE SCREENED -THE DEWATERING PROCESS IS TO REMOVE WATER FROM THE SCREENED SLUDGE. THE RESULTING DEWATERED BIOSOLIDS MUST BE A MINIMUM OF 20% SOLIDS BY WEIGHT. THE DEWATERING PROCESS MAY BE ACCOMPLISHED WITH THE USE OF PORTABLE DEWATERING BELT, CENTRIFUGE SEPARATOR, OR OTHER AVAILABLE DEWATERING TECHNOLOGY. 34. DISPOSAL OF SEPARATED FLUID-THE FLUID SEPARATED DURING DEWATERING WILL BE DISPOSAL OF SEPARATED FLUID-THE FLUID SEPARATED DURING DEWATERING WILL BE -THE FLUID SEPARATED DURING DEWATERING WILL BE DISPOSED OF AT A NEARBY PLANT DRAIN. A DRAIN IS LOCATED APPROXIMATELY 40 FEET FROM THE STAGING AREA OF PROPOSED DEWATERING LOCATION. 35. DISPOSAL OF DEWATERED BIOSOLIDS-THE DEWATERED BIOSOLIDS SHALL BE TRANSFERRED DISPOSAL OF DEWATERED BIOSOLIDS-THE DEWATERED BIOSOLIDS SHALL BE TRANSFERRED -THE DEWATERED BIOSOLIDS SHALL BE TRANSFERRED TO THE APPROPRIATE LOCATION ON THE STAGING PAD BY THE CONTRACTOR. THIS MUST BE COORDINATED WITH EPWWTP OPERATORS FOR EXACT DUM0PING LOCATION. 36. SCREENINGS GREATER THAN 1/4 INCH-THE CONTRACTOR SHALL PROVIDE PORTABLE SCREENINGS GREATER THAN 1/4 INCH-THE CONTRACTOR SHALL PROVIDE PORTABLE -THE CONTRACTOR SHALL PROVIDE PORTABLE COLLECTION DUMPSTER BINS TO COLLECT SCREENINGS GREATER THAN 1/4 INCH. THE CONTRACTOR WILL BE RESPONSIBLE FOR THE HAULING, TRANSPORTATION AND DISPOSAL OF THE SCREENED MATERIAL FROM EPWWTP TREATMENT FACILITIES. ALL MATERIALS WILL BE DISPOSED OF OFF GOVERNMENT PROPERTY IN ACCORDANCE WITH ALL APPLICABLE LAWS AND REGULATIONS. 37. DEWATERED BIOSOLIDS-AFTER TRANSFER BY THE CONTRACTOR TO THE STAGING AREA, THE DEWATERED BIOSOLIDS-AFTER TRANSFER BY THE CONTRACTOR TO THE STAGING AREA, THE -AFTER TRANSFER BY THE CONTRACTOR TO THE STAGING AREA, THE DEWATERED BIOSOLIDS WILL BE PROCESSED AND DISPOSED OF BY THE CONTRACTOR. ALL MATERIALS WILL BE DISPOSED OF OFF GOVERNMENT PROPERTY IN ACCORDANCE WITH ALL APPLICABLE LAWS AND REGULATIONS. 38. THROUGHOUT THIS PROJECT, UNTIL FINAL ACCEPTANCE OF THE WORK BY THE CONTRACTING THROUGHOUT THIS PROJECT, UNTIL FINAL ACCEPTANCE OF THE WORK BY THE CONTRACTING OFFICER, THE CONTRACTOR SHALL KEEP THE WORKSITE AND OTHER AREAS USED BY IT IN A NEAT AND CLEAN CONDITION, AND FREE FROM ANY ACCUMULATION OF RUBBISH AND DEBRIS. THE CONTRACTOR SHALL DISPOSE OF ALL RUBBISH AND WASTE MATERIALS OF ANY NATURE OCCURRING AT THE WORKSITE AND SHALL ESTABLISH REGULAR INTERVALS OF COLLECTION AND DISPOSAL OF SUCH MATERIALS AND WASTE. 40. THE CONTRACTOR SHALL ALSO KEEP ITS HAUL ROADS FREE FROM DIRT, RUBBISH AND UNNECESSARY OBSTRUCTIONS RESULTING FROM ITS OPERATIONS. CARE SHALL BE TAKEN TO PREVENT SPILLAGE ON HAUL ROUTES. ANY SUCH SPILLAGE SHALL BE IMMEDIATELY CONTAINED AND REMOVED AND THE ARE CLEANED. STAGING EQUIPMENT, AND MATERIAL STORAGE SHALL BE CONFINED TO AREAS APPROVED BY THE COR AND AS DISCUSSED DURING THE PRE-CONSTRUCTION WALK THROUGH. 41. DISPOSAL OF ALL RUBBISH AND SURPLUS MATERIALS SHALL BE OFF THE SITE OF DISPOSAL OF ALL RUBBISH AND SURPLUS MATERIALS SHALL BE OFF THE SITE OF CONSTRUCTION, AT THE CONTRACTORS EXPENSE, IN ACCORDANCE WITH LOCAL, STATE, AND FEDERAL CODES AND ORDINANCES GOVERNING LOCATIONS AND METHODS OF DISPOSAL, AND IN CONFORMANCE WITH ALL APPLICABLE SAFETY LAWS, AND THE REQUIREMENTS OF THE OSHA SAFETY AND HEALTH STANDARDS FOR CONSTRUCTION. 42. ALL IMPACTED SUMPS AND MANHOLES ARE TO BE CLEANED AND FREE OF DEBRIS AT THE ALL IMPACTED SUMPS AND MANHOLES ARE TO BE CLEANED AND FREE OF DEBRIS AT THE COMPLETION OF THE PROJECT. ALL CLEANUP COST SHALL BE INCLUDED IN THE CONTRACTOR'S BID. 43. CONTRACTOR SHALL PROVIDE SPILL CONTAINMENT PLANS FOR THE ON-SITE ACTIVITIES. CONTRACTOR SHALL PROVIDE SPILL CONTAINMENT PLANS FOR THE ON-SITE ACTIVITIES. SPILLS OF ANY NATURE CAUSED BY THE ACTIVITIES OF THE CONTRACTOR SHALL BE CONTROLLED AND CLEANED IMMEDIATELY. THE SOLIDS SOURCE FOR THE DIGESTED SLUDGE MATERIAL HAS BEEN EXCLUSIVELY MUNICIPAL IN ORIGIN. 44. AFTER COMPLETION OF THE WORK, THE CONTRACTOR SHALL SUPPLY A STATEMENT THAT AFTER COMPLETION OF THE WORK, THE CONTRACTOR SHALL SUPPLY A STATEMENT THAT THEY HAVE COMPLIED WITH THE REQUIREMENTS OF THE CALIFORNIA DEPARTMENT OF HEALTH SERVICES, THE STATE WATER RESOURCES CONTROL BOARD, THE INTEGRATED WASTE MANAGEMENT BOARD, AND THE STATE AIR RESOURCES BOARD, OR ANY AGENCY NOT AFOREMENTIONED IN THE ABOVE DOCUMENT. 45. POWER-CONTRACTOR SHALL SUBMIT A WRITTEN ESTIMATE OF POWER NEEDS TO THE COR POWER-CONTRACTOR SHALL SUBMIT A WRITTEN ESTIMATE OF POWER NEEDS TO THE COR -CONTRACTOR SHALL SUBMIT A WRITTEN ESTIMATE OF POWER NEEDS TO THE COR FOR APPROVAL AND SHALL LIST THE ESTIMATED CONNECTIONS THAT REQUIRE POWER. THE CONTRACTOR SHALL NOT CONNECT WELDING MACHINES OR OTHER HIGH POWER USE LOADS TO THE SUPPLY. ALL ELECTRICAL WORK SHALL BE IN ACCORDANCE WITH THE CALIFORNIA ELECTRIC CODE AND THE APPLICABLE PROVISIONS OF THE CALIFORNIA ADMINISTRATIVE CODE. ALL TEMPORARY WIRING SHALL BE DONE WITH TYPE SO/PORTABLE CABLE. CONVENIENCE OUTLETS MAY BE USED WITH APPROVAL OF THE EPWWTP, BUT GFIS SHALL BE UTILIZED BETWEEN THE CONTRACTOR EQUIPMENT AND EPWWTP POWER SUPPLY. ALL LOCATIONS OF POWER CONNECTION WILL BE DISCUSSED DURING THE PRE-CONSTRUCTION WALK TROUGH. 46. WATER-EPWWTP WILL ALSO FURNISH TO THE CONTRACTOR REASONABLE QUANTITIES OF WATER-EPWWTP WILL ALSO FURNISH TO THE CONTRACTOR REASONABLE QUANTITIES OF -EPWWTP WILL ALSO FURNISH TO THE CONTRACTOR REASONABLE QUANTITIES OF POTABLE WATER FROM EXISTING OUTLETS WITHIN THE TREATMENT PLANT AS SPECIFIED IN THE PRE-START WALK THROUGH MEETING. THE CONVEYANCE SYSTEMS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR AND SHALL BE PROVIDED AT THE CONTRACTOR'S EXPENSE. THE CONTRACTOR SHALL INFORM THE COR IN WRITING OF ITS WATER NEEDS INCLUDING QUANTITY AND CONNECTION SIZE/TYPE. DURING THE PRE-CONSTRUCTION WALK-THROUGH THE COR SHALL IDENTIFY LOCATIONS AT WHICH CONNECTIONS MAY BE MADE. IF PLANT OPERATION NECESSITATES CHANGING THE CONNECTION LOCATIONS, THE CONTRACTOR SHALL DO SO AT THE COR'S REQUEST. 47. CONSULT WITH AND OBTAIN PRIOR APPROVAL FROM THE COR BEFORE COMMENCING WITH ANY CONSULT WITH AND OBTAIN PRIOR APPROVAL FROM THE COR BEFORE COMMENCING WITH ANY WORK. 48. CONTRACTOR SHALL PROVIDE AN ADEQUATE SUPPLY OF CLEAN, POTABLE DRINKING WATER CONTRACTOR SHALL PROVIDE AN ADEQUATE SUPPLY OF CLEAN, POTABLE DRINKING WATER FOR EMPLOYEES AT THE WORKSITE, WHICH SHALL BE DISPENSED THROUGH APPROVED SANITARY FACILITIES. WARNING-CONTRACTOR SHALL NOT USE ANY EPWWTP PIPELINE FOR SUPPLYING POTABLE WATER TO CONTRACTOR'S EMPLOYEES FOR DRINKING. PRIMARY DIGESTER DIMENSIONS DIAMETER: 40'-8" EXTERIOR WALL HEIGHT: APPROX. 23'-0" FROM GRADE SECONDARY DIGESTER DIMENSIONS DIAMETER: 30'-0" EXTERIOR WALL HEIGHT: APPROX. 21'-0" FROM GRADE
AutoCAD SHX Text
OF
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
NO.
AutoCAD SHX Text
PKG.
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
TITLE OF SHEET
AutoCAD SHX Text
SUB SHEET NO.
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
TECH. REVIEW:
AutoCAD SHX Text
DRAWN:
AutoCAD SHX Text
DESIGNED:
AutoCAD SHX Text
EL PORTAL
AutoCAD SHX Text
YOSEMITE NATIONAL PARK
AutoCAD SHX Text
GENERAL NOTES CONT.
AutoCAD SHX Text
EL PORTAL WWTP
AutoCAD SHX Text
RPH
AutoCAD SHX Text
CRK
AutoCAD SHX Text
RPH
AutoCAD SHX Text 02/2018
AutoCAD SHX Text G3
AutoCAD SHX Text
GENERAL NOTES 1. THE PURPOSE OF THIS PROJECT IS TO CLEAN DIGESTERS #1 AND #2 LOCATED AT THE EL THE PURPOSE OF THIS PROJECT IS TO CLEAN DIGESTERS #1 AND #2 LOCATED AT THE EL PORTAL WASTEWATER TREATMENT PLANT (EPWWTP). OVER TIME, SAND AND DEBRIS ENTERED THE DIGESTERS, ACCUMULATED AND SETTLED OUT IN THE BOTTOM OF THE DIGESTERS, CHANGING THE WORKING VOLUME OF THE DIGESTER AND HAMPERING THE ABILITY TO MIX AND AGITATE THE MATERIALS EFFICIENTLY. 2. A PRE-BID WALK THROUGH WILL BE HELD AND ATTENDANCE IS ENCOURAGED BY ALL A PRE-BID WALK THROUGH WILL BE HELD AND ATTENDANCE IS ENCOURAGED BY ALL BIDDERS TO ANSWER QUESTIONS AND CLARIFY STAGING AND UTILITY CONNECTION LOCATIONS. SAMPLING OF DIGESTERS #1 AND #2 MATERIALS WILL BE ALLOWED AT THIS TIME. 3. CONTRACTOR SHALL TAKE ALL NECESSARY SAFETY PRECAUTIONS AND FURNISH AND INSTALL CONTRACTOR SHALL TAKE ALL NECESSARY SAFETY PRECAUTIONS AND FURNISH AND INSTALL ALL EQUIPMENT, LABOR, MATERIALS, APPURTENANCES, GAS DETECTORS, EXPLOSION PROOF VENTILATION EQUIPMENT, AND ALL OTHER SERVICES REQUIRED TO MEET SAFETY REQUIREMENTS IN ALL WORKING AREAS AT NO ADDITIONAL COST TO THE GOVERNMENT. 4.