Att 05_140P8420Q0033_PORE 2019 Radon Report_0001.pdf
PDF 147 KB Posted
- Attached to
- Radon Mitigation, NPS-PORE
- Solicitation number
- 140P8420Q0033
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Test Exposure Duration:
National Park Service-Dave Brouillette
Point Reyes Station CA 94956 Point Reyes Station CA 94956
Point Reyes National Seashore
Radon in Air
1 Bear Valley Road 1 Bear Valley Road
CA Certified Radon Lab 101193AL
NRSB ARL0017
NRPP 103216 AL
EPA Method #402-R-92-004
NRSB Device Code 12001
NRPP Device Code 8205
Alpha Track
NELAC NY 11769
Area Tested Device Number
Log Number
Laboratory Report for: Property Tested:
Result pCi/L
2501919 3842491 First Floor LE Office Barn05/03/201911/13/2018 6.9
2501920 3842493 First Floor Cultural Office Barn05/03/201911/13/2018 4.1
2501921 3842494 Basement LE Dispatch Office05/03/201911/13/2018 2.4
2501922 3842495 Basement Dave's Old Office04/30/201911/13/2018 2.4
This report may only be transferred to a third party in its entirety. Analytical results relate to the samples AS RECEIVED BY THE LABORATORY. Results shown on this report represent levels of radon gas measured between the dates shown in the room or area of the site identified above as "Property Tested". Incorrect information will affect results. The results may not be construed as either predictive or supportive of measurements conducted in any area of this structure at any other time.
AccuStar Labs, its employees and agents are not responsible for the consequences of any action taken or not taken based upon the results reported or any verbal or written interpretation of the results.
05/10/2019 06/05/2019 06/06/2019
2 Saber Way Ward Hill MA 01835 888-480-8812
The uncertainty of this radon measurement is ~+/- 15 %. Factors contributing to uncertainty include statistical variations, daily and seasonal variations in radon concentrations, sample collection techniques, and operation of the dwelling. Interference with test conditions may influence the test results.
Page 1 of 1Rev 1802
Distributed by: Inspect USA
A copy of this report was emailed to david_brouillette@nps.com.Comment:
05/31/2019
Disclaimer:
Date Received: Date Logged: Date Analyzed: Date Reported:
Shawn Price, Director of Laboratory Operations, AccuStar Labs
Report Approved By: _______________________Report Reviewed By: _________________
File details come from the government source that posted it. Updated .