STATEMENT OF WORK

CHANNEL ISLANDS NATIONAL PARK

SEA/OCEAN RANGER HAUL OUT

RFQ # 140P8420Q0025

1 – Introduction

The National Park Service (NPS), Channel Islands National Park (CHIS), has a requirement for dry-docking two boats, the Sea Ranger and the Ocean Ranger, located at Ventura Harbor, California for inspection, repair and cyclic painting.

2 – Background

The Sea Ranger is a 58’ fiberglass hulled cabin crew boat that does 5-day live aboard research trips with divers for Kelp Forest and Shipwreck Monitoring. It fills in for the Ocean Ranger doing daily transportation when the Ocean Ranger is in the boatyard. The Ocean Ranger is a 100’ crew boat designed to transport personnel and cargo to the Channel Islands.

Sea Ranger characteristics:

Length 58 ft. (approx.)

Beam 18.5 ft.

Draft (full Load) 3.5 ft.

Cruise Speed (at full load displacement) 12 knots Deck Cargo Capacity 20 tons Number of Shafts 2 Construction Fiberglass

Ocean Ranger characteristics:

Length 100 ft. (approx.)

Beam 23 ft.

Draft (full load) 6 ft. (max.)

Cruise Speed (at full load displacement) 16 knots Cargo Space (main deck) 720 sq. ft.

Cargo Area Length 40 ft.

Deck Cargo Capacity 25 tons SS Electric Plant 2 ea. 40kw Propulsion System Geared Diesel Number of Shafts 3 Construction Aluminum

RFQ No. 140P8420Q0025, Attachment No. 02 – Statement of Work

3 – Scope

The Contractor shall furnish labor, materials, and equipment to accomplish the boat haul out, maintenance, and repairs on the vessel as specified herein. The Government will provide items such as paint and replacement parts as specifically outlined in summary in Section 5 below and in detail under the particular Line Items in Section 4. Only one boat may be out of the water at any given period. See Section 7 below for period of performance detail.

The Contractor shall ensure all areas exposed on the boats throughout the contract performance are protected from damage due to environmental conditions, which include but are not limited to rain, condensation, wind, dust, overspray and debris.

The NPS reserves the right to perform routine maintenance or ship’s work on the vessel during the contract performance. Government personnel will not interfere nor delay the Contractor’s execution of the contract and will refer to the Contractor’s performance schedule in planning such work to prevent conflicts with Contractor performance.

The Contracting Officer is the only person authorized to make changes to this solicitation/contract. Approved changes will be issued via amendment/modification to this solicitation/ contract.

4 – Tasks

Items 0001-0009 apply to the Sea Ranger.

Items 0010-0022 apply to the Ocean Ranger.

The work under this contract includes:

Item 0001 Haul/Launch, Block, Pressure Wash Bottom Item 0002 Prepare and Paint Bottom Item 0003 Remove and Replace Propellers Item 0004 (option item) Lazarette Ventilation Item 0005 (option item) Additional Painting Item 0006 (option item) Remove and Replace Shaft Seals and Bearings Item 0007 (option item) Remove and Replace Bow Thruster Propellers Item 0008 (option item) Welding Item 0009 (option item) Mechanical or Machining

Item 0010 Haul/Launch, Block, Pressure Wash Bottom Item 0011 Remove and Replace Propellers Item 0012 Remove and Replace Thruster Propellers Item 0013 Sand Blast and Paint Bottom

Item 0014 (option item) Remove and Replace Shaft Savers and Bearings Item 0015 (option item) Remove/Replace Wheelhouse Forward Windows Item 0016 (option item) Remove and Replace Cabin Side Windows Item 0017 (option item) Remove and Replace Wheelhouse Side Windows Item 0018 (option item) Additional Welding Item 0019 (option item) Additional Preparation/Painting/Sandblasting Item 0020 (option item) Additional Mechanical and Machining Item 0021 (option item) Bilge Cleaning Item 0022 (option item) Sand Blast Swim Step

The Government, at its discretion, may award any single item, any group of items, or no items, subject to budgetary or scheduling restraints. If an out of water inspection by the Contracting Officer’s Representative (COR) reveals additional work is beneficial to the Government, one or more “option items” (i.e., welding, additional painting, machining, repair and or replace shaft seals) may be exercised via modification to the contract if approved by the Contracting Officer.

For items 0002, 0004, 0005 and 0007, areas requiring painting or polishing shall be prepared, primed and painted under the following Specifications for Painting/Preparations/Polishing:

All coatings shall be applied according to manufacturer's recommendations. The contractor is responsible for all protective measures to the vessel while sanding, painting and polishing, and is responsible for the repair of any and all damage occurring as a result. The contractor shall mask, tarp, etc., to prevent over spray or accidental application, as well as clean up any unintended paint, polish or non-skid that may occur, without causing damage or alteration to the surface, in a timely manner to prevent tape or overspray from sticking to surfaces. Contractor shall remove any tape residue that may occur on surfaces. All areas not previously painted, including but not limited to rub rails, cap rail, swim step, stairs, crane, deck hatches, cleats, vents, hand rails, life rafts, ladders, hardware, fixtures, windows, gel coat and anchor shall be masked to prevent being painted. Any previously existing lettering such as the vessel name and arrowhead logos shall also be masked and protected.

All preparation and painting shall be inspected by the designated National Park Service COR or Project Inspector for compliance with the requirements specified herein. Quality issues such as holidays, bubbles, excessive streaking, puddles, drips and similar conditions discovered by the inspector shall be cause for rejection and repair/renewal.

Contractor shall seal all openings to interior spaces and hull including, but not limited to, ventilation intakes, doors and other openings, to preclude entry of sandblast material, overspray, moisture or debris. Contractor shall clean up if entry does occur, and remove all sealant, masking, etc. before launching vessel.

If polishing is awarded, all areas with chips or dents shall be filled and sanded smooth before polishing. 3M Marine Rubbing Compound shall first be applied to all surfaces and buffed out, followed by Meguiar’s Flagship Premium Marine Wax. All filling, buffing and waxing shall be done to manufacturer’s recommendation and industry standards. Contractor shall supply filler, rubbing compound and wax.

Items 0001 – 0009 apply to the Sea Ranger.

Item 0001: Haul/Launch, Block, Pressure Wash Bottom. Remove vessel from water for complete inspection of the hull and appendages prior to painting. Haul shall be accomplished in accordance with standard commercial practice, providing adequate blocking to evenly support the vessel and prevent strain. The Contractor shall be responsible for shifting the vessel or the blocking where necessary to affect repairs to the hull, and in order to access all areas for renewal, repairs, preparation and painting. The Contractor shall use pressurized water, with or without additives, to clean and prepare the bottom of the vessel for inspection by the Contracting Officer’s Representative (COR).

Item 0002: Prepare and Paint Bottom. The Contractor shall clean the bottom of the vessel of all marine growth before painting with black Ameron ABC – 3 anti-fouling paint. The sea screens shall be removed, cleaned, holes reamed of growth, painted with anti-fouling paint on both sides, and reinstalled prior to launching the vessel. Thru-hull openings shall also be cleaned of growth as far up as possible and painted with a minimum of 2 coats of anti-fouling paint. The Contractor shall paint the entire bottom of the vessel using two full coats of anti-fouling paint. A third coat of Ameron ABC – 3 shall be applied from the boot stripe to three inches below the chine. All manufacturers’ recommendation for storage, handling, preparation and application of the coating system shall be strictly adhered to. All manufacturers’ requirements for surface preparation and weather conditions must be met prior to paint application. After the hull bottom is completely dry and free from any potential damage to newly applied paint, the Contractor shall remove/relocate dry-dock blocks and cradles to expose unprepared/unpainted bottom areas for proper preparation and painting of these areas. The entire bottom shall be painted with two coats before the boat is refloated. The Government will provide bottom paint. The Contractor shall remove existing zinc plates prior to painting and reinstall after painting. The Government will determine if plate zincs need to be replaced and if so will provide all zincs.

Item 0003: Remove and Install Two (2) Propellers. The Contractor shall furnish labor and material to complete the removal of the propellers on the Sea Ranger. The removed set will be returned to Channel Islands National Park. The propellers are then to be replaced by the Contractor with a Government provided set. Contractor shall use the industry standard for removal and replacement of propellers.

Item 0004: Nitrox Ventilation in Lazarette (option). The NPS has a Nitrox dive compressor which runs off a 20Kw generator, both in the lazarette. There is a need for increased ventilation for adequate cooling. The NPS will purchase a 1,100 CFM AC axial fan and (2) two aluminum dorade vent boxes for the Contractor to install and wire. Contractor shall install the fan in the lazarette in a location designated by the NPS and wire the fan directly to the 20Kw generator.

This will require the contractor to move and relocate some existing compressor components in the compartment.

A passive intake dorade vent shall be installed on the back deck over the port forward corner of the laz under the cap rail. The exhaust dorade vent box shall be installed over the starboard aft corner of the laz under the cap rail. Both vent openings shall be approximately 120 square inches and a minimum of 16 inches above the deck. The exhausting axial fan shall be ducted to the exhaust dorade. Vent boxes shall be thru bolted and mounted on a plastic isolation ring a minimum of ¾ inch thick. Contractor shall relocate a stainless davit currently in the location designated for the exhaust dorade. The new location shall be immediately inboard of present location, toward a stainless deck cleat, and include under the deck support structure.

This job will require cutting into the deck to install vent boxes, sealing all work areas to make watertight, painting aluminum vent boxes with primer and topcoat, and touching up damaged areas of paint to match existing color. Dorades shall be painted with (2) two coats of Ameron Haze Gray 235 Epoxy Primer followed by (2) two coats of Pearl Gray topcoat to match surrounding paint. Contractor shall supply all ducting and wiring materials for the project, hardware, isolation rings, and under deck support. NPS will supply primer and topcoat paint. All work shall be done to industry standards.

Contractor shall quote this as a lump sum job. Item 0004 (option) may be exercised via contract modification, with the Contracting Officer making the final approval of the work.

Item 0005: Additional Preparations/Painting/Polishing (option). As work progresses, or in case of rain/weather delays, or as funds become available, additional painting or polishing may be awarded. The Government will provide necessary paint. Contractor shall provide polishing materials.

Areas in need of additional painting or polishing under this Item 0005 (option) shall be prepared, primed and painted under the specifications for preparations/painting/polishing described above.

Contractor shall identify these areas to the COR and will provide a written quote to the COR/Contracting Officer with a brief description of work and the number of hours required for the additional painting. Upon review, Item 0005 (option) may be exercised via contract

Item 0006: Pull Shaft, Remove and Replace PSS Pro Shaft Seals, Remove and Replace Shaft Bearings (option). Either of two shafts may need to be pulled and recoupled to the engine to replace either the shaft seal or cutlass bearings. This job shall include pulling one shaft, replacing the shaft seal, and replacing both bearings. Shafts are tapered at the engine. The propellers will already be removed and replaced as part of base item 0003 and should not be included in the price of this job. If only a final bearing needs to be replaced it is not necessary to pull the shaft and replace seals or intermediate bearing on the Sea Ranger. If required, replacement of a final bearing only shall be bid under additional mechanical, Option Item 0009.

The Contractor shall follow PYI’s recommendations for replacing the PSS Pro Shaft Seals on either of two (2) 3” shafts. If inspection reveals excessive wear on either of two intermediate shaft bearings, the Contractor shall remove existing shaft bearings and replace with Government-provided equivalent shaft bearings. If one shaft is pulled both bearings per shaft will be replaced.

Two (2) or four (4) bearings may be replaced. Upon completion the Contractor shall ensure that that each engine is aligned in the water to within .005 or less of an inch tolerance. The Contractor shall quote this job per removal and replacement of one (1) shaft, (1) one shaft seal, and two (2) bearings. The Government will supply the shaft seals and bearings. On the Sea Ranger the intermediate bearing is fiber shell and the final bearing is bronze or brass for the stainless struts.

The Contractor shall identify shaft seals or shaft bearings needing replacement to the COR and will provide a written Condition Found Report to the COR/Contracting Officer with a brief description of work and the number to be replaced. Contractor shall quote this as a lump sum job per shaft. If the COR determines this is required, Item 0006 (option) may be exercised via contract

Item 0007: Remove, Prep, Paint and Replace Bow Thruster Propellers (option). Contractor shall remove bow thruster propellers and then either sandblast, pressure wash, or hand sand as needed to remove all growth and corrosion on propellers and inside thruster tube. Any areas on propellers or tube devoid of bottom paint shall receive 3 coats of Ameron-235 primer, each coat a different color, followed by 3 coats of black Ameron-ABC 3 anti-fouling bottom paint. The Government will decide whether to have the Contractor install the original set of propellers after painting or whether to replace with a new set, depending on the condition of the existing set after an out of water inspection.

Contractor shall make a recommendation to the COR and will provide a written Condition Found Report to the COR/Contracting Officer with a brief description of work. Upon review, Item 0007 (option) may be exercised via contract modification, with the Contracting Officer making the final approval of the work.

Item 0008: Welding (option). This work item is defined as any structural deficiencies to the vessel or components that may be deemed necessary to be repaired. Contractor shall ensure that the ECM’s are disconnected prior to welding. All materials and workmanship shall be in accordance with the applicable American Bureau of Shipping rules for fitting, forming and welding.

Repairs will be specified by the COR following an out of the water inspection of the vessel. The Contractor shall verify the COR’s recommendations by providing a written quote to the COR/Contracting Officer with a brief description of work and the number of hours required for the additional welding. Upon review, Item 0008 (option) may be exercised via contract

Item 0009: Mechanical or Machining (option). This work item is defined as any parts that require mechanical or machining to be cleaned and made free from rust and all impaired, defective, or substantially worn parts restored to a sound condition or replaced with new, rebuilt, or unimpaired parts; and such other operations performed by the mechanical or machining shop as are necessary to put the item in sound working condition, performed to industry standards.

Contractor shall identify these areas to the COR and will provide a written quote to the COR/Contracting Officer with a brief description of work and the number of hours required for machining. Upon review, Item 0009 (option) may be exercised via contract modification, with the Contracting Officer making the final approval of the work.

Items 0010 – 0022 apply to the Ocean Ranger.

Item 0010: Haul/Launch, Block, Pressure Wash Bottom. The Contractor shall haul and launch the vessel in accordance with standard commercial practices, providing adequate blocking to evenly and safely support the vessel and prevent strain. The Contractor shall shift the vessel or the blocking where necessary to allow for repairs to the hull, and in order to allow complete access to all areas of the vessel for renewal, repairs, preparation, and painting. The Contractor shall use fresh, pressurized water, with or without additives, to clean and prepare the entire underwater hull bottom of the vessel for inspection by the Contracting Officers Representative (COR).

Item 0011: Remove and Replace Propellers. Contractor shall remove and replace three (3) propellers. Contractor shall use the industry standard for removal and replacement of propellers.

NPS is responsible for getting the propellers trued; the removed sets will be returned to Channel Islands National Park. The Contractor shall replace propellers with a Government-provided set of propellers.

Item 0012: Remove, Prep, Paint and Replace Bow Thruster Propellers. Contractor shall remove and replace two (2) bow thruster propellers according to manufacturer’s specifications.

After removal of thruster propellers, Contractor shall either sandblast, pressure wash or hand sand as needed and as approved by COR to remove all growth and corrosion on propellers and inside thruster tube. Any areas on propellers or tube devoid of bottom paint shall receive 3 coats of Ameron-235 primer, each coat a different color, followed by 3 coats of Ameron ABC #3. The Government will decide whether to have the Contractor install the original set of propellers after painting or whether to replace with a new set, depending on the condition of the existing set after an out of water inspection. The Government will provide the replacement propellers if needed.

Following an out of water inspection of the vessel, the Government will determine if the thruster drive unit needs to be replaced. The Contractor shall provide a written quote to the COR/Contracting Officer with a brief description of work and the number of hours required for this job under Option Item 0021, Additional Mechanical.

Item 0013: Sand Blast to Bare Metal and Paint Bottom. Contractor shall tarp to protect the vessel and sand blast the entire bottom to bare metal, from the keel to six inches below the boot stripe. The final six inches of bottom paint below the boot stripe shall be removed by sander, down to an intact layer of Ameron 235 Epoxy Primer, feathering the primer into the edge of bare metal.

Contractor shall then apply one coat of Ameron 302 Zinc to bare metal, followed by three coats of Ameron 235 Epoxy Primer, and then two coats of Ameron ABC #3 Black Antifouling Bottom Paint over the entire bottom. A third coat of Government-provided Antifouling Paint shall be applied from the waterline to three inches below the chine.

Sea screens shall be removed, sandblasted and painted with the same coats of paint on both sides as the rest of the bottom, and replaced prior to launching the vessel. The Contractor shall remove existing plate zincs and shaft zincs prior to sandblasting and reinstall after painting. The Government will determine if plate zincs need to be replaced and if so will provide all zincs. All manufacturers’ recommendation for storage, handling, preparation and application of the coating system shall be strictly adhered to. All manufacturers’ requirements for surface preparation and weather conditions must be met prior to paint application. After the hull bottom is completely dry and free from any potential damage to newly applied paint, the Contractor shall remove/relocate dry-dock blocks and cradles to expose unprepared/unpainted bottom areas for proper sandblasting and painting of these areas, with the same number of coats as specified. The entire bottom shall be painted with two coats before the boat is refloated. The bottom shall be dry, grease free and cleaned to industry standards before applying bottom paint.

After the first coat of Ameron 302 Zinc is applied to all bare metal, the following schedule shall be followed for the entire bottom:

Coat Paint Description

1 Ameron-235 2–part surface tolerant anticorrosive epoxy

Off-White, or as approved by

COR

2 Ameron-235 2–part surface tolerant anticorrosive epoxy

Buff, or as approved by COR

3 Ameron-235 2–part surface tolerant anticorrosive epoxy

Haze Gray

Each coat of Ameron-235 2-part surface tolerant anticorrosive epoxy shall be applied 10- 12 mil. thickness wet.

The following coatings shall be applied to the entire bottom, below the boot stripe, and shall be applied with government provided paint according to manufacturer’s recommendations:

Coat Paint Description

1 Ameron ABC #3 Antifouling Bottom Paint

Black

2 Ameron ABC #3 Antifouling Bottom Paint

Black

Apply a third coat of Government-provided Black Ameron #3 Antifouling Paint from the waterline to three inches below the chine.

All areas requiring painting shall be prepared, primed and painted under the following Specifications for Painting/Preparations:

Spot blast to bare metal all areas exhibiting oxides and corrosion as defined in NACE No. 2/SSPC- SP #10 (Near-white Metal Blast Cleaning), or as approved in advance by COR. The remaining surface area shall be sanded utilizing rotary or vibrating power tools to remove surface contaminants, such as sea salt residue, fender rubbing deposits and similar contaminants. The sanding shall produce a surface acceptable for bonding or cohesion of subsequent paint coatings (refer to SSPC-SP #3; Power Tool Cleaning). Prior to painting, National Park Service COR will inspect area to ensure proper fairing. Prior to the application of any paint, all surfaces shall be cleaned with dry compressed air followed by wiping down with clean, oil free rags. All openings to interior spaces and hull including ventilation intakes, doors and other openings shall be sealed to preclude entry of sandblast material.

The Contractor shall mask to protect overspray on unwanted areas and allow adequate drying time before masking freshly painted adjacent areas. Contractor shall match existing lettering and color on all areas being painted, or as approved by the COR.

The Contractor is responsible for all protective measures to the vessel while sandblasting and painting and is responsible for the repair of any and all damage occurring as a result. The Contractor shall mask, tarp, etc., to prevent painting over spray or accidental application, as well as clean up any paint over spray that may occur, without causing damage or alteration to the surface below the over spray. All over spray preventative materials shall be removed in a timely manner to prevent tape from sticking to surfaces. The Contractor shall remove any tape residue that may occur on surfaces. The Contractor shall seal all openings to interior spaces and hull including, but not limited to, ventilation intakes, doors and other openings, to preclude entry of sandblast material.

All painting shall be inspected by the designated National Park Service COR or Project Inspector for compliance with the requirements specified herein. Quality problems such as “holidays”, bubbles, excessive streaking, puddles, drips and similar conditions discovered by the NPS inspector shall be cause for rejection and repair/renewal.

The government will provide all paint and thinners. Contractor shall supply the NPS COR a list of required paint and thinners. If an out of water examination reveals more paint is needed, the COR will procure more paint at that time. All paint shall be applied in accordance with the paint manufacturer’s application procedures, drying time between coats and climatic restrictions.

Item 0014: Pull and Recouple Shaft, Remove and Replace PSS Pro Shaft Seal, Remove and Replace Shaft Bearings (option). Any one of (3) three shafts may need to be pulled and recoupled to the engine to replace either the shaft seal or cutlass bearings. Shafts are tapered at the engine.

This job shall include pulling one shaft, replacing the shaft seal, and replacing (2) two bearings, the intermediate and final. The propellers will already be removed and replaced as part of Base Item 0011 and should not be included in the price of this job.

The Contractor shall follow PYI’s recommendations for replacing the PSS Pro Shaft Seals on any one of (3) three 3” shafts. If inspection reveals excessive wear on any one of (6) six shaft bearings, the Contractor shall remove existing shaft bearings and replace with Government-provided equivalent bearings. If one shaft is pulled both bearings per shaft will be replaced. Two (2), four (4) or six (6) bearings may be replaced. Upon completion the Contractor shall ensure that that each engine is aligned in the water to within .005 or less of an inch tolerance. The Contractor shall quote this job per removal and replacement of one (1) shaft, (1) one shaft seal, and two (2) bearings. The Government will supply the shaft seals and bearings. On the Ocean Ranger all bearings are fiber shell for the aluminum hull and struts.

The Contractor shall identify shaft seals or shaft bearings needing replacement to the COR and will provide a written Condition Found Report to the COR/Contracting Officer with a brief description of work and the number to be replaced. Contractor shall quote this as a lump sum job per shaft. If the COR determines this is required, Item 0014 (option) may be exercised via contract modification, with the Contracting Officer making the final approval of the work.

Item 0015: Remove and Replace Wheelhouse Forward Windows (option). There are (5) five forward facing windows in the lower wheelhouse: 1 is 30”X30”, 2 are 29”X30”, and 2 are 6”X30”.

Contractor shall remove windows, sand to remove any corrosion, prep and paint 2 inches around exterior of frame, and replace with ¼ inch clear laminated glass with seals. Vessel protection shall be installed once windows are removed to protect from elements, sanding and painting, and contractor shall protect the wood trim bordering the rubber seals on the interior. New windows shall be installed and all work done to industry standards to ensure there are no leaks, and final appearance has a finished look similar to that prior to removal of windows. After windows are removed and corrosion prepped, Contractor shall feather edges into intact paint, mask two to three inches outward from the window opening, apply two coats of Off-White Ameron 235 Epoxy Primer and two coats of white topcoat to match existing paint. NPS will supply primer and topcoat paint. Contractor shall supply windows and seals.

If COR determines this work is to be awarded, Item 0015 (option) may be exercised via contract modification, with the Contracting Officer making final the approval of the work.

Item 0016: Remove and Replace Cabin Side Windows (option). There are (6) six side cabin windows measuring 37”X16”, three on the port and three on the starboard. Contractor shall remove windows, sand to remove any corrosion, prep and paint 2 inches around exterior of frame, and replace with ¼ inch clear laminated glass with seals. Vessel protection shall be installed once windows are removed to protect from elements, sanding and painting, and contractor shall protect the wood trim bordering the rubber seals on the interior. New windows shall be installed and all work done to industry standards to ensure there are no leaks, and final appearance has a finished look similar to that prior to removal of windows. After windows are removed and corrosion prepped, Contractor shall feather edges into intact paint, mask two to three inches outward from the window opening, apply two coats of Off-White Ameron 235 Epoxy Primer and two coats of white topcoat to match existing paint. NPS will supply primer and topcoat paint. Contractor shall supply windows and seals.

If COR determines this work is to be awarded, Item 0016 (option) may be exercised via contract modification, with the Contracting Officer making final the approval of the work.

Item 0017: Remove and Replace Lower Wheelhouse Side Windows (option). There are (4) four 28”X24” side facing windows in the lower wheelhouse, two on the port side and two on the starboard. Contractor shall remove windows, sand to remove any corrosion, prep and paint 2 inches around exterior of frame, and replace with ¼ inch clear laminated glass with seals. Vessel protection shall be installed once windows are removed to protect from elements, sanding and painting, and contractor shall protect the wood trim bordering the rubber seals on the interior. New windows shall be installed and all work done to industry standards to ensure there are no leaks, and final appearance has a finished look similar to that prior to removal of windows. After windows are removed and corrosion prepped, Contractor shall feather edges into intact paint, mask two to three inches outward from the window opening, apply two coats of Off-White Ameron 235 Epoxy Primer and two coats of white topcoat to match existing paint. NPS will supply primer and topcoat paint. Contractor shall supply windows and seals.

If COR determines this work is to be awarded, Item 0017 (option) may be exercised via contract modification, with the Contracting Officer making final the approval of the work.

Item 0018: Additional Welding (option). The Government may opt to have additional welding performed while the vessel is in drydock. All materials and workmanship shall be in accordance with the applicable American Bureau of Shipping rules for fitting, forming and welding. Contractor shall prevent avoidable damage to surrounding areas as a result of cutting, welding, or falling slag, and shall be responsible for correcting any damage that does occur. Contractor shall ensure that electronic engines are disconnected before welding begins to prevent damage to the ECMs. All welding shall be completed prior to painting. All areas burned by welding shall be prepped to shiny metal, feathered and primed after welding, if applicable.

Contractor shall make a recommendation to the COR and will provide a written quote to the COR/Contracting Officer with a brief description of work and the number of hours required. Upon review, Item 0018 (option) may be exercised via contract modification, with the Contracting Officer making the final approval of the work.

Item 0019: Additional Preparations/Painting/Sandblasting (option). As work progresses, additional areas of painting and sandblasting may be awarded which were not previously identified.

Contractor shall make a recommendation to the COR and will provide a written quote to the COR/Contracting Officer with a brief description of work and the number of hours required for the additional painting and sandblasting. Upon review, Item 0019(option) may be exercised via contract modification, with the Contracting Officer making the final approval of the work.

Areas requiring additional painting under this Item 0019 shall be prepared, primed and painted under the Specifications for Painting/Preparations as listed under Item 0013 (Paint Bottom) above.

Item 0020: Additional Mechanical or Machining (option). This work item is defined as any parts that require mechanical or machining to be cleaned and made free from rust and all impaired, defective, or substantially worn parts restored to a sound condition or replaced with new, rebuilt, or unimpaired parts; and such other operations performed by the mechanical or machining shop as are necessary to put the item in sound working condition.

Contractor shall identify these areas to the COR and will provide a written quote to the COR/Contracting Officer with a brief description of work and the number of hours required for mechanical or machining. Upon review, Item 0020 (option) may be exercised via contract modification, with the Contracting Officer making the final approval of the work.

Item 0021: Clean Bilges and Side Shell Voids (option item). Contractor shall clean specified bilges and side shell voids throughout the vessel. Some areas are difficult to access due to water tanks, narrow compartments, or other obstructions. Contractor shall make all surfaces oil free and clean of salt, oils, hydraulic fluid, debris, dirt, wires, metal shavings, etc. The Contractor shall quote bilge cleaning at an hourly rate.

Contractor shall identify these areas to the COR and will provide a written quote to the COR/Contracting Officer with a brief description of work and the number of hours required for bilge cleaning. Upon review, Item 0021 (option) may be exercised via contract modification, with the Contracting Officer making the final approval of the work.

Item 0022: Sand Blast Swim Step (option item). Contractor shall sand blast all paint off of swim step to bare aluminum and use a grit coarse enough to leave a non-slip texture when the surface is wet. Contractor shall tarp and mask to protect the painted surfaces of the transom and other features such as stairs, hand rails and dive ladder. If awarded, this job shall be done concurrently with sand blasting the bottom of the vessel to minimize prep, tarp, mask and clean up time of sand blasting.

If COR determines this work is to be awarded, Item 0022 (option) may be exercised via contract modification, with the Contracting Officer making final the approval of the work.

5 - Government-Furnished Property

The following Government-Furnished Property is provided for the Contractor’s use on this contract. A brief description of the Government-Furnished Property is listed in association with the Line Item number it is provided under, as follows:

Item 0002 – Primer, Paint and (if needed) zincs

Item 0003 – Replacement Propellers

Item 0004 – AC Fan, 2 Vent Boxes, Primer and Paint

Item 0005 – Primer and Paint

Item 0006 – PSS Pro Shaft Seals and Cutlass Bearings

Item 0007 – Paint and (if needed) Thruster Propellers

Item 0011 – Replacement propellers

Item 0012 – Paint and (if needed) Thruster Propellers

Item 0013 – Primer, Paint and (if needed) Zincs

Item 0014 – PSS Pro Shaft Seals and Cutlass Bearings

Item 0015, 16 and/or 17 – Primer and Paint

Item 0019 – Primer and Paint

6 - Place of Performance

Work is anticipated to occur at the Contractor’s facility.

7 – Period of Performance

The work on the Sea Ranger II shall be undertaken and completed first and is anticipated to take no more than three (3) weeks. The work on the Ocean Ranger is anticipated to take no more than four (4) weeks. Only one boat may be out of the water at any given period. The period of performance for either vessel can begin any time after award of contract (anticipated award date March 11, 2020) with the goal of all work being finished by April 30, 2020.