Att 01_140P8420Q0025_Quote Sheet.pdf

PDF 111 KB Posted

Attached to
Sea Ranger & Ocean Ranger Haul Outs, NPS-CHIS
Solicitation number
140P8420Q0025
Issued by

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT NO. 01 Company Name: ________________________

RFQ NO. 140P8420Q0025

QUOTE SHEET

PROJECT AREA: Channel Islands National Park, Ventura County, CA PROJECT TITLE: Sea Ranger and Ocean Ranger Haul Outs

NOTICE: Quoters are required to submit, at a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all Additive line items. Failure to do so may render this proposal unacceptable. On lump‐ sum (LS) line items, provide the total price only. For all unit‐price (UP) line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs on a related item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts govern. Round totals and extend prices to whole dollars.

CONTRACT

LINE ITEM

NUMBER

(CLIN)

CONTRACT LINE ITEM TITLE

QUANTITY

UNIT OF

MEASURE

UNIT PRICE

TOTAL

PRICE

Sea Ranger:

Haul/Launch, Block, Pressure Wash Bottom 1 LS

Prepare and Paint Bottom

1 LS

0003 Remove and Replace Propellers

TOTAL PRICE FOR ALL BASE LINE ITEMS (CLIN 0001-0003)………………………………

0004 Option Item 1 – Lazarette Ventilation

0005 Option Item 2 – Additional Preparations/ Painting/Polishing (hourly rate for one person) *

(TBD)

HR

0006 Option Item 3 – Remove and Replace Shaft Seals and Bearings **

0007 Option Item 4 – Remove and Replace Bow Thruster

0008 Option Item 5 – Additional

Welding (hourly rate for one person)*

0009 Option Item 6 – Additional Mechanical or Machining (hourly rate for one person) *

TOTAL PRICE FOR ALL OPTION LINE ITEMS (CLIN 0004-0009)…………………………...

TOTAL PRICE – BASE PLUS OPTION ITEM CONTRACT LINE ITEMS

(CLIN 0001 – 0009)………………………………………………………………………….

Ocean Ranger:

Haul/Launch, Block, Pressure Wash Bottom

Remove and Replace

0012 Remove and Replace Thruster

0013 Sand Blast and Paint Bottom

TOTAL PRICE FOR ALL BASE LINE ITEMS (CLIN 0010-0013)………………………………

0014 Option Item 1 – Remove and Replace Shaft Savers and Bearings ***

0015 Option Item 2 – Remove and Replace Wheelhouse Forward Windows

0016 Option Item 3 – Remove an Replace Cabin Side Windows

0017 Option Item 4 – Remove and Replace Wheelhouse Side Windows

0018 Option Item 5 – Additional Welding (hourly rate for one person) *

0019 Option Item 6 – Additional Preparation/Painting/

Sandblasting (hourly rate for one person) *

0020 Option Item 7 – Additional Mechanical and Machining (hourly rate for one person) *

0021 Option Item 8 – Bilge Cleaning*

0022 Option Item 9 – Sand Blast Swim Step

TOTAL PRICE FOR ALL OPTION LINE ITEMS (CLIN 0014-0022)…………………………...

TOTAL PRICE – BASE PLUS OPTION ITEM CONTRACT LINE ITEMS

(CLIN 0010 - 0022)………………………………………………………………….……………….

GRAND TOTAL PRICE – BASE PLUS OPTION ITEM CONTRACT LINE ITEMS

(CLIN 0001 - 0022)………………………………………………………………….……………….

NOTES:

*CLIN 0005, 0008, 0009, 0018, 0019, 0020, 0021 ‐ Option Items – Anticipated number of hours per task is provided for evaluation purposes only. Actual hours to be determined following an out of water inspection of the vessel and/or as work progresses.

**CLIN 0006 ‐ Option Item 1 (Sea Ranger) – Remove and Replace Shaft Seals and Bearings ‐ Per the Statement of Work, it may be determined that the PSS shaft saver bellows be removed and replaced for any/all of two (2) 3‐inch shafts. The Contractor shall quote this task per removal and replacement of one (1) shaft, (1) one shaft seal, and two (2) bearings.

***CLIN 0014 ‐ Option Item 1 (Ocean Ranger) – Remove and Replace Shaft Savers and Bearings ‐ Per the Statement of Work, it may be determined that the PSS shaft saver bellows be removed and replaced for any/all of three (3) 3‐inch shafts. The Contractor shall quote this task per removal and replacement of one (1) shaft.

File details come from the government source that posted it. Updated .