This solicitation advertises a design-build contract to rehabilitate a large on-site septic system at Olympic National Park in Washington state. The contractor will be responsible for designing and constructing a new LOSS system to meet current and future peak wastewater flow conditions at the Hurricane Ridge Visitor Center. Key details include: the work must be completed during the summer of 2020; the location is Olympic National Park near Port Angeles, WA; proposals are due by the date specified in SF1442 or subsequent amendments; there will be an optional site visit on January 30; the contract will be fixed-price and subject to Davis-Bacon wage rates; the project value is estimated between $1,000,000-$2,000,000; it is a small business set-aside for NAICS 237110 with a $39.5M size standard; the solicitation is available on SAM.gov; no award will be made until funds are available; the Department of the Interior National Park Service Pacific West Region is the contracting agency.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Revised form provided with Solicitation Amendment 3 SECTION B: Contract Price Schedule, 140P8320R0003
INSTRUCTIONS
Enter price for all line items; failure to do so may render the offer non-responsive. On lump-sum-priced line items, provide the total price only. If no specific line item exists for a portion of the work, include the costs in a related item. In case of errors in summations, the total of the corrected amounts govern. Round totals to whole dollars.
Complete this page and return with other documents described in Section L.
CONTRACT PRICE SCHEDULE
All work shall be performed in accordance with the attached specifications, drawings, and wage determination. All lines are “lump sum” except where noted. Refer to Attachment 1 for line item definitions.
Item 1: Design LOSS and Develop Construction Documents
| Item 2: Demolition/Abandonment |
| $__________________ |
| Item 3: Gravity Sewer Piping |
| $__________________ |
| Item 4: Septic and Pump Tanks & Appurtenances |
| $__________________ |
| Item 5: Drainfield |
| $__________________ |
| Item 6: Access Road |
| $__________________ |
| Item 7: Electrical Controls |
| $__________________ |
| Item 8: Professional Services During Construction |
| $__________________ |
| TOTAL FOR ITEMS 1 through 8: |
| $__________________ |
The Government reserves the right to unilaterally award any or no options at or after time of award. These estimated quantities will be used solely for price evaluation purposes and are not a guarantee of future quantities to be exercised. See Parts H.7 and M.1 C for details.
| Unit price |
| Est. Quantity |
| Line Total |
| OPTION A, SEPTIC PUMPING, per trip (defined as 3,000 gallons) |
| $____________ |
| 90 trips |
| $_________________ |
| OPTION B, ADDITIONAL ASTM C-33 SAND per ton |
| $____________ |
| 200 tons |
| $_________________ |
OPTION C, SEWAGE COLLECTION SYSTEM REHABILITATION (lump sum)
| 1 |
| $_________________ |
| TOTAL FOR ALL ITEMS and OPTIONS |
| $_________________ |
| Business name: _________________________________________ | Phone number: ____________________ |
| DUNS number: _________________________________________ | CAGE code: ______________________ |
| Point of contact name: ____________________________________ | E-mail: __________________________ |
The representations and certifications in SAM apply to this proposal (see FAR provision 52.204-8(b)(2)): __yes __no.