Revised Price Schedule form with Option C_0003.docx

DOCX document 17 KB Posted

Attached to
Rehab large on-site septic system, Olympic NP, WA
Solicitation number
140P8320R0003
Issued by

About this file

This solicitation advertises a design-build contract to rehabilitate a large on-site septic system at Olympic National Park in Washington state. The contractor will be responsible for designing and constructing a new LOSS system to meet current and future peak wastewater flow conditions at the Hurricane Ridge Visitor Center. Key details include: the work must be completed during the summer of 2020; the location is Olympic National Park near Port Angeles, WA; proposals are due by the date specified in SF1442 or subsequent amendments; there will be an optional site visit on January 30; the contract will be fixed-price and subject to Davis-Bacon wage rates; the project value is estimated between $1,000,000-$2,000,000; it is a small business set-aside for NAICS 237110 with a $39.5M size standard; the solicitation is available on SAM.gov; no award will be made until funds are available; the Department of the Interior National Park Service Pacific West Region is the contracting agency.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Revised form provided with Solicitation Amendment 3 SECTION B: Contract Price Schedule, 140P8320R0003

INSTRUCTIONS

Enter price for all line items; failure to do so may render the offer non-responsive. On lump-sum-priced line items, provide the total price only. If no specific line item exists for a portion of the work, include the costs in a related item. In case of errors in summations, the total of the corrected amounts govern. Round totals to whole dollars.

Complete this page and return with other documents described in Section L.

CONTRACT PRICE SCHEDULE

All work shall be performed in accordance with the attached specifications, drawings, and wage determination. All lines are “lump sum” except where noted. Refer to Attachment 1 for line item definitions.

Item 1: Design LOSS and Develop Construction Documents

Item 2: Demolition/Abandonment
$__________________
Item 3: Gravity Sewer Piping
$__________________
Item 4: Septic and Pump Tanks & Appurtenances
$__________________
Item 5: Drainfield
$__________________
Item 6: Access Road
$__________________
Item 7: Electrical Controls
$__________________
Item 8: Professional Services During Construction
$__________________
TOTAL FOR ITEMS 1 through 8:
$__________________

The Government reserves the right to unilaterally award any or no options at or after time of award. These estimated quantities will be used solely for price evaluation purposes and are not a guarantee of future quantities to be exercised. See Parts H.7 and M.1 C for details.

Unit price
Est. Quantity
Line Total
OPTION A, SEPTIC PUMPING, per trip (defined as 3,000 gallons)
$____________
90 trips
$_________________
OPTION B, ADDITIONAL ASTM C-33 SAND per ton
$____________
200 tons
$_________________

OPTION C, SEWAGE COLLECTION SYSTEM REHABILITATION (lump sum)

1
$_________________
TOTAL FOR ALL ITEMS and OPTIONS
$_________________
Business name: _________________________________________Phone number: ____________________
DUNS number: _________________________________________CAGE code: ______________________
Point of contact name: ____________________________________E-mail: __________________________

The representations and certifications in SAM apply to this proposal (see FAR provision 52.204-8(b)(2)): __yes __no.