Solicitation (RFQ) no. 140P8319Q0069, Attachment no. 5

SECTION 01010

PART 1: GENERAL

1.1 DESCRIPTION:

SUMMARY OF WORK

1. The Work of this contract consists of the installation of cedar shingle roofs on the Olympic National Park Headquarters Adminstration Buiding located at 600 East Park Avenue in Port Angeles, WA. Work includes the removal and disposal of the existing shingle roofs to skip sheathing. Work shall include:

A. Installation of new roof on ONP Headquarters Administration Building. Work includes underlayment paper, ice and water membrane and flashing.

8. Removal and dispose of existing shingle roofs. Materials shall be disposed of outside the park.

C. Repairs of skip sheathing will be addressed separately.

2. All work shall be performed under a single contract.

1.2 LOCATION: 600 East Park Ave, Port Angeles, WA.

1.3 CONTRACTOR'S USE OF PREMISES:

1. Construction Camp: Establishment of a camp within the Park and at this location will not be permitted.

2. Work Hours: Work hours are from 7:00am to 7:00pm Monday through Friday. Weekend work will normally not be allowed. Special requests may be made through the Contracting Officer.

3. Confine storage of materials to the area as indicated during the pre-construction meeting as part of this contract. Coordinate deliveries so that deliveries fit available storage area.

4. The following conditions shall be followed during the Contractor's work while in the Park:

A. To prevent unnatural attractants to bears, no foods, garbage, drinks, trash, or food and drink containers shall be placed outside trailers or buildings, except during actual use.

B. Pets are prohibited.

C. Feeding of any wildlife is prohibited.

D. Any mishandling of garbage, trash, foods, and other potential bear attractants described above will result in the responsible person or Contractor receiving a citation subject to a fine or court appearance before the U.S. Magistrate.

Repetition of mishandling or any case of deliberate feeding will result in loss of in-Park operation privileges.

5. PreseNation of Natural Features: Confine all operations to work limits of the project. Prevent damage to natural surroundings. Restore damaged areas, repair or replace damaged trees and plants (per direction by NPS arborists and horticulturists), at no additional expense to the Government.

Re-Roof HQ Admin Bldg 01010-1 Summary of Work

SECTION 01025

PART1 GENERAL

1.1 DESCRIPTION

DEFINITION OF BID ITEMS

1. The intent of this section is to explain, in general, what is and what is not included in a line item, and the limits or cut-off points where one line item ends and another begins.

2. If no line item exists for a portion of the work, include the costs in a related line item.

BASE LINE ITEM 1: The work of this line item consists of the installation of new cedar shingle roofs on the Olympic National Park Headquarters Administration building. Work includes the removal and disposal of the existing shingle roofs, as well as cleaning, re-pointing and repairs to masonry chimney. Payment shall be made on a lump sum basis.

OPTION LINE ITEM A: The work of this line item is optional. Replacement of deteriorated substrate shall be in kind, with 2" car decking. Payment shall be made on a unit price (square foot) basis per unit price quoted and negotiated/accepted at time of award. Work will include the removal and disposal of the existing shingle roofs.

PART 2: PRODUCTS Not used.

PART 3: EXECUTION Not used.

END OF SECTION 01025

Re-Roof HQ Admin Bldg 01025-1 Definition of Bid Items

SECTION 01170 ACCIDENT PREVENTION

PART 1: GENERAL

1.1 DESCRIPTION: The work of this section consists of establishing an effective accident prevention program and providing a safe environment for all personnel and visitors.

1.2 SUBMITTALS:

1. Site Specific Safety & Accident Prevention Plan: Before on-site work begins, submit for approval a safety plan. The Contracting Officer and Contracting Officer's Representative (COR) will review the proposed plan for compliance with OSHA and project requirements. If the plan requires any revisions or corrections, the Contractor shall resubmit the plan, which is required to be reviewed and approved prior to issuance of the Notice to Proceed. The plan shall include:

A Name of responsible supervisor to carry out the program.

B. Weekly and monthly safety meetings.

C. First aid procedures.

D. Outline of each phase of the work, the hazards associated with each major phase, and the methods proposed to ensure property protection and safety of the public, National Park Service personnel, and Contractor's employees. Identify the work included under each phase by reference to specification section or division numbers.

E. Training, both initial and continuing.

F. Planning for possible emergency situations, such as floods, fires, cave-ins, slides, explosions, power outages, and wind storms. Such planning shall take into consideration the nature of construction, site conditions, and degree of exposure of persons and property.

G. Housekeeping: Section 01560.

H. Fire Protection: Section 01510.

2. Submit a report of safety meetings and of inspections.

3. Upon request, submit proof of employees' qualifications to perform assigned duties in a safe manner.

1.3 QUALITY ASSURANCE:

1. Clauses entitled "Accident Prevention" and "Permits and Responsibilities" of the General Provisions. In case of conflicts between Federal, state, and local safety and health requirements, the most stringent shall apply. Equipment or tools not meeting OSHA requirements will not be allowed on the project site. Failure to comply with the requirements of this section and related sections may result in suspension of work.

2. Qualifications of Employees:

A Ensure that employees are physically qualified to perform their assigned duties in a safe manner.

B. Do not allow employees to work whose ability or alertness is impaired because of drugs, fatigue, illness, intoxication, or other conditions that may expose themselves or others to injury.

C. Operators of vehicles, mobile equipment, hoisting equipment, and hazardous plant equipment shall be able to understand signs, signals, and operating instructions, and be capable of operating such equipment. Provide operating instructions for all

Re-Roof HQ Admin Bldg 01170-1 Accident Prevention

PART 1 GENERAL

1 .1 DESCRIPTION

SECTION 07313

CEDAR SHINGLE ROOF

A. The work of this section consists of furnishing and installing a cedar shingle roof. Work includes removal and disposal of existing cedar shingle roof to substrate. Demolished materials shall be disposed of outside the park.

B. Substrate repairs are not included in this work and will be addressed if necessary.

I .2 SUBMITTALS

A. As specified in Section O 1330.

B. Submit samples of shingles.

I .3 QUALITY ASSURANCE

A. Grading rules of the Cedar Shingle and Shake Bureau (CSSB).

I .4 GUARANTEE

A. Furnish manufacturer's warranty in writing, guaranteeing at least five years from date of final acceptance.

PART 2 PRODUCTS

2 .1 SHINGLES

A. Certigrade Number I Grade Western Red Cedar shingles, 18-inch

2 .2 HIP AND RIDGE UNITS

A. Prefabricated units complying with CSSB Grading Rules. Length, same as shingles.

2 .3 NAILS

A. Nails must be stainless steel type 316 in locations within ( 15) miles of salt water. For other locations use hot-dipped zinc coated box nails. Use 3d nails in field ofroofand 5d for hips, ridges, and starter course.

2 .4 ROOFING FELT STRIPS

A. ASTM D226-89, Type I or II, 30-pound or heavier, unperforated, asphalt saturated felt.

2 .5 EDGE BOARD

A. 1/2-inch by 6-inch Cedar beveled siding, C Grade.

OL YM HQ Administration Building Re-Roof 07313-1

WOOD SHINGLE ROOF