Appendix_A_Estimated_work_load_data_PUHO_0001.docx
DOCX document 16 KB Posted
- Attached to
- PUHO WASTEWATER REMOVAL
- Solicitation number
- 140P8226Q0027
About this file
This is an appendix document providing estimated workload data for a wastewater removal contract. The National Park Service solicitation 140P8226Q0027 for PUHO Pump and Remove Sewage requires recurring portable toilet servicing and holding tank removal at the Keokea Picnic Area. The estimated annual workload consists of 520 service visits for five portable toilets, with service scheduled twice weekly (Monday and Thursday) for 52 weeks. Additionally, the contract includes one 5,000-gallon sludge removal from the holding tank, with scheduling to be arranged as needed. This appendix establishes the baseline service frequency and tank capacity requirements that form the foundation for contractor proposals and cost estimates under this solicitation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Appendix_C_Maps_0001.docx | DOCX document | |
| Appendix_B_Compodium_0001.pdf | ||
| Sol_140P8226Q0027_Amd_0001.pdf | ||
| Sol_140P8226Q0027.pdf | ||
| Wage_Determination.pdf | ||
| PWS_PUHO_Waste_Water_Removal_Final.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Estimated workload data:
Reoccurring 520 annual services for portable toilets.
Keokea Picnic Area: 5 toilets 2x a week for 52 weeks= 520 One 5000 gallons sludge from holding tank
Estimated project schedule:
Luas: Weekly service Monday and Thursday Holding tank call to schedule