Sol_140P8220Q0023_Amd_0001.pdf

PDF 86 KB Posted

Attached to
Install Mini-Split AC System in Two Offices at the Federal contract opportunity
Solicitation number
140P8220Q0023
Issued by
Department of the Interior National Park Service

View the file

Other files for this federal contract opportunity

Other files attached to Install Mini-Split AC System in Two Offices at the, newest first.
File Type Posted
Pre-Proposal Site Visit Attendance Sheet_0001.docx DOCX document
SCA WD 15-5689.txt TXT text file
Sol_140P8220Q0023.pdf PDF
PWS for AC install Maint Shop Offices-Final.docx DOCX document
Project Locations for AC Maint Shop FY20.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140P8220Q0023 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

PPP

Honolulu HI 96850 Box 50165 300 Ala Moana Blvd, Room 6-226

NPS, PWR - HONO MABO

08/05/20200001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

07/22/2020

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Install Mini-Split AC System in Two Offices at the Maintenance Shop, Pearl Harbor National

Memorial, Hawaii

The purpose of this amendment is to provide the pre-proposal site visit attendance sheet

(see attached) and to provide responses to questions/RFIs received through 8/5/2020 as follows:

Q1. Please confirm that Outside Air is required for the offices that we are installing the

Air Conditioning.

A1. Per the PWS, all systems or components shall be installed according to the specifications, manufacturer's recommendations, permit conditions (where applicable), and

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Joelle Mascarenas

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 2

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140P8220Q0023/0001 local, State, and Federal codes, standards, and regulations. It is the contractor's responsibility to determine what is needed for compliance with the aforementioned requirements.

Q2. Please confirm that preventive maintenance of the units will not be required after installation.

A2. Correct. Preventive maintenance is not included in the scope of this contract.

Q3. Will we [contractor] be responsible for running the power wiring from the existing panel box (fuse box) to the new outdoor condensing unit?

A3. Yes, the contractor will be responsible for the electrical installation as part of the contract.

All terms and conditions remained unchanged unless specified herein.

Period of Performance: 09/01/2020 to 09/30/2020

Point of Contact:

Joelle Mascarenas, Contracting Officer, 808.541.2693 ext. 741, joelle_mascarenas@nps.gov

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)

Sponsored by GSA

FAR (48 CFR) 53.110

File details come from the government source that posted it. Updated .