LAKE ABVC FIBER OPTIC CABLE PLACEMENT Federal contract opportunity
Solicitation number
140P8125B0015
Issued by
Department of the Interior National Park Service Pacific West Region

About this file

This document is an Amendment (0002) to a federal solicitation for fiber optic cable placement at Lake Mead National Recreation Area. The amendment corrects an outdated statement of work and extends key dates: the bid due date is now 8/14/25 by 2 PM PDT (7 calendar days later), and the questions deadline is extended to 8/4/25 by 2 PM PDT. The amendment provides clarifications about fiber optic cable requirements, including specific conduit specifications (FUTUREPATH JUMBO 2-way 1 1/4" True SIDR 11.5), confirms multiple bore pit drilling is acceptable, notes that the NDOT permit will be transferred to the awarded vendor, and emphasizes that trenching should be minimized due to landscaping considerations. The period of performance is set for 09/01/2025 to 04/29/2026, and attachments include an updated Statement of Work and a duct product example.

View the file

Other files for this federal contract opportunity

Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140P8125B0015 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

PPL

Boulder City NV 89005-2426 601 Nevada Way

NPS, PWR - LAKE MABO

07/08/20250002

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

07/08/2025

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

The purpose of amendment 2 is to update the statement of work, extend the bid and questions due date, and provide answers to questions received from contractors. See continuation page below for details.

Period of Performance: 09/01/2025 to 04/29/2026

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Caroline Bachelier

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Continuation Page

Amendment 0002

Statement of Work - It has come to our attention that an outdated version of the statement of work, which did not address the fiber, had been posted with the solicitation originally. The correct version has been included with this amendment as Amd 2 Atch 1 ¿ Statement of Work 7.29.25.

Bid & Questions Due Date - Due to the error with the statement of work, the bid due date has been extended by 7 calendar days, from 8/7/25 by 2 PM PDT to 8/14/25 by 2 PM PDT. Additionally, the questions deadline has been extended from 7/29/25 by 2 PM PDT to 8/4/25 by 2 PM PDT to allow for follow up questions on the updated statement of work.

Questions & Answers ¿ See below for a list of questions and answers:

Q1: Is there fiber to be placed?

A2: Refer to attached updated statement of work where it is highlighted starting in section B 1, 3 and 4 stating the requirements for the fiber optic cable to be provided, its placement, splicing and testing. For the conduit/duct the recommended product or equal is a dual duct and is FUTUREPATH JUMBO 2-way 1 1/4" True SIDR 11.5 and was specified by the A&E group in design (see Amd 2 Atch 2 - Duct Product Example).

Q2: Can the contractor use multiple bore pits to drill from different directions:

A2: Yes, see the attached updated statement of work that addresses multiple bore pits.

Q3: Will contractor be responsible for NDOT permit?

A3: NPS already has the permit, but it will need to be transferred to the awarded vendors name for execution.

Q4: Will trenching be allowed?

A4: trenching is to be kept to a bare minimum due to the landscaping/nature area.

Attachments:

1. Statement of Work 7.29.25

2. Duct Product Example