This document is an amendment to a solicitation for the purchase of a mini excavator for Joshua Tree National Park. The purpose of the amendment is to provide a revised statement of work and answer questions submitted by potential offerors.
The key details are:
- The revised statement of work includes additional details on the required mini excavator configuration, including that it must be new and have a telescoping clamp-ready arm with quick attachment capability.
- The period of performance has been extended to 6 months from receipt of order due to lead time constraints.
- The solicitation number is 140P8124Q0062, and the quote due date remains August 15, 2024 at 10:00 am PDT.
- The contracting agency is the Department of the Interior National Park Service, Pacific West Region.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| B09_Atch_1_SOW_Amd_1_0001.docx | DOCX document | |
| Sol_140P8124Q0062.pdf | ||
| B08_Atch_1_SOW.docx | DOCX document | |
| B08_Combined_Synopsis.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140P8124Q0062 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PPL
Boulder City NV 89005-2426 601 Nevada Way
NPS, PWR - LAKE MABO
07/29/20240001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
07/29/2024
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Project Title: Supply Mini Excavator for Joshua Tree National Park.
Purpose of Amendment: The purpose of Amendment 1 is to provide a revised statement of work
(see attached B09 Statement of Work amendment 1) and to provide answers to questions submitted below. There is no change to the quote due date. The quote due date remains
08/15/2024 10:00 am PDT.
Acknowledgement of Amendment. See section 11 of the SF-30.
Questions and Answers (Q&A):
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Maria Stubitz
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140P8124Q0062/0001
Q.1 Equipment suppliers are advising that the mini excavator with the extendable arm, the lead time will be 3 to 6 months from the order date.
Will NPS be willing to extend the period of performance due to these lead times?
A.1: Yes, the revised and anticipated delivery date is now six months from receipt of order.
Q.2 There are no mention of attachments being included in the request for quote. If NPS is planning on using attachments ie. buckets, breakers, vibratory plates, what are the current configurations so that the quote may include the proper quick coupler?
A.2: The mini-ex attachments have been included in the scope of work. See attached B09 Atch 1 SOW
Amd 1 for further details.
Q.3 Does the excavator need to be new or used?
A.3: The excavator needs to be new. Used and or pre-owned is not acceptable. See attached B09
Atch 1 SOW Amd 1 for further details.
Q.4 Also on the description, Arm configuration that is a clamp ready telescoping arm with quick attachment mounting system, quick couplers, clamp mounts, port releases and fingertip controls.
Does the NPS need the clamp already pre-installed or just need to have the function capability?
A.4: The NPS will need the clamp pre-installed.
Period of Performance: 08/22/2024 to 02/24/2025
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110