Attach_1_-_Project_Specifications.pdf
PDF 3 MB Posted
- Attached to
- Replace Alan Bible Visitor Center HVAC and Roof
- Solicitation number
- 140P8124B0002
About this file
This document appears to be a set of project specifications for the replacement of the HVAC system and roof at the Alan Bible Visitor Center located at Lake Mead National Recreation Area in Boulder City, Nevada. The project is being solicited by the Department of the Interior's National Park Service Pacific West Region. The specifications cover detailed requirements for various construction and installation activities including demolition, concrete repair, metal fabrication, roofing, piping, HVAC equipment, and electrical work. Key products and services required include HVAC equipment, insulation, ductwork, piping, and electrical components. The document provides extensive technical details and requirements for these products and services. This appears to be a complete set of project specifications, rather than a summary document or template.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LAKE 228968 & 334958_Div 1 Specs FINAL_1-29-24
| LAKE 228968 & 334958_Div 2-49 Specs FINAL_1-29-24 |
| DIVISION, SECTION & PARAGRAPH NUMBERING |
| DIVISION 02 |
| EXISTING CONDITIONS |
| PART 2 - PRODUCTS - NOT USED. PART 3 - EXECUTION |
| 3.2 PREPARATION |
| 3.3 REPAIR / RESTORATION - NOT USED. |
| 1.2 LIMITATIONS |
| 1.3 STANDARDS |
| 1.4 QUALIFICATIONS |
| 1.5 PRECONSTRUCTION CONFERENCE |
| 1.6 SUBMITTALS |
| 1.7 PROJECT CONDITIONS |
| PART 2 – PRODUCTS |
| PART 3 – EXECUTION |
| 3.2 UTILITIES |
| 3.3 CONCRETE SOUNDING AND LAYOUT |
| 3.4 CONCRETE REMOVAL |
| 3.5 QUALITY CONTROL INSPECTIONS |
| PART 2 – PRODUCTS |
| PART 3 – EXECUTION |
| 3.2 SHORING DESIGN REQUIREMENTS |
| 3.3 SHORING INSTALLATION CERTIFICATION |
| 3.4 REMOVAL OF SHORING |
| 1.2 SUBMITTALS |
| 1.3 SITE CONDITIONS |
| PART 2 - PRODUCTS |
| PART 3 - EXECUTION |
| 3.2 PREPARATION |
| 3.3 DEMOLITION/ABANDONMENT |
| 3.4 HAZARDOUS MATERIALS |
| 3.5 DISPOSAL |
| 3.6 SALVAGE |
| DIVISION 03 |
| CONCRETE |
| 1.2 REFERENCES |
| 1.3 SUBMITTALS |
| PART 2 - PRODUCTS |
| PART 3 - EXECUTION |
| 1.2 REFERENCES |
| 1. ACI 318 |
| 1.3 SUBMITTALS |
| 1.4 DELIVERY, STORAGE, AND HANDLING |
| PART 2 - PRODUCTS |
| PART 3 - EXECUTION |
| 1.2 REFERENCES |
| 1. ACI 318 |
| 1.3 SUBMITTALS |
| 1.4 DELIVERY, STORAGE, AND HANDLING |
| PART 2 - PRODUCTS |
| 2.2 FABRICATION - NOT USED. PART 3 - EXECUTION |
| 1.2 REFERENCES |
| PART 2 – PRODUCTS |
| PART 3 – EXECUTION |
| 3.2 DEMOLITION |
| 3.3 PREPARATION |
| 3.4 PLACEMENT AND CURING OF REPAIR PRODUCTS FOR REPAIR AREAS |
| 3.5 FIELD QUALITY CONTROL |
| 3.6 CLEANING |
| 1.2 DESCRIPTION |
| 1.3 UNIT PRICES |
| 1.4 PREINSTALLATION MEETINGS |
| 1.5 ACTION SUBMITTALS |
| 1.6 INFORMATION SUBMITTALS |
| 1.7 QUALITY ASSURANCE |
| 1.8 DELIVERY, STORAGE, AND HANDLING |
| 1.9 PROJECT CONDITIONS |
| 1.10 WARRANTY |
| PART 2 – PRODUCTS |
| 2.2 ELASTOMERIC JOINT SEALANTS |
| 2.3 JOINT-SEALANT BACKING |
| 2.4 MISCELLANEOUS MATERIALS |
| PART 3 – EXECUTION |
| 3.2 PREPARATION FOR SEALANT INSTALLATION |
| 3.3 INSTALLATION OF JOINT SEALANTS |
| 3.4 FIELD QUALITY CONTROL |
| 3.5 CLEANING |
| 3.6 PROTECTION |
| DIVISION 05 |
| METALS |
| 1.2 ACTION SUBMITTALS |
| 1.3 QUALITY ASSURANCE |
| PART 2 – PRODUCTS |
| 2.2 MATERIALS AND COMPONENTS |
| 2.3 FASTENERS |
| 2.4 MISCELLANEOUS MATERIALS |
| 2.5 FABRICATION, GENERAL |
| 2.6 SHELF ANGLES |
| 2.7 MISCELLANEOUS STEEL TRIM |
| 2.8 DOWNSPOUT GUARDS |
| 2.9 LOOSE BEARING AND LEVELING PLATES |
| 2.10 LOOSE STEEL LINTELS |
| 2.11 STEEL WELD PLATES AND ANGLES |
| 2.12 MISCELLANEOUS METAL ITEMS |
| 2.13 FINISHES, GENERAL |
| 2.14 STEEL AND IRON FINISHES |
| PART 3 – EXECUTION |
| 3.2 PREPARATION |
| 3.3 INSTALLATION, GENERAL |
| 3.4 INSTALLING BEARING AND LEVELING PLATES |
| 3.5 ADJUSTING AND CLEANING |
| 1.2 RELATED WORK |
| 1.3 REFERENCE |
| 1.4 FIELD MEASUREMENTS |
| 1.5 SUBMITTALS |
| PART 2 - PRODUCTS |
| 2.2 FRAMES, COVERS, ACCESS HATCHES |
| 2.3 DRY PIT/SUMP PUMP GRATE FRAMES |
| 2.4 MANHOLE LADDERS |
| 2.5 LADDER “SAFETY POST” |
| PART 3 - EXECUTION |
| 3.2 GENERAL |
| DIVISION 06 |
| WOOD, PLASTICS, & COMPONENTS |
| 1.2 SECTION INCLUDES |
| 1.3 REFERENCES |
| 1.4 SUBMITTALS |
| 1.5 QUALITY ASSURANCE |
| 1.6 DELIVERY, STORAGE, AND HANDLING |
| PART 2 - PRODUCTS |
| 2.2 ACCESSORIES |
| 2.6 FACTORY WOOD TREATMENT |
| PART 3 - EXECUTION |
| 3.2 GENERAL |
| 3.3 FRAMING INSTALLATION |
| 3.4 WOOD NAILERS & INSUALTION STOPS FOR ROOFING |
| 3.5 DRILLING, CUTTING AND NOTCHING |
| 3.6 ROUGH HARDWARE AND ADHESIVES |
| 1. ASTM F844. |
| 2. ASTM F1667: |
| 3.7 SITE APPLIED WOOD TREATMENT |
| 3.8 WORKMANSHIP |
| 3.9 TOLERANCES |
| DIVISION 07 |
| THERMAL & MOISTURE PROTECTION |
| 1.2 RELATED WORK |
| 1.3 APPLICABLE PUBLICATIONS |
| 1.4 PREINSTALLATION MEETINGS |
| 1.5 SUBMITTALS |
| 1.6 QUALITY ASSURANCE |
| 1.7 FIELD CONDITIONS |
| 1.8 WARRANTY |
| PART 2 - PRODUCTS |
| PART 3 - EXECUTION |
| 3.2 RE-ROOFING PREPARATION – GENERAL |
| 3.3 COMPLETE ROOFING SYSTEM REMOVAL |
| 3.4 DECK PREPARATION |
| 3.5 TEMPORARY ROOFING |
| 3.6 BASE FLASHING REMOVAL |
| 3.7 FIELD QUALITY CONTROL |
| 3.8 DISPOSAL |
| 1.2 SECTION INCLUDES |
| 1.3 SUBMITTALS |
| 1.4 SYSTEM DESCRIPTION |
| 1.5 DELIVERY, STORAGE AND HANDLING |
| 1.6 PROJECT CONDITIONS |
| PART 2 - PRODUCTS |
| PART 3 – EXECUTION |
| 3.3 INSTALLATION |
| 1.2 SUMMARY |
| 1.3 DEFINITIONS |
| 1.4 REFERENCES |
| C. AMERICAN STANDARD OF TESTING METHODS (ASTM): |
| D. AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI): |
| E. FACTORY MUTUAL (FM): |
| F. INTERNATIONAL CODES COUNCIL (ICC): |
| G. NATIONAL ROOFING CONTRACTOR’S ASSOCIATION (NRCA). |
| 1.5 PREINSTALLATION MEETINGS |
| 1.6 ACTION SUBMITTALS |
| 1.7 INFORMATIONAL SUBMITTALS |
| 1.8 CLOSEOUT SUBMITTALS |
| 1.9 QUALITY ASSURANCE |
| 1.9 DELIVERY, STORAGE, AND HANDLING |
| 1.10 FIELD CONDITIONS |
| 1.11 WARRANTIES |
| PART 2 – PRODUCTS |
| 2.2 ROOFING SYSTEM BASIS OF DESIGN |
| 2.3 PERFORMANCE REQUIREMENTS |
| 2.4 FIELD SHEET MATERIALS |
| 2.5 FLASHING SHEET MATERIALS |
| 2.6 AUXILIARY ROOFING MATERIALS |
| 2.7 ROOF INSULATION |
| 2.8 INSULATION ACCESSORIES |
| 2.9 WALKWAYS |
| PART 3 – EXECUTION |
| 3.2 PREPARATION |
| 3.3 INSTALLATION, GENERAL |
| 3.4 THERMAL BOARD INSTALLATION |
| 3.5 ROOFING INSTALLATION, GENERAL |
| 3.6 INSULATION INSTALLATION |
| 3.7 BASE SHEET INSTALLATION |
| 3.8 FIELD INSTALLATION |
| 3.9 FLASHING INSTALLATION |
| 3.10 LIQUID-APPLIED FLASHING |
| 3.11 WALKWAY INSTALLATION |
| 3.12 FIELD QUALITY CONTROL |
| 3.13 PROTECTING AND CLEANING |
| 1.2 SECTION INCLUDES |
| 1.3 REFERENCES |
| 1.4 SUBMITTALS |
| 1.5 QUALITY ASSURANCE |
| 1.6 WARRANTY / GUARANTEE |
| PART 2 - PRODUCTS |
| 2.2 ACCESSORIES |
| 2.3 FABRICATION |
| PART 3 - EXECUTION |
| 3.2 PREPARATION |
| 3.3 INSTALLATION - GENERAL |
| 3.4 INSTALLATION – FLASHINGS |
| 3.5 INSTALLATION – SEALANT |
| 1.2 SECTION INCLUDES |
| 1.3 REFERENCES |
| 1.4 SUBMITTALS |
| 1.5 QUALITY ASSURANCE |
| 1.6 ENVIRONMENTAL REQUIREMENTS |
| 1.7 COORDINATION |
| 1.8 GUARANTEE |
| PART 2 – PRODUCTS |
| 2.2 PRIMER |
| 2.3 ACCESSORIES |
| PART 3 – EXECUTION |
| 3.2 EXAMINATION |
| 3.3 PREPARATION |
| 3.4 INSTALLATION – SEALANTS, GENERAL |
| 3.5 CLEANING |
| 3.6 PROTECTION OF FINISHED WORK |
| 3.7 FIELD QUALITY CONTROL |
| DIVISION 08 |
| OPENINGS |
| 1.2 SUMMARY |
| 1.3 DEFINITIONS |
| 1.4 PERFORMANCE REQUIREMENTS |
| 1.5 SUBMITTALS |
| 1.6 QUALITY ASSURANCE |
| 1.7 PROJECT CONDITIONS |
| PART 2 - PRODUCTS |
| 2.2 FABRICATION, GENERAL |
| 2.3 FIXED, EXTRUDED-ALUMINUM LOUVERS |
| 2.4 LOUVER SCREENS |
| 2.5 WALL VENTS (BRICK VENTS) |
| 2.6 FINISHES, GENERAL |
| 2.7 ALUMINUM FINISHES |
| PART 3 - EXECUTION |
| 3.2 PREPARATION |
| 3.3 INSTALLATION |
| 3.4 ADJUSTING AND CLEANING |
| DIVISION 09 |
| FINISHES |
| 1.2 SECTION INCLUDES |
| 1.3 REFERENCES |
| 1.4 SUBMITTALS |
| 1.5 QUALITY ASSURANCE |
| 1.6 REGULATORY REQUIREMENTS |
| 1.7 DELIVERY, STORAGE & HANDLING |
| 1.8 PROJECT CONDITIONS |
| PART 2 - PRODUCTS |
| 2.3 ACCESSORIES |
| PART 3 - EXECUTION |
| 3.2 EXAMINATION |
| 3.3 PROTECTION |
| 3.4 GYPSUM BOARD INSTALLATION |
| 3.5 INSTALLATION OF TRIM & ACCESSORIES |
| 3.6 JOINT TREATMENT |
| 3.7 TOLERANCES |
| 3.8 CLEAN UP |
| 1.2 SECTION INCLUDES |
| 1.3 REFERENCES |
| 1.4 SUBMITTALS |
| 1.5 QUALITY ASSURANCE |
| 1.6 REGULATORY REQUIREMENTS |
| 1.7 DELIVERY, STORAGE, AND PROTECTION |
| 1.8 ENVIRONMENTAL REQUIREMENTS |
| 1.9 EXTRA MATERIALS |
| PART 2 - PRODUCTS |
| 2.2 PAINTS AND COATINGS - GENERAL |
| 2.3 ACCESSORY MATERIALS |
| PART 3 - EXECUTION |
| 3.2 GWB FINISH INSPECTION WITH SECTION 09 29 00 & PROJECT SUPERINTENDENT |
| 3.3 EXAMINATION |
| 3.4 SURFACE PREPARATION |
| 3.5 PROTECTION |
| 3.6 APPLICATION |
| 3.7 FINISHING MECHANICAL AND ELECTRICAL EQUIPMENT |
| 3.8 CLEANING |
| 3.9 BACK-PRIMING |
| 3.10 SURFACES THAT DO NOT REQUIRE PAINT FINISH |
| 3.11 SURFACES THAT REQUIRE PAINT FINISH |
| 3.12 SCHEDULE - PAINT SYSTEMS (ALL WORK IS MPI PREMIUM GRADE) |
| DIVISION 22 |
| PLUMBING |
| 1.2 SUMMARY |
| 1.3 ACTION SUBMITTALS |
| PART 2 - PRODUCTS |
| 2.2 METAL PIPE HANGERS AND SUPPORTS |
| 2.3 FIBERGLASS PIPE HANGERS |
| 2.4 FIBERGLASS STRUT SYSTEMS |
| 2.5 FASTENER SYSTEMS |
| 2.6 PIPE STANDS |
| 2.7 PIPE-POSITIONING SYSTEMS |
| 2.8 MATERIALS |
| PART 3 - EXECUTION |
| 3.2 HANGER AND SUPPORT INSTALLATION |
| 3.3 EQUIPMENT SUPPORTS |
| 3.4 METAL FABRICATIONS |
| 3.5 ADJUSTING |
| 3.6 PAINTING |
| 3.7 HANGER AND SUPPORT SCHEDULE |
| 1.2 ACTION SUBMITTALS |
| PART 2 - PRODUCTS |
| 2.2 STENCILS |
| PART 3 - EXECUTION |
| 3.2 INSTALLATION, GENERAL REQUIREMENTS |
| 3.3 INSTALLATION OF EQUIPMENT LABELS, WARNING SIGNS, AND LABELS |
| 1.2 ACTION SUBMITTALS |
| 1.3 INFORMATIONAL SUBMITTALS |
| 1.4 QUALITY ASSURANCE |
| 1.5 DELIVERY, STORAGE, AND HANDLING |
| 1.6 COORDINATION |
| 1.7 SCHEDULING |
| PART 2 - PRODUCTS |
| 2.2 INSULATING CEMENTS |
| 2.3 ADHESIVES |
| 2.4 MASTICS AND COATINGS |
| 2.5 LAGGING ADHESIVES |
| 2.6 SEALANTS |
| 2.7 FACTORY-APPLIED JACKETS |
| 2.8 FIELD-APPLIED JACKETS |
| a. 3M. |
| 2.9 FIELD-APPLIED FABRIC-REINFORCING MESH |
| 2.10 FIELD-APPLIED CLOTHS |
| 2.11 TAPES |
| 2.12 SECUREMENTS |
| 2.13 PROTECTIVE SHIELDING GUARDS |
| PART 3 - EXECUTION |
| 3.2 PREPARATION |
| 3.3 GENERAL INSTALLATION REQUIREMENTS |
| 3.4 PENETRATIONS |
| 3.5 GENERAL PIPE INSULATION INSTALLATION |
| 3.6 INSTALLATION OF FLEXIBLE ELASTOMERIC INSULATION |
| 3.7 INSTALLATION OF GLASS-FIBER INSULATION |
| 3.8 INSTALLATION OF PHENOLIC INSULATION |
| 3.9 INSTALLATION OF POLYOLEFIN INSULATION |
| 3.10 INSTALLATION OF FIELD-APPLIED JACKETS |
| 3.11 FINISHES |
| 3.12 FIELD QUALITY CONTROL |
| 3.13 PIPING INSULATION SCHEDULE, GENERAL |
| 3.14 INDOOR PIPING INSULATION SCHEDULE |
| 3.15 OUTDOOR, ABOVEGROUND PIPING INSULATION SCHEDULE |
| 3.16 INDOOR, FIELD-APPLIED JACKET SCHEDULE |
| 1.2 ACTION SUBMITTALS |
| 1.3 INFORMATIONAL SUBMITTALS |
| 1.4 FIELD CONDITIONS |
| 1.5 WARRANTY |
| PART 2 - PRODUCTS |
| 2.2 PIPING MATERIALS |
| 2.3 GALVANIZED-STEEL PIPE AND FITTINGS |
| 2.4 DUCTILE-IRON PIPE AND FITTINGS |
| 2.5 COPPER TUBE AND FITTINGS |
| 2.6 ABS PIPE AND FITTINGS |
| 2.7 SPECIALTY PIPE FITTINGS |
| PART 3 - EXECUTION |
| 3.2 JOINT CONSTRUCTION |
| 3.3 INSTALLATION OF SPECIALTY PIPE FITTINGS |
| 3.4 INSTALLATION OF HANGERS AND SUPPORTS |
| 3.5 CONNECTIONS |
| 3.6 IDENTIFICATION |
| 3.7 FIELD QUALITY CONTROL |
| 3.8 CLEANING AND PROTECTION |
| 3.9 PIPING SCHEDULE |
| 1.2 SUMMARY |
| 1.3 DEFINITIONS |
| 1.4 ACTION SUBMITTALS |
| 1.5 INFORMATIONAL SUBMITTALS |
| 1.6 CLOSEOUT SUBMITTALS |
| PART 2 - PRODUCTS |
| 2.2 MISCELLANEOUS SANITARY DRAINAGE PIPING SPECIALTIES |
| PART 3 - EXECUTION |
| 3.2 PIPING CONNECTIONS |
| 3.3 LABELING AND IDENTIFYING |
| 3.4 PROTECTION |
| DIVISION 23 |
| HEATING, VENTILATING, & AIR CONDITIONING (HVAC) |
| 1.2 SUMMARY |
| 1.3 DEFINITIONS |
| 1.4 ACTION SUBMITTALS |
| 1.5 INFORMATIONAL SUBMITTALS |
| 1.6 CLOSEOUT SUBMITTALS |
| 1.7 QUALITY ASSURANCE |
| PART 2 - PRODUCTS |
| 2.2 ANTIMICROBIAL SURFACE TREATMENT |
| PART 3 - EXECUTION |
| 3.2 CLEANING |
| 3.3 CLEANLINESS VERIFICATION |
| 3.4 RESTORATION |
| 3.5 PROJECT CLOSEOUT |
| 1.2 SUMMARY |
| 1.3 DEFINITIONS |
| 1.4 SUBMITTALS |
| 1.5 QUALITY ASSURANCE |
| 1.6 DELIVERY, STORAGE, AND HANDLING |
| 1.7 COORDINATION |
| PART 2 - PRODUCTS |
| 2.2 PIPE, TUBE, AND FITTINGS |
| 2.3 JOINING MATERIALS |
| 2.4 TRANSITION FITTINGS |
| a. NIBCO INC. |
| 2.5 DIELECTRIC FITTINGS |
| 2.6 MECHANICAL SLEEVE SEALS |
| 2.7 SLEEVES |
| 2.8 ESCUTCHEONS |
| 2.9 GROUT |
| PART 3 - EXECUTION |
| 3.2 PIPING JOINT CONSTRUCTION |
| 3.3 PIPING CONNECTIONS |
| 3.4 EQUIPMENT INSTALLATION - COMMON REQUIREMENTS |
| 3.5 PAINTING |
| 3.6 CONCRETE BASES |
| 3.7 ERECTION OF METAL SUPPORTS AND ANCHORAGES |
| 3.8 ERECTION OF WOOD SUPPORTS AND ANCHORAGES |
| 3.9 GROUTING |
| 1.2 SUMMARY |
| 1.3 COORDINATION |
| PART 2 - PRODUCTS |
| 2.2 MOTOR CHARACTERISTICS |
| 2.3 POLYPHASE MOTORS |
| 2.4 ADDITIONAL REQUIREMENTS FOR POLYPHASE MOTORS |
| 2.5 SINGLE-PHASE MOTORS |
| 1.2 SUMMARY |
| 1.3 ACTION SUBMITTALS |
| 1.4 INFORMATIONAL SUBMITTALS |
| 1.5 QUALITY ASSURANCE |
| PART 2 - PRODUCTS |
| 2.2 METAL PIPE HANGERS AND SUPPORTS |
| 2.3 TRAPEZE PIPE HANGERS |
| 2.4 FIBERGLASS PIPE HANGERS |
| 2.5 PLASTIC PIPE HANGERS |
| 2.6 METAL FRAMING SYSTEMS |
| 2.7 FIBERGLASS STRUT SYSTEMS |
| 2.8 THERMAL-HANGER SHIELD INSERTS |
| 2.9 FASTENER SYSTEMS |
| 2.10 PIPE STANDS |
| 2.11 EQUIPMENT SUPPORTS |
| 2.12 OUTDOOR EQUIPMENT STANDS |
| 2.13 MATERIALS |
| PART 3 - EXECUTION |
| 3.2 HANGER AND SUPPORT INSTALLATION |
| 3.3 EQUIPMENT SUPPORTS |
| 3.4 METAL FABRICATIONS |
| 3.5 ADJUSTING |
| 3.6 PAINTING |
| 3.7 HANGER AND SUPPORT SCHEDULE |
| 1.2 SUMMARY |
| 1.3 DEFINITIONS |
| 1.4 PERFORMANCE REQUIREMENTS |
| 1.5 ACTION SUBMITTALS |
| 1.5 ACTION SUBMITTALS |
| 1.6 INFORMATIONAL SUBMITTALS |
| 1.7 CLOSEOUT SUBMITTALS |
| 1.8 QUALITY ASSURANCE |
| PART 2 - PRODUCTS |
| 2.2 FLEXIBLE DUCT CONNECTORS |
| 2.4 VIBRATION ISOLATION EQUIPMENT BASES |
| 2.5 SEISMIC-RESTRAINT DEVICES |
| 2.6 THRUST RESTRAINT MATERIALS |
| 2.7 FACTORY FINISHES |
| PART 3 - EXECUTION |
| 3.2 APPLICATIONS |
| 3.3 VIBRATION-CONTROL AND SEISMIC-RESTRAINT DEVICE INSTALLATION |
| 3.4 ACCOMMODATION OF DIFFERENTIAL SEISMIC MOTION |
| 3.5 FIELD QUALITY CONTROL |
| 3.6 ADJUSTING |
| 3.7 HVAC VIBRATION-CONTROL AND SEISMIC-RESTRAINT DEVICE SCHEDULE |
| B. HVAC EQUIPMENT VIBRATION ISOLATION SCHEDULE |
| 1.2 ACTION SUBMITTALS |
| PART 2 - PRODUCTS |
| 2.2 EQUIPMENT LABELS |
| 2.3 WARNING SIGNS AND LABELS |
| 2.4 WARNING TAPE |
| 2.5 PIPE LABELS |
| 2.6 DUCT LABELS |
| 2.7 STENCILS |
| 2.8 VALVE TAGS |
| 2.9 WARNING TAGS |
| PART 3 – EXECUTION |
| 3.2 INSTALLATION OF DUCT LABELS |
| 3.3 INSTALLATION OF VALVE TAGS |
| 3.4 INSTALLATION OF WARNING TAGS |
| 1.2 SUMMARY |
| 1.3 DEFINITIONS |
| 1.4 PREINSTALLATION MEETINGS |
| 1.5 INFORMATIONAL SUBMITTALS |
| 1.7 QUALITY ASSURANCE |
| 1.8 FIELD CONDITIONS |
| 3.1 EXAMINATION |
| 3.2 PREPARATION |
| 3.3 GENERAL PROCEDURES FOR TESTING AND BALANCING |
| 3.4 TESTING, ADJUSTING, AND BALANCING OF HVAC EQUIPMENT |
| 3.5 GENERAL PROCEDURES FOR BALANCING AIR SYSTEMS |
| 3.6 PROCEDURES FOR CONSTANT-VOLUME AIR SYSTEMS |
| 3.7 PROCEDURES FOR MOTORS |
| 3.8 PROCEDURES FOR COILS |
| 3.9 DUCT LEAKAGE TESTS |
| 3.10 HVAC CONTROLS VERIFICATION |
| 3.11 PROCEDURES FOR TESTING, ADJUSTING, AND BALANCING EXISTING SYSTEMS |
| 3.12 TOLERANCES |
| 3.13 PROGRESS REPORTING |
| 3.14 FINAL REPORT |
| 3.15 VERIFICATION OF TAB REPORT |
| 3.16 ADDITIONAL TESTS |
| 1.2 SUMMARY |
| 1.3 ACTION SUBMITTALS |
| 1.4 INFORMATIONAL SUBMITTALS |
| 1.5 QUALITY ASSURANCE |
| 1.6 DELIVERY, STORAGE, AND HANDLING |
| 1.7 COORDINATION |
| 1.8 SCHEDULING |
| PART 2 - PRODUCTS |
| 2.2 INSULATING CEMENTS |
| 2.3 FIRE-RATED INSULATION SYSTEMS |
| 2.4 ADHESIVES |
| 2.5 MASTICS AND COATINGS |
| 2.6 LAGGING ADHESIVES |
| 2.7 SEALANTS |
| 2.8 FACTORY-APPLIED JACKETS |
| 2.9 FIELD-APPLIED FABRIC-REINFORCING MESH |
| 2.10 FIELD-APPLIED CLOTHS |
| 2.11 FIELD-APPLIED JACKETS |
| 2. .12 TAPES |
| 2.13 SECUREMENTS |
| 2) GEMCO; CD. |
| 2. 14 CORNER ANGLES |
| PART 3 - EXECUTION |
| 3.2 PREPARATION |
| 3.3 GENERAL INSTALLATION REQUIREMENTS |
| 3.4 PENETRATIONS |
| F. INSTALLATION OF CALCIUM SILICATE INSULATION |
| G. CELLULAR-GLASS INSULATION INSTALLATION |
| H. FLEXIBLE ELASTOMERIC INSULATION INSTALLATION |
| I. INSTALLATION OF MINERAL-FIBER INSULATION |
| 3.5 FIELD-APPLIED JACKET INSTALLATION |
| 3.6 FIRE-RATED INSULATION SYSTEM INSTALLATION |
| 3.7 FINISHES |
| 3.8 FIELD QUALITY CONTROL |
| 3.9 DUCT INSULATION SCHEDULE, GENERAL |
| 3.10 INDOOR DUCT AND PLENUM INSULATION SCHEDULE |
| 3.11 ABOVEGROUND, OUTDOOR DUCT AND PLENUM INSULATION SCHEDULE |
| B. PIPING INSULATION SCHEDULE, GENERAL |
| F. INDOOR PIPING INSULATION SCHEDULE |
| G. OUTDOOR, ABOVEGROUND PIPING INSULATION SCHEDULE |
| H. INDOOR, FIELD-APPLIED JACKET SCHEDULE |
| I. OUTDOOR, FIELD-APPLIED JACKET SCHEDULE |
| 1.2 ACTION SUBMITTALS |
| 1.3 INFORMATIONAL SUBMITTALS |
| 1.4 CLOSEOUT SUBMITTALS |
| 1.5 QUALITY ASSURANCE |
| 1.6 DELIVERY, STORAGE, AND HANDLING |
| PART 2 - PRODUCTS |
| 2.2 COPPER TUBE AND FITTINGS |
| 2.3 STEEL PIPE AND FITTINGS |
| 2.4 VALVES AND SPECIALTIES |
| 2.5 REFRIGERANTS |
| PART 3 - EXECUTION |
| 3.2 VALVE AND SPECIALTY APPLICATIONS |
| 3.3 INSTALLATION OF PIPING, GENERAL |
| 3.4 PIPE JOINT CONSTRUCTION |
| 3.5 INSTALLATION OF HANGERS AND SUPPORTS |
| 3.6 FIELD QUALITY CONTROL |
| 3.7 SYSTEM CHARGING |
| 3.8 ADJUSTING |
| 1.2 SUMMARY |
| 1.3 ACTION SUBMITTALS |
| 1.4 INFORMATIONAL SUBMITTALS |
| 1.5 QUALITY ASSURANCE |
| PART 2 - PRODUCTS |
| 2.2 SINGLE-WALL RECTANGULAR DUCTS AND FITTINGS |
| 2.3 DOUBLE-WALL RECTANGULAR DUCTS AND FITTINGS |
| 2.4 SINGLE-WALL ROUND AND FLAT-OVAL DUCTS AND FITTINGS |
| 2.5 DOUBLE-WALL ROUND AND FLAT-OVAL DUCTS AND FITTINGS |
| 2.6 SHEET METAL MATERIALS |
| 2.7 FLEXIBLE DUCTS: |
| 2.8 DUCT LINER |
| 2.9 SEALANT AND GASKETS |
| 2.10 HANGERS AND SUPPORTS |
| 2.11 SEISMIC-RESTRAINT DEVICES |
| PART 3 - EXECUTION |
| 3.2 INSTALLATION OF EXPOSED DUCTWORK |
| 3.3 DUCTWORK EXPOSED TO WEATHER |
| 3.4 DUCT SEALING |
| 3.5 HANGER AND SUPPORT INSTALLATION |
| 3.6 CONNECTIONS |
| 3.7 PAINTING |
| 3.8 FIELD QUALITY CONTROL |
| 3.9 DUCT CLEANING |
| 3.10 STARTUP |
| 3.11 DUCT SCHEDULE |
| 1.2 SUMMARY |
| 1.3 ACTION SUBMITTALS |
| 1.4 INFORMATIONAL SUBMITTALS |
| 1.5 CLOSEOUT SUBMITTALS |
| 1.6 MAINTENANCE MATERIAL SUBMITTALS |
| PART 2 - PRODUCTS |
| 2.2 MANUAL VOLUME DAMPERS |
| 2.3 DUCT-MOUNTED ACCESS DOORS |
| 2.4 FLEXIBLE CONNECTORS |
| 2.5 DUCT ACCESSORY HARDWARE |
| 2.6 MATERIALS |
| PART 3 - EXECUTION |
| 3.2 FIELD QUALITY CONTROL |
| 1.2 SUMMARY |
| 1.3 ACTION SUBMITTALS |
| 1.4 INFORMATIONAL SUBMITTALS |
| 1.5 CLOSEOUT SUBMITTALS |
| 1.6 MAINTENANCE MATERIAL SUBMITTALS |
| PART 2 - PRODUCTS |
| 2.2 SQUARE IN-LINE CENTRIFUGAL FANS |
| 2.3 UTILITY SET FANS |
| 2.4 MOTORS |
| 2.5 SOURCE QUALITY CONTROL |
| PART 3 - EXECUTION |
| 3.2 DUCTWORK AND PIPING CONNECTIONS |
| 3.3 ELECTRICAL CONNECTIONS |
| 3.4 CONTROL CONNECTIONS |
| 3.5 .STARTUP SERVICE: |
| 3.6 ADJUSTING |
| 3.7 CLEANING |
| 3.8 FIELD QUALITY CONTROL |
| 3.9 DEMONSTRATION |
| 1.2 SUMMARY |
| 1.3 ACTION SUBMITTALS |
| 1.4 INFORMATIONAL SUBMITTALS |
| 2.1 PERFORATED DIFFUSERS |
| PART 3 - EXECUTION |
| 3.2 INSTALLATION |
| 3.3 ADJUSTING |
| 1.2 SUMMARY |
| 1.3 ACTION SUBMITTALS |
| 1.4 INFORMATIONAL SUBMITTALS |
| PART 2 - PRODUCTS |
| 2.2 SOURCE QUALITY CONTROL |
| PART 3 - EXECUTION |
| 3.2 INSTALLATION |
| 3.3 ADJUSTING |
| 1.2 SUMMARY |
| 1.3 DEFINITIONS |
| 1.4 ACTION SUBMITTALS |
| 1.5 INFORMATIONAL SUBMITTALS |
| 1.6 FIELD CONDITIONS |
| 1.7 CLOSEOUT SUBMITTALS |
| 1.8 MAINTENANCE MATERIAL SUBMITTALS |
| 1.9 WARRANTY |
| PART 2 - PRODUCTS |
| 2.2 MANUFACTURERS |
| 2.3 UNIT CASINGS |
| 2.4 FANS, DRIVES, AND MOTORS |
| 2.5 COILS |
| 2.6 REFRIGERANT CIRCUIT COMPONENTS |
| 2.7 AIR FILTRATION |
| 2.8 DAMPERS |
| 2.9 ELECTRICAL POWER CONNECTIONS |
| 2.10 CONTROLS |
| 2.11 ROOF CURBS |
| 2.12 ACCESSORIES |
| 2.13 MATERIALS |
| 2.14 SOURCE QUALITY CONTROL |
| PART 3 - EXECUTION |
| 3.2 INSTALLATION |
| 3.3 PIPING CONNECTIONS |
| 3.4 DUCT CONNECTIONS |
| 3.5 ELECTRICAL CONNECTIONS |
| 3.6 CONTROL CONNECTIONS |
| 3.7 FIELD QUALITY CONTROL |
| 3.8 STARTUP SERVICE |
| 3.9 ADJUSTING |
| 3.10 CLEANING |
| 3.11 FIELD QUALITY CONTROL |
| 3.12 DEMONSTRATION |
| 1.2 SUMMARY |
| 1.3 ACTION SUBMITTALS |
| 1.4 INFORMATIONAL SUBMITTALS |
| 1.5 CLOSEOUT SUBMITTALS |
| 1.6 MAINTENANCE MATERIAL SUBMITTALS |
| 1.7 QUALITY ASSURANCE |
| 1.8 COORDINATION |
| 1.9 WARRANTY |
| PART 2 - PRODUCTS |
| 2.4 ACCESSORIES |
| PART 3 - EXECUTION |
| 3.2 CONNECTIONS |
| 3.3 FIELD QUALITY CONTROL |
| 3.4 STARTUP SERVICE |
| 3.5 DEMONSTRATION |
| DIVISION 26 |
| ELECTRICAL |
| 1.2 MINIMUM REQUIREMENTS |
| 1.3 TEST STANDARDS |
| 1.4 QUALIFICATIONS (PRODUCTS AND SERVICES) |
| 1.5 APPLICABLE PUBLICATIONS |
| 1.6 MANUFACTURED PRODUCTS |
| 1.7 EQUIPMENT REQUIREMENTS |
| 1.8 EQUIPMENT PROTECTION |
| 1.9 WORK PERFORMANCE |
| 1.10 EQUIPMENT INSTALLATION AND REQUIREMENTS |
| 1.11 EQUIPMENT IDENTIFICATION |
| 1.12 SUBMITTALS |
| 1.13 SINGULAR NUMBER |
| 1.2 REFERENCES |
| 1.3 SUBMITTALS |
| 1.4 QUALITY ASSURANCE |
| 1.5 EXISTING CONDITIONS |
| 1.6 COORDINATION |
| 1.7 MAINTENANCE |
| 1.8 WARRANTY |
| PART 2 – PRODUCTS |
| PART 3 – EXECUTION |
| 3.2 EQUIPMENT IDENTIFICATION |
| 3.3 NOISE AND VIBRATION |
| 3.4 GENERAL INSTALLATION METHODS |
| 1.2 SUMMARY |
| 1.3 DEFINITIONS |
| 1.4 SUBMITTALS |
| 1.5 QUALITY ASSURANCE |
| 1.6 COORDINATION |
| PART 2 - PRODUCTS |
| 2.2 CONNECTORS AND SPLICES |
| 2.3 SLEEVES FOR CABLES |
| 2.4 SLEEVE SEALS |
| PART 3 - EXECUTION |
| 3.2 CONDUCTOR INSULATION AND MULTI-CONDUCTOR CABLE APPLICATIONS AND WIRING METHODS |
| 3.3 INSTALLATION OF CONDUCTORS AND CABLES |
| 3.4 CONNECTIONS |
| 3.5 SLEEVE INSTALLATION FOR ELECTRICAL PENETRATIONS |
| 3.6 SLEEVE-SEAL INSTALLATION |
| 3.7 INSPECTION AND TESTS |
| 1.2 SUMMARY |
| 1.3 SUBMITTALS |
| 1.4 QUALITY ASSURANCE |
| PART 2 - PRODUCTS |
| 2.2 CONNECTORS |
| 2.3 GROUNDING SYSTEM DEVICES |
| PART 3 - EXECUTION |
| 3.2 EQUIPMENT GROUNDING |
| 3.3 INSTALLATION |
| 3.3 TESTING |
| 1.2 SUMMARY |
| 1.3 DEFINITIONS |
| 1.4 PERFORMANCE REQUIREMENTS |
| 1.5 SUBMITTALS |
| PART 2 - PRODUCTS |
| 2.2 FABRICATED METAL EQUIPMENT SUPPORT ASSEMBLIES |
| PART 3 - EXECUTION |
| 3.2 SUPPORT INSTALLATION |
| 3.3 INSTALLATION OF FABRICATED METAL SUPPORTS |
| 3.4 PAINTING |
| 1.2 SUMMARY |
| 1.3 DEFINITIONS |
| 1.4 SUBMITTALS |
| 1.5 QUALITY ASSURANCE |
| PART 2 - PRODUCTS |
| D. IMC: ANSI C80.6. |
| 2.2 NONMETALLIC CONDUIT AND TUBING |
| C. LFNC: UL 1660. |
| 2.3 METAL WIREWAYS |
| 2.4 BOXES, ENCLOSURES, AND CABINETS |
| PART 3 - EXECUTION |
| 3.2 INSTALLATION |
| 3.3 PROTECTION |
| 1.2 RELATED DOCUMENTS |
| 1.3 DEFINITIONS |
| 1.4 PERFORMANCE REQUIREMENTS |
| 1.5 SUBMITTALS |
| 1.6 QUALITY ASSURANCE |
| PART 2 – PRODUCTS |
| PART 3 – EXECUTION |
| 3.2 APPLICATIONS |
| 3.3 SEISMIC-RESTRAINT DEVICE INSTALLATION |
| 3.4 ACCOMMODATION OF DIFFERENTIAL SEISMIC MOTION |
| 3.5 FIELD QUALITY CONTROL |
| 1.2 SUMMARY |
| 1.3 SUBMITTALS |
| 1.4 QUALITY ASSURANCE |
| 1.5 COORDINATION |
| PART 2 – PRODUCTS |
| 2.2 EQUIPMENT IDENTIFICATION LABELS |
| 2.3 MISCELLANEOUS IDENTIFICATION PRODUCTS |
| PART 3 - EXECUTION |
| 3.2 IDENTIFICATION SCHEDULE |
| 1.2 SUMMARY |
| 1.3 DEFINITIONS |
| 1.4 PERFORMANCE REQUIREMENTS |
| 1.5 SUBMITTALS |
| 1.6 QUALITY ASSURANCE |
| 1.7 DELIVERY, STORAGE, AND HANDLING |
| 1.8 PROJECT CONDITIONS |
| 1.9 COORDINATION |
| 1.10 WARRANTY |
| 1.11 EXTRA MATERIALS |
| PART 2 – PRODUCTS |
| 2.2 DISTRIBUTION PANELBOARDS |
| 2.3 LIGHTING AND APPLIANCE BRANCH-CIRCUIT PANELBOARDS |
| 2.4 DISCONNECTING AND OVERCURRENT PROTECTIVE DEVICES |
| 2.5 PANELBOARD SUPPRESSORS |
| 2.6 ACCESSORY COMPONENTS AND FEATURES |
| PART 3 – EXECUTION |
| 3.2 INSTALLATION |
| 3.3 IDENTIFICATION |
| 3.4 FIELD QUALITY CONTROL |
| 3.5 ADJUSTING |
| 3.6 PROTECTION |
| 1.2 SUMMARY |
| 1.3 DEFINITIONS |
| 1.4 SUBMITTALS |
| 1.5 QUALITY ASSURANCE |
| PART 2 - PRODUCTS |
| 2.2 STRAIGHT BLADE RECEPTACLES |
| 2.3 GFCI RECEPTACLES |
| 2.4 TWIST-LOCKING RECEPTACLES |
| 2.5 WALL PLATES |
| 2.6 FINISHES |
| PART 3 - EXECUTION |
| 3.2 IDENTIFICATION |
| 3.3 FIELD QUALITY CONTROL |
| 1.2 SUMMARY |
| 1.3 SUBMITTALS |
| 1.4 QUALITY ASSURANCE |
| 1.5 PROJECT CONDITIONS |
| 1.6 COORDINATION |
| 1.7 EXTRA MATERIALS |
| PART 2 – PRODUCTS |
| 2.2 CARTRIDGE FUSES |
| 2.3 PLUG FUSES |
| 2.4 PLUG-FUSE ADAPTERS |
| PART 3 – EXECUTION |
| 3.2 INSTALLATION |
| 3.3 IDENTIFICATION |
| 1.2 SUMMARY |
| 1.3 DEFINITIONS |
| 1.4 SUBMITTALS |
| 1.5 QUALITY ASSURANCE |
| 1.6 PROJECT CONDITIONS |
| 1.7 COORDINATION |
| 1.8 EXTRA MATERIALS |
| PART 2 - PRODUCTS |
| 2.2 NONFUSIBLE AND MANUAL SWITCHES |
| 2.3 ENCLOSURES |
| PART 3 - EXECUTION |
| 3.2 INSTALLATION |
| 3.3 IDENTIFICATION |
| 3.4 ADJUSTING |
File details come from the government source that posted it. Updated .