Questions_and_Answers_0001.pdf

PDF 131 KB Posted

Attached to
Replace Water Meter Federal contract opportunity
Solicitation number
140P6426Q0114
Issued by
Department of the Interior National Park Service Midwest Region

About this file

This document is a Questions and Answers amendment to Solicitation 140P6426Q0114 for a FILA Water Meter Replacement project. The Q&A clarifies key project specifications and requirements for contractors submitting quotations.

The project involves replacing a Government-furnished Sensus Cordonel-P ultrasonic water meter (4-inch model 101715794 with a 20-inch lay length) on a 4-inch main water line with a 3-inch bypass loop at a federal facility in Canton. Prime contractors may use licensed commercial plumbing subcontractors and may rely on subcontractor qualifications and project references to meet solicitation requirements, including three similar projects completed within the past five years. The City of Canton will perform the main water shutdown at the curb, as no shutoff valve exists before the meter, and no permit fees, inspection fees, or shutdown charges apply since this is a federal facility. Contractors are responsible for replacing any pipe insulation removed or damaged during work but are not required to provide temporary water or fire-protection service during the shutdown. All physical removal, installation, testing, and restoration work must be completed within a three-day Monday-through-Wednesday shutdown window. Contractors may request a pre-quote site visit through the Contracting Officer to verify measurements, access conditions, piping layout, and existing corrosion. The meter replacement work is separate from fire-main systems, and fire-alarm or fire-suppression language in the Statement of Work does not apply to this project.

View the file

Other files for this federal contract opportunity

Other files attached to Replace Water Meter, newest first.
File Type Posted
Sol_140P6426Q0114_Amd_0001.pdf PDF
Site_Pictures.pdf PDF
Sol_140P6426Q0114.pdf PDF
Statement_of_Work.pdf PDF
DOL_Wage_Determination.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation #: 140P6426Q0114

Amendment #: P0001

FILA – Water Meter Replacement

Questions and Answers listed below:

QUESTIONS:

Question # Question Answer/Response

1. May we, as the prime contractor, use a licensed commercial plumbing subcontractor to perform the specialized on-site plumbing work?

Yes

2. May we rely on the subcontractor’s licenses, qualifications, technical experience, and project references to meet the solicitation requirements?

Yes

3. Please confirm whether subcontractor project references will be accepted for the required three similar projects completed within the past five years.

Yes

4. Please confirm the exact size and material of the existing main water line, bypass piping, valves, tees, and flanged connections.

4” on main and 3” bypass

5. The Statement of Work refers to a 3-inch bypass loop connected to a 4-inch main line. Please confirm that these dimensions are correct.

Yes

6. Please provide the exact model number, specifications, flange requirements, and installation drawing for the Government-furnished Sensus Cordonel-P ultrasonic meter.

Cordonel -P 4” Mod. 101715794

7. Please confirm whether the Government-furnished meter has a 20-inch lay length.

20”

8. Will the City of Canton perform the main water shutdown, meter sealing, and final inspection, or must the contractor arrange these services?

The city will have to turn off the water at the curb to replace meter and valves. There is not a shutoff valve before meter.

9. Are permit fees, inspection fees, water-department fees, or shutdown charges the contractor’s responsibility?

These fees are N/A. This is a Federal Facility.

10. Is a pre-quote site visit available so interested contractors may verify measurements, access conditions, piping layout, and existing corrosion?

There is no scheduled site visit.

However, contractors can inquire with the CO and something can be set up.

11. Please confirm whether the fire alarm, fire suppression, emergency impairment, and fire-system inspection language in the Statement of Work applies to this water meter replacement project.

The meter replacement is separate from the fire main.

12. Please confirm whether the contractor is responsible for replacing any pipe insulation removed or damaged during the work.

Yes

13. Please confirm whether the contractor must provide temporary water service or temporary fire-protection service during the shutdown.

No

14. Please confirm whether all physical removal, installation, testing, and restoration work must be completed within the three-day Monday-through-Wednesday shutdown window.

Yes

15. Please confirm whether any specific City of Canton plumbing registration, permit, backflow certification, or water-department credential must be submitted with the quotation.

The city will have to turn off the water at the curb to replace meter and valves. There is not a shutoff valve before meter.