This document is an amendment to Solicitation No. 140P6424B0006 for the Construct Stanford Trailhead project for the Cuyahoga Valley National Park in Brecksville, Ohio. The purpose of the amendment is to correct the work description and post the questions and technical answers for all interested parties. The corrected work description specifies that the project will involve milling and overlaying the asphalt surface on a section of the existing Stanford Road, constructing an asphalt parking lot for vehicular and horse trailer parking, connecting the parking lot to the trail with an asphalt path with chip seal surface, constructing culverts, detention ponds, and associated grading and piping, and all other items necessary for the construction of this project. The project is located within an environmentally sensitive area, and proper precautions shall be taken to avoid disturbing wetlands outside of the work area. The solicitation is a firm-fixed-price contract, with a project magnitude between $1,000,000 and $5,000,000, and is set aside for 100% Total Small Businesses.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions_and_Answers_-_Stanford_Road_-__2_0002.pdf | ||
| Sol_140P6424B0006_Amd_0002.pdf | ||
| Questions_and_Answers_-_Stanford_Road_NPS_Responses_0001.pdf | ||
| B08_Solicitation_-_Construction_Contract_Administration.pdf | ||
| B08_Solicitation_-_Notice_to_Contractors.pdf | ||
| B08_Solicitation_-_Specifications.pdf | ||
| B08_Solicitation_-_Limitations_on_Subcontracting_Report.xlsx | XLSX spreadsheet | |
| Sol_140P6424B0006.pdf | ||
| B08_Solicitation_-_Bid_Schedule.xlsx | XLSX spreadsheet | |
| B03_DOL_Wage_Determination.pdf | ||
| B08_-_Submittal_List.pdf | ||
| B08_Solicitation_-__Specifications_-_Addendum_1.pdf | ||
| B08_Solicitation_-_Drawings.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
140P6424B0006 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
PMO
Sagamore Hills OH 44067-1678 1113 West Aurora Road NPS, MWR - Ohio MABO
06/04/20240001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
05/17/2024
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
The purpose of this amendment is to:
1. Correct the work description posted at solicitation
2. Post the questions and technical answers for all interested parties.
All else remains the same.
Corrected work description:
Work will consist of providing all labor, materials, tools and other equipment necessary
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Christopher Bauer
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
140P6424B0006/0001 for milling and overlaying the asphalt surface on a section of the existing Stanford Road;
constructing an asphalt parking lot for vehicular and horse trailer parking for the Stanford
Trailhead; connecting the parking lot to the trail with an asphalt path with chip seal surface; constructing culverts, detention ponds, and associated grading and piping; and all other items necessary for the construction of this project. All work is located within an environmentally sensitive area and proper precautions shall be taken to avoid disturbing wetlands outside of the work area.
NOTE: Please complete the SF Form 1442 as instructed. All amendments must also be read - SF
30 can be signed and returned once downloaded from SAM.gov or acknowledged that it was reviewed in block 19 on the SF 1442.