Amd_0003_Atch_2_Addendum_to_SOW_0003.pdf

PDF 63 KB Posted

Attached to
St. Croix National Scenic Riverway-Repair and Main
Solicitation number
140P6326B0005
Issued by

About this file

This document is a Statement of Work (SOW) for federal contract 140P6326B0005 that includes an addendum clarifying scope modifications. The primary work requirement is the replacement of three overhead uninsulated garage doors, each measuring 10'x10', along with associated rails and motor/opener systems. The contractor must match existing specifications unless otherwise noted and is required to confirm size, thickness, profile, and color for Contracting Officer Representative (COR) approval prior to ordering materials.

The addendum modifies the original SOW by explicitly separating the door replacement from the motor installation and clarifying that new door openers must be installed with all associated brackets, hardware, and wiring. This distinction emphasizes that the contractor is responsible for a complete replacement system rather than merely replacing doors and rails separately. All material specifications and selections require COR approval before procurement to ensure compliance with existing facility standards and requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Current 140P6326B0005 SOW

Part 1 - General

Item 1 – Description of work

4. B. Replace 3 overhead uninsulated garage doors, rails, and motors. Garage doors are 10’x10’.

i. Match existing unless noted otherwise.

ii. Contractor must confirm size, thickness, profile, and color and submit for COR approval prior to ordering.

Addendum to 140P6326B0005 SOW

Part 1 - General

Item 1 – Description of work

4. B. Replace 3 overhead uninsulated garage doors and rails. Install new motor/openers.

Garage doors are 10’x10’.

i. Match existing unless noted otherwise.

ii. Install new door openers and all associated brackets, hardware, and wiring.

ii. Contractor must confirm size, thickness, profile, and color and submit for COR approval prior to ordering.