B09_Amd_0002_Atch_1_Questions-Answers_8_6_23_0002.pdf
PDF 511 KB Posted
- Attached to
- CHAM Theater Seating
- Solicitation number
- 140P6324Q0043
About this file
This document contains the Questions and Answers related to the Chamizal National Memorial-Reupholster Theater Seats Solicitation # 140P6324Q0043. The key details are:
The contract is for reupholstering theater seats at the Chamizal National Memorial, managed by the National Park Service Midwest Region. The work can be performed on-site or the seats can be removed and transported off-site for reupholstery. The seat dimensions are provided, with the top seat being 21 inches by 21 inches with 1 inch foam, and the bottom seat being 24 inches by 24 inches with 4 inch foam. The National Park Service will provide a space with heat and air for the contractor to use. The contractor is responsible for the logistics and costs of removing and transporting the seats if working off-site. The solicitation requires a minimum of 400,000 double rubs for the fabric, and the desired fabric color is dark gray.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Sol_140P6324Q0043_Amd_0002.pdf | ||
| Amd_0001_Atch_1_Questions-Answers_0001.pdf | ||
| Sol_140P6324Q0043_Amd_0001.pdf | ||
| B08_Atch_3_Experience_Questionnaire.xls | XLS spreadsheet | |
| Sol_140P6324Q0043.pdf | ||
| B08_Atch_1_SOW.pdf | ||
| B08_Atch_2_Price_Schedule.pdf | ||
| B08_Atch_4_DOL_Wage_Determination_2015-5229.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Chamizal National Memorial-Reupholster Theater Seats Solicitation # 140P6324Q0043
Question 1: Would the Government allow replacing the foam and reupholstery on site? Would the Government allow replacing and reupholstery off site such as removing/disassembling 100 seats and transporting them back and forth?
Reference: 4.1 Detailed Project Description in SOW
Government Response:
Per the specifications, work can be accomplished on site, the National Park Service will provide a space for the contractor to conduct the service. The space must be returned to its original state and the floor must be protected by ram board.
Per the specifications, If the Contractor chooses to work offsite. The Contractor is responsible for taking seats out and shipping them to the work site. The park service will not be responsible for removing seats and shipping the seats to the work site. Work can be done on park grounds. AC power is available to the contractor. If the seats do need to be removed and shipped off site, the contractor is responsible for the logistics and removal. The space must be returned to its original state.
Reference: 4.1 Detailed Project Description in SOW
Question 2: Can the Government confirm that if the seats standards are left in place and anchored into the floor can the existing foam and fabric pieces be removed to reupholster/replace the fabric and foam?
Government Response:
The Government will allow the removal of the existing foam and fabric pieces to be removed to reupholster/replace the fabric and foam. Please note that the seat will have to be unattached. The top and arm rest are together. Some of the seats are attached together. There is no uniform anchoring it depends on seat.
Reference: 4.1 Detailed Project Description in SOW
Question 3: Can the Government provide theater seat dimensions?
Government Response:
The top part of the seat:
length 21 inches width 21 inches foam depth is 1 inch thick.
The bottom part of the seat length 24 inches width 24 inches foam depth is 4 inches thick.
Question 4: Added 8.6.23- Does the space provided by the National Park Service have heat and air?
Government Response:
The space provided by the National Park Service includes heat and air.
Question 5: Added 8.6.23: Can the National Park Service provide the make and model of the theater chairs?
Government Response:
The National Park Service has no reference/history and therefore cannot provide the make and model of the theater chairs.
Question 6: Added 8.6.23 The specifications mentions up to 400,000 rubs. Does this mean at least 400,000 double rubs? Is the NPS looking for 100,000 double rubs up to 400,000 double rubs?
Government Response:
400,000 double rubs is what the parks requires.
Question 7: Added 8.6.23 Does the National Park Service want fabric or vinyl? Fabric color of choice is dark gray.
Government Response:
Fabric. Example of fabric similar in color.