B08_Atch_2_SOW_Addendum_1.pdf

PDF 45 KB Posted

Attached to
Fort Union Trading Post NHS Wastewater System Impr Federal contract opportunity
Solicitation number
140P6324B0004
Issued by
Department of the Interior National Park Service Midwest Region

About this file

This addendum to the statement of work outlines adjustments to the project period and work restrictions for a wastewater system improvements contract at Fort Union Trading Post National Historic Site. The base project period is 210 calendar days starting in late April or May 2024, contingent upon notice to proceed. The contracting officer will work with the contractor to adjust the period without additional cost if unexpected adverse weather delays progress near the end. Additionally, construction will not be permitted from June 6-18, 2024 in the area north of the fort that includes a new lift station, septic tank, and force main, as the park utilizes this space for a special event during that timeframe. The contractor must clear debris and equipment from this restricted location during the specified dates, also at no added expense to the government.

View the file

Other files for this federal contract opportunity

Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

The project start date will be late April/May (contingent on the Notice to Proceed) supporting 210 calendar days. If there are weather related environment factors affecting the construction period towards the end of the project where unexpected adverse weather conditions may delay progress. The CO will work with the contractor to adjust the performance period at no additional cost to the government.

The Park has a special event (Fort Union Rendezvous) scheduled from June 6-18, 2024, located at and immediately North of the Fort. The Park utilizes this area for this special event and sewer renovation construction in this specific area will not be allowed during this period. Specific location includes the new lift station, septic tank, and force main located north of the Fort North Wall and extending to Highway 1804. All other construction areas at Fort Union will remain available for construction to the contractor during this period. The contractor will be expected to have this location, which is North of the Fort site, clear of construction debris, fill existing holes, remove all construction materials, barriers, and equipment during this time frame. Coordinate this effort with the COR/Facility Manager. This specific “stop work period” at this location during June 6th through the 18th 2024, will be at no additional cost to the government.