About this file

This document is an amendment to a solicitation for the replacement of the HVAC system at the Minuteman Missile Delta Launch Facility. The amendment extends the bid due date from August 3, 2021 to August 12, 2021. It clarifies that the period of performance may extend into or begin in the spring of 2022 depending on material and equipment lead times. The amendment also states that the current HVAC systems will remain in use until the new equipment is received and installation can begin. It indicates that the contractor will be responsible for supplying temporary heat if the HVAC system is shut down during cold periods and may use the park's electrical utilities for this purpose. Additionally, the requirement to complete a bid schedule as part of the response has been removed. The solicitation is being conducted by the National Park Service Midwest Region for the Department of the Interior.

View the file

Other files for this federal contract opportunity

Other files attached to MIMI - Replace HVAC System, newest first.
File Type Posted
Attach_6_Additional_Q_A_0003.pdf PDF
Sol_140P6321B0012_Amd_0002.pdf PDF
Sol_140P6321B0012_Amd_0001.pdf PDF
B09_Amendment_Attach_4_Q_A_0001.pdf PDF
B09_Amendment_Attach_5_Site_Visit_Sign_In_0001.pdf PDF
Attach_2_Drawings.pdf PDF
Attach_3_WD_-_SD20210022.pdf PDF
Attach_1_Specifications.pdf PDF
Sol_140P6321B0012.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140P6321B0012 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

PMN

Keystone SD 57751-4401 24290 Doane Mountain Road

NPS, MWR - NEKOTA MABO

07/28/20210003

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

06/25/2021

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Amendment 0003 - Minuteman Missile Delta-01 Launch Facility HVAC Replacement

The purpose of this amendment is to extend the bid due date, provide additional answers to questions, clarify the period of performance and temporary heat possibility, and remove requirement to complete a bid schedule in the bid submission.

1. The response/due date for sealed bids is changed to August 12, 2021 at 2:00 PM Mountain

Time.

2. See Attach 6, Additional Q&As. The government does not anticipate further clarifications and contractors should carefully review this information and all amendments.

Continued ...

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Ronald Kesterson

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

NAME OF OFFEROR OR CONTRACTOR

2 2

CONTINUATION SHEET

REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF

(A) (B) (C) (D) (E) (F)

140P6321B0012/0003

3. The performance period may extend into or begin in the spring depending on material and equipment lead times. The government will work with contractor to adjust Notice to Proceed timelines affecting mobilization due to lead times following award.

Current HVAC systems will remain online until new equipment is received, and installation can begin.

Once the contractor provides onsite work schedules, the government and contractor will work together on sequence of work to include demo of existing system and supplementing temporary heat. The contractor will be responsible for supplying temporary heat if HVAC system is shutdown during the cold winter periods.

Contractor may plug into park electrical utilities to supplement necessary temporary heat.

4. Section B: Bid Schedule of the original solicitation is updated to remove the requirement for contractors to complete Attachment 5, a Bid

Schedule. The solicitation does not contain a

Bid Schedule and contractors shall input their lump sum bid amount on the SF 1442.

5. There are no other changes.

Contractors must acknowledge this amendment.

LIST OF CHANGES:

Bids due date : 03-AUG-21 changed to 12-AUG-21

Period of Performance: 12/01/2021 to 03/01/2022

NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)