LIBO 245219

LINCOLN BOYHOOD NATIONAL MEMORIAL

LINCOLN CITY, IN

Visitor Center EPDM ROOF REPLACEMENT

PMIS 245219

PROJECT SPECIFICATIONS

NATIONAL PARK SERVICE

MIDWEST REGIONAL OFFICE

April 25, 2019

ATTACHMENT 1

TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 Summary of Work 01 26 01 Contract Modification Procedures 01 31 00 Project Management & Coordination 01 32 16 Construction Schedule 01 32 33 Photographic Documentation 01 33 23 Submittal Procedures 01 35 23 Safety Requirements 01 40 00 Quality Requirements 01 42 00 Reference Standards 01 50 00 Temporary Facilities and Controls 01 57 19 Noise & Acoustics Management 01 67 00 Product Requirements 01 73 29 Cutting and Patching 01 73 40 Execution 01 74 19 Construction Waste Management and Disposal 01 77 00 Closeout Procedures 01 78 23 Operation and Maintenance Data

DIVISION 02 – Existing Conditions

02 41 19 Selective Demolition

DIVISION 06 – Wood, Plastics and Composites

06 10 00 Rough Carpentry

DIVISION 07 – Thermal and Moisture Protection

07 53 23 EPDM Roofing 07 62 00 Sheet Metal Flashing

DIVISION 22 – Plumbing

22 14 23 Storm Drainage Piping Specialties

SECTION 01 10 00 – SUMMARY OF WORK

PART 1 - GENERAL

1.1 PROJECT INFORMATION

A. Project Identification: This project is for the Lincoln Boyhood National Memorial 'Replace EPDM Roofing Over End Halls of Visitor Center'. The project is to remove and replace the EPDM membrane roofing system. Project includes removal and replacement of EPDM membrane, insulation board, and other roofing accessories as necessary. All materials to meet code and warranty. All work shall be performed in accordance with local codes, standards and enforcement.

Project Location: Lincoln Boyhood National Memorial Visitor Center. Park Address: 3027 E South Street, Lincoln City, IN 47552.

Description of Work: The Contractor shall furnish all personnel, equipment, tools, materials, supervision, and other items and services necessary to decommission, dispose of and replace the Visitor Center End Hall EPDM roofs and associated EPDM components. Work only to take place on roofs covering the Nancy Hanks Lincoln and Abraham Lincoln Halls of the Visitor Center.

Work only to include replacement of EPDM “gutter” portion of roofs. Roofing systems to be replaced are located at two separate sections of the building and located over the two end halls of the Visitor Center. Contractor shall start and finish roofing system replacement on one section before moving on to roof replacement of the other section. This requires all work from tear-off to installation be completed independently for one roof at a time. No work to take place on EPDM roof covering the cloister hallway, auditorium or office areas of the Visitor Center. Contractor shall limit foot traffic and install temporary walkway protection on existing EPDM roofing not being replaced. No work to take place on copper roof over end halls, except for necessary modifications to the outer 10 inch copper roof edge that transitions to EPDM. All work required by the project documents shall be accomplished by the contractor. Work must be performed to prevent damage to historic fabric of structure.

The Work includes the removal and replacement of the EPDM roof systems over the Visitor Center ends halls with a fully adhered 60 mil reinforced EPDM membrane system. Roof area replacement anticipated to be approximately 3,520 square feet. Work will include removal and replacement of existing EPDM roofing system to include; EPDM membrane, insulation board, limited roof decking as necessary, cast iron roof drain domes and clamping rings (4) and all necessary hardware and accessories to provide for a fully weathertight roofing system with a manufacturer's standard 20 year warranty. The new roof will include the addition of a protective cover board over the insulation board and below the EPDM membrane. All work to be performed according to manufacturer’s recommendations.

The intention of the Work is to not remove parapet capstones or copper roofing as both are in good condition. Copper parapet flashing and copper roof edge temporary modifications will be required as necessary to allow EPDM system removal and installation. All copper modifications shall provide for sufficient EPDM adherence and terminations. Copper flashing and roof edges shall be returned to original locations and conditions following temporary modifications, and secured firmly in place to provide EPDM protection as required by roofing manufacturer.

1.2 WORK RESTRICTIONS

A. Contractor's Use of Premises: A contractor staging area will be determined and discussed during site visit. During construction, Contractor will have limited use of Visitor Center, parking area and adjacent grounds. Contractor's use of premises is limited by Government’s right to perform work or employ other contractors.

B. On-Site Work Hours: Limit work at the existing building to hours of 6:30 a.m. to 5:00 p.m., Monday through Friday, unless otherwise agreed to in advance by Government.

1. Weekend Hours: No weekend work allowed without prior approval from Contracting

Officer and Contracting Officer’s Representative (COR).

2. Holiday Hours: No federal holiday work allowed.

FEDERAL HOLIDAYS

New Year’s Day 1 January Martin Luther King Day Third Monday in January President’s Day Third Monday in February Memorial Day Last Monday in May Independence Day 4 July Labor Day First Monday in September Columbus Day Second Monday in October Veteran’s Day 11 November Thanksgiving Day Fourth Thursday in November Christmas Day 25 December

1.3 QAULITY ASSURANCE

A. The removal and installation of the roof and components must be accomplished by a firm who has been in the profession at least 10 years. Proof of establishment, licensing and certification must be provided.

B. The work shall be performed by competent craftsmen skilled in the trade involved and shall be done in a manner consistent with normal industry standards. All work shall conform to the applicable state and local codes or standards.

C. All work will be completed in a professional manner. Unless otherwise specified, all materials and equipment shall be new, unused and undamaged. Materials and equipment shall be the current and standard designs of manufacturers regularly engaged in their production.

D. All material will need to fit into existing locations.

E. Contractor is responsible for all work including any disruptions to any electrical, gas, and plumbing and other utilities and operational functions as originally designed.

F. Contractor will be responsible for any lawn or landscape damage resulting from work.

G. Comply with the manufacturer’s instructions for rigging and handling equipment.

H. Install all parts plumb and level, firmly anchored in locations of previous footprint, and maintain manufacturer’s recommended clearances.

I. Comply with all applicable OSHA and National Park Service DO-50 regulations and directives (https://www.nps.gov/policy/DOrders/50B.htm) pertaining to security, safety, occupational health, fire, traffic, and personnel clearances while at Lincoln Boyhood National Memorial.

Primary contractors will brief subcontractors on safety, occupational health, and fire prevention regulations at all times. Maintain documentation that all subcontractors have been briefed.

Work involves roof replacement on flat roof with short 12” (approximate) parapet wall.

Contractor must comply with OSHA fall protection requirements and supply necessary fall protection equipment. Contractor to consult with COR regarding proposed fall protection measures at pre-construction meeting, during mobilization, and during construction to ensure fall protection measures are planned and in place during construction. COR shall approve fall protection equipment prior to use. Fall protection equipment shall be temporary in nature and not damage any historic building fabric.

J. Contractor to adhere to all Park policies and procedures regarding Force Protection/Anti- Terrorism Standards. This includes, but not limited to securing vehicles, tools and materials as well as access to facilities with keys, door codes, etc. Under no circumstances will contractors be allowed to escort unauthorized personnel without written notification from park COR.

Contracting Officer (CO) to provide list of names of all contractors/sub-contractors to COR who will be on the job site.

K. No signs or advertisements (except those specified herein) shall be displayed on the construction site or within the park unless approved by the Contracting Officer.

1.4 WORK COORDINATION

A. GENERAL: Project schedule for completion of this project will be within 120 calendar days from contract award. This allows for 30 days for shop drawing creation, submittal review and material procurement; 10 days for mobilization; 70 days for removal and installation, 10 days for punch list and final completion. The contractor shall coordinate all work schedules with the CO and the COR prior to the start of the work. Notify the CO and the COR five days prior to moving onto the work-site to commence work. You must provide notification the day you move back to the work-site after an interruption of work of two or more work days. Before initiating any work, the Contractor shall meet with the CO and COR and agree on: a sequence of procedures; a means of access to premises and buildings; placement of dumpsters and haul routes; delivery of materials and use of approaches; use of corridors, stairways, elevators, and similar means of egress;

communications; the location of partitions and barriers; eating spaces, and restroom for contractor’s employees; any other incidentals to the project.

Interview COR with regard to sources of available research information, maintenance and repair history, known location of utility systems, panel boxes, and construction sequencing (allowable impacts to staff and visitor activities).

Interruption of Work: When work begins, this project will be the priority of the Contractor.

Delays due to other project schedules will not be acceptable. If it becomes necessary to interrupt work activities in buildings and/or areas for construction purposes (excluding those otherwise described/agreed), the Contractor shall request permission, in writing, from the CO, or designated representative(s), at least five (5) working days in advance. The Contractor shall submit written requests for any approved street closings ten (10) working days prior to closing of the street.

Temporary Construction: Contractor to provide temporary weatherproofing of all exposed roof surfaces during non-work hours of project. If damage occurs as a result of inadequate weatherproofing, Contractor shall make repairs at no additional cost to Government.

Work Sequence: Roofing systems to be replaced are located at two separate sections of the building and located over the two end halls of the Visitor Center. Contractor shall start and finish roofing system replacement on one section before moving on to roof replacement of the other section. This requires all work from tear-off to installation be completed independently for one roof at a time.

B. UTILITY WORK: Contractors shall coordinate with park when conducting any work on or near any utility lines, above or below ground. Contractor responsible for preventing damage to known utilities. If damage occurs, repair utility at no additional cost to Government. Notify COR not less than two days in advance of proposed utility interruptions. Do not proceed with utility interruptions without Contracting Officer’s (CO) written approval.

C. PROJECT SUPERVISOR: Contractor to employ a full-time supervisor who has been in the trade for at least 8 years for this project. The supervisor’s duties shall include the overall management of the project, coordination of the sub-contractors work, and liaison with the Contracting Officer and the COR/Inspector. No work shall be performed without the presence of the supervisor or a competent representative on the job-site. A competent representative is as defined by the Occupational Safety and Health Administration (OSHA) Standards.

D. 24-HOUR POINT OF CONTACT: Provide the Contracting Officer with a 24-hour number or numbers where their authorized representative can be contacted at any time day or night. This number should be provided at the notice of contract award, but not later than the first day of contract work at the site.

E. CONTRACTOR’S OFFICE SPACE: Office space required for the Contractor’s operation shall be the responsibility of the Contractor. Any office space to be located at the Lincoln Boyhood National Memorial must be approved by the Contracting Officer and be placed within an identified and agreed upon area with COR.

F. CONTRACTOR’S STORAGE AREA: Contractor will be allowed to have one storage trailer at the construction site. The location must be approved by the COR. All other trailers, storage, and equipment will be stored at a site designated by the COR. The government is not responsible for damages or losses.

G. SITE AND STORAGE AREA MAINTENANCE: The construction site is located at the park Visitor Center and shared parking areas. Contractor will be responsible for general maintenance of construction site and storage area(s) on a daily basis. This includes, but not limited to, cleaning, safety checks and disposal of trash and debris.

H. DRIVEWAYS, WALKWAYS AND ENTRANCES: Keep driveways and entrances serving premises clear and available to Government, park visitors and emergency vehicles at all times.

Do not use these areas for parking or storage of materials.

I. PRESERVATION OF NATURAL FEATURES: Construction site is located with the park’s historic cultural landscape. Contractor shall take necessary measures to prevent damage to natural surroundings. Restore damaged areas, repairing or replacing damaged trees, plants and lawn, at no additional cost to the Government. If vehicle use, equipment or material storage on lawn is required, it is advised to protect lawn with plywood or matting to prevent or reduce rutting and landscape damage. For all disturbance to grounds, the contractor shall complete final repairs within one week of the disturbance. COR will provide product specifications for topsoil, seeding and mulching should any lawn restoration be necessary and Contractor shall use specified procucts.

J. DUST CONTROL/ NOISY OPERATIONS: Contractors shall be responsible to pick up, clear and/or sweep away any mud or debris from roadways left by heavy equipment or trucks.

Contractors shall use whatever means necessary to ensure equipment and trucks do not leave mud and debris on the roadways, to the satisfaction of the Contracting Officer Representative (COR).

Noisy operations such as those involving use of air hammers, etc., in demolition, or cutting of openings shall be scheduled with the Contracting Officer (CO).

K. OCCUPANCY: Government will occupy premises during entire construction period. Cooperate with Government during construction operations to minimize conflicts and facilitate Government usage. Perform work so as not to interfere with Government operations. Contractor shall protect the occupied areas from dust, smoke, etc., by a method reviewed by the Contracting Officer.

Maintain existing exits, unless otherwise indicated.

1. Maintain existing building in a weather tight condition throughout construction period.

Repair damage caused by construction operations. Protect building and its occupants during construction period.

L. NONSMOKING BUILDING: Smoking is not permitted within the building or within 25 feet of entrances, operable windows, or outdoor-air intakes.

M. CONTRACTOR CONDUCT: At all times contractor shall conduct his operations in conformance with the rules and regulations by the Secretary of the Interior for the National Park Service, and applicable park rules and regulations prescribed by the Park Superintendent.

N. PUBLIC USE OF SITE: Contractor shall at all times conduct his operations to ensure the least inconvenience to the public.

O. HAULING RESTRICTIONS: Comply with all legal load restrictions in the hauling of materials.

Load restrictions on park roads are identical to the state load restrictions with such additional regulations as may be imposed by the Park Superintendent. Information regarding rules and regulations for vehicular traffic on park roads may be obtained from the Office of the Park Superintendent. A special permit will not relieve Contractor of liability for damage which may result from moving of equipment.

P. PATCHING AND REPAIRING: After the work has been completed, any contractor caused damages to Government-owned structures, facilities, streets, curbs, walks, lawns, etc., shall be properly patched, repaired, or replaced to the complete satisfaction of the Contracting Officer or COR. Any holes, cuts, breakages, and damages made in finished surfaces of the area in which work has been accomplished, shall be properly repaired and the disfigured areas then painted over or otherwise repaired and resurfaced to match the existing finishes to the complete satisfaction of the Contracting Officer/COR.

Q. DISPOSITION OF REMOVED GOVERNMENT PROPERTY: All materials and equipment to be removed by the Contractor and not reinstalled under this contract, including debris generated by this project, shall be removed at regular intervals from the site and disposed of off-site by the contractor. Recycling of debris is encouraged. Disposal of materials shall be in conformance with applicable Federal, state, and local pollution regulations at the contractor’s expense.

R. RECYCLE: The existing equipment and all debris must be removed from the job site and recycled or properly disposed. Recycle all ferrous and non-ferrous metals from the project. The Contractor shall also recycle general administrative refuse associated with this project. This refuse includes cardboard, plastic bottles, plastic soda bottles, aluminum cans, and mixed paper.

S. FINAL CLEANUP: Upon completion of the project, all equipment and debris will be removed from the site(s) and left in an acceptable condition approved by the COR.

1.6 UTILITIES AND SERVICES

A. COMMERCIAL UTILITIES: Contractor will be permitted the use of the utility services such as electric, gas, sewer, and water. Temporary connections such as portable sanitary facilities are at the contractor’s expense and are subject to approval by the Contracting Officer (CO).

Contractor will be responsible for any relocation of existing and/or new construction of commercial utilities to include but not limited to cable, gas, telephone, electrical, etc.

1. No utility interruptions are expected during this project. If an interruption is necessary notify Contracting Officer not less than Two (2) business days in advance of proposed utility interruptions for coordination. Do not proceed with interruption without written permission from the COR.

2. Contractor shall be responsible for locating and preventing damage to known utilities. If damage occurs, repair utility at no additional expense to the Government.

B. SANITARY FACILITIES: Provide portable restroom facility for construction personnel.

Locate sanitary facility where directed by the COR. Remove facility upon completion of the work.

PRODUCTS

1.5 SUBSTITUTION OF MATERIALS AND EQUIPMENT

A. The Contracting Officer (CO) reserves the right to reject or accept any or all of the proposed changes based on completeness, clarity, and other requirements of the plans and specifications.

When the Contractor requests approval of substitute materials and/or equipment, it shall be understood and agreed that such substitution, if approved, will be made without cost to the government, regardless of changes in connections, spacing, electrical service, and all other appurtenances.

1.6 BRAND NAMES

A. References in specifications to any brand name equipment or materials shall be regarded as establishing a standard of quality and shall not be construed as limiting competition. The

Contractor may submit proposed equal equipment and/or materials for government consideration during the submittal process of the contract after award.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

END OF SECTION 01 10 00

SECTION 01 26 01 – CONTRACT MODIFICATION PROCEDURES

PART 3 - GENERAL

3.1 SUMMARY

A. The work of this section consists of administrative and procedural requirements for contract modifications.

3.2 DEFINITIONS AND ALLOWANCES

A. Home Office Overhead: Those costs incurred in support of all of a contractor’s projects and not attributable to a specific job. The cost for home office overhead is only allowed as a percentage of all direct work excluding profit. The following items represent allowable home office overhead costs identified in Part 31 of the Federal Acquisition Regulation (FAR):

1. Rent

2. Utilities

3. Furnishings

4. Office equipment

5. Executive and management staff not exclusively assigned to the project

6. Support, accounting, and administrative staff

7. Preparation of cost proposals, estimating, and schedule analyses connected with

Modifications

8. Estimating and preconstruction services

9. Mortgage costs

10. Real estate and corporate taxes

11. Automobile maintenance and travel costs for home office personnel

12. Home office insurances i.e. structure, automotive, umbrella, flood, etc.

13. Depreciation of equipment and other assets

14. Home office supplies (paper, staples, etc.)

15. Legal services

16. Accounting and data processing

17. Professional fees/registration

B. General Conditions (Field Office Overhead): Management and administrative costs incurred on site for the designated project. Costs associated with the preparation of modifications will not be allowed. The costs for these items are to be included only in the general conditions of the modification estimate. Only in the case of a contract time extension are additional general conditions included in modifications. The following items, if applicable, are considered allowable costs for calculating General Conditions:

1. Project Manager, Assistant Project Manager

2. Superintendent, Assistant Superintendent

3. Quality Control, Safety Officer, Environmental Manager, etc.

4. Engineers

5. Travel, lodging, and per diem (as established by Federal Travel Regulations)

6. Scheduling

7. Field Office Trailers and associated temporary utilities

8. Field office supplies

a. Mailing and couriers

b. Reproduction costs

c. Storage

d. Phones

e. Computers

f. Copiers

9. Personal vehicles i.e. Superintendent Pickup trucks

C. General Requirements: These are costs directly associated with the project and are necessary to perform the actual work of the modification. These costs shall be shown as direct costs in the estimate. The following items, if applicable, are considered allowable costs for calculating General Requirements:

1. Hoisting

2. Material handling

3. Temporary fencing

4. Port-a-lets

5. Trash removal, dumpsters

6. Barricades

7. Small tools

8. Safety supplies

9. Scaffolding

10. Daily cleaning

11. Traffic control

12. Temporary signage

13. Temporary heating and power

D. Personnel Costs: Costs included in the modification must only be for General Conditions staff and workers actually present and working on the project site. Modification costs for salaried workers are only allowed within the structure of a 40 hour week and no overtime or holiday pay will be allowed.

1. Worker Hourly Rates are costs directly associated with the individual worker and consist of the following:

a. Base Rate: This is the hourly rate paid directly to the worker

b. Labor Burden: Employer payments of all applicable burdens, this includes insurance and taxes that the business must pay on behalf of the worker to government entities and educational forums , such as:

1) Social Security

2) Medicare

3) Workers Compensation– Policy and company calculation to be made available.

4) FUTA– Cap Rate and percentage to be proportionally allocated over one year.

5) SUTA– Cap Rate and percentage to be proportionally allocated over one year.

6) Union agreement costs – Other costs required under an enforceable collective bargaining agreement.

c. Fringe Benefits: Various non-wage compensations provided to employees such as:

1) Health Care Insurance Premiums

2) Cell Phone

3) Clothing

4) 401K and Pensions

5) Vehicle allowances

6) Gas allowance

7) Life insurance premiums

8) Disability insurance

9) Other Fringe Benefits required under an enforceable collective bargaining agreement

E. Bonuses or Deferred Compensation: No Bonus or Deferred Compensation will be allowed within any components of pricing including Home Office Overhead, General Conditions, General Requirements, Hourly Worker Rates, or the direct costs of work.

F. General Liability Insurance: An insurance policy that protects the contractor from claims resulting from bodily injury or property damage to a third party. Include this as a separate line item within all modification proposals and provide a current insurance quote upon request.

G. Performance and Payment Bonds: A performance bond is a surety bond issued by an insurance company or bank to guarantee satisfactory completion of a project. The Payment Bond guarantees that the contractor will pay the labor and material costs they have incurred. Banks and Insurance companies charge a premium for each individual project based on a sliding scale which relates to the size of the project. Include this as a separate line item in modification proposals and provide current company bonding rates upon request.

H. Builder’s Risk Insurance: This covers the contractor’s loss due to fire, high winds, or other natural forces. This is not reimbursed by the National Park Service (NPS) and shall not be included in modification proposals.

3.3 MODIFICATION PROPOSAL PRICING REQUIREMENTS

A. General:

1. Your proposal must be received in the format and within the time frame specified in the Request for Proposal letter. Costs or delays resulting from failure of contractor to submit within the time frame specified will not be compensable.

2. The proposal must be detailed with itemized lists of equipment, materials, labor, production rates, overhead, profit, and bond markup for each item. Labor costs must be itemized by craft and hourly rate, including Fringe Benefits and Labor Burden. If the costs of Fringe Benefits and Labor Burden are not itemized, it is assumed that that they are included in the hourly rate shown, or contractor is not requesting reimbursement.

Contractor may utilize the government provided Contractor Estimate Form, or their

ATTACHMENT 1

http://en.wikipedia.org/wiki/Employee http://en.wikipedia.org/wiki/Surety_bond http://en.wikipedia.org/wiki/Insurance http://en.wikipedia.org/wiki/Bank http://www.nps.gov/dscw/publicforms.htm#ct own form, provided that it contains the same information and level of detail as the Gov’t provided form.

3. Requests for extensions of contract time as a result of this change must be justified with a Time Impact Analysis (TIA). Refer to Division 01 Specification, “Construction Schedule”, for time impact analysis requirements. TIA and associated costs must be received with the proposal by the date shown within the Request for Proposal letter.

Contractor’s failure to submit within the specified time frame will be construed as the Contractor waiving the right for additional time and no time extension will be allowed.

4. All supporting documentation used to justify the proposed modification will be made available to the Contracting Officer upon request.

5. Contractor must review and approve all subcontractor/supplier pricing in detail for proper format, scope, production rates, and pricing prior to submission to the NPS. All delay costs associated with not reviewing and approving subcontractor/supplier pricing will be borne by the Contractor.

6. All pricing and production rates within the estimate must be based on fair and reasonable pricing and cannot include built-in contingency.

B. Labor:

1. Contractor shall estimate the cost of labor by itemizing each craft involved, indicating worker hourly rate (base rate + labor burden + fringe benefits) for each and itemizing the hours required for each craft that will be directly engaged in modification work.

Any work proposed that will require overtime work or premium pay shall be itemized separately. All rates shall be in accordance with the Davis-Bacon Act as incorporated herein. Labor Burden may include payroll taxes, Social Security, unemployment insurances, workers compensation insurance, FICA, FUTA, and other direct costs resulting from Federal, State or local laws.

2. Itemize labor costs for equipment operators separate from equipment costs.

3. The labor cost for foremen shall only be costs for related work required for the modification.

C. Materials:

1. The estimated cost for materials shall include quotes from multiple sources. Material prices must include all applicable fees and credits, including but not limited to, sales tax, freight and delivery charges, and tax rebates.

2. No markup shall be applied to any material provided by the NPS.

D. Equipment:

1. Equipment used for the project must be appropriately sized for the work being performed.

2. Do not include costs for “miscellaneous tools and equipment”, in your proposal for a replacement value of $500 or less. Costs shown in excess of $500 must be broken out separately.

3. Regardless of ownership, the rates to be used in determining equipment rental costs shall be the lowest cost from one of the following sources:

a. U.S. Army Corps of Engineers , Ownership and Operating Expense Schedule (use latest edition and applicable region)

b. Construction Blue Book

c. Local equipment rental rates, documented by actual invoice charges, or itemized vendor quotes.

4. The estimated equipment rates shall include the operating costs of all fuel, oil, lubrication, supplies, small tools, necessary attachments, ground engaging components, tires & tracks, routine repairs and maintenance (cost of major repair and overhaul is not allowed per FAR 31.105(d)(2)), depreciation, storage, insurance, and all incidentals.

Mobilization, if applicable, may be included for equipment solely used on the modification work but must be listed separately.

5. Estimate the full rate for equipment only for the duration that the equipment will be utilized to accomplish the work of the modification.

6. Standby unit rates used are to be in accordance with paragraph 1.3, D, 2, above. If the US Army Corp of Engineers is utilized then their standby rates prevail. If Bluebook or local equipment pricing is accepted, then ½ of the equipment costs minus any operating costs, major repair and overhaul will be accepted.

7. If equipment is in standby mode due solely to a documented NPS delay, the established standby rate shall apply from the first day of the delay.

8. Equipment that is not used and on the jobsite for up to five consecutive days may be classified at standby rates, provided that the equipment is or has been used solely to perform work on the modification and will be necessary to complete additional modification work. Equipment that is still on the jobsite but not in use after five consecutive days will not be considered in the modification pricing.

9. Requests for compensation for equipment stand by time must be justified, documented and itemized separately.

10. The estimated timeframe (daily, weekly, monthly) for use of the equipment must reflect the lowest cost to the Government.

E. Establishment and Application of Overhead and Profit Percentages:

1. Home Office Overhead and Profit (OH&P) shall be applied to direct costs only. Profit shall not be applied to overhead amounts; and overhead shall not be applied to profit.

Home office overhead shall contain only allowable, allocable, and reasonable costs per the contract documents and FAR Part 31. Profit percentages are based on risk factors found in FAR Part 31which have been applied to the specific type of work included in this project. Negotiated rates shall not exceed the following percentages for OH&P for contractor self-performed work:

Overhead & Profit………………10%

OH&P on Subcontractor’s Work:

Overhead & Profit………………5%

2. Total aggregate limit of markup (OH&P) for contractor and subcontractors on modification work shall not exceed 25%. The NPS will not be responsible for allocation of percentages between contractor and subcontractors at any tier.

3. If contractors form a partnership, than the partnership may only receive home office overhead and profit in the same amount as an individual contractor (refer to par 1.3,E,1 above). It is the responsibility of the partners to decide on the division of revenue.

4. Combined Increases and Decreases: On proposals involving both increases and decreases in the Contract Price, the overhead and profit mark-ups are required on the net increases and deducted on net decreases.

5. At no time can profit be calculated on Overhead or itself, it must be calculated on direct costs of work only.

PART 4 - PRODUCTS (Not Used)

PART 5 - EXECUTION (Not Used)

END OF SECTION 01 26 01

SECTION 01 31 00 - PROJECT MANAGEMENT AND COORDINATION

PART 6 - GENERAL

6.1 SUMMARY

A. This Section includes administrative provisions for coordinating construction operations on Project including, but not limited to, the following:

1. Definitions

2. Construction Coordination.

3. Submittals

4. Coordination Drawings.

5. Requests for Information (RFIs).

6. NPS/DSC SharePoint Project Website.

7. Project meetings.

8. Environmental Coordination.

9. Permits

B. Related Requirements:

1. Section 01 32 16 “Construction Schedule” for preparing and submitting Contractor’s construction schedule.

2. Section 01 73 40 “Execution” for procedures for coordinating general installation and field-engineering services, including establishment of benchmarks and control points.

3. Section 01 77 00 “Closeout Procedures” for coordinating closeout of the Contract.

6.2 CONSTRUCTION COORDINATION

A. Coordination: Coordinate construction operations included in different Sections of the Specifications to ensure efficient and orderly installation of each part of the Work. Coordinate construction operations, included in different Sections, which depend on each other for proper installation, connection, and operation.

1. Schedule construction operations in sequence required to obtain the best results where installation of one part of the Work depends on installation of other components, before or after its own installation.

2. Coordinate installation of different components with other Contractors to ensure maximum accessibility for required maintenance, service, and repair.

3. Make adequate provisions to accommodate items scheduled for later installation.

4. Where availability of space is limited, coordinate installation of different components to ensure maximum performance and accessibility for required maintenance, service, and repair of all components, including mechanical and electrical.

5. Properly plan construction operations to include permit requirements. Allow enough time to execute permit provisions to maintain work schedule, site visits, inspections, and reporting deadlines.

B. Prepare memoranda for distribution to each party involved, outlining special procedures required for coordination. Include such items as required notices, reports, and list of attendees at meetings.

C. Administrative Procedures: Coordinate scheduling and timing of required administrative procedures with other construction activities and activities of other contractors to avoid conflicts and to ensure orderly progress of the Work. Such administrative activities include, but are not limited to, the following:

1. Preparation of Contractor's Construction Schedule.

2. Preparation of the Schedule of Values.

3. Installation and removal of temporary facilities and controls.

4. Delivery and processing of submittals.

5. Progress meetings.

6. Permit requirements.

7. Pre-installation conferences.

8. Project closeout activities.

6.3 SUBMITTALS

A. Division 01 documents: The following items shall be submitted a minimum of one week prior to the Preconstruction Conference. Contracting Officer will notify Contractor of tentative date for the Pre-Construction Conference.

1. Letter designating Project Superintendent.

2. Construction Schedule.

3. A comprehensive breakdown of the Schedule of Values.

4. Accident Prevention Plan.

5. A list of Subcontractors for this project.

6. Written statements from subcontractors certifying compliance with applicable labor standard clauses.

7. Satisfactory evidence of liability insurance coverage and workman’s compensation for the

Contactor and all subcontractors.

8. Quality Control Plan.

9. List of Required Construction Permits. Include the following information for each permit:

a. Name of Permit.

b. The Agency(ies) with Jurisdiction issuing the permit.

c. Information required from the Government to complete the permit application.

B. All items listed must be provided to the Contracting Officer before the Pre-Construction Conference is held. If all of these documents have not been received one week prior to the scheduled Pre-Construction Conference date, the conference will be cancelled, Notice to Proceed will not be issued, and the Contracting Officer will consider other contractual remedies. Work shall not commence until written Notice to Proceed has been issued.

6.4 REQUESTS FOR INFORMATION (RFIs)

A. General: Immediately on discovery of the need for additional information or interpretation of the Contract Documents, Contractor shall prepare and submit an RFI utilizing the form provided by the CO or one created by the Contractor that is approved by the CO.

1. CO will not respond to RFIs submitted by other entities controlled by Contractor.

2. Coordinate and submit RFIs in a prompt manner to avoid delays in the work.

B. Content of the RFI: Include a detailed, legible description of item needing information or interpretation and the following:

1. RFI number, numbered sequentially.

2. Date.

3. RFI subject.

4. Specification Section number and title and related paragraphs, as appropriate.

5. Drawing number and detail references, as appropriate.

6. Field dimensions and conditions, as appropriate.

7. Contractor's suggested resolution. If Contractor's suggested resolution impacts the

Contract Time or the Contract Sum, Contractor shall state impact in the RFI.

8. Contractor's signature.

9. Requested date for response.

10. Attachments: Include sketches, descriptions, measurements, photos, Product Data, Shop

Drawings, coordination drawings, and other information necessary to fully describe items needing interpretation.

a. Include dimensions, thicknesses, structural grid references, and details of affected materials, assemblies, and attachments on attached sketches.

C. Contracting Officer’s Action: CO will review each RFI, determine action required, and respond.

CO will determine the critical nature of each RFI and issue a response accordingly.

1. The following are not considered to be RFIs and will receive no action:

a. Requests for approval of submittals.

b. Requests for approval of substitutions.

c. Requests for approval of Contractor's means and methods.

d. Requests for coordination information already indicated in the Contract Documents.

e. Requests for adjustments in the Contract Time or the Contract Sum.

f. Requests for interpretation of Architect's actions on submittals.

g. Incomplete RFIs or inaccurately prepared RFIs.

2. CO's action may include a request for additional information, in which case time for response will date from time of receipt of additional information.

3. CO's action on RFIs may result in the need for a change to the Contract Time or the Contract Sum. All contract changes will be processed following the terms and conditions of the contract.

6.5 PROJECT MEETINGS

A. Preconstruction Conference: Before start of construction, Contracting Officer will arrange an on-site meeting with Contractor. The meeting agenda will include the following as a minimum:

1. Roles & Responsibilities/ Lines of Authority.

2. Park rules and regulations.

3. Jobsite Safety.

4. Resolution of comments on required Division 01 documents.

5. Coordination of Subcontractors.

6. Labor law application.

7. Modifications.

8. Payments to Contractor.

9. Payroll reports.

10. Contract time.

11. Contractor Performance Evaluation.

12. Display of Hotline posters.

13. Notice to proceed.

14. Correspondence procedures.

15. Acceptance/rejection of work.

16. Progress meetings.

17. Submittal procedures.

18. Environmental requirements.

19. Permit requirements.

20. As-constructed drawings/operation and maintenance (O&M) manuals.

21. Saturday, Sunday, holiday and night work.

22. Reference materials.

23. Value engineering.

B. Progress Meetings: The Contracting Officer will schedule meetings as necessary with the Contractor.

1. Attendees: In addition to Government Representatives, each Contractor, Subcontractor, supplier, and other entity concerned with current progress or involved in planning, coordination, or performance of future activities shall be represented at these meetings.

All participants at the meeting shall be familiar with the Project and authorized to conclude matters relating to the Work.

2. Agenda: Review and correct or approve minutes of previous progress meeting. Review other items of significance that could affect progress. The meeting agenda will include the following:

a. Approval of minutes of previous meetings.

b. Submittal status.

c. Review of off-site fabrication and delivery schedules.

d. Requests for information (RFI) and other issues.

e. Modifications.

f. Work in progress and projected.

1) Status of required inspections (Special Inspections, Accessibility, etc.)

g. Inspections of work in progress and projected (Special inspections,

h. Construction Schedule update (provide updated CPM).

i. Status of Project Record Drawings and O&M manuals.

j. Other business relating to work.

k. Permit requirements.

C. Preinstallation Conferences: Conduct a preinstallation conference at Project site before each construction activity that requires coordination with other construction.

1. Attendees: Site Superintendent and installer shall attend the meeting. Advise CO of scheduled meeting dates.

2. Agenda: Review progress of other construction activities and preparations for the particular activity under consideration, including requirements for the following:

a. Contract Documents.

b. Options.

c. Related RFIs.

d. Related Change Orders.

e. Purchases.

f. Deliveries.

g. Submittals.

h. Review of mockups.

i. Possible conflicts.

j. Compatibility requirements.

k. Time schedules.

l. Weather limitations.

m. Manufacturer's written instructions.

n. Warranty requirements.

o. Compatibility of materials.

p. Acceptability of substrates.

q. Temporary facilities and controls.

r. Space and access limitations.

s. Regulations of agency(ies) with jurisdiction.

t. Testing and inspecting requirements.

u. Installation procedures.

v. Coordination with other work.

w. Required performance results.

x. Protection of adjacent work.

y. Protection of construction and personnel.

3. Record significant conference discussions, agreements, and disagreements, including required corrective measures and actions.

4. Reporting: Distribute minutes of the meeting to each party present and to other parties requiring information.

5. Do not proceed with installation if the conference cannot be successfully concluded.

Initiate whatever actions are necessary to resolve impediments to performance of the Work and reconvene the conference at earliest feasible date.

6. Required Preinstallation conferences:

a. EPDM Roof Replacment

6.6 PERMITS

A. General:

1. Permits and Responsibilities: The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses and permits, and for complying with any Federal, State and municipal laws, codes, and regulations applicable to the performance of the work. The Contractor shall also be responsible for all damages to persons or property that occur as a result of the Contractor’s fault or negligence. The Contractor shall also be responsible for all materials delivered and work performed until completion and acceptance of the work. No building permit will be required. Contractor shall confirm if any disposal permits are required and acquire as necessary.

2. For the purpose of this contract the Contractor will not be considered an agent of the Government. Therefore the Contractor will comply with the appropriate Federal, State and local laws.

PART 7 - PRODUCTS (Not Used)

PART 8 - EXECUTION (Not Used)

END OF SECTION 01 31 00

SECTION 01 32 16 – CONSTRUCTION SCHEDULE

PART 9 - GENERAL

9.1 SUMMARY

A. This Section consists of Construction Schedule requirements including but not limited to the following:

1. Schedule of Values

2. Construction Schedule Requirements.

3. Construction Schedule Updates.

4. Time Impact Analysis.

B. Purpose: The purpose of the Construction Schedule is to ensure adequate planning, coordination, scheduling, and reporting during execution of the work by the Contractor. The Construction Schedule will assist the Contractor and Contracting Officer in monitoring the progress of the work, evaluating proposed changes, and processing the Contractor's monthly progress payment.

9.2 DEFINITIONS

A. Activity: A discrete part of a project that can be identified for planning, scheduling, monitoring, and controlling the construction project. Activities included in a construction schedule consume time and resources.

1. Critical activities are activities on the critical path. They must start and finish on the planned early start and finish times.

2. Predecessor Activity: An activity that precedes another activity in the network.

3. Successor Activity: An activity that follows another activity in the network.

B. Cost Loading: The allocation of the Schedule of Values for the completion of an activity as scheduled. The sum of costs for all activities must equal the total Contract Sum, unless otherwise approved by the Contracting Officer.

C. CPM: Critical path method, which is a method of planning and scheduling a construction project where activities are arranged based on activity relationships. Network calculations determine when activities can be performed and the critical path of Project.

D. Critical Path: The longest connected chain of interdependent activities through the network schedule that establishes the minimum overall Project duration and contains no float.

E. Float: The measure of leeway in starting and completing an activity.

1. Float: Float is not for the exclusive use or benefit of either the Government or the Contractor but is jointly owned.

2. Free float is the amount of time an activity can be delayed without adversely affecting the early start of the successor activity.

3. Total float is the measure of leeway in starting or completing an activity without adversely affecting the planned Project completion date.

F. Resource Loading: The allocation of manpower and equipment necessary for the completion of an activity as scheduled.

G. Fragnet: A partial or fragmentary network that breaks down activities into smaller activities for greater detail.

9.3 SUBMITTALS

A. Electronic Copies: All schedules and reports submitted shall be sent to the CO, provided in the native electronic file format. It is the intent of the Government to limit the number of printed reports to only those reports determined by the project team to be essential.

B. Schedule of Values: After contract award and before the Pre-Construction conference submit a schedule of dollar values based on the Contract Price Schedule.

C. Construction Baseline Schedule: After contract award and before the Pre-Construction conference, submit one digital (PDF) of baseline schedule, large enough to show entire schedule for entire construction period.

D. Construction Schedule Updates: On or before the 7th day preceding the progress payment request date, submit estimates of the percent completion of each schedule activity and necessary supporting data. Provide two paper copies and one digital (PDF).

E. Construction Schedule Revisions and Time Impact Analysis: For each Construction Schedule revision submit one digital (PDF) of a Time Impact Analysis. Each Time Impact Analysis shall include a Fragmentary Network (Fragnet), incorporated into the currently accepted Construction Schedule, demonstrating how the Contractor proposes to incorporate a modification, change, delay, or Contractor request.

9.4 QUALITY ASSURANCE

A. The Contractor shall meet with the Contracting Officer on the day of the preconstruction conference to go over the following:

1. Review software limitations, content and format for reports.

2. Verify availability of qualified personnel needed to develop and update schedule.

3. Discuss constraints, including work stages, interim milestones and continuous Government occupancy.

4. Review time required for review of submittals and re-submittals.

5. Review requirements for tests and inspections by independent testing and inspecting agencies.

6. Review time required for completion and startup procedures.

7. Review time required for obtaining and activating permits.

8. Review and finalize list of construction activities to be included in schedule.

9. Review baseline schedule comments, resolve issues and progress on incorporating them

10. Review procedures for updating schedule.

11. Discuss reporting requirements and establish a protocol for naming and transmitting electronic schedules.

9.5 COORDINATION

A. Coordinate preparation and processing of schedules and reports with performance of construction activities and with scheduling and reporting of separate Contractors.

B. Coordinate Construction Baseline Schedule with the Schedule of Values, list of subcontracts, Submittals Schedule, progress reports, payment requests, and other required schedules and reports.

1. In developing the Construction Baseline Schedule, ensure that the Subcontractor’s work at all tiers, as well as the prime Contractor’s work, is included and coordinated.

2. Secure time commitments for performing critical elements of the Work from parties involved.

3. Coordinate each construction activity in the network with other activities and…