This is an addendum to bidding documents for the National Park Service covering amendments to project specifications and drawings. The addendum pertains to the Ste. Genevieve National Historical Park Green Tree Tavern Retaining Wall Rehabilitation project (PMIS No. 351091), issued on 8 July 2026 by NPS Interior Regions 3, 4, and 5 at 601 Riverfront Drive, Omaha, Nebraska 68102.

The amendments modify Section 1.2 (Reconstruction) of Part 1 (General) by removing an original specification that required 100-percent reuse of existing stones with no new stones necessary. In its place, the addendum adds two revised notes clarifying that while 100-percent reuse of existing stones remains the expectation, the contractor may replace up to 15 percent of stones if existing stones are unusable, subject to Contracting Officer/Contracting Officer's Representative (CO/COR) approval. Additionally, the addendum specifies excavation requirements: the contractor shall over-excavate a minimum of 6 inches to a maximum of 8 inches, place non-woven geotextile fabric on hand-tamped soil, and place a minimum 6-inch layer of 1-inch-minus limestone with fines to serve as the wall bearing. All excavated soil material must be transported to a designated site within the park upon COR approval.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDM-1, Page 1

ADDENDUM NO. ADDM-01 National Park Service – Interior Regions 3, 4 5 Facilities, Planning and Infrastructure to the 601 Riverfront Drive Bidding Documents Omaha, NE 68102 for 8 July 2026

STE. GENEVIEVE NATIONAL HISTORICAL PARK – GREEN TREE TAVERN RETAININGWALL

REHAB

PMIS No. 351091

NOTICE TO BIDDERS: The Specifications and Drawings for the above referenced project are hereby amended as follows:

PART 1 - GENERAL

Section 1.2 - RECONSTRUCTION

a. REMOVE the following note from the detail:

- ” The existing stones are of a size and density providing the expectation that re-use should be 100-percent and no new stones are necessary.”

b. ADD the following notes to the detail:

- “The existing stones are of a size and density providing the expectation that re-use should be 100-percent. If stones are not unusable, the contractor is able to replace up to 15-precent with the approval from the CO/COR.”

- “Contractor shall over excavate a minimum of 6 inches to a maximum of 8 inches place a non-woven Geotextile fabric on hand-tamped soil and place 6-in minimum of 1in-minus limestone with fines to bear the wall. Transport all soil material to designated site within the park, upon approval from the COR.”

END OF ADDENDUM